PP scenario to complete the production order without GR and No stock update

Hi Experts,
I have a very typical PP scenario here. Let me explain,
I want to create a production order (CO01) add operations to it and do the confirmation. As set, the cost will get updated against the production order. This is perfect.
Now the trick is, i actually DONT want to update the stock of the material. That is, the goods reciept should not happen. But at the same time, I need to have the count of how much is delivered in the production order.
I was thinking of having new movement type created (that would statiscally do the goods reciept without updating the actual stock of the material). Would this suffice, or do you guys have any other way of getting the count in the production order without having the goods reciept done.
Thanks for your early reply.
Beatle

Dear ,
If you want to avoid inventory issues as well as cost issue , i think  you can bring the Confirmation -Yeild field as Delevered quianity in a Z-report  .You can also utilise COOIS-Select Confirmation -Standrad Profile -Enter Order Type and Plant Code .Here you can select the change lay out option and bring the  confirm yeild qty  field from Hidden column  to diplay colmn for all these  orders .
You can use following tabel  for your custom report or utlise coois for the same
1.AFRU -Confiramtion
2.GMNGA-Yeild Confirmed
3.LMNGA-Yeild to confirm .
Regards
JH

Similar Messages

  • Bapi to complete the Production Order completely

    Hi All,
    I am using the above Bapi to complete the Production Order completely. Now my requirement is to complete technically. I don't want to write BDC. Can anybody please let me if there is any FM to meet this requirement.
    Thanks n Regards

    used BDC

  • GR for create the production order without material(co07)

    Hi all,
               I am creating the  production order without  material (T-Code :co07), After creating this order i want to get the Material from W/H and after dismantling how to do GR for this Prod.order, What is the Movement type to be used?Please advice me

    Dear Kumar,
    CO07 specially meant for Rework order (Production order
    without material) or for dismantalling the Customer returns or
    Inhouse rejected,for the components which re good to reuse
    again,their quantity will be entered in -ve and so 531 movement
    takes place.
    On the other hand,if you want to use for rework purpose and
    want to consume some components,using MB1A T code ,the
    materials required are issued.
    Already our Forum member(Krishnamohan) has given clearly in his first reply.
    Regards
    Mangalraj.S

  • Serial number creation at the completion of production order

    I am trying to create a production order and the finished goods is serialized. However, when I complete the production order it never asks me for a serial number for the finished goods. I have to go to registered products screen and manually create the serial number. I am assuming there is a way to minimize the number of step I have to use during the production process to create a serial number.
    Any Ideas?
    Thank you
    Chintan

    Hi Chintan,
    i believe that serial numbers are not supported in production orders.
    Serial numbers are available on delivering and receiving goods
    Regards
    Andreas Czech

  • Production order without material

    I am using Production order without material and without sales order in CO07. I want to derive profit center for this production order. What  is procedure to derive it?

    Hi Mayuresh,
    We can settle the order against cost objects, cost center,  material,  order item, order,  sales document item, WBS element...
    But Profit center is not a cost object so you can link the cost center in production order, Cost center can be linked with profit center so u can get the result in profit center also.
    Regards,
    S.Suresh.

  • Attached Documents in the Production order

    Hello,
    My question is:
    how to setup the system to be able from the Production order to see (and have access)  to the documents attached to the BOM and/or Routing?
    Thank you in advance.
    Peter

    Hi,
    In production order if you notice you should be able to find a link for documents. In the documents page you would be able to get the documents attached in the BOM (not sure about the routing, please check).
    But do note that this is just a link & the order does not store these documents, you will have to go to DMS (CV03n) to view the document.
    In OPKP (production scheduling profile) you select the option to link the documents on release.
    Hope the above helps.
    Regards,
    Vivek

  • Assemble-to-order with spliting the Production Order

    Hello,
    I'm new to SAP and we just implemented the SAP System.
    My Experince is from one year as Process Owner for PP in our Project.
    I have a specific Question regarding the assemble to order process.
    So far we did not implemet Capacity Planning in the System, but I would like to use it.
    The Idea is the following:
    1. There is a sales order coming for 1pc of Product. The scheduling is carried out, ATP-Check and so on. The production order is created and at least the capa is placed on the end of the chain (using quetimes). One Product needs 60min to assemble.
    2. more orders are comeing in, all consuming 60min of capa on that day. If the capa is used, move to later date until capa is back again. this also should be now Problem to set as far as I understand what I have learned already  
    3. What i do not like... If I get orders with too many qty.... I would like to hav a maximum qty. where the order gets splited and moved forward to the next day... so... Customer orders 10, 5 are placed on Tuesday, 5 on wednesday and so on.
    Each of those "Splits" should have one production order header.
    Any idea how I can reach that?
    Thanks, hope I will find a solution
    BR Marian

