Product Heuristic

Hello Gurus,
I would like to check what requirements I need, enable to execute the Product Heuristic in the Product View.
I have maintained in the Product Master, under the PP/DS tab the Product Heuristic: SAP_PP_002 – Planning of Standard Lots. I have created Forecast Requirement (Planned Independent Requirement) from R/3 and been transferred to APO, however when I tried executing the Product Heuristic button it specifies:Product Heuristic Finished on 05/17/2007 at 15:30:40  but no Planned Orders has been created against the FC Req.
Thanks.

Hi
As Mark says, you will need to check those items.  Also the following may help:
In transaction /sapapo/mvm do you have anything in the setting "No order without source of supply" for PP/DS?
Do you have valid planning file entries? (transaction /sapapo/RRP_NETCH and ensure "create pegging areas" is set)
Do you have a value in PP/DS Production Horizon on the product location master, it will only create PP/DS orders within this period.
Regards
Ian

Similar Messages

  • Scheduling Lines not deleted during Product Heuristic

    Hi All
    During Planning run in PPDS, Surlplus Schedule lines are not getting deleted. The Heuristic using is Planning of Standard lots in 3 horizons. Earlier these schedule line were created based on Dependant demand. Since the dependant demand is deleted, we were expecting that the surplus schedule lines gets deleted during Planning run. But it is not happening.
    Please note that the surplus schedule lines are well with in the Horizons defind in the heuristic.
    Interesting point here is, in RRP3 view, if we execute variable heuristic using heuristic Planning of standard lots, it is perfectly deleting Excess Schedule lines
    whereas it is not with heuristics Planning of standard lots in 3 horizons
    Am I missing any settings here?
    Please let me know
    regards
    Vijay

    Hi Rohit
    Thx
    Let me implement and get back to you
    Thank you very much again
    regards
    Vijay

  • Dependent requirement grouping in SCM Product heuristic

    Hi,
    How to group dependent requirement?
    Example - SFG (Semifinished) order created with Lot size =1
    dependent demand created  - for child part with lot = 1
    Purchase requisition created for child part with lot size >1 (periodic lot size)
    are any method to aggregate dependent requirent?
    Regards
    lav Mishra

    Hi Lav Mishra,
    Other method to aggregate dependent requirement is to have minimum
    and maximum lot size.
    When you are using period lot size, you need to put check against
    "start of lot size grouping" indicator in procedure tab of Lotsize
    in material master of APO
    Regards
    R. Senthil Mareeswaran.

  • Delivery creation/change triggers heuristic run

    Hi all
    We use planning procedure '3' "Cover Dependent Requirements Immediately" for finished goods in our distribuition centers. In the event: "Create or Change a Sales Order", we have the action: "Start Product Heuristic Immediately" which leads to my two questions:
    1. When a sales order delivery is created/changed, heuristic is also triggered. Is there anyway to avoid this for deliveries (should still work for sales orders)?
    2. When heuristic is triggered due to sales order creation/changes, new stock transport requisitions created by heuristics are automatically ATP checked and confirmed in the supplying plant. When heuristic is triggered due to sales order delivery creation/change, new stock transport requisitions are not ATP checked... How come?
    Thank you in advance for your help.
    Best regards,
    Dan

    Hi Dan,
    If you are using MTS scenario, then Sales Order is business event "A" while Delivery is business event "B". In case of MTO, these will be AE and BE. For check instruction of your Check mode and Business event for delivery (B or BE), remove production. Use option "Availability check only, No Production" in Check Instruction.
    This will solve your first problem.
    Again, for solving 2nd issue, check Product Availability Check for ATP group and business event for Delivery. Check Control and Scope of check decide which receipts and requirements should be considered.
    Both these settings are in GATP customizing.
    Regards,
    Bipin

  • Plor not generated  for components during Heuristic planning run

    Hi experts,
                     i had run planning run PP_02 run in PPDS and i am able to see dependent requirment for componenets but my question is its not generating planned order for my components. Please let me know if i had missed any config.
    Second point is i am planning to run 1. Infinit planning runa nd then finit planning run ( PP-02 and MRP_02).please suggest.
    Third is when i run planning run  (Product heuristic its giving me an error saying it space constrains.Please suugest me.
    Thanks
    Raj

