Please explain steps for Time based reduction scenario

Hi,
I am done with the RFC connections.
The scenario I am going to work with is 'Time Based Reduction'.
Can somebody please explain the process step-by-step from here on.
Thanks,
Mohammed Tauseef Ahmed

hi,
thanks for the replies.
the step "Start Programs for Generation and Receiver Settingsu201D is taking very very long time for execution(the log shows that the process started on May20,and it is still going on).
Now till the execution of this step is completed,we cannot execute furthet steps.Is there a way that we can execute the other steps or do we have to wait for this step to be completed?
Secondly, on the suggestion to change the process settings, I was not able to make the changes in process settings. Can the somebody kindly explain step-by-step on how to change the process settings.
Thanks.
Mohammed Tauseef Ahmed

Similar Messages

  • Sales orders in TDMS company/time based reduction  are outside the scope

    Guys,
    I have had some issues with TDMS wheras it didn't handle company codes without plants very well. That was fixed by SAP. But I have another problem now. If I do a company code and time based reduction, It doesn't seem to affect my sales orders in VBAK/VBUK as I would have expected. I was hoping it would only copy sales orders across that have a plant which is assigned to a company code that was specified in the company code based reduction scenario. That doesn't seem to be the case.
    VBAK is now about one third of the size of the original table (number of records). But I see no logic behind the reduction. I can clearly see plenty of sales documents that have a time stamp way back from what I specified in my copy procedure and I can see others that have plant entries that should have been excluded from the copy as they do belong to different company codes than the ones I specified.
    I was under the impression that TDMS would sort out the correct sales orders for me but somehow that doesn't seem to be happening. I have to investigate further as to what exactly it did bring across but just by looking at what's in the target system I can see plenty of "wrong" entries in there either with a date outside the scope or with a plant outside the scope.
    I can also see that at least the first 10'000 entries in VBAK in the target system have a valid from and to date of 00.00.0000 which could explain why the time based reduction didn't work?
    Did you have similar experiences with your copies? Do I have to do a more detailed reduction such as specifying tables/fields and values?
    Thanks for any suggestions
    Stefan
    Edited by: Stefan Sinzig on Oct 3, 2011 4:57 AM

    The reduction itself is not based on the date when the order was created but the logic enhances it to invoices and offers, basically the complete update process.
    If you see data that definitely shouldn't be there I'd open an OSS call and let the support check what's wrong.
    Markus

  • TDMS time based reduction method has no end date

    Hello TDMS experts,
    I am in the process of configuring the 'Time based reduction' method of TDMS. In the package, I am in phase "System Analysis"->"Analyze and specify'from date'".
    Here it gives me the option to specify the start/from date only. If I want to transfer data for only  a month in the past lets say april of 2007, then how can I specify the from and to dates.
    Please advise.
    Thank you,
    kind regards,
    Zaheer Shaikh

    Hi Pankaj,
    Thanks for the reply.
    In the phase "maintain Table Reduction" I have chosen SAP standard reduction, that means the table reduction is handled by SAP itself. Since my sender system database is 4 Terabytes, my question is if I select the 'from date' as 10th April 2009 (present date is 20 April 2009), will the TDMS still copy the whole tables for which I have not manually defined any reduction?
    Please advice.
    Thank you,
    Kind regards,
    Zaheer Shaikh

  • TDMS - time based reduction - receiver system deletion

    Experts,
    I'm doing a time based reduction.  I'm on the step "Start Deletion of Data in Receiver System".  It's been running for over 18hours.
    But I don't see any jobs running in SM66 on the Central/Control or Sender or Reciever systems.
    When I click on the "Task" button, I see it has completed 8,444 of 12,246  sub activites.  There are 3,802 not yet started.
    We're on all the latest levels of DMIS and ECC.
    Any ideas?
    Thanks
    NICK

