Dear All,
Is there any User Exit to check the Purcahse Requisition line item quantity changes.
For example If a PR Line item is converted into a PO,no user should be able to increase the item quantity in PR.
where as now i can change the quantity(offcourse,i doesnt allow you just like that,but once you enter a new line item in your PR ,it opens all the quantity fields in that PR). Is it possible thru Configurations?
Thanks in advance.

Hi Linda,
The Enhancement name is MEREQ001.
In this enhancement, the following exits are available.
EXIT_SAPLMEREQ_001
EXIT_SAPLMEREQ_002
EXIT_SAPLMEREQ_003
EXIT_SAPLMEREQ_004
EXIT_SAPLMEREQ_005
EXIT_SAPLMEREQ_006
EXIT_SAPLMEREQ_007
EXIT_SAPLMEREQ_008
EXIT_SAPLMEREQ_009
EXIT_SAPLMEREQ_010
I hope EXIT_SAPLMEREQ_001 will serve the purpose.
Regards
Elini.P

Similar Messages

  • In CO06 tcode if confirmed quantity change it becomes '0'

    Hi All,
    In SD, if the confirmed quantity change from 200 to 100 it becomes '0' in CO06 tcode, after becomes '0' in the table level the entry is getting deleted.why it is happening, is it functional related or  technical related, if technical where it will happen. Generally how it will happens in the business scenrarios. this program is standard one SAPMV45A so in which exit we can find the related information.
    Please provide detailed scenario and in the technical (abap) point of view where needs to check and what needs to be done for this issue in the technical side if it is abap related issue.
    Thanks,
    V.V.

    Hi,
    You can achive with sales order save userexit, we have done same thing, but something differnt, like when creating delivery if system dont have stocks to deliver for some items then those items will have to place reason for rejction during delivery creation. Thats thing i did at MV50AFZZ/ ZB.
    We have defined new reason for reection for this requirment, used to for this purpose.
    Let me know if any questions

  • Delivery quantity changed while delivery was being picked .

    Hi Friends .
    I have  a big problem, because the delivery quantity changes while the delivery was being picked.
    This is the positively the 3rd time that we have seen this, possibly the 4th, recently.
    Delivery was created this morning for 800pc. Batch determination was telling the picker to pick from perticular storage location SLOC 112. (all 800pc) (25pc =1 pallet)
    The picker knew that he was picking 32 pallets from that row.
    After he picked 32 pallets, the system was telling him that he needed to pick 2 more pallets.
    At that point, I  saw delivery .The quantity in the delivery had, at this point, increased to 850.
    Delivery shows that 32 pallets that had been picked up to this point.
    again  it is calling to pick 2 more pallets.
    at this point of time  delivery is for 850 (not the original 800)
    I have not changed the quantity in delivery or in order . how come delivery quantity has changed while materials are being picked .
    Kindly I request your speedy reply as it's priority ticket .
    Thanks in advance .
    Jayapala S.h

    Hi jayapala
    The delivery qty can change while you pick the quantity  if the stock is less than the stock that is to be actually you are going to deliver. As the stock is changing , check the stock in MMBE for that material.
    Example :
    Say you have created a sales order for 100pcs but when you are doing delivery material is taking only 75pcs because there are only  75pcs of stock in the storage location
    Regards
    Srinath

  • Create work flow for date and quantity change in Purchase order

    Hi SAP Guru's,
           Kindly share abt how to create a workflow in SAP for purchase order date and quantity change and link it with SAP PS.
    Scenerio : If someone change the Date n Quantiy of PO , the system should trigger a mail to the person responsible.
    Thanks a Lot
    Regards
    Janani

    I did create a Workflow in SWDD for PO date n quantity change , but am not sure how to map the same with the project . Kindly explain step by step.
    Thanks
    Janani A

  • Phantom assembly quantity change in production order

    Hello experts,
    We are producing 1 type of goods, but for 2 different customers. each of them has their own specification for packaging. as per system it was decided to not create another finished goods partnumber with additional BOM, but instead we created 2 phantom assemblies in 1 BOM. 1 of them is the main (for customer 1), another one is alternative (for customer 2).
    Now the idea was that whenever Purchasing is maintaining materials in production orders they were supposed to switch quantity from main phantom assembly to alternative phantom assembly whenever goods were required for customer 2.
    We quickly tested the possibility of quantity change on our test server, but not entirely. the thing is, that for some reason you can change phantom assembly required quantity only if it's already has required quantity higher than 0. otherwise the item is greyed out and you can't perform any changes in it.Same happens if you simply reduce required quantity of phantom assembly item to 0. once you do so - the item becomes greyed out as well.
    So, the question is - is it some kind of settings in BOM\MMD that prevents user from changing quantities for phantom assemblies (and if it is - where exactly you can change it), or it's something else (like i dunno, maybe user authorization issue or something).
    Any help will be appreciated.
    P.S. - i know that you can still simply remove entire item from production order and put it back with quantities and etc., but that way of work has higher risk of making a mistake.
    BR
    VE

