Product impressions and UK shipping experience

Shipping speed:
Ordered my 60GB white engraved 5G on 13/10 which was shipped on 21/10 and arrived to me in the UK on 25/10 so a 12-day experience from start to finish. This was better than I expected due to the delay that I thought the engraving would cause.
Product impressions:
I ordered the 5G despite that fact that I was sceptical on the practicality and usefulness of video on a small 2.5-inch screen. I went ahead with the order only because one of the family iPods needed an upgrade and frankly of the products that Jobs had presented together with the 5G all of which whetted my appetite, 5G was the only one I could purchase as I already have an G5 iMac and a separate iSight.
Given that I would be upgrading myself from the iPod Photo and not being too enthusiastic in general about portable video, it was going to be very hard for me to be impressed.
Yesterday when the product came and I turned it on I immediately observed that the screen felt considerably larger than iPod Photo’s, but also it is much brighter and the font used is more pleasing to the eye. Additionally whilst remaining heavy as before (perhaps even slightly heavier I thought not having seen the official stats), it is impressively thinner compared to the 60GB iPod Photo. Additionally after seeing the screen quality and the tasteful design of the new and old extras, my initial impression of it was very positive but I had to test the video quality to reach a definitive verdict.
Over the past weekend I had transferred some video content onto iTunes in anticipation of the arrival of the 5G. I used ffmpegX and Handbrake for this purpose. There were some glitches along the way but overall the conversions went reasonably smooth. By the way I can also confirm that the ripping instructions provided for Handbrake works like a charm.
After connecting the 5G to my G5 and acquainting it with its new master iPhoto, using the USB 2.0 connection I manually transferred files across to my new iPod. Pausing momentarily here to comment on the USB 2.0 vs. Firewire connection speed issue, I haven’t noticed any material difference in speed between the USB 2.0 transfers and the Firewire transfers that I had been using for iPod Photo. If there is a difference it is certainly not prohibitively marked. So for me at least the lack of Firewire connection is not going to be an issue.
After uploading the videos and checking them one by one, I must admit I was blown away by the quality of the screen, its brightness, the level of detail it can show, the realism of the colours and the feasibility of the overall portable viewing experience. Especially on material where you are familiar with the characters, in my humble opinion it is a perfectly acceptable way of watching stuff on the go or otherwise. I wouldn’t go as far as saying I would prefer the iPod over my TV when I’m at home but I could certainly see myself retiring to bed with the iPod from time to time even when I’m at home. The sound quality obtained from the encoding process was excellent as well.
If you want to have an idea before you buy the 5G as to how the video looks like on the iPod, after you load your material up onto your iTunes, simply play with the screen size to make it the same size as the 2.5 inch 4:3 format screen on the iPod, get really close to your computer screen and see if you can live with this size and the amount of detail it is capable of showing. In my case with such high quality a display (on the 5G), I know I can even though I had serious doubts even at the time of my order.
The quality of the image on the iPod is in my opinion very nearly as good as its quality on the computer screen so a test as above would enable you to make a pretty accurate assessment I thought. My only previous portable gadget video experience with a PSP was not as reassuring despite the PSP’s considerably larger screen (I must give full credit to PSP on photo and gaming display situations though). On th

Thanks. Here is the rest of the review that got cut-off:
... On the 5G I haven’t yet uploaded any photos but with moving images displaying so well, I have no doubt the quality will be brilliant.
Lastly concerning the case (actually a pouch rather) that comes with the 5G, it is a nice to have but for most people including myself who love their gadgets something more sturdy, offering better protection is required. Also I thought the pouch was a little tighter than what it needs to be for the 60GB. It could have been designed to be a little looser without causing the gadget fall out. It is a very light grey in colour so it will pick up and show dirt very easily I think. So in my opinion its definitely worth getting extra protection.
Overall I’m very pleased with my purchase. It is a worthy upgrade in my opinion even from a 60GB iPod Photo if you can put the retiring iPod Photo to good use. From any older generation iPod it would be a worthy upgrade under all circumstances except financial perhaps.
One suggestion I have for the next version is (in addition to larger memory capacity as a single 1.5hr movie takes up nearly 0.6GB) enlarging the screen even further by using a portrait shape rather than the current landscape mode making use of the idle real estate that remains on the front of the machine as a result of the now smaller yet highly effective nano-style wheel.
More tests to come including connection to a big screen TV. I will come back to tell you about them to extent I have anything of importance to say.

