dear experts,
while doing process order confirmation, the system displays the message "Actual Data for QM Characteristics for operation 011 missing"
i have maintained QM data tick in material master.
could u suggest the possible reasons.
Rishi

Hi Rishi,
I think you have maintained 03-Inspection type which is for inprocess inspection.
So when you are trying to confirm 011 operation, due to inspection type 03 maintained, it creates an inspection lot of the same type and as it is inprocess inspection , you have to do result recording for that particular lot.
So after doing result recording for that particular lot, I think this message will not come.
If you dont want inprocess inspection, remove inspection type from material master and if you want, then just do result recording.
Your problem will be solved.
Reward if it hepls.
Regards,
Sunny

Similar Messages

  • How to view the characteristics in process order

    Hi, How to see the characteristics in process order screen which are assigned in material master classification view. say, created a material and assigned some characteristics in classsification view. for the same material created a process order. like to see those characteristics in process order. is it possible. please advise.

    raju
    to see this characteristic in the process orden you should go to Header >> CO Classification. If you want to add a characteristic, this should be added to SAP_KKR_CLASS. Characteristics for material  (001) are not the same than those for CO Classification (013), so you should develop some special report (we did some special developmet for the printing of order forms )
    regards

  • Process Order Warning Message while doing the Goods Receipt

    Dear All,
    While doing the GR against process order via t.code MB31, we are getting a warning message which reads u201CProduction date of bch 110420 (17.06.2011) does not match the prod. date entered (26.08.2011)u201D this happens only if the batch number already exists in the system for the same material code , in this scenario if the user ignores the warning message & posts the document the existing batch number production date also will be over written with current/inputted manufacturing dateu2026 this will collapse the batch traceability. Is there a way to customize where we can have a different production date for same batch number?..
    For example:
    Batch Number: ABCD
    Production date 10.02.2011
    Batch Number: ABCD
    Production date 11.02.2011
    Batch Number: ABCD
    Production date 12.02.2011
    Regards,
    Sivanandan

    I'm sorry to say that I find your requirement to be absolutely not logical; a batch is, by definition, a homogenous quantity of a material, that you want to separate by it's characteristics from other, different, quantities of the same material.
    If you decided that manufacturing date is a characteristic of the batch, then it has to be unique for one batch.
    So, as I see it, you have two options: either decide that manufacturing date is not important and do without, or have different batches for the different dates.

  • Warning message during batch determination while doing GR for process order

    Hi Experts,
    During delivery against process order for all SFGs and FGs, we are getting warning message u201CInvalid batch according to selection criteria in batch determinationu201D.
    Following settings maintained for batch determination in process order.
    Condition table for order/material type maintained
    Access sequence maintained for order/material type
    In strategy type above access sequence has been maintained. The common class and sort sequence created for all materials in the plant have also been assigned to this strategy type. In batch split changes allowed box has been checked and quantity proposal maintained as 1.
    In search procedure control maintained for order/material type. Search procedure has been assigned to all process order types and check activated.
    In spite of the above when GR for order is taking place , system is throwing warning message.
    GI of components is being done through backflush and without any warning message.
    Please advise how to ensure proper batch determination during GR against order.
    Regards
    Sm.

    Issue resolved by removing required indicators from characteristics which were not being valuated but were maintained in the class assigned to SFGs/FGs.
    Regards
    Sm.

  • Strategy Types in Batch Search Strategy (Process Order)

    Hi Expert,
    What are the difference between the strategy types - Order type/Plant/Mat, Order type/Plant, Prod Material?
    For Order type/Plant combination- If my criteria is to do automatic batch determination at process order release against the sort rule characteristics (LOBM_LWERT) GR received date. I maintained LOBM_LWERT in all material classes, now in selection criteria which class I will choose as different materials contain different class in the class type 023.
    I am confused.
    In case of Order type/Plant/mat- number of master data is huge.
    Pls suggest
    Krish

    Got answer.closed

  • Settlement of process order

    In PP-PI  We want to use active ingredient for scenario:
    Our Raw material is MINING ORE which will have varying proportion of COPPER & COBALT.
    Valuation of ORE is based on itu2019s content of COPPER & COBALT content. So we will use active ingredient to capture value of this raw material based on it content of CU & CO.
    Now when we issue this material for production to process order, our semi finished output ( Say SFG1) will also have varying content of COPPER & COBALT based on kind of input quality. There will several process orders doing diff. processe.
    Now my query is
    1)     Can we settle the process order variance to COPPER & COBALT content of SFG1 instead of normal settlement to SFG1?
    2)     Can I maintain my valuation of SFG1 based on COPPER & COBALT content?
    3)     Do we have any user exit or BADI available to replace SFG1 with CO& CU in process order settlement rule?
    4)     In standard cost estimate can we capture COPPER & COBALT characteristics?
    Ultimately COPPER & COBALT are our finished goods.
    I try to search sap help but not much info to help me on this.
    Your input will be highly appreciated.
    Nitesh