    Hi,
    With the heuristics  SAP_MRP_002: Product planning (plan comp. immediately) , components that are defined as being planned automatically and immediately are planned using a simple lot-sizing heuristic.
    SAP_PP_001 is for Changing orders manually. Better choice may be to use SAP_PP_002: Planning standard lots. We  use this heuristic to create new receipt elements in order to cover product requirements
    regards
    Datta

  • Any known viruses/malware that target Photoshop or Adobe products in general?

    In 2006 I got a virus via the Internet and have been very leery about viruses and privacy ever since.
    Are there any viruses/malware known to target Photoshop or Adobe products in general?
    * * I understand any posts by Photoshop/Adobe employees are in no way product endorsements of any kind. * *
    What protects Photoshop/Adobe products and privacy the best?
    I currently use Avast Pro.
    What is recommended in system maintanance for Photoshop/Adobe products?
    Thank you.

    I will second Marian here, just make sure your Flash and/or Acrobat/Acrobat Reader are kept up-to-date, as well as your AV Security Suite, and your OS of course, with security updates. No system is 100% secure, not Mac, not Windows, not Linux etc, but by making sure you install all relevant security updates, have your AV products "Heuristic scanning" mode running, and carry out regular full system scans, you'll have done all that you can to keep the nasty stuff out!

  • Supply shortage, after heuristic run

    hi guru s,
    i run heuristic (for loc. product). then i c planning book, i c that for every product heuristic has planned, except one loc-product combination (say product A loc B). analysis .... i found that for that product (A), no planning object found(err msg). then i run consistency check, again run heuristic, and faced the same problem, e.g, no planning for 'A', showing supply shortage in the planning book at loc 'B', but demand was their.and this time no err msg.
    there are valid transportation lane for tht (A) product . procurement type at source loc is 'E' , at desti loc. "F (loc B).
    any help will be highly appreciated.
    Regards,
    Satyajit

    Harish,
    Thank you for your answer. No i didnt create planned order in rrp3, coz, i dont have setting for ppds, so i m not so confident to create planned order in rrp3 (actually i dont have much idea on apo), thinking that it might change the requirment. we r very near to go-live and on final testing.
    no the all other products dont have PPMs in the model, but some of the products have PPMs.
    And one thing what is special procurement type?.. I hve planned order setting -'apo order type' 31 (that is 'in-house production' ) for heuristic run (to genarate Planned order), in the destination loc. (plant).  'Model consys check' completed before.
    Satyajit

  • Purchase Requisition not getting generated in APO

    Hi,
    I am facing an issue in APO. Once I confirm a sales order, I have to run the Product Heuristic in APO to generate the purchase requisition through rrp3. The problem is the purchase requisition is getting generated without the PR number. The line does not show the number and also the purchase req is not reflecting in ECC. Please refer the screenshot. Kindly help me with this.
    Thanks & Regards,
    Raja S

    Hi Guys,
    Sorry for the delayed response. Now got another issue. My CIF model for a Sales Order is not getting activated. I also cleared the queue in APO through /sapapo/cq and then start running the CIF. But it runs for a long period.
    What could be the other possible issues with CIF model activation?
    I am getting a message box like the below when try to activate the CIF. I keep ignoring the message and trying to run the CIF. But still I am unable to resolve. Kindly help
    After resolving this only, I can go for the above mentioned issue. I sincerely thank all your support.
    Regards
    Raja S

  • Automatic creation of planned order in APO

    Dear Gurus,
    I originally posted this in PP and SD, however, it does now seem to be APO related.
    Hence my posting here. Can you help? This is the question:
    "How can we prevent that APO immediately creates a planned order when the purchase requisition is put in the system.
    (apparently they set up the system as such that a flow then starts and automatically transforms the planned order into a production order).
    We want to prevent APO to automatically create a planned order from the purchase req, we only want a planned order at a later stage, i.e. the finalised purchase order.
    If a setting like this exists, can we activate this per plant?"
    Thanks!