    Marian,
    Standard ERP Sales order ATP cannot be made to confirm Sales orders based on capacity availability.  All capacity related conflicts and resolutions are done during dispatching, which is a separate step.
    If you need SO ATP to consider available capacity while confirming the Sales order, you could use functionality that exists in APO.  Otherwise, in ERP, you are facing custom development.
    Assemble to order in general is restrictive as to what types of scheduling can be permitted.  There is no automatic production order splitting in standard SAP ATO.  Some manual manipulation is permitted.  Of course, with custom development, you are only limted by your imagination.
    Best Regards,
    DB49

  • Deleting the reservations for components of a production order without TECO

    Dear Gurus,
    I forgot to activate the backflush indicator in the beginning. I activated the backflush indicator in between. But for the confirmations already made I had to issue the material as unplanned consumption for the order. This is not clearing the reservations for the material.
    How to delete the reservations for components of a production order without TECOing the production order? My order is not completed.
    Thanks and Regards,
    Raghu

    Hi Kumar,
    I have a production order for 1000 header (A) qty. My control key is PP03 (auto goods receipt from confirmation in CO11N).
    For this order the component B qty is 1000 (BOM consumption is 1:1)
    Without doing GI, the confirmation is done for 300 A qty. I realized that auto GI is not done for the 300 qty of component B as there was no backflush indicator.
    Now the backflush indicator is activated in the production order for component B.
    In the next confirmation for another 300 A qty, automatic GI is posted for 300 B qty because of backflush now.
    Now my confirmed and GR qty for A in two rounds is 300 + 300 = 600.
    GI of component B done is only 300 (through backflush).
    Qty yet to confirm = 400.
    So I did GI of 300 B qty through MB1A (which is an unplanned issue). This does not update the withdrawn qty in the production order. Also the reservations for component B for this 300 qty are not reduced in the system.
    Now the reservations against the order for component B = 1000 - 300 = 700 (which is 300 more than the qty yet to confirm).
    Now when I run MRP for another 2000 qty of A, the procurement proposals for B will be 2000 + 300(undeleted reservations) = 2300. Though the system is behaving properly, this 300 is additional and unwanted.
    For this reason I need to delete these reservations before the MRP run. As order is still open, I cannot TECO the order. Nor can I clear all open reservations from CO11N.
    Thanks and Regards,

  • What is the use of production order without material?

    Hi gurus,
    can anyone plz tell what is the use of production order without material?
    n steps involve to perform this task?

    Dear amnpp,
    It's widely used for capturing the rework activities(components and activity cost),both for final rework and inprocess rework
    activities.
    Check these links,
    Rework order manually (not Trigger)
    rework order
    Rework Order Steps
    Re: Coustomization order type for Rework
    Regards
    Mangalraj.S

  • To close the unclosed production orders without imbalancing with invoice

    Hi MRP Experts,
    I want solution for following situation.
    Mrp was not implemeted during software implementation.
    Now we need to implement.
    But since manual production entry was not done according to invoice there is no link between them.
    At present i have unclosed production orders which was actually manually closed and at present if i try to close it it might show imbalance during the mrp implementation with respect to mismatch in date.
    Please give me some suggestions to close the unclosed production orders without imbalancing
    Thanks and regards,
    Tejaswini

    Hi,
    Once the production order is active then only these orders will be considered for MRP.
    So, you go with setting the System Status of the Orders with TECO.
    Select your Orders and in the Transaction: COHV you can do the Mass processing for TECO.
    TECO status will not look for production order settlement etc..
    You enter the demand and execute MRP..
    Planned orders will be genearted, convert them to Prod. Orders work on those orders..
    But it is same as having prod. orders earlier to MRP or Creating fresh production orders..
    System will calculate the Net requirements first in the MRP, so ther will not be inconsistencies..
    Revert for further discussion..
    Regards,
    Siva

  • Lock the production order creating without material for order type zp01

    Hi all,
    Good morning.My client wants to lock the production order creating without material for order type zp01.He does not want to create production order without material.Its very urgent.Please guide me the settings if any.
    Thanks and Regards
    Sukumar

    Hi Sukumar,
    You can do by applying user exit.
    Use PPCO0007 - Exit when saving production order.
    Function module - EXIT_SAPLCOZV_001.
    Include Program - ZXCO1U06
    Write your Code:
    *&  Include           ZXCO1U06
    Regards,
    Sankaran

  • FOR MTO & MTS scenario when the Production order shows the Sysy status DLV?

    Hi ALL,
    In the MTO & MTS  scenario when the Production order system status become DLV ?
    Regards
    Satish

    Hi Satish,
    For both the planning strategies (MTO/MTS)..
    The status of the production order becomes DLV ,
    when you do GR for the order with 101 movement type.
    (OR) 
    At the time of final confirmation if automatic goods receipt is activated.
    Regards,
    Anil

  • Production Order without Material Number and linked to a PM Order...