Similar Messages

  • Product description and Customer ship description to should be visible in R

    Currently we are able to see the Customer ship to number and Product number in SNC Responsive Replenishment (RR) screen. We want to have Customer Ship description and Product description in addition to Customer ship to number and Product number  to be displayed on  Responsive replenishment screen.
    Current display of RR screen in SNC:
    In this we can see the 7529000 and 23100.
    The Product description and Customer ship description to should be visible in RR screen.
    Product 7329000: Brass coil
    Customer ship to 23100: Evershine company

    Hi Vaibhav
    we have faced similar problem in case of SNI monitors where SNC does not provide the product or location description and our users used to remember those things by their description. Std. SNC does not provides descriptions on SNI monitor and I think its the same case with RR monitors also.
    SAP suggest us that time is that they will try to include this thing in next releases. Other option remains for use is to go for the customization.
    Hope this will help you.
    Thanks
    Pravin

  • Worst and most frustrating experience in twenty years of software use

    February, 2010 I purchased Photoshop Elements 8.  I registered it, got a website dedicated to my screen name, etc.  I finally got the time to accumulate all my photos into organizer and organize them.  It took me two days.  I went in today, the third day, and the software won't open because there's a popup screen from Adobe for me to upgrade to Photoshop Elements 9.   The pop-up doesn't have a close button on it.  I can't get into the software I've paid for because Adobe wants to sell me more software.  After two days of use, I have no intention of sending them more money to use software I already have.  So then I called Support and waited on hold for 25 minutes only to be told I need TECH support and am put back on hold for another five minutes.  After 1/2 hour total on hold time, they tell me that Adobe Photoshop 8 is a pay-for-support product.  YOU ARE KIDDING ME!  They want $39 from me to answer the question of why the software they sold me won't open because they are trying to sell me an upgrade and forgot to put a Close button on the pop-up? 
    The guy says there's an answer on the forum for the problem.  Well, I searched the forum.  I didn't see an answer.  Maybe it's here.  I don't know. 
    So I'm really just trying to scream here and see if anyone at Adobe listens or cares enough to be able to address their failure. 
    By the way, I was working with the purchasing department on a competition for use of imaging and document management software to satisfy regulatory compliance requirements for the global consulting firm where I work.  Probably a multi-million dollar long term deal.  Nice that they've blown that over $39 Support fee trying to get a $60 upgrade out of me after two days of using properly purchased, licensed, registered software. 
    Oh, I forgot to mention that the e-mail with which I registered doesn't show as registered, despite my having a web-site set up for me and despite them being able to find me to try and sell me upgrades, they can't find me when it's time to provide assistance.   
    This is hands down the worst product support and most frustrating experience of using software I have had in well over twenty years as a software user.  Nothing else has even come close - including situations that resulted in lawsuits!
    - Derek Zurfluh

    Derek,
    Off hand I don't remember the remedy for your predicament, there is one, but in the meantime go to the PhotoshopElementsEditor.exe file (or similar, this is PSE9) and hopefully start the software by double clicking on it.
    Juergen

  • Lenovo ThinkPad T430s - first impressions and issues

    I bought ThinkPad T430s last week and just wanted to write down my thoughts, first impressions and the issues I ran into.
    I am very pleased with the laptop in terms of hardware - solid and nice build quality, understated style and (relatively) light weight. The screen is sharp, sound is good enough for me (I am no audiophile) and I am getting used to the chiclet keyboard - which feels just a little springy.
    But I am not pleased with the software. There is just too much bloatware on the system and some of it is hard to get rid of.
    SugarSync
    Evernote
    Lenovo MyCloud
    VeriSign VIP Access
    Intel AppUp
    and the biggest offender - Lenovo SimpleTap -- You can't get rid of the SimpleTap without uninstalling the individual apps first.
    It would be nice if the system showed a dialog box that said "Hey, here are some cool apps we highly recommend and you may want to look at", instead of pre-installing all these stupid apps.
    On top of that I ran into the Windows updates failing issue.
    So I ended up specnding 4+ hours just to get the system right.
    Lenovo and Microsoft need to understand that they need to deliver an excellent and functional experience to users and not push any stupid system that they have come up with just to make an extra buck.
    Look at Apple products. People love Apple products (I don't, but I do admire them) because of the simple and functional experience they provide.
    In short install just what is necessary. You can let users know that there are other goof programs but leave it up to the users.