    Hello there,
    The control that you mentioned can be maintained at a product level, which is more granular than what you have asked for. Refer to the PP/DS tab of the product master and you will find a filed for PP planning procedure, which determines various actions that PP/DS executes for a specifi type of event. There are standard planning procedures (procedures 1-9) and ofcourse you can configure your own procedures as well.
    The configurations here define if your dependents requirements have to created immediately or just a planning file entry has to be created or a product heuristic has to be started immediately or no action has to be taken!
    Refer to below link for more info:
    http://help.sap.com/saphelp_scm70/helpdata/en/c1/147a375f0dbc7fe10000009b38f8cf/frameset.htm
    Cheers,
    Kalyan.

  • Answer for the Interview Questions

    Hello Experts,
            Below is the list of questions from DP and SNP which I took it from APO Interview Questions thread. Please provide us the answers for the questions. It will be really helpful for the beginners like me. If every one in the forum contributes then it will be very great.
    Thanks for your reply.
    Best Regards,
    Raj.
    Where do you define Info-objects?
    Info-objects comprise of?
    What is Administrator Workbench is used to create and manage?
    What are the different types of data in liveCache?
    what is the difference between Storage Bucket Profile and Planning Bucket Profile?
    How can you setup two grids in the Planning Book / Data View?
    What can be sources of data in the timeseries keyfigure?
    What is the use of ex-post forecast in Univariate Statistical Forecasting?
    What are the types of Keyfigure aggregation in terms of characteristics/Calc Type?
    What are the types of Keyfigure aggregation in terms of time?
    Where do you maintain keyfigure aggregation?
    What are aggregates?
    What is the difference between planning characteristic and navigational attribute?
    What are selection profiles used for?
    What are the different ways of creating CVCs?
    How many levels does a macro have?
    What are the different types of standard macros?
    When is the exit and default macro executed?
    What is process chain and how is it used in Demand Planning?
    what is an Infospoke? Where do you find the configuration in BW Admin Workbench?
    what is the basis of creation of planning books and data views considering background job performance?
    Where do you set the level at which a DP background job activity has to execute?
    How can you setup custom alert types for DP and SNP?
    what is the difference between Dynamic and Database alerts?
    Where are database alerts stored (table name)?
    What is realignment and explain the process?
    What is cannibalization group?
    What are the different forecast error measures and which is most preferred?
    What are the different types of keyfigures you can use in a Planning Book?
    What is planning version and planning area initialisation?
    What is the master data in APO Demand Planning?
    what is meant by Release of Demand Plan to SNP?
    How do you create proportional factors? What is the standard keyfigure for Proportional Factor?
    1. What is the difference between order series and time series data. How does different types of transaction data get mapped to Interactive Planning keyfigures?
    2. What are the different methods of doing Supply Network Planning namely Heuristic, Optimiser, Multi-Level Demand Supply Match (CTM)?
    3. What are aggregates and how are they used in SNP.
    4. What is SNP Stock Transfer Horizon? What is the relation with Planning Time Fence?
    5. What is SNP Horizon? What is the relation with PPDS Horizon?
    6. What is the key difference in planning with SNP vs PPDS?
    7. What is the master data required for planning in SNP?
    8. How are SNP Plans different from PPDs Plans.
    9. How can capacity constraints considered in SNP.
    10. What are Quota Arrangements and how are they used?
    11. How do you get forecast in SNP? What is forecast consumption?
    12. How does the different transaction data aggregate and show up in different keyfigures in Interactive SNP?
    13. What are the different types of SNP Heuristics possible?
    14. What are the different Safety Stock calculation methods that can be sued in SNP?
    15. What is Netting and Forecast Consumption? Explain Backward and Forward Consumption?
    16. Are requirements and receipts in SNP pegged? How is it different from PPDS?
    17. What is the relationship between SNP Horizon and PPDS Horizon?
    18. Briefly describe the different ways of managing safety stock in SNP
    19. What is the difference between a model and a version
    20. In what scenario Capable-to-Match is applicable.
    21. Briefly explain how SNP optimiser can be setup and used.