    Ashley and Niraj,
    Hey, I'm all for tips/tricks so don't worry about messing up my thread.
    I completely shut down the central/control system via stopsap and restarted.  Still it was in "running" status but no jobs were running on sender/rec or central/control.
    So I tried the trouble-shooting but it was un-clear to me what to do.
    I ended up highlighting the phase I reference earlier, then doing "execute" again.  The status changes from the "truck" to a green flag and I started to see jobs run again on the receiver system.  Again they have stopped, but I see another job scheduled to run in a few minutes....It's just weird, I didn't run into this on my last time-based copy.
    I'll post a few things I've learned to increase performance:
    RDISP/MAX_WP_RUNTIME = 0
    At LEAST 25 WP and 25 BCK procs
    rec/client = OFF
    RDISP/BTCTIME = 60
    RUN STATS regularly
    TAKE OUT OF ARCHIVELOG MODE
    Read/Impl these notes:
    Read theseu2026Update these parameters
    o TD05X_FILL_VBUK_1 Note 1058864
    o TD05X_FILL_VBUK_2 Note 1054584
    o TD05X_FILL_BKPF Note 1044518
    o TD05X_FILL_EBAN Note 1054583
    o TD05X_FILL_EQUI Note 1037712
    Set these oracle index on rec system:
    Table: QMIH
      fields: MANDT, BEQUI
    Table: PRPR
      fields: MANDT, EQUNR
    Table: VBFA
      fields: MANDT, VBELN, VBELV, POSNV
    set parameter u2018P_CLUu2019 to u2018Yu2019 in the following
    activities before you start the activities for filling internal header tables:
    TD05X_FILL_BKPF
    TD05X_FILL_CE
    TD05X_FILL_EKKO
    TD05X_FILL_VBUK
    TD05X_FILL_VBUK_1
    TD05X_FILL_VBUK_2
    TD05X_FILL_VSRESB
    TD05X_FILL_WBRK_1
    run TCODE CNVMBTACTPAR, specify the project number to do this
    IMPORTANT TCODEs
    CNV_MBT_TDMS_MY  Main TDMS starting point     
    CNVMBTMON  Process Monitor (must know your project number)
    DTLMON  MWB transfer monitor
    CNVMBTACTPAR  activity parameters
    CNVMBTACTDEF  MBT PCL activity maint
    CNVMBTTWB  TDMS workbench to develop scrambling rules
    CNV_TDMS_HCM_SCRAM  run in SENDER system for scrambling functionality
    Reports
    CNV_MBT_PACKAGE_REORG  to reorganize TDMS projects..aka delete
    CNV_MBT_DTL_FUGR_DELETE  deletes function groups associated with old projects
    Tables
    CNVMBTUSEDMTIDS   lists obsolete MTIDs
    IMPORTANT NOTES
    Note 894307 - TDMS: Tips, tricks, general problems, error tracing
    Note 1405597 - All relevant notes for TDMS Service Pack 12 and above
    Note 1402704 - TDMS Composite Note : Support Package Independent
    Note 890797 - SAP TDMS - required and recommended system settings
    Note 894904 - TDMS: Problems during deletion of data in receiver system
    Note 916763 - TDMS performance "composite SAP note"
    Note 1003051 - TDMS 3.0 corrections - Composite SAP Note
    Note 1159279 - Objects that are transferred with TDMS
    Note 939823 - TDMS: General questionnaire for problem specification
    Note 897100 - TDMS: Generating profiles for TDMS user roles
    Note 1068059 - To obtain the optimal deletion method for tables (receiver)
    Note 970531 - Installation and delta upgrade of DMIS 2006_1
    Note 970532 - Installation of DMIS Content 2006_1
    Note 1231203 - TDMS release strategy (Add-on: DMIS, DMIS_CNT, DMIS_EXT...)
    Note 1244346 - Support Packages for TDMS (add-on DMIS, DMIS_CNT, ...)
    I'm doing this for an ECC system running ecc 6.0 EHP6 by the way.
    Still any help with my issue on the delete would be helpful. but post tips I don't kwnow about
    NICK

  • Exclude a table from time-based reduction

    Hi,
    Iu2019d like to exclude a table from time-based reduction. How can I do this ? Is there any manual how to do customizing in TDMS ?
    Regards
    p121848

    Thank you Markus for your annotation.
    AUFK is technically declared as an Master Data Table, but stores orders. Standard
    TDMS provides a reduction of this file and in the client copies we did via TDMS a lot of  records disappeared when we selected time-reduction.
    Now we fond out that some Transactions as OKB9 or KA03 refer to old internal orders. So we would like to maintain the customizing, to exclude AUFK from reduction. But this is not possible in activity TD02P_TABLEINFO, because no changes can be done to the tables, which have got the transfer_status 1 = Reduce.
    You can manipulate the Transfer-Status in file CNVTDMS_02_STEMP before getting to activity  TD02P_TABLEINFO, but I wonder whether this is the way one should do.
    Any idea ?
    Regards p121848

  • TDMS copy based on Company Code and time based reduction.