    Dear ,
    Couple of points on this issue which may help you understand the problem  : Bom Explosion With Phantom Assemblies will happen based on the following set up .
    1. You need to maintain the special procurement key-50 for the phantom Assembly
    in the MRP 2 View of the material master
    2. We can override the Phantom Assembly Setting by defining in SPRO --->
    Define Explosion Types so that MRP Creates Procurement Propasals for the
    Phantom Assembly itself.ie We can Swith off the Phantom Assembly Settings.
    This settting need to be defined in the BOM Item details screen in the Basic
    Data Tab Page under MRP Area.
    So check in your Bom whether switch off phantom assembly is defined.Make the Explosion Type-Blank
    3.Run MRP Single Item - Multi level - Transaction MD02 with Planning Mode 2 : 'Re-explode BOM and Routing'. The Phantom Item will now get exploded correctly in the Planned Order.
    4.Check the Validity of the BOM  and planning date
    5.Check the MRP4 set up in FG where you have kept the BOM/Routing selection
    6.Check wether dependent requirement  material master -MRP4 view -MRP  for Depent Requ should be blank .
    Check the above points and come back
    Regards
    JH
    Edited by: Jiaul Haque on Jun 14, 2010 2:15 PM
    Edited by: Jiaul Haque on Jun 14, 2010 2:18 PM

  • BOM quantity change (STPO-MENGE) resulting quantity less than 1

    Hi,
      Anyone have done a BOM quantity change (STPO-MENGE) where the resulting quantity is less than 1.  Please help.
      Thanks,
         Hazel

    Do you mean base quantity by saying header quantity?  I'm running variant configuration.  The base quantity is restricted to 1.  Moreover, changing the unit of measure is not an option.  Each is the official base unit of measure.
    Sample Scenario/Requirement:
    An order for a qty of 1000 requires a total 84 plates.  Each plate can yield a qty of 12.
    SAP uses the equation -->
    Current Component Qty =
                (required qty/base qty) * saved component qty
    Calculations:
    Step 1) Derive Current Component Qty
    Let required qty = order qty (VBAP-KWMENG),
              base qty = max yield per plate (given)
    Current Component Qty =
                 ceiling (VBAP-KWMENG/max yield per plate)
              = ceiling (1000/12)
              = ceiling (83.333333)
              = 84
    The Current Component Qty (84) is the qty used production orders and is equal to the Requirements Qty of the component (RESBD-MENGE)
    Step 2) Derive save component qty.  In Variant Configuration, save component qty is equal to STPO-MENGE.  Base quantity of 1 is assigned to the KMAT (configurable material).
    Since Current Component Qty =
          (required qty/base qty) * saved component qty
    by substitution -->
        84 = (1000/1) * saved component qty
    saved component qty = (84/1000)
    saved component qty = .084
    Issue/Problem:
    I have the above calculations correct in Variant Configuration.  To run a check, I do a production order simulation (CO01S) for a Total order qty of 1000 with today's Finish date.  When I click for components overview, it gives me a Requirements qty of the component of 83 and NOT 84.
    I'm not sure how SAP does the calculation in the background, but I was thinking; maybe, by increasing the number of decimals from 3 (.083) to 6 (.083333) would give me the 84 that I needed.
    Roberto

  • Delivery Quantity change during creation of Delivery Document

    Hi Friends,
       I have a requirement of creating a Partial delivery when not much stock is available.
       For this I am using a BADI 'LE_SHP_DELIVERY_PROC' method Save_Document_Prepare.
       I am changing the contents of CT_XLIPS-lfimg in the method and also keeping UPDKZ as 'I', but still
       the quantity is not changing.
    Pls Suggest.
    Arpit

    Check, "Outline agreement message" in Document type details in VOV8- (eg: CQ- Quantity Contract) under Transaction flow view.
    Use Indicator:A- Check at Header level.
    Then system pop ups the message saying " Already Contract is open for this Customer" - ( Assume, SOld to party already have Open Contract)
    similarly, for Material, for this you should use  Indicator" B- Check at Item Level.
    Hope it helps

  • Price & Quantity change in COsting

    Dear All,
    After saving the sale order and costing, the quantity and price is automatically changed in the costing. After re open the sale order, the changes are carried, what is the problem and is there any configuration level changes?
    Urgent one, pls revert back guys.

