Planned cost/target cost/control cost

Dear Expets,
Ps guide me on the below.
Difference between - planned cost/target cost/control cost and Plan qty/target qty/control qty in MTS or MTO.
your response will be highly appreciated.
regards
Raman Rana
Moderator: Please, avoid asking basic questions

Dear Raman,
planned costs:
The costs anticipated for a particular undertaking (such as an order).
Target costs:
The costs expected to be incurred when a specific quantity is produced.
In Cost Object Controlling, the target costs are calculated on the basis of the planned values of a service unit (such as the planned cost of a production order) and the control quantities (such as the yield delivered to stock).
Target costs can be used for purposes such as:
u2022     To determine variances
u2022     To valuate work in process
u2022     To valuate unplanned scrap 
Control costs:
The costs that are compared against the target costs when the variances are calculated.
In Overhead Cost Controlling (CO-OM), the control costs are always the actual costs.
In Cost Object Controlling (CO-PC-OBJ), the control costs are either the actual costs less the work in process and scrap or the cost calculated in the preliminary cost estimate for the order, depending on the target cost version.
br, Guido

Similar Messages

  • Extraction error "Target cost version in controlling area does not exists"

    Hi Gurus,
    I am trying to pull some data from a SAP OLTP system into SAP BW 710 system, using extractor "0CO_PC_02". The data load is failing with the below error message:
    Target cost version in controlling area does not exist     KN     147
    Target cost version 2 not defined. Check your entry     KV     35
    Internal program error ( Order 000010510554 Version 002 )     RM     11
    Errors in source system     RSM     340
    The same error is thrown when I am trying to execute the extractor in RSA3 in the source system.
    Please help me with the resolution of the same. It's a high priority job we are handling as of now in this.
    Thanks & Regards,
    Vikas Kr.

    You are attempting to display data on a target cost version that does not exist in controlling area.
    see this http://forums.sdn.sap.com/thread.jspa?threadID=1609418
    http://www.consolut.com/en/s/sap-ides-access/d/s/doc/YV-KN147

  • IW32  control data tab cost varaiant actaul and cost varaiant planned field

    Hi Team,
    In my preventive maintenance order , in control data tab cost varaiant actaul and cost varaiant planned field is not avialble it is hidden , but comming in PM01 order tye.
    Tcode OIAN for preventive maint. order type
    Cstg variant actual CAUFVD-KLVARI             
    Cstg variant planned CAUFVD-KLVARP
    Input indicator is selected.
    What may be the reason.
    Thanks in advance.

    Hello,
    I already ran the report Z_FILL_COSTING_VARIANTS and after that I will go to calculate costs in the order but nothing. I this order I already had confirmations but when running the cost calculation the system doesn't made the calculation.
    Can you help me?

  • Plan cost line items for cost centers report

    Hello,
    I am displaying the report: Plan cost line items for cost centers and when I display the details of a line item it appears a document number, where could I display this document?
    I have tried to display it in FB03 transaction but it seems not to be this kind of document.
    On the other hand in the field Business transaction it appears RKP6, what is the meaning of this field?
    Thank you very much

    Hi Beatriz Amezua ,
    For displaying plan line items for cost center - KSBP and for display of individual plan document : KABP
    RKP6 means "Planning Activity Dependent Costs"
    Like in FI module, the business transaction have been codified and the list you can find in KANK transaction , mention your controlling area, menu -- Groups --  Display Groups
    Srikanth Munnaluri

  • Pocess order - target quantity in cost analysis report

    hi experts ,
    i am not getting the target quantity in cost analysis report of header material , though i have made the GR of the process order .
    target quantity is showing zero.
    i am getting target quantity of components , sfg used.
    kindly give your inputs.
    reagrds,
    satish

    Dear
    First Check the Validity of the standard cost for the header material, It can be seen in ck13n, Dates tab.
    Target costs are populated when you do the goods receipt. System will search for the released standard cost estimate and then apply that for each material component. If these 2 conditions are passed, then you will get target cost in order.
    Plan cost = Plan qty * std cost estimate
    Target Cost = Actual qty * std cost estimate
    Actual cost = Actual qty * actual costs
    Eg:
    A production order is planned for producing 10 units of a material
    Then plan cost on the order = 10 units * std cost
    Target costs are calculated once production is confirmed.
    Suppose only 9 units were produced out of 10 planned
    Then target cost = 9 units * std. costs
    Regards
    Ganesh M