    Dear Raj,
      you  can go through the following questions and answers which will help you.
    How can a planning version be frozen and unfrozen?
    A Planning Version can be frozen and unfrozen using Function Module /SAPAPO/TS_PAREA_VERSIO_FREEZE so that no further changes to the planning version can be done.
    What is Release Profile?
    Release Profile is used to release timeseries data from DP to SNP/PPDS. You need to define the DP Planning Area and timeseries keyfigure the data in which is released and the SNP Category Type (typically FA) to which data is released. You may maintain a Daily Buckets Profile it will define the number of working days (working days determined based on Shipping Calendar maintained for the location master) starting on and from the From Date if released online/ interactively or that many workdays of the planning horizon when release is carried out in background. The Period Split (blank, 1 and 2) field in the SNP2 tab of location-product master determines how demand plan is released to SNP from DP (how bucketed data is disaggregated to the workdays).
    What is the usage of Period Factor?
    Period Factor maintained in the SNP PPM or Transportation Lane determines the Availability Date of a Receipt element within a time bucket (period). The system determines the exact availability date/time of the receipt elements within a period, by adding a time interval (that it gets by multiplying the period factor with the period length) to the start time of the period. You can enter a factor between 0 and 1, where 0 is the start of the period, 0.5 the middle, and 1 the end of the period. When calculating the availability date/time, the system takes into consideration all weekdays, meaning that it does not take into consideration any days that have been defined as non-workdays in the calendars.
    Period Factor used is .71 = 7x0.71 = 4.97 or 5 days from ptimizer of weekly bucket resulting in a Friday.
    If Period Factor is not maintained in PPM or Transportation Lane then the User Period Factor indicator and the Period Factor value maintained in the Lot Size tab of the location-product combination is used. If this is not maintained a default value of 0.5 is used.
    What determines stock categories displayed in Stock on Hand keyfigure?
    The categories defined in Category Group ST1 (can be maintained in table /SAPAPO/APOCGC) determine the stock categories that are displayed in the Initial bucket in the Stock on Hand keyfigure. Subsequent buckets are dynamically computed.
    Does dynamic alerts show up in Alert Monitor?
    Dynamic Alerts do not show up in the stand-alone alert monitor. Network alerts are to show pegging relationships.
    What is the report to execute MASSD?
    The report for executing MassD in background job is MASSBACK.
    What is the shortcut to change location type in APO?
    Report /SAPAPO/CHECK_LOCATION_TYPE can be used to change location type (say from 1001 to 1002 or vice-versa) of existing locations in APO. The table to refer is /SAPAPO/LOCMAP. SAP does not recommend this process.
    How can a transaction be executed even when no authorization?
    SE93 - Transaction code for Transaction Code E.g. CRC1 Create Resource has txn code CRAH. So if you do not have authorization to create resource you can use SE93 and enter txn CRAH and then Test F8 button to go to the txn.
    How to copy a Process Chain?
    To copy a process chain to another process chain, goto the Process Chain you want to copy and then type copy in the tool tar and hit enter. It will allow you to copy the Process Chain to another Process Chain that can be modified as per user's requirement, saved, activated and used.
    What is the process to copy planning versions in R/3?
    Use OLIX to first delete previous MRP planning versions. Then use MCB& to create the new MRP planning versions by choosing the appropriate version you want to create as ICO Version. The info structure in this case is S094.
    How to use create planning book with two tables?
    To use two tables on one screen of Planning Book/Data View - select indicator next to second page title and give name. Additional tab page is displayed in Planning Book Maintenance wizard to define the keyfigures for the second table.
    What is Master Data in DP?
    Master Data in Demand Planning primarily is Charcateristic Value Combinations commonly termed CVCs. CVCs are the planning combinations against which data is stored in keyfigures.
    What is the behaviour of Procurement Type X?
    Procurement Type X - source selection is based on matching due date then priority then cost. If both In-house Production and External Procuremnet is possible then In-house Production (PPM) is chosen as source of supply.
    What is PPDS Fixing Horizon?
    PP/DS fixing Horizon defines the PP/DS time Fence - within that period if heuristic is run no orders get changed.
    What is the reuse mode in Product Heuristic?
    Reuse mode in Product Heuristic - makes the system to reuse orders already present in the heuristic run i.e. orders are not deleted and recreated.
    What is Planning Procedure?
    Planning Procedure in Product Master (PP/DS) defines that when you convert a planned order to process order it is in Deallocated state and not Scheduled state and more.
    <u><i><b>Award me if helpful</b></i></u>
    Regards
    Srikanth

