Production order Target cost Zero - Varience calculation error KV151

Hi Experts,
I am having an issue on KKS2 variance calculation, system throwing error KV151 Target cost is 'Zero'
All pre-requisites are ok including BOM, Rates, Routings etc..
Process:
Production order with FERT - valuated material,
All BOM components in production order are Non valuated stock items, Non-stock items
Note: Cost Estimat e is for Labor and Overhead only.
After production order confirmation CO11N, production order Cost analysis displays - Target value ("Zero") and actual value.
Due to above reason in KSS2 we are unable to calculate variance, system displayed error KV151.
I cannot settle the production order, guide if I am missing some thing in config. ?
I appreciate you quick response.
Thanks,
RK

Thanks for your reply Swapvik & Takashi, I have no issues on configuration side very thing looks good.
Cost estimate - Good
Variance key - Good
Production order - FERT (Valuated) - good
BOM components - UNBW, NLGS only - Good
Labor rates - good
Periods - good
Production order confirmation - Good
Actual cost - Good
My Issue is Target cost is zero on cost analysis in CO03 but if I can see target cost in KKBC_ORD report.
I am unable to calculate variance and settlement.
I appreciate your response.
Thanks,
Raj

Similar Messages

  • Exclusion of target cost in Variance calculation

    Hi,
    While calculating variance in period end closing for a process order we are getting the errors.
    1)     “No standard cost estimate for material 400000020 in plant TSIL on 26.12.2006          Target Costs: Determine Valuation Basis”
    2)     “Only remaining var. in version 0 - no target costs for 000001000109          Variances”
    We do not want to include the Target cost in variance calculation.
    Please advise.
    Regards
    Aniruddha

    Hello Anirudh,
    If you choose costing version in variance calculation 0, then system calculates variance based on std. cost est. and actual cost. if you select 1, then system calculates variance based on planned cost and actual cost.
    Go to customization settings in variance analysis calculation and change the costing version from 0 to 1.
    Please let me know if you require any more clarifications.
    Reward points if helpful.
    Regards,
    Santosh

  • CN41N and S_ALR_87013533 report not showing Production order planned cost

    Hi Experts,
    I am having issue to get total planned production order values in my CN41N or S_ALR_87013533 cost report. I am facing 2 issues :
    1. CN41N repoet does not show individual material cost planned in BOM.
    2. CN41N report and S_ALR87013533 report does not show total value but only picking fixed value.
    Example :
    1. CN41N report :
    Above screenshot shows no values in Project plan cost & Order cost column but it shows total cost as a lumpsum on top for project. I need to know how can i get material cost populated here for Project Valuated stock material?
    2. S_ALR_87013533
    This report shows Total Cost of BOM as 1 line under Material Procurement activity similar to CN41N report. Also Order value is picking from Fixed cost from planned order and total cost is added on top. How can i get Total cost picked from production order?
    Is there any Setting in PS config which allow me to pick the detail production order plan cost in both report under planned cost.
    Thanks in advance.
    Ashish

    Hi Ashish,
    I doubt whether Item level reporting  in S_ALR... (hierarchy report) is possible or not because I haven't seen item level cost in them only the lump-sum cost because they are summarized at cost object level itself. Navigation path are there which we use to go into details of cost.
    Please check the following links:
    https://scn.sap.com/thread/1743833
    (In the above thread,focus on  Mr. Mohamed Rafi comment.)
    http://scn.sap.com/thread/3530080
    http://scn.sap.com/thread/1311820
    Order cost plan in report CN41N
    Display of plan cost., CN41N | ABAP, SAP, benX AG, benXBrain,&…
    Just an additional pointer ,have a look on your costing variant and variation variant settings for material section.
    Regards
    Saurabh

  • Material cost in production order plan cost

    Dear all,
    -we are in sales order cost object with non-valuated stock...
    -we have created two production orders from MRP run. First one is for semi finished material and second one is for finished material.
    Issue-1
    Both production orders not showing material cost in production order plan cost...
    Issue-2
    When i consumed raw material against semi-finished material production order (261-E), system not gnerated any document and material cost not updated either in production order or sales order...
    where should i do changes in configuration to get updated material cost in the production order...
    Best regards
    Kishore