    kamaleshp wrote:
    Thanks for your response ThorsHammer.
    In fact that is exactly what I am going to do this weekend.
    I am in the middle of posting another message asking for recommendations and experience on the absolute minimum I can get away with.
    Right now I am thinking Windows 7, System Update and Power Manager.
    In my case, I installed the following:
    Windows 7
    Intel chipset drivers
    Intel WIFI driver (wifi driver only)
    Intel Ethernet driver
    Lenovo Power Management driver
    Lenovo Power Manager
    Optimus video drivers for Intel HD 4000 and NVIDIA 5200M
    RealTek audio driver - I think this also installed Dolby Home Theater v4
    Ricoh Media driver
    Lenovo Ultranav driver
    Webcam driver
    I don't install much more than that.  I like to manually check the download areas for updates so I don't install Lenovo ThinkPad System Update.

  • SAP NetWeaver 7.01 Java installation on MSCS and Log shipping for DR

    Hi Experts,
    Can anyone please explain if below is possible :
    - We have installed Netweaver 7.01 Java application server on Microsoft clustering which is working perfectly ok.
    -Now we are looking at building a DR solution for the above installation using SQL Server 2008 Log-shipping. The DR site has the same MSCS configuration as the primary site.
    -If we log-ship the production database and create a secondary database in "standby" or "norecovery" mode, how do we install a Passive SAP Central instance in case we want to failover from the primary to secondar ?
    - We know that we have the primary database log-shipped to the secondary site and in the event of failure we can switch the roles and make secondary as primary and then perform the system copy steps on the MSCS. the drawback here is that it will take a long time to bring the system online if we perform the system copy. Our RTO is one hour only so this is not acceptable.
    Question : Is there anyway we can install the Central Services and Applicaiton servers beforehand on the secondary site on the secondary log-shipped database so that in the event of failure all we do is bring the secondary database primary and then start the SAP on the secondary site ?
    If yes then can anyone point me the any SAP note or documentation that has the details of how to do this.
    I have already looked at 1101017, 965908 but its not clear how we can perform the installation on the JAVA stack only.
    We want to implement similar to what is shows in the below diagram :
    http://help.sap.com/saphelp_apo/helpdata/en/fc/33c028d58511d386ee00a0c930df15/content.htm
    Appreciate if someone can assist in resolving the above query.
    Thank you.
    RA

    Thanks Markus for your reply.
    I did looked at the HA web page from SAP and configured MSCS for HA but there's no information regarding DR setup. All it says is setup a log shiping which we already know but there's no procedure to setup SAP on the DR site(Passive SAP central instance)
    My original question still stands :
    - Is system copy the only option that we need to perform at the DR site in the event of failure ( Assumption is that we ieve make the secondary database as primary and also sync file system for JAVA using SAN replication technologies)
    - We have to achieve an RTO of 1 hour which is not possible in this case as performing system copy using MSCS HA option will take few hours to setup and test.
    -The link "http://help.sap.com/saphelp_apo/helpdata/en/fc/33c028d58511d386ee00a0c930df15/content.htm" shows that we can have SAP PAssive central instance. Whats the procedure of installing this Passive instance on the secondary site so in the event of failure all we do is make the secondary database primary and bring the SAP system online(installed already - no system copy performed) and also file system is already is sync.
    Thank you.
    RA

  • SAP on MSCS and log shipping for DR

    Hi Experts,
    Can anyone please explain if below is possible :
    - We have installed Netweaver 7.01 Java application server on Microsoft clustering which is working perfectly ok.
    -Now we are looking at building a DR solution for the above installation using SQL Server 2008 Log-shipping. The DR site has the same MSCS configuration as the primary site.
    -If we log-ship the production database and create a secondary database in "standby" or "norecovery" mode, how do we install a Passive SAP Central instance in case we want to failover from the primary to secondary?
    - We know that we have the primary database log-shipped to the secondary site and in the event of failure we can switch the roles and make secondary as primary and then perform the system copy steps on the MSCS. the drawback here is that it will take a long time to bring the system online if we perform the system copy. Our RTO is one hour only so this is not acceptable.
    Question : Is there anyway we can install the Central Services and Applicaiton servers beforehand on the secondary site on the secondary log-shipped database so that in the event of failure all we do is bring the secondary database primary and then start the SAP on the secondary site ?
    If yes then can anyone point me the any SAP note or documentation that has the details of how to do this.
    I have already looked at 1101017, 965908 but its not clear how we can perform the installation on the JAVA stack only.
    We want to implement similar to what is shows in the below diagram :
    http://help.sap.com/saphelp_apo/helpdata/en/fc/33c028d58511d386ee00a0c930df15/content.htm
    Appreciate if someone can assist in resolving the above query.
    Thank you.
    RA