  • How sales order number generated in the SAP R/3  is transferred to SAP APO

    Dear Experts,
    During the creation of the Sales order in SAP  R/3 an Purchase requisition is created in SAP APO and assigned with temporary sales order and when we save the sales order in R/3 the corresponding sales order number is attached with the purchase requisition in SAP APO. Is there any exits or BADI available while this Sales order detail transferred to APO or during this sales order details attached to Purchase requisition  in APO side.
    Many thanks in advance,
    Senthil

    Senthil,
    During the creation of the Sales order in SAP R/3 a Purchase requisition is created in SAP APO
    ?? I guess you are talking about one of the planning procedures that executes 'Start product heuristic immediately', yes?
    and assigned with temporary sales order
    I guess you are talking about [Temporary Quantity Assignments|http://help.sap.com/saphelp_glossary/en/74/b171467944d3119b440060b0671acc/content.htm], yes?
    Is there any exits or BADI available while this Sales order detail transferred to APO
    Standard enhancements are
    Sales order CIF enhancement on the ECC side
    CIFSLS03  (outbound from ECC)
    Sales order CIF enhancement on the APO side
    APOCF010 (Inbound from ECC)
    Best Regards,
    DB49

  • Planned orders created at APO side are not coming to the ECC

    Hi All,
    I am not getting the planned orders generated in the APO in to the ECC side after running the Product Heuristic. Many times I refreshed the stock requirements at ECC side and also APO side but still the planned orders generate has not come to the ECC. I am just new to APO. It would be great help if somebody can help me can guide/advice me on this.
    Thanks & Regards
    psamp1

    As well as Sajeev's reply, you also need to ensure that the Products and Plants you are planning are in an active integration model and that the transactional data you are expecting is also in an active integration model
    You can check this by using the transaction CFM5 in ECC, enter your products and plants in the general selection options then tick the checkboxes for Materials, Plants and Planned Orders. On execution the system will tell you if they are in an active model or not.

  • Need Help : Native SQL ABAP dump "DBIF_DSQL2_SQL_ERROR" on procedure "APS_ORDER_CHANGE".

    Hi All,
    We are facing an issue and want to check if you have seen it in past and can help us in resolving it. Any input will be greatly appreciated.
    Issue:
    While executing product heuristic on few product/location combinations in product view, we encounter native SQL ABAP dump “DBIF_DSQL2_SQL_ERROR” on
    procedure “APS_ORDER_CHANGE”.
    We were debugging for one particular product/location combination, this combination has 2 planned orders, and the Internal order number of these planned orders are
    given as input to this procedure “APS_ORDER_CHANGE”. These 2 internal order numbers are the only inputs given to this procedure.
    When we try to delete those planned orders we again encounter same ABAP dump. There are many product/location having the same issue.
    We also checked variable duration maintained on the PPM of this product/location, and was fine.
    For more deatils : Please check the attached document of downloaded ABAP Dump.
    Thanks and Regards,
    Pritesh Jain

    Hi Pritesh.
    What liveCache version/build/patch are you on? What is the database error text shown in this dump?
    If it is exactly the one below
    Database error text........: "POS(1) Work rolled back: tExcept 30730 in
    APS_ORDER_CHAN"
    You can try running report SLCA_EMERGENCY_SWITCH, then turning off the option "Verify that all input table records have been read" and saving the results. If that solves the issue, you can use this as a workaround until the next time you upgrade your liveCache build.
    To get a clear root cause, you may need to create an OSS incident under BC-DB-LCA component providing a reproducible example.
    Regards,
    Tiago

  • Resource selection in pland Order

    in PDS the '01' resource mode is on proirity 'A' but in the product heuristic run system is selecting the Mode 02 that is with the priority 'B'. system should assign the resorce '01' as its on higher priority.