  • How to Close Planned Over Heads in product costing

    HI,
    We are maintaining planned over heads through KP26 and Costing sheet.Kindly tell me how to close planned over head wether it is periodicall closing or other?
    Kindly provide me the guide lines  how to do this Planned overheads closing in the system?How many ways are there to close planned overheads in the system?
    Kindly adviice me?
    Thanks
    Sunitha

    Dear Sunitha,
    To run the Cost estimate or close the planned overhead KP26 and Costing Sheet is not enough you have to move forward and you need to define Cost component Structure (OKTZ) Path: SPRO > IMG > Controlling > Product Cost Controlling > Product Cost Planning > Basic Setting for Material Costing > Define Cost Component Structure. After maintaining cost component structure you need to define Costing variant T.code OKKN Path: SPRO > IMG > Controlling > Product Cost Controlling > Product Cost Planning > Material Cost Estimate with Quantity Structure . Here you copy PPC1 standard and create your own costing Variant.
    After Maintaining the Configuration go to T.code CK11n and run your costing and if it is correct then save it. To update Price in MM run T.code CK24 and release Material and update it.
    thx.
    Ganpat

  • HOW TO FIND OUT VA TARGET IN MATERIAL COSTING

    Hi experts,
        how to find out va target in material costing. I got a field from keph-kts004 but i cant able to find out how it is calculated.
    Whenever costing using ck11n for one material  va target coming correct value but using ck40n for multiple material  va target coming incoorect . it is taking previous material  va target value .
       Please  help on this one and u can get reward points,
    Thanks,
    venky

    Hi Vishwa,
                 The control would be something like this for navigation in Get_p_xxx method u mention as link and u mention a event name which gets triggered on the click of this hyperlink. So your GET_P_XXX method would have the following code:
    CASE iv_property.
        WHEN if_bsp_wd_model_setter_getter=>fp_fieldtype.
          rv_value = cl_bsp_dlc_view_descriptor=>field_type_event_link.
        WHEN if_bsp_wd_model_setter_getter=>fp_onclick.
          rv_value = 'EXAMPLE'.
    Now you have to create a method as EH_ONEXAMPLE at your IMPL class and within which you would give an outbound plug method. Within the outbound plug the target data would be filled in the collection and window outbound plug would be triggered.
    This is a huge topic and  i have just mentioned you basic things.
    Regards,
    Bharathy.

  • Report  for bom wise target and actual cost as well as qty at line item

    Dear Experts,
    Is there any standard tcode for bom wise target and actual cost as well as qty at line item level for the month.
    there is one tcode s_alr_87013127 but user has to double click in order to get line item details.
    I want to see line item wise breakup/bom wise target and cost cost as well as qty.
    Thanks in advance.
    regards
    RK

    Dear experts,
    I am still looking for a revert.
    regards
    RK

  • Std report to view planned price1, planned price date1 in view costing 2

    Hello Guru
    Is it possible to view planned price1, planned price date1 in view costing 2 in material master using standard SAP report when I select specific material and plant in selection screen ?
    I really want standard SAP report but don't want to create my own query specific for this case
    Any reply would be appreciated
    Thanks

    HI,
    In Table SE16N - MBEW you can get the planned price data.
    Regards,
    BK

  • Data Source to upload plan data for CO_OM_CCA_: CC: Costs and Allocations

    Hi Guru's,
    We have Data source that which upload Actual data for CCA (0CO_OM_CCA_1 - Cost Centers:cost and allocations).  Every time it is full upload before loading the data deletion of previous load request will be done.
    One more information required that i have checked in the BW cube for plan data it is available in the info cube for one cost center and rest of the costcenter i don't have the data now the users are requesting to upload the plan data for rest of cost centers.
    Now as per the business requirement the users are requesting to upload the plan data in to the same i am not sure whether it will pull the plan data with actuals in to BW cube. Is there any alternate with the same data source or else is there any specific data source for uploading Costs and Allocations plan data
    Please suggest me how can i go a head with this requirement.
    Thanks in Advance.
    Ganni

    You can use the same datasource to load plan/budget data to the cube for all the costcenters. And regarding the actuals, you can use 0CO_OM_CCA_9 datasource to load to actuals cube and create a multi on top of both plan and actuals cube for reporting purposes.