    Thanks Marcus and John for your reply.
    I did looked at the HA web page from SAP and configured MSCS for HA but there's no information regarding DR setup. All it says is setup a log shiping which we already know but there's no procedure to setup SAP on the DR site(Passive SAP central instance)
    My original question still stands :
    - Is system copy the only option that we need to perform at the DR site in the event of failure ( Assumption is that we ieve make the secondary database as primary and also sync file system for JAVA using SAN replication technologies)
    - We have to achieve an RTO of 1 hour which is not possible in this case as performing system copy using MSCS HA option will take few hours to setup and test.
    -The link "http://help.sap.com/saphelp_apo/helpdata/en/fc/33c028d58511d386ee00a0c930df15/content.htm" shows that we can have SAP PAssive central instance. Whats the procedure of installing this Passive instance on the secondary site so in the event of failure all we do is make the secondary database primary and bring the SAP system online(installed already - no system copy performed) and also file system is already is sync.
    Thank you.
    RA

  • What is wrong with my shipping address? I want to order pictures via apple store with iPhoto. Apple Id and payment seem ok. My current and correct shipping address appears with red letters. Why and what to do?

    What is wrong with my shipping address? I want to order pictures via apple store with iPhoto. Apple Id and payment seem ok. My current and correct shipping address appears with red letters. Why and what to do?
    Maybe this is relevant: I bought iphoto from the German apple store but I now live in Italy. I have tried German credit card with German invoicing address and Italian shipping address. And I have tried Italian credit card with Italian invoicing address and Italian shipping address. The phenomenon is the same: shipping address appears in red and I am asked to fill in the mandatory fields (which turn red whatever I enter).

    KarinavD,
    what is the setting for the Print Products Store in the Advanced Tab of the iPhoto Preferences?
    The country you select there has to match the billing address. And your billing address should match the country of your AppleID and credit card used with the AppleID.
    Regards
    Léonie

  • One Sold to party and 250 ship to party (MTO Process)

    Dear Experts,
    Please provide me the solution with your valuable experience.
    Issue is: We are working on MTO process. and I am working in SD on sales order.
    issue is here that I have one SP(Sold to party) and many ship to party. I have created 250 Ship to party under one Sold to party in XD02 partner function . But now what we want that, we want to make single sales order and want to distribute same Finish Good to different parties.
    Example: Making SO: 1000 with one SP and One SH and Finish Good is FG0001(Same Finish Good we want to distribute into different parties). Finish Good comes Bit n pieces and when we do availability  check then it is done with wherever amount of Finish Good we got. First time it is ok and send to one ship to party with delivery now again we got some Finish Good and doing availability check but this time again the ship to party is same but we want to change it for different ship to party with in single Sales order.
    Please provide me the solution for this how we can proceed with single sales order.
    Thanks for your time.
    Smith

    Thanks Ragu,
    Issue is
    One Sales Order(MTO) suppose quantity is 100 and now I am doing delivery 20 with 5 items each from sales order item level(Changing SH every time at item level with WRT quantity acc to SH, delivery is coming fine.) Now We have to apply postal charges on each delivery.
    Postal charges depends on weight and the distance of items that are packed in case or in Boxes.
    Example: First delivery is of 5 items and the weight of 5 item is 100kg after packing now delivery guys tell the charges wrt to distance, if they are sending via Speed post then cost will be 100*5 (1km per 1RS so if distance is 5km then charges will be 5rs)=500rs
    Now this 500rs we want to add in our billing per bill or collective also like total = price +500 should come.
    Please suggest me how should i configure this step by step.
    Thanks
    Smith

  • Product Costing and Production Planning

    Hi,
    Is Product Costing absolutely required before implementing Production Planning, specifically PP orders? My client does not want to plan costs or need any cost estimates. They want to use a PP order to check availability for a BOM, and then issue it out to an external vendor for services. After this material is processed by the external vendor, he would ship it back and we would be doing a goods receipt at the parent level of the BOM. The whole purpose of this is to get the accurate price of the BOM parent which would include all service costs. This parent would finally be sold via the regular SD sales order process. Our Logisitics consultant suggested that the only way this could be accomplished is a PP order. All this looks okay, but he also mentioned that a PP order cannot work without Product Costing and the process cant be accomplished CO-PC. I am unable to grasp why SAP would force us to have costing when the client doesnt need any cost estimates, planning etc. Could any one please tell me if we need CO-PC for this scenario?