    I'm struggling to understand the process of this scenario.
    I created a new client in the target system (using local client copy with SAP_UCSV).
    I configured a time based and company code based reduction.
    After the TDMS copy is complete, I check the target system and still find plenty of data that isn't related to the company codes I selected. It appears that it still copies part of the excluded data. For example: I can still find work orders and sales orders for company codes that I specifically didn't select for the copy process.
    Any idea why this is? It appears that the copy doesn't bring across ALL of the excluded data. Just some.
    I double checked and triple checked my TDMS selection for company code based reduction and I can't find any error in there.
    To be more specific: I selected company code A01 A02 A03 and left B01 B02 B03 out. After the copy there are still orders visible in the target system with company code B01 B02 B03.
    This is after I created an empty target client first so it's not copying into an already existing client.
    Thanks for any guidance guys.

    Hm, not sure what's going on. There is no clear link between those existing orders and the company codes I initially selected. Then again it only seems to have a "high level" record of the data. As soon as one starts to drill down, the data is missing as expected. Same goes for other areas as well.
    Looks like we can live with that for now so I won't lose any sleep over it anymore.

  • SPC charts for time-based data?

    I'll try to be succinct in explaining what I'm trying to achieve.
    We run batch processes, and at various points in the process we take samples and test them. The sample results should be increasing exponentially over the course of the batch. I have data from a lot of batches in x/y format - x is the duration of the batch and y is the sample result. It makes a very noisy but clearly exponentially increasing data set.
    What I want is to calculate some control limits that will obviously have to be increasing over time as well. I want to be able to say that, for a current batch, a sample at X time does or does not fall within the expected historical range.
    Is this even possible with xMII, either in the logic editor or the iSPC charts?
    I'd like to make the same sort of chart for other time-based samples that have more complex trends over the duration of a batch, not simply exponential or linear.

    Hi, Carrie.
    Your application doesn't really sound like what I would call an "SPC" chart, but rather, more of a so-called "golden batch" chart.  This type of visualization is used when a production activity should have an expected set of value(s) and/or a shape to a curve.  You would then "overlay" actual values onto this curve to track actual vs. expected and perhaps to highlight deviations.
    This can best be done by combining a multiple queries using BLS (one or more queries for the "limits" and expected values, one query for the actual values), and combining/merging them so that the charting engine (either a line/marker chart or an XY plot) sees them as coming from a single source.
    With some creativity, you can even have the "outlier" points displayed in another color.  The xMII application team can help you with setting this up - Jeremy may still have a chart template/transaction I put together a while back called "LimitChart", which could be used for your application.
    Rick

  • Steps for Browser based PI sheet.

    Hi PP Gurus,
    I'm working on Browser based PI sheet first time. Can you please extend your help by providing the steps and configuration to be done to achieve the same in PP-PI-PI sheet scenarios?
    Thanks & Regards,
    Abu Arbab

    closed

  • Same send step for multiple receivers:   BPM scenario

    Hi forum,
    I have a file -BPM -file scenario,
    from the BPM i need to send the same message to multiple Business systems,
    so, i need to make receiver determinations in the IB_directory, but it allows me to have only 1 receiver determination for a set of Sender service and message interface,   so how can i have multiple receivers in the receiver determination...
    i have gone through a blog which asks me to make use of "SEND CONTEXT" in the send step in the BPM and query it in the receiver determination in the IB-directory, but how to quey it?   pls help
    thanks

    hi,
    For a set of one business system and receiver u can create only one Receiver determination step.
    If Want to send messages to different receivers.
    Go to -> Integration Directory-> Open the receiver determination step in change mode.
    Go to "Configured Receiver" step -> Click on "+" symbol to add other receivers
    "Conditions" is an optional tab.
    Then configure receiver interface determination and receiver agreement for the new receiver
    Regards,
    Shabari

  • C# application for time based licensing

    Hello Everyone,
    We are developing some content based applications in C#, this would be licensed to clients for a specified duration of time and the code should be robust enough to track time. Since majority of our customers would not be accessible to internet it would be
    impossible for us to track time or handle situations where clients might change system time.
    Need opinion on how to proceed on this.
    Regards
    Suresh Sharma

