PPV for subcontracting materials mystery- posting to a different cost element?

Dear All:
Are there any OBYC (FI-MM) account determination settings to have PPV incurred due to Subcontract (SC) POs post to a different account than regular PPV? If not, is there any distinguishing characteristic at the line item level for SC PPV posting to report it in contrast with regular PPV line item?
Or am I looking at creating a substitution rule to make this happen?
Looking forward to some insights!

Hi Althea and Szymon: Thank you for your inputs. The subcontract material in our system is setup as F/30 (Procurement Type, Special Procurement) and as a HALB (semi-finished goods) in the same plant as other semi finished goods. So, no opportunity to segregate their PPV (posted via MT 101) account via valuation modifier in OBYC.
BSV transaction is used to store the offsetting account during inventory receipt during 101. So, in essence here's an example of accounting doc during GR :
Description       Amount   Transaction     Material      Quantity
FG Inv (B/S)        100          BSX              FG123            +1
GR/IR (B/S)         -15          WRX            FG123            -1
PPV (P/L)            -25          PRD            FG123             -1
SFG Cons (P/L)   -75          BSV            FG123              -1
Subc Fee (P/L)     15           FRL            FG123             +1
Inv SFG (B/S)       -12          BSX           SFG456           -1
SFG Cons (P/L)    12         GBB-VBO    SFG456           +1
So BSV+PRD = BSX (FG)
I am looking to see if I can get the $25 favorable PPV posted to some other account via OBYC. Right now it's getting posted through PRD and getting mixed up with PPV for external purchases.
Thanks for your inputs.

Similar Messages

  • Material determination for subcontracting materials

    Hi
    Where and how  material determination will happen for subcontracting materials ?
    thanks

    While creating the PO when you put the item category L it will search the BOM for the FG and its components, if BOM doesn't exists in the system for the FG then put the components in PO manually..
    To create the BOM for the FG go to T-code CS01 nad mantain the components for the FG  and save it  it will be copied to PO in ME21N in material tab by putting the item category L Subcontracing.
    You can do it in ME21N at item detail level in material tab...
    Here mantain the components  for the FG.
    Regards
    Sujoy
    Edited by: Sujoy on Apr 9, 2009 12:51 PM

  • For financial report requirment can we consider secondary cost element cost

    For financial reporting requirment can we consider secondary cost element cost to profit and loss a/c

    In our senario _ cost is booking cost centers and revenues booking concern profit centers .
    for Financial reporting requirment can I include secondary cost to profit and loss a/c
    what is the impact on the report
    exp: salary booking in primary cost,than Per hour man hour cost computed by costing dept for allocate to concern department
    it is cost center activity price we specify in kp26 at the time of pm order confirm it will confim the activity quandity price will from planning area only,  so for salaries in primary g/ls already captured, if we consider secondary it may double booking
    srinivasa reddy

  • Delivery Split for subcontract materials in ME20

    Hi Friends
    When I try to delivery multiple materials from the same PO through ME2O, they get split into multiple deliveries. Lets say I have selected about 4 materials in one transaction, I see that 3 materials go into one delivery, 1 material  go into  separate delivery This way I now have about 2 deliveries for a single PO.
    I want to understand how this split is working and how to avoid?
    All these  below parameters are same for all the 3 materials 
    a)delivery date u2013 Same 
    b) Shipping Point - Same shipping point
    c) Shipping Condition - Same
    d) Delivery Type - LB for all
    e) Loading group - Same for all materials
    f) Route - Is also same
    Thanks In Advance
    Pala

    Hi
    My functional scope is Sales And Distribution , as  this dilivery split comes under my scope , I am investigating this issue even though I have to understand MM functionality .
      I am not able to find PO for this sub contract delivery .In SD , In VL02N, document flow starts from delivery for subcontract process , there is no display of precceeding document(PO) for this subcontract delivery .
         If I want find PO for this delivery , how  and what do I do ?
        Thanks
    Jayapala S.H

  • Production Order - Segregating Costs for different cost elements.

    Hi Experts,
    I am a QM Key User and have been asked to look into improving our current Non-conformance / re-work process.
    My plan is to include the rework operations within the original PP01 Production Order.
    So far:
    Three Work Centres have been created:
    1. NCRTEST u2013 1st WC to collect hours
    2. NCRTEST2 u2013 2nd WC to collect hours
    3. NCROUTSO u2013 To collect costs associated with outsource operations i.e. weld repair, shaft straightening.
    NCR-02: Activity Type Created
    Two new control keys created
    1. NC01: Confirmation of hours
    2. NC02: Outsource operations (requisition generated)
    NCRTEST-CC: Cost Centre Created
    The Price Planning for Cost Centre/Activity has been specified (KP26 and KPB6)
    Two new Cost Elements have been created:
    1. 43001201 u2013 Costs associated with the outsource operation
    2. 94301021 u2013 NCR Labour Hour Costs 
    On a test production order we have managed to isolate the NCR hours to cost element 94301021 and the outsource operation costs to 43001201; however these costs are automatically settling to the production order material which then settle to the WBS (that is my understanding).
    Is there any way of stopping the costs associated with the two cost elements from settling to the Production Order material? The costs cannot be settled this way as my intention, is for a new development which allocate the costs to the relevant notification QM Order.
    The QM Order will then be settled in the normal way. Settling the production order and the QM order will result in duplicate costs.
    I am not sure if this is a possible solution but is it possible for a negative cost to automatically post to the production order material for the two cost elements. The production order value would be correct and the QM Order could be posted as normal.
    Thanks in Advance
    Ben