    Hi All,
    Is it possible to create a Production Order without Material Number (because it is a "just one time" production), and link it to a PM Order (enterred by a sister Plant) in order to finally report the cost to that PM Order?
    And if YES, how to do it???
    Explanation of the problem (business scenario):
    We have 2 Plants. Let say Plant "A" and Plant "B".
    Plant B is producing spare parts for Plant A.
    There are usual spare parts, which have a Material Number.
    But there are also spare parts which will be produced only once, and which don't have a Material Number. (= because it is a very punctual production).
    Plant A needs a punctual spare part.
    It creates a PM Order for Plant B.
    Plant B needs to create a Production Order for that spare part (without Material Number).
    Then, when confirmed and delivered, the cost of that production needs to be reported (assigned) to the PM Order.
    Thanks in advance for your help on the subject.
    Regards,
    Rudy.

    Thank you for the information.
    After some modifications on the Prod.Order Type and the creation of a Reference Operation Set, it seems to work.
    Still have a cost problem, but on the way to be solved.
    Thanks a lot,
    Rudy.

  • In the Production Order, Sales Quotation is displayed not the Sales Order

    Hello to All,
    I need a kind help from you.
    My scenario is as follows
    There is a Configurable Material (Finished Product)
    Sales quotation (VA21/2/3) were made for this material.
    Sales Order (VA01/2/3) with reference from the Sales Quotation were made for this same material.
    Now when I run the MRP (MD02) for this material, Planned Orders were created.
    Planned orders were converted to the Production Order.
    In the Production Order (say in Display mode), under the 'General' tab, there is a segment called 'Sales order'. In this segment, the sales order is being displayed if the Production Order is created for a sales order (MTO scenario).
    But, in my case, the Sales Quotation number is being displayed instead of the Sales order.
    My Issue which need your answers:
    Is it a standard SAP scenario?? I mean, if the production order is created for a sales order and again if the sales order is created earlier with reference to a sales quotation, then in the production order, the Sales quotation is displayed. Is it a standard?? Or it is showing wrongly? I mean, is it like that, always the sales order should be displayed in the Production order and not the sales quotation??
    Please suggest so that I can overcome this problem, if at all it is a problem.
    Some More Inputs (For your analysis/research):
    1. After the MRP run of the material the Planned Order is created. I have checked the planned order, and found tha the assignment of sales document (in this case Quotation) is done in the Planned order itslef. It is visible wthin the "Assigmnet" tab of the Planned Order.
    2. For the analysis purpose, I created one stand-alone Sales Order for the same material. I mean, without reference from any Sales Quotation. Then, when I run the MRP (md02), the Planned Order and then production order were created normally, with reference to the Sales order. This just for your kind information.
    3. I have checked the pegged requirement of the Production order in the MD04. It is showing the Sales order itself. But, if I see the production order (CO02/O03), it shows sales quotation.
    User Requirement:
    Evenif, the sales order is created with reference to a Sales Quotation, after MRP run, in the Planned and thereby subsequent production order, the Sales Order should display and not the Sales quotation.
    Please suggest.
    Thanks and Regards,
    Supriyo

    Hi
    Since your scenario is configurable material,  the system takes the reference of sales quotation only. Because the in case of configurable materials the sales quotation is the base and based on the sales quotation the sales order is created and subsequent production order.
    This is std SAP and for configurable materials the sales quotation is deciding factor
    Krishna

  • Is there a situation where we create a production order without BOM/Rtg ?

    What I see in the system, I was able to create a prod order without maintaining master data for PP ( expect material master)
    Is there a situation/scenario where we create a production order without BOM, Rtg
    Does the above situation applies to scenario like special procurement key ( 40- stock transfer from other plant )
    Please clarify

    Pradeep,
    Thank you for detailed answer
    Round robin of discussions
    When you covert a planned order to a prod order with reference to a material (CO40), it will ask for routing
    if rtg is not maintained for the material, the system will automatically pick the default rtg from OPJG
    When you create a prod order ( without ref to a material- C007), say suppose for unplanned rework we have
    maintain the rtg and BOM manually to the prod order
    Lastly, FOR SPk - 40 ( Stock Transport) for the issuing plant both BOM & Rtg needs to be maintained in the recieveing & issuing plant
    Due points have been assigned

Maybe you are looking for

  • Automatic creation of service notification for maintenance order

    hi, I created one new document type (SR) as service requestion in material management. Then i create maintenance order for service and attached service master. System generated PR. Where document type to be given to get SR instead of PR. Kindly expla

  • Delete App Store. How do I get it back?

    Edit: never mind, I figured it out.

  • How to use Box.glue

    i have a java app using Swing JList the problem is that when the person resizes or gridbaglayout interprets the sign in such a way the list expands and covers up the button below it. i don't want the JList to expand and cover up the JButton that was

  • FIREFOX 4 - YAHOO 'YES OR NO' DIALOGUE BOX FAILURE

    I logged on to Firefox to search for something. I got this gray pop-up dialogue box asking me to select Yahoo Tool bar functionality. I declined on everything because I really hate Yahoo from a disastrous run in with it's instant messaging a year ago

  • Download old connector version

    Hi, How can I download an old connector version. I am using OIM version 9.1.0.1. I am looking for a certified SAP connector (user management), probably version 9.0.4.8 But in the following page, I can only download the version 9.1.1.0, certified for