    You can not track time properly without having internet access at least once in a while. The only other solution is to literally hack into your clients machine and prevent time changes by some sort of background service which will get you into all sort of
    trouble, not to mention it's most probably illegal.
    Best licensing model is the one that checks for internet access at least once a month or every couple of months. If you have to do it with no internet access at all -I don't know what type of stone age architecture your clients might run, if it's about security
    have they heard of VPN, firewalls, and stuff like that?!!-, then your best choice is to count the number of times your application has run and stored that in an encrypted file in the filesystem. This way you're completely isolated from a reliable source of
    time tracking, and still can limit the use to your software.
    http://nader.elshehabi.com

  • Format axis for time based on xml file

    I am creating a graph with data that was pulled each minute.
    I have a time entry in the xml file. When I use a categoryaxis it
    creates the graph correctly, but how can I get it to only display
    the time field every 30 minutes on the horizontal axis. Right now
    the time is unreadable because it displays all of the time entries.
    I still want each entry just not the time field.

    The following link contains some source code on the subject:
    http://www.inquiry.com/techtips/java_pro/10MinuteSolutions/Gabhart10min03/Gabhart10min03-3.asp

  • What is a time based scenario in TDMS?

    We need only to transfer the data from the last 90 days.
    We know we should use time based scenario. However we cannot find instruction how to implement this scenario.
    Could you help?  Thanks!

    Hi
    Describing how to do time based reduction using TDMS will not be possible over this medium. It is recommended that you refer to the TDMS guides (specifically the Solution operation guide). Refer to the following thread for the same -
    Links, Documents, Support Pack Schedule
    However i will brief you some steps - Once you are on the TDMS overview screen do the following steps -
    1) create project
    2) create sub-project
    3) create package (use the option "initial package for time based reduction from the popup")
    4) once the package screen appears execute various activities of the package in correct order. Detailed documentation for each activity is available on the package screen.
    I hope this helps
    Pankaj

  • Needs steps in ID(configaration) for Proxy to JMS scenario

    Hi All,
    Please can anybody give steps for Proxy to JMS scenario in Integration Directory .
    Thanks in advance.
    Regards,
    Kalpana

    kalpana,
    Create two communication channels in ID. One for Proxy(XI adapter) and another for JMS(JMS adapter). Then sender agreement, receiver agreement, receiver determination and interface determination.
    For JMS adapter please see this weblogs:
    /people/kan.th/blog/2007/02/05/exploring-jms-and-sap-xi-jms-adaper
    http://help.sap.com/saphelp_nw2004s/helpdata/en/10/b1b4c8575a6e47954ad63438d303e4/content.htm
    ---Satish

  • Define Time-Based Fields for Cost Centers

    Dear All!
    I would like to know , how I'm abale to cahnge the setting
    of business area for Time-Based Field of Cost Centers to period
    Transaction is OKEG
    Would be thankful

    You can maintain master data for cost centers, cost elements, activity
    types, and business processes with time dependencies. You can make
    changes at any time for any given time interval. Data storage also takes
    place with a time reference. In this way, a master data record can have
    multiple database records storing different information.
    The smallest interval is one day. To ensure data consistency, you
    cannotchange each field daily. The timeframes in which you can change a
    field depend on the field functions, which are fixed by the SAP R/3
    System and cannot be changed. Master data maintenance includes an
    automatic check for each field's time-based consistency, resulting in
    individual time-based maintenance for each field.
    Regards
    Prabhu

  • What are the different steps for  costing related to repetitive manufacturi

    Hi PP guys
    can any one explain the different steps for costing in repetitive scenario as compared to discrete scenario what is the major difference
    thanks
    shaik

    Dear Michel,
    !.In REM scenario Product cost collector is required for all the products for which production booking is
    to be done.
    2.For each production version created a product cost collector will be created in KKF6N.
    3.Without a product cost collector production confirmation can not be done in MFBF.
    4.Product cost collector is the cost object in REM scenario.
    5.Once after creating material master,BOM,work center,rate routing,aproduction version the next steps
    is creating product cost collector.
    6.While creating the PCC,the system creates a preliminary cost estimate nothing bu the sum up of the
    BOM and dare routing cost.
    7.Either a prelimnary cost or a standard cost estimate can be used for doing the production
    confirmation in MFBF as per the REM profile assigned.
    8.Standard cost estimate can be done in CK40N and this costs gets updated in the material master.
    9.For every production confirmation made in MFBF the costs gets accumulated in the respective PCC.
    10.the variances can be settled periodically as per the business requirement.
    Regards
    Mangalraj.S

Maybe you are looking for