    Dear SAPFicon,
    Technically, to run PP without using product cost planning would cause a lot of problems during business process of production order. Because, once a production order is created then the data structured is freezed in the PO and if there is any missing data it will cause errors. Any errors in production order would stop the following transactions. We never know what would be the error level of the production order. The worst case, the production or should be cancel and start it all over again.
    But by using product costing or product cost planning, this is a preliminary step to prevent and eliminate any error of the products tobe produced.
    So, ideally, there is one person in charge to ensure that the products which be produced in the production orders are free of error.
    So, the product costing is an integrated module that take data from variouse module such as PP, MM, CO, HR.
    The product costing use the Logistic master data such as folllowing;
    1. Bill of material
    2. Routing
    3. Work center
    4. Material master
    How you can say, that running PP without PC will run, while the to run the smooth production order, you need to mandatory parameter in Material Master that belong to Costing area.
    Without having product costing, I can assure that your client will trap in a lot of troubles with their business process.
    Please see the online documentation for product costing for a better overview or you are welcome to ask again
    Regards,
    Irhasni

  • Production planning and controlling (pp) related kpi's

    Hi, friends
    I am new to pp module and I am in search for pp related kpi's. help to find kpi's, post me kpi's friends.
    thank you

    Prathap,
    I can give you some high level idea from which you can develop required dashboards for your requirements.
    1.Number of goods being produced without error
    2.Delays caused by machine downtown
    3.Errors caused by workers
    4.View Summation statistics of company profits
    5.Find out who are the major customers
    6.Review safety procedures by measuring worker injuries
    7.Quality of products being made
    8.Products produce and profits per worker
    9.Delays caused by each product manufacturing process
    10.Cost to sales ratio of each product
    11.Worker injuries and costs to production
    12.Top retail distributors and product sell-through rates
    13.Revenue by sales representative
    14.Revenue by product or product group sold
    15.Delays caused by shipping problems
    16.Order cancellations or returns
    Manufacturing Dashboard 1 - For selected date Range  With Target, Current Inventory, Current Open orders, Waste etc
    Manufacturing Dashboard 2 – Orders by Location wise say at different operation stages with Quantities and Values
    Manufacturing Dashboard 3 – Production schedule and their current status
    Manufacturing Dashboard 4 – Mfg. Revenue and Mfg. Operating profit 
    Please note above are generic KPIs requirement for any manufacturing industry.
    Br
    KK  

  • Production planning and control

    Dear Experts,
    I have some doubt in my mind can you all help me out to resolve my issue.
    i am in production dept of our company and our company have 3rd party location to whom our purchase dept arrange the
    RM,PM and Labels. We get the material packed through this 3rd party and provide them packing charges on per units basis and
    and afterward packing they offer the FG to our QC person  for checking and after checking our QC person give the FG UD
    if FG was found ok.
    Generally our 3rd party location make the production order, release it, issue it, GR it and do confirmation. That is overall
    SAP related activities are been handled by our 3rd party location.
    So kindly confirm me that how can we control our 3rd party production activites from our end.
    What is the correct system, i mean who should release the production order we or our 3rd party, who should issue the material we or 3rd party,
    who should GR and do confirmation we or 3rd party.
    Please provide me the best solution for controlling this 3rd party location.
    Thanks in advance have a nice day.

    Hi,
    which kind of production U have? MTO or MTS?
    I think is better U leave at the 3rd party the autonomy to do all SAP actions. U can monitor in any case what is going on there via COHV, COGI and so on. In any case I would suggest that U release the Production order and then the 3rd can proceed, in this way U can plan the activity to them till the GR on the Production Order. Then later U can post the godd issue and send a shipping notification to the 3rd party.
    I hope it helps,
    Cheers,
    Mik

  • Best production version and master recipe?