    Hi,
       I would expect that the costs get settled to the material only when you settle the production order to the receiver material. I don't think that happens automatically....it will have to be done explicitely
    regards
    Waman

  • Manually post to a different cost center during APP

    Hi,
    When the proposal is created, we manually go and edit the proposal and enter 2% cash discount. I have done the settign in OKB9 to pick up the cost center for the Discount Received account.
    Now, is there anyway that I can enter the cost center manually after running APP (will delete the OKBP settings). If i run APP it gives me error that in proposal log that discoun received account requires CO object.
    thanks,
    JR

    NO.
    If you have set up an account assignment rule in OKB9 you wont be able to stop the payment run as it creates the accounting documents.
    If it is always a certain Cost Center you could look at a substution looking at the document type of the payment run to make it different.

  • Cost element for materials in network profile

    Dear All,
    Want to use material planning field in internal activity under assignment tab. But I have the following queries
    What is the cost element that I have to mention in network profile under internal activity?
    If I mention the cost element in network profile and plan my internal activity in initial stage and later on if I assign material to internal activity will the  Plan cost of that internal activity increases by the material added to that activity.
      3.  under OBYC materials have different cost elements based upon valuation class. so how the planned vs actuals will be show in the report.
    Regards
    Avinash

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

  • Planning of subcontracting materials with scrap percentage

    Hi All,
    Need your help for below mention scenario,
    For planning, where my planning is start with subcontracting materials.
    To clarify more, strategy group is defined in subcontracting materials. Now when I entering Assembly scrap or Component scrap in material master or BOM, system is not considering this scrap percentage for planning.
    when i defining scrap percentage with procurement type, E (Inhouse Production) or X ( Both) system is considering scrap percentage. But for external like F or X with special procurement 30 (Subcontracting) its not considering the scrap percentage.
    Please suggest, how I can plan subcontracting materials with scrap percentage.
    Regards,
    Rajesh
    Edited by: Rajesh Sawant on Feb 18, 2009 4:54 AM

    Hi Jejesh,
    Thanx for reply.
    This scrap is required for subcontracting materials.
    Setting in material master,
    In MRP 1 and MRP 4 view- Define scrap as Assembly and Component scrap as per the requirement.
    Procurement key - F or X
    Special Procurement key - 30 (Subcontracting)
    Strategy group- 40 (Planning with final assy) in MRP 4 view.
    Bill of Material setting,
    Component scrap and Operation Scrap in Bill of material.
    Based on above master data, Plan Independent Requirement (PIR)  cration for above materials and MRP Run.
    Here after mrp run based on above setting, scrap percentage is not considered. Plz suggest the solution.
    Regds,
    Rajesh

  • Need to do availability check for multiple materials (in bulk)

    HI Friends,
    I need to do availability check for multiple materials. Currently i am using function module AVAILABILITY_CHECK within a loop.For my purpose I could find this particular FM as well as BAPI "BAPI_MATERIAL_AVAILABILITY" however both of this options can not be used for more then one materials at a time.
    I want to take out the loop from the code and get multiple materials be ckecked at once for availability. If AVAILABILTY_CHECK FM can be used for multiple materials, please post the usage.
    Any other options are there?
    Any help or clue would be appreciated.
    Thanks in advance.

    Use the BAPI.  Even if such a function existed, it would still perform the relevant internal logic required for checking by material, so you wouldn't gain anything.

  • Posting for secondary cost element

    Hi All,
    After running KSU5 (cost centre settlement, we have small balance in secondary balance. Could you please advise how we can post entries between secondary cost element.
    Regards
    Deepak

    KSU5 is used for cost center assessments (settlements are a type of allocation for internal order/WBS elements/networks/etc). Once you define the rules for the allocation, SAP will follow those rules and post the appropriate entries. You cannot post manually/directly to secondary cost elements. SAP cannot get "out of balance" during an allocation. When you say "small blance in secondary balance", I am not sure what you mean. Are you saying there is a financial balance remaining in the Sender cost center? More info is need to properly address the issue.