    Hi,
    The concept explained is typically a co-product scenario:
    Ore produces SEMI COPPER and SEMI COBALT.  SEMI COPPER and SEMI COBALT produce FIN COPPER and FIN COBALT.
    This scenario is covered under u2018CO-PROUDUCTu2019 concept.  Here Ore is Raw Material, SEMI COPPER and SEMI COBALT are SEMI-PRODUCT and finally COPPER and COBALT are Finished Product.
    Now estimate the standard cost for your SEMI-PRODUCTS and FINISHED PRODUCTS using integrated BOM.  Sit with your PP Consultant who can give you good input for costing the products whether based on quanity yield or quality yield.
    Once this is tested and found the results are expected, the solution can be freezed.
    Please let me know your feed back.
    Regards,
    Ashok

  • Process order with variant configuration material

    Hi,
    I create a process order for a material XX.
    This material has a BOM with a material that has variant configuration "class type 300" for price configuration.
    When I save the process order I get a message saying "There are still characteristics for components to evaluate". I dont want to evaluate this material in my process order.
    What can I do to not have this message?
    Regards.

    Hi all,
    Yes, I work with variant configuration. But sales orders are not involved.
    What I do is:
    1) I create a purchase order for material X (this material belongs to a BOM), this material has variant configuration. I give a value to the characteristics in the PO.
    2) I create a process for a material XXX that has a BOM (material X is in the BOM and cannot be removed).
    3) When I save the process order the system asks me to evaluate again the characteristics. This is what I dont want it to do.
    Any ideas?
    Regards.
    Eduardo

  • Header material batch copy to component in Process order

    Hi,
    I have the following requirement...
    We create process order and assign the batch to process order manually..now during saving of the process order system has to copy batch of the process order ( header material ) to the one of the component in the batch automatically, as this is component is by product which comes to stock along with header material...What is the enhancement/ User exit can be used to meet this requirement...
    Thanks
    Kumar

    Kumar.
    What should be copied? The header batch or some/all of the characteristics of the header batch to a new batch for the component?
    Anoop

  • How to assign Inspection characteristic to the Phases in Process order

    Hi PP/QM  experts,
    There is business requirement to assign Master Inspection
    Characteristics to the Phases in the process order. But there is no
    functionality to assign MIC's in process order. So this is stopping me to map the scenario for Rework execution.
    Requirement is results recording is required for additional added phases (Phases added to the process order to perform Rework) in the process order.
    Expecting to provide a possitive solution to resolve this issue.
    thanks®ards,
    Hima

    hi hima
    there may be one solution that if you maintained separate master recipe for rework and maintained inspection characteristics there.and while creating rework order assign that master recipe. that would help you to result record.
    and one more solution is that you have to maintained inspection characteristics for your rework phase in the master recipe.
    if any query please come back
    Regards
    Pravin
    Edited by: pravin dhokey on Jan 15, 2009 10:01 AM

  • Process order based on split valuation

    Hi Experts,
                      I have a scenario where the same HALB material in the plant can be of 3 different grades.
                      Accordingly, if I do a split valuation based on the 3 grades, how can I ensure that while creating a process order on the HALB, depending on the grade (and hence the valuation type) the system picks up the recipe from an available collection of 3 different recipes (for the 3 types)?
    Regards
    Sm.

    Hi
    Just go to CT04 and creat three characterstics with grade 1,2 & 3 or as u wish. You can give single value to identify the grade say 1,2,3
    go to CL02 and creat class using material class as class type .
    Assign these three characteristics to this class
    go to mm01 and type the halb and extend the classifcation view
    specify the class that is created.
    go to bom and in the HALB  line item delete it. and create new line item using  k as item category and save the bom
    now when you creat configuration profile using cu40 and make sure you can use it in production
    after this try creating a production order the system will prompt for characteristics use your grade and proceed for production
    Krishna

  • Resource selection in process order

    Dear Experts,
                         I have a scenario where I want to group similar resources under specific resource types and finally arrive at a situation where if I try to change the resource in an order from the drop-down menu in the resource field, it only shows those particular resources which belong to the same category. Can anybody suggest a way to map this ?
                        Thanx in anticipation.
    Regards
    Sm.