    Is there a way in SAP (ECC.5.0) to  choose the best production version on its own besides the date?
    Can MRP choose the best production version  and master recipe on its own based on cost?
    If so How? Config?
    Please advise
    thanks
    Walter

    Hi,
        MRP  selects production version based on   Lotsize,Validity date and status.In R/3 ,we dont have functionality like
       1. Simultaneous MRP and Capacity Planning
       2. Best Optimum  route of production.
    This is very much available in APO only. You can use either of Quota arrangement or Capacity evolution functionality to distribute planned qty into other resources based on past experience.
    Regards,
    Velmurugan S

  • Is Yosemite compatible with Kodak production planning and workflow software like Prinergy Workflow?

    Is the new OS 10.10 system compatible with Kodak production planning and workflow software? like Prinergy Workflow (incl. the Workshop and Workspace user interfaces as well as the ColorFlow and Preps Client) and Prinergy Evo Client,

    Steven,
    Thank you for your quick reply and information there in. The video is very nice too. Great angles and composition.
    So I guess, I'm going to have swap my drive and re-install my OS when the machine arrives.
    I'm not going to be able to capture directly to my desktop (due to poratability reasons). So is there I way in Premire CS3 to uncompress the HDV from the camera and store it in my HDD in uncompressed format? I don't mind having to do this extra step each time if the post production experience is going to be better.
    I've heard a lot about Aspect HD from you and others here as well as other forums. I'm not very video savvy yet and don't understand a lot of the vocabulary used :). I've been to their website and don't get what their products are supposed to give me either (I guess their audience understands exactly what they are saying).
    What I do get is it decompresses the MPEG 2 to saves it to yout HDD for editing purposes. However, I would have thought the Premier Pro CS3 would have that capability as part of the product, no?
    I'd also like to use footage that is not HDV as well as photos/images (composits) but still retain the final cut to be HDV quality. Is this possible and if so, what does it do to the editing experience/performance?
    Will I be able to output the final cut back to my camera's Mini DV tape (without having to buy Aspect HD)?

  • How can i use my account without the billing info, as i do not have a credit card. and my shipping and billing info is under US. i'm in singapore. how do i change this?

    how can i use my account without the billing info, as i do not have a credit card. and my shipping and billing info is under US. i'm in singapore. how do i change this?

    If you are just visiting Singapore, then leave the account as it is. If you have moved there, then view your account using the iTunes app on a Mac or PC and change the country/region to your current location and address. If you do not have a bank card, you can fund your account using iTunes gift cards if available in Singapore.

  • IDOC for Creation of Production order and also adding components

    Hi ,
    I have a requirement like I get the data from a 3rd party system and using that i have to create production orders and also should be able to add more materials in COMPONENTS part of that Production order. I was looking for a BAPI which can handle this process.
    And also can any one help me by letting me know is there any Message type available for handling this process of Production order creation and Adding extyra components to it.
    I have a  message type LOIPRO (for Production Order) and associated function modle CLOI_MASTERIDOC_CREATE_LOIPRO for creation of master IDoc, but not sure can i handle the Components part in this.
    Please do send replies ASAP, its very urgent.
    Or else atleast suggest me the other ways of doing this .
    Also send me any BDC program if anyone has already developed for this.
    Thanks
    Kumar
    Edited by: Phani Kumar Peddagopu on Mar 19, 2008 6:56 PM

    Resolved .

Maybe you are looking for

  • How to get the pull path name from a file upload window

    Hello everyone! I have encountered the following problem with the following JSP code: <form method="post" action="filename.jsp"> Upload JAVA program: <input type=file size=20 name="fname" accept="java"> <input type=submit value="go"> </form> <% Strin

  • AutoSize not working properly in TextField when using non-zero line spacing

    When using non-zero line spacing, the autoSize property is not functioning as expected, causing text fields to scroll that shouldn't.  Also, when using device fonts, the sizes of the TextFields are wrong in the Flash IDE. I have a TextField whose hei

  • JAXB  I realy need you help

    JAXB I realy need you help Dear friend We have next structure of XML file <order> <entities> <entity>1</entity> <entity>2</entity> <entity>3</entity> </entities> </order> according to xml we generate XSD after that use xjc.exe for generate JAXB Objec

  • People Photo Stacks not showing photo and how to change that photo

    I had a very large database of images that I ocnverted from PSE 10. All is well, except for this rather glaring annoyance. When the People is clicked to show the people photo stacks, many of the stacks only have a standard icon instead of the others

  • Installing on Standalone Application Server

    Hi, Assuming an Oracle Database is installed on 1 server, and OBIEE on another. Is it necessary to install an Oracle Database Client on the OBIEE server - or does OBIEE come with it's own client? Thanks