  • Target Vs Acual Cost Comparison for multiple process orders

    Dear SAPians,
    I want to take a report for target vs actual cost for all process orders and product cost collectors created in a particular period. I have checked the standard report KKBC_ORD that serve my purpose but for a single order. I want the same report for multiple process orders and product cost collectors.
    Is there any standard report or should I create a report painter report. I have tried to create a report painter report based on library 7KO, but target cost was not showing for selected order.
    Kindly suggest.
    Shirazi

    Target Costs are available in library 601 for internal orders (and can be used for process/production orders).
    Regards,
    Adrian

  • Maintain default cost element in controlling area Message number FI660

    Hi All,
    We found the Down Pay Request (doc. booked by F-47)  cannot be picked up by F110. In Job log the error shown as Maintain default cost element in controlling area.
    Long text error details.
    Maintain default cost element in controlling area
    Message number FI660
    CO down payment update is active in controlling area WAPC. You  must  therefore maintain a default cost element and a revenue element  for down payments.
    Maintain the default cost element for dow payment for controlling area in the project system implementation guide.
    Kindly advice.
    Note
    In the define dafault cost elemens for down payments in Project system-OKEP  the CE for vendor and cusotmer downpayemnt  is missing

    hi srinivas
    OKEP configuration is necessary
    if while creating down payment request you have not assigned cost element
    maintain cost elements there.
    regards
    rohit

  • Maintain default cost element in controlling area USD

    Hi All,
    I were trying to clear vendor down payment with vendor invoice ( error)required me to Maintain default cost element in controlling area USD.
    Is that a way to do without making to default cost elemnt
    Thank you for your help
    Regards
    bali

    Hi,
    As process you should clear the down payment first and then vendor thry F-44.
    It should not be asking you for default cost centre untill there is validation rule set.
    hope this helps you.
    Regards
    Bharat

  • Control Costs not Displayed in Process Order Cost Reports

    Hi
    After Variance calculation and settlement of Process Orders also COntrol COst appearing as Zero, is there any step I am missing or any configuration needs to be adjusted?
    Thanks in Advance
    Regards
    Venkat

    Hi,
    I checked in IDES system as well, there also using standard settings control costs are not getting updated on the process orders. 
    I couldn't makeout how the control costs fields get updated in the process order cost reports
    Regards
    Venkat

  • Raw Material Costing with Overhead, Product Cost Planning

    Hi,
    I have an issue applying overhead to purchased raw materials. We need to apply this overhead for only a certain materials. So, I have defined a overhead key/overhead Group, and assigned the group in the material master of the raw material. The overhead is 2% freight on raw material costs.
    In the std.costing variant, I have assigned the costing sheet under Overhead on material components tab of the corresponding valuation variant. I have also included the Freight OH in the cost component structure.
    However, when I run the costing with CK11N for the raw material, it is showing only the raw material cost, not the overhead.
    What could be the problem?
    I appreciate your help.
    Thanks,
    Ram

    Is the overhead rate a percentage type or quantity based?
    Have you maintained both actual and plan rates (1 & 2) under define % based OH rates or Qty based OH rates accordingly?
    Does the validity date (in define OH rates )cover the date of costing?
    Is the Costing sheet assigned to the valuation variant at plant level?
    Is the OH base in the costing sheet includes the cost element of the raw material?

Maybe you are looking for

  • Fixed format file!  to_char formatting!

    I'm tryint to create a simple fixed with output file. I am concatenating everything together but having problems when numeric values that are null. And SQL plus keeps putting a 1 space between each field. I'm using this SQL select to_char(p.county,'b

  • My macbook pro became very slow all of a sudden?

    I just bought a used macbook pro early 2012. It was all restored and nice when I got it. It has worked perfectly for about a week and then I don't know why, but all of a sudden it became very slow in every aspect; Booting, opening apps, even surfing

  • Monitor Screen Resolution

    I want to upgrade to a 24" monitor that uses 1920 X 1080 resolution, but I do not see that in the choice list in the Display preferences.  Where do I get a display driver to add that resolution?

  • Problem executing a sql query in 10g environment

    Hi, I am having problem executing the following sql query in 10g environment. It works fine in 8i environment. I tried to_number(to_char) and it did not work. **A.APPL_ACTION_DT >= TO_CHAR("&v_strBeginStatusDate&", 'DD-MON-YYYY') AND A.APPL_ACTION_DT

  • File validation for duplication

    Hello All,             I am looking for the best solution for validation of duplicate file being read in xi pipeline. 1. a file will come to FTP folder... 2. XI will pick the file...and in the adapter module we just need to check whether a file with