    The mode priority feature was designed to be more of a way to restrict the modes which can be used in an operation than a way of prioritization.
    The mode selection itself is made in LiveCache during order scheduling. LiveCache sorts the possible modes according to the availability dates and only after that according to mode priorities
    When the "Lowest Mode Priority" setting is not defined in the strategy profile, the system selects for the operation the mode with higher priority when the operation:
    ends as early as possible at the forward scheduling
    starts as late as possible at the backward scheduling

  • PO doesn't create STO in SNP

    Hi All,
    When the FC Req is entered, APO generates PReq in the Receiving SAP R/3  and in Interactive Production Planning (Product view) on the Supplaying Location there is Stock Transport Requsition. After Product Heuristic run a Planned Order is created on Supp. R/3 system.
    The problem is when PReq is manually converted to POin Recv R/3 system . Stock Transport Req. is deleted and by running Product Heuristic on Supp. Location a Planned Order is also deleted! So, it seems as there is no more demand for production when PR is converted to PO?!
    Can you please suggest what should be done to get STO generated and Planned Order not deleted.
    Thanks,
    Nenad

    Hello Søren,
    Good news! I've finally got STO! Actualy, it is not by way I think it should be, but at least there is STO :).
    So, I coulnd't get STO out of SO. Then I've got idea to create PO in APO (by setting conversion indicator). And it works! PO was created and STO apperared also.I created SO manually and put wrong PO number (by intention), SO was transfered to APO and at the same time STO and SO existed in APO. Then I've changed PO number in SO and when transfered to APO it causes STO to be deleted. So, it's a normal behaviour. Unfortunately, if Planned Order wasn't firmed or at least conv. ind wasn't set , after Product Heuristic run at Product view Planned Order would be deleted. Is it regular behaviour?
    Additionally, when I 've just changed PO number in the header of SO, no change transfer sent to APO ( I should change also some other data in SO to be caught from integration model). Also, when I've changed availability check for SO (to include Planned Orders in scope, just for testing ) I could confirmed whole quantity in SO (not just available stock at that moment), but then this SO wasn't transfered to APO. Do you know why? I'm not sure what will be the moment when PO (and SO) will be created by business. What if they will be created when production of FG is already done? Then no SO will be transfered to APO and the planning situation will be totaly wrong. Am I right?
    Btw,what is the way you're using to create PO (in APO or in R/3)? I'm wondering is it possible to have PO created in R/3 and at the same time to get STO in APO?
    Thanks.
    Best regards,
    Nenad

Maybe you are looking for

  • XML Namespace in DataGrid

    Hi, I am having troubles with a XML document. I have a xmlns tag, that screws up the datagrid. As soon as I take it out, it works, however my webservice responds with the xmlns tag... What's the best way to make flex ignore this namespace and display

  • Angry Birds

    Dear support, I have a problem installing Angry birds after nokia belle update. Every time I try to install it says download error please try again later. It worked fine on my E7 with Symbian Anna. After belle update Angry birds disappeared. I tried

  • Regarding Generic DataSource loading transaction data

    What I have done: Create a Generic DataSource  from a table, replicate it to BW. Create a standard DataStore object, and create InfoPackage, and DTP. Now I want to load data,  What's the steps I need to do? Start InfoPackage and execute DTP. But  I c

  • How to import PDF image into Pages manuscript that is larger than the text bed margins

    How do I import a PDF image into a Pages book manuscript, whose dimensions are larger than the global text bed margins? Any imported PDF image is automatically shrunk to fit within the text bed. I know I can set up a single page with wider margins an

  • HT2731 Can not connecttoitunes iTunes

    I have ipad2 when I try to add apps it keeps saying cannot connect to iTunes my wifi is connect and I can surf the Internet with no problems