  • How to populate the sales order as a cost object in cost element posting

    When posting sales to a cost element the error comes up stating Account ******** requires an assignment to a CO object.
    This comes from the sales (repair) order and I would like to pass the sales order and line as a cost object.
    Could someone please tell me where I would make the configuration to pass that into the accounting document?
    Thank you,
    Sergiy

    Snavaneetha,
    unfortunatelly I don't have access to any CO consultants that could help me on this one. We are a small company so I am an unofficial CO consultant for time being
    Anyway, maybe I should post this one on the CO forum as well.
    I looked at the material master and I don't see the field for the GL account or cost element anywhere like you said. I do see the account assignment group and that's where my account determination procedure determines the right one to use, and it is trying to post to the account I need it to post but I get the above error, for some reason the sales order that I am billing for does not get passed at a cost object to this cost element account during billing.
    Sergiy
    Edited by: Sergiy Mysyk on Jul 26, 2010 3:25 PM

  • MIRO Cost Element error for Cost center

    Hi,
    When i am doing MIRO - there are some price variances. System is giving the error to maintain the Cost center for that price differance cost element.
    But i have already maintain the Cost center for that Cost element in OKB9 Transaction. Why the system is asking for Cost center assignment again?
    Kindly help me
    Thanks
    Sunil

    Hi Sunil,
    Maintain the OKB9 settings with valuation area mandatory and dont give business area in the sub-sequent screen. Maintain only Valuation area and Cost center. It will not give any error and it will pull the cost center from OKB9.
    Thanks
    Kishore

  • Report for issuing componets to subcontracting materials

    Hi
    I am trynig to develop a report for issung components  to subcontacrting maerial
    as per our scenerio... every day we are creating purchase orders item cat L for subcontract material
                                      then issue the materials against to subcon. pur.order...then do GR with 101..
    as per our requirement...
    report input entries..like   1. subcon material code
                                 2.  from date --- to --- todate
    out put..for report..like.... total consumption of components with line item wise (as per bom) with that pertical period..
    for this any std. report is there  ?
    or  if  go for zreport....pls guide to me..
    any one can suggest to me
    thanku
    regards
    sesidhar

    HI,
    Certain set of inforamtion can be availed in MB51 and using 541 Mvt type..
    But it is better that you develop a zreport to get the information what you wanted if you are not satisfied with the MB51 report from standard SAP.
    Try MBLB also
    Thanks & Regards,
    Kiran

  • Batch number issue when posting goods receipt for Subcontracting PO

    Dear expert,
    I always heard there will be issues while posting goods receipt for subcontracting PO. If the component is managered by batch.
    No batch number will be proposed during PGR in MIGO...
    I dont quite understand where is the issue??
    My understanding:
    We have batch managered components and End Product. All have batch numbers, then we PGI the stock to 'SC stock' via 541 movement type.
    Then Vendor will finish the end product and send us back the end product.
    We consumption the components use 543 O movement type? And GR the end product..
    So while goods receipt, the sytem just need pick the existing batch number for both components and finish products..
    Where are the issues???
    Thanks.

    Hoo Laa wrote:
    I have questions for people always mentioning there are issues with batch determination while post goods receipt for subcontracting orders.
    >
    > I am thinking maybe they didnt active the batch determination for 543 movement type..
    >
    > Thanks.
    Hi Hoo,
    You are right!!
    Setting of batch number determination has its importance in Mvt Type be it 541, 543....
    The issue you might have observed would be with Batch Determination in Goods Issues which folks find it bit tough to achieve n make it work for them.
    Cheers!!
    Shiva

  • Problem in Posting of GR for Subcontracting PO Through MIGO

    Hi All,
    When I am posting 101 through MB01 for Subcontracting PO The system is creating three line items in Material Document( 101, <b>543 & 545</b> ) which is correct.
    But if i am doing the same through MIGO it is posting three line items as (101, <b>543 & 543</b>) - Which is wrong.
    I am using SAP R/3 4.7.
    Please let me know if there is any OSS note to fix this.
    Thanks a ton in advance.
    -Nirupam

    Hi,
    I can't belive it....543 is showing Credit indicator and 545 is showing debit indicator.  Which is perfect.  So, when we receive a subcontracting PO, if at all there is any byproduct that is going to be received, it has to be either debit or credit (only one way) whether we receive from MB01 or MIGO.  If you see 545 in MB01 that means, you are receiving by-products along with ....However, in MIGo you are showing only 543 (consumption of components).....Are you missing any by-products comingup in mIGO?  Is the PO the same you are using in both MB01 and mIGO....very minimal differences in terms of functionality we may encouner between these two transactions but I strongly doubt about posting two different movements types for exactly the same data....I am not doubting you; just curious to work on such problem.  Please cross verify again and let me know.
    Regards