    Hi
    Issue 1 : Check Whether Standard cost is present for header material of prod order, and under control tab of order costing variant for plan is present.
    Issue 2 : Use 261 instead 261E.
    Rajneesh

  • How to see cost componentwise production order actual cost-not planned cost

    Hi,
    Can anybody tell me how to see cost componentwise production order actual cost ?
    Thanks,
    Bijay

    Hi,
    CO03->Goto-> costs-> Anlysis
    or use the std. report KKBC_ORD
    std. reoprt MCRI
    KVBI - Actual Costs
    Regards,
    R.Brahmankar

  • Standard table for production order settlement cost

    Hello,
    Is there any standard table available which carries the production order settlement cost?

    Dear,
    Once you do Production order settlement using T.Code KO88.
    You will find all relevant tables once RKACSHOW is executed for the corresponding object .
    Try the table is COEP
    Thanks,
    MS

  • PCC vs Production Order Based Costing

    Hi,
    Please reply back difference between PCC and Production Order Based Costing.
    Thanks in advance.
    Regards,
    Sameer

    Hi,
    PCC is product cost collector which is  used in mostly REM process.
    1. Here you have to creat the product cost collector mean sthe cost is based on period, when u create PCC you are creating the priliminary cost means the quanity strucure costing considering BOM , activity prize and the cost from costing sheet i.e admin cost, etc .
    2. In product cost collector the the cost of document posted in backflush is posted periodiclly. For that u have to run standard cost run i. CK11N and CK24. monthly.
    3. but in Production oredr or Process order thre is no PCC instaed of PCC the cost is settle with the settlement profile defined in OPL8 i.e order type dependent parameter SPRO.
    4. Each prd ord is REL,CNF and TECO when the status is TECO means the logistic point of view the order is complet now ready to costing .
    5 Then FI consultant settle this order
    6. here order based costing no period based costing
    hope u r prob solve..
    Siddhesh

  • Error during variance calculation for production order "NO cost estimate "

    hi all,
    I'm gettin this error message while trying to calculate the variance for a production order. error is "No cost estimate for material xxxx for 01.10.2008.
    when i look at material xxx in MM02, under cost estimate for current period there is a value but nothing for previous period. So i'm guessing the the Cost estimate was not run of this material? am i correct here?
    Now if i try to run cost estimate for material for the missing periods using CK11N, i get an error "cannot save for past period"
    Could some one tell me how can i get a prior year estimate into the material master?
    I tried CK40N and CKN1 but just cant get it to work...
    Thanks heaps

    Hi Tom
    unfortunately there is no easy way to get a product cost estimate for a past date. One of the reasons for this would be inconsistant product valuation.
    You could in theory create a cost estimate in a current date and use an ABAP or manually adjust the valid from and to dates directly in the tables (e.g. KEKO). To do this in a production environment would be restrictive off course.
    The standard cost estimate is the basis for the target costs so as an alternative you could look to change the configuration of the target cost version in OKV6 to either of the following:
    - Plan Cost/Preliminary Costing (that is the plan calc done on your production order)
    - Alternative Material Cost Estimate (one that is not necessarily a product costing that is set for marking and release).
    I hope this is of some help.
    Elaine

  • Target cost zero in process orders

    Target cost is zero in process orders...
    I did investigation on the forum and folks have suggested could be standard cost is not released at the time of process order release...
    I need help in setting that configuration...
    regards

    Check if you have released Std cost estimate. If No release it if Yes then check if the process order material is having any GR Qty. Becuase Target costs are planned costs for actual production.

  • Error during production order confirmation - costing related

    Dear All,
    When i am confirming a production order through CO15 following error is coming and system is not allowing to proceed further
    Enter rate EUR / SAR rate type M for 01.01.1998 in the system settings
    Kindly guide me how to avoid this error

    Dear,
    Please go to OB08
    Then enter the details Currency Type M
    Then put the valid date from date
    Then put the currency from
    Then put the currency to
    in last columan put the rate
    as
    Exc rate   Valid From              Ratio(From)            From                                Dir.Quot                   Ratio               