    Hi
    This can be achieved by using Work center class type 019.
    For example if you have manual lathe machine and automatic lathe machine which can be used to do the same the operaion. Then the resource can be selected after creating the process order based on availability.
    1. Create a class type 019 and assign the required characteristics of the work center.
    2. Create a resource using CRC1 and Goto Extras-->Clasification and assign the class created.
    3. Create Recipe.
    4. Select the operation in the recipe and  click on the resource selection criteria radio button in the bottom menu and mention the selection criteria.
    5. Create a process order and if more than one work center is satifying the criteria mentioned in the recipe then you can change the resouce in process order by cliking execute resource selection.
    Regards
    S.Senthil

  • PP Process Order Status Get Urgent

    Hi all,
    I want to have the Correct Process Order Status in PP Module.
    i got one function : CBIF_GLM1_PROCESS_ORDER_READ :but it shows all Status, i just want Active Status. The Status who are checked, i want only them.
    thanks,
    Usman Malik

    Hey,
    You can get the object number (OBJNR) for the order from the table AUFK.
    Now use function module 'STATUS_READ' to get all active statuses for the order.
    If you want inactive statuses, the set the parameter on the FM for get inactive characteristics. if you don't need it, set the parameter to space.

  • PP Process Order Status Get

    Hi all,
    I want to have the Correct Process Order Status in PP Module.
    i got one function : CBIF_GLM1_PROCESS_ORDER_READ :but it shows all Status, i just want Active Status. The Status who are checked, i want only them.
    thanks,
    Usman Malik

    Hey,
    You can get the object number (OBJNR) for the order from the table AUFK.
    Now use function module 'STATUS_READ' to get all active statuses for the order.
    If you want inactive statuses, the set the parameter on the FM for get inactive characteristics. if you don't need it, set the parameter to space.

  • COHVPI-closing process order error

    Dear all,
    Some of the process order is in TECO status
    I need to close the order.
    While doing mass process order to close the order by using COHVPI tcode,i got error for all material
    Inspection lot xxxxxx for the order xxxxxx does not have necessary status.
    By using qa32 i checked,for that lots status is released.
    So i tried to make results entries and usage decision,But no characteristics was maintained in results,so we are not able to do usage decision.
    The error message which i got for the materials ,inspection type was 03.
    So kindly let me know how to process it.
    Regards
    Rajasekaran

    To process them cleanly, you should have at least one characteristic result recorded.  Why have you created an 03 lot with no inspection characteristics to begin with?
    What is the error message when you do a UD?  You should be able to do a UD on those lots where the order has a status of TECO.
    Craig

  • PRTs in Process order

    Hi
    I want to use PRTs in process order.I am not able to do it?.Why SAP is not supporting to use PRTs in process orders?
    Can anybody through some light on this?
    Rgds
    Gob

    PRT Assignments to Operations/Phases in Process Order
    Use
    You use this function in master recipes to determine which production resources/tools (PRT) are required to carry out an operation or phase.
    You can subsequently assign the PRTs as test equipment to the inspection characteristics of the operation or phase.
    PRTs are not taken into account in recipe scheduling or product costing. As PRTs cannot be used in process orders at the moment, they do not affect capacity requirements planning, availability check, or confirmation.
    Prerequisites
    The PRTs must have a master record in the system. Depending on the PRT category, the following additional conditions have to be met:
    Materials, equipment, and documents must be released for use as production resources/tools in their status
    PRTs with a PRT master record (miscellaneous) must be released for resource planning in their status
    PRTs with material master records, PRT master records, or equipment master records must be intended for use in master recipes in their task list usage
    Features
    You can assign several PRTs to an operation or phase and one PRT to several operations and/or phases.
    During assignment, you can enter data that determine how PRTs should be treated during order processing. As PRTs cannot be used in process orders in Release 4.0, this data does not have any functional significance in PP-PI. This includes:
    The PRT control key
    Data on the quantity, usage value, and usage dates of the PRT

Maybe you are looking for

  • How to get multiple Rows in UCCX DB

    Hi All, Here is the scenario. One of customer has DB which return the multiple rows of data by querying against one Field. suppose there is a Field "National ID Number"  which fetches cutomers' more than one account like post paid customer , prepaid

  • Session variable being lost between parent and include file

    I am running into the following scenario: Page 1 includes page 2, on both pages a session variable is returned to the screen. On occasions, page 2 throws an error on the session variable even though it was successfully called on page 1. It only happe

  • Using .Mac alias in Mail

    I have created a .mac alias on the .mac website. I then created a .mac account using this alias in Mail. (In additon to my orginal .mac account) However, I am unable to send mail using it. It asks for a password. I'm assuming you use the orginial .ma

  • Still run Tiger on my Dual 2.7 PowerPC.  Benefits upgrading to Leopard?

    Hello, I decided to put this post here, instead of in a more general hardware discussion, due to Logic Pro being my main app concern. I am using a Dual Processor 2.7 PowerPC G5 Power Mac, with the latest version of Tiger. I have heard several mumblin

  • Debugging at PSA level

    Hi All, I need to delete a few records in field "ERDAT" in PSA. I've followed the steps to get to Debugging at PSA (using SE11). Now, I've no clue how and what to do to delete the records in the debugging mode for this field. Can you guyz please help