    Hi there,
    Could you please explain step by step procedure of your req. coz it is not clear.
    What is BoQ?
    Customer gives raw material with out knowing the specification of sheet?
    Thanx
    Jess

  • Delivery Order Quantity Change

    Hi ,
    I seem to be facing a very strange problem where in i am unable to change the delivery Order Quantity (lips_lfimg)  in the Customer Exit MV50AFZ1 for VL01N Tcode.
    I am trying to change the Quantity in the Subroutine USEREXIT_SAVE_DOCUMENT_PREPARE.
      I do not know if the system does not allow you to change the Quantity .
    I checked all the threads available but none of then seem to be helping me out on this.
    Has anyone ever tried updating the Quantity in VL01N Tcode . If yes pls help me as to where the code should be written for the same.
    Presently working on an 4.7 SAP system.

    Check Delivery Qty change at the creation and change of Delivery
    Update all the fields as said.

  • Quantity change on billing document.

    Dear Gurus,
    I am working on Dairy project. I cant map one scenario as following.
    Our client company creating sales order for 10000 ltr and delivery is also for 10000 ltr
    But invoice quantity is dependent on confirmation of customer proof, if confirmation of customer is for 9800 ltr, it is obligatory on us to create invoice only for confirm quantity.
    Can I change quantity on invoice?
    What about quantity diff. in inventory 
    Pls tell me how to map this scenario. Send me block if available.
    Thanks & Regards

    hello, friend.
    as always in SAP, there are a few ways you can do this.
    1.  use POD or Proof-of-Delivery.  this is activated for customer, item, etc.  in this business scenario, the customer confirms receipt of your delivery.  if there are differences, then this is indicated when you do t-code VLPODL.
    2.  or, you can just simply retain the standard SD process, and just issue a credit memo request to cover the difference in volume.
    in either case, there should be no adjustment in your inventory.  this also means your company absorbs the difference of the 200 liters of dairy product, which you can eventually charge to a third party (e.g. forwarder) if it is determined to be the third party's responsibility, for example.
    regards.
    p.s.
    there is such a thing as 'catch-weight' Industry Solution.  but i'm not certain if this is entirely applicable.

  • PR quantity change after Release

    Hi Friends,    
                                       I am unable to change PR Quantity after release of PR. Please suggest..
    Regards,

    hi,
    When you set up the release strategy there is an indicator for the changability, which states that whether you wanna make the further changes in the PR doc, once it is released...
    So, if you wanna allow the changability for the PR docs, then you can use the any of the indicator among 4, 5 , 6 as per your req....
    by this you shd be able to make changes...
    Regards
    Priyanka.P

  • COR2- Process order material  quantity change

    Hi, I want to change the material quantity of process order with COR2 transaction, could you plese help me out in finding the bapi or function module which will be relevent.

    I have done it through BDC recording, change on first line, then upload using bdc from 2nd line.

  • Inspection Lot quantity change (lot origin 03) when Prod. ord. qty changes?

    Hi,
    it seems that for an inspection lot, with lot origin 03:Production, its Inpsection Lot qty doesnt change when the Production order Total Quantity field changes. Only the Actual Inspection Lot changes.
    How can the Inspection lot quantity field of the Inspection Lot be changed accordingly?
    Should the enhancement PPCO0007 be used?and then LOSMENGE (table QALS) =GAMNG (table AFKO)
    Can it be done?
    Thanks in advance

    Hi,
    In that case, you can do it by :
    - Reread the master data of production order(From Menu Bar).
    - The status of production order will be converted from "Released" to "Created".
    - Release the production order again.
    Thanks
    SUMIT

  • Quantity change in Service Entry Sheet

    Dear Sappers,
    My client is procuring Service for different purpose.Their requirement is they need to change the qunatity in Service Entry Sheet.But in Standrd SAP, when I'm maintaining a SES respect to PO, quantity I'm not able to change.
    Is there any way to set tolerance limit in SES.When I'm maintaining SES respect to PO, and changes the quantity, system is giving error message.
    Thanks & Regards
    PKB

    Dear ,
    while creating Service Po in Me22N...
    Go to Service Tab:
    Maintain the Overfulfillment Tolerance in the grid.
    also you can Check the check box of Unlimited.
    Unlimited Overfulfillment
    Specifies whether or not unlimited overfulfillment of requirements (overperformance of a service) is allowed at the time of service entry.
    This will work
    Check this out.
    regards
    Utsav

  • No PO/PR quantity change to be allowed less than delivery requested quantity?

    Dear Experts,
    We are using SNC to post and confirm our deliveries(Purchase Order Collaboration). The client now wants to restrict any change(less than to be restricted but more than allowed) to be made to the delivery requested quantity in ECC once the delivery request is posted to SNC.
    Is there any standard method to configure these restriction using the message output generated post delivery request posting? Request your inputs on the same.
    Thanks,
    Sadiq

    Hi Sadiq,
    Refer below link:
    Consensus Finding in SNC 7.0
    Regards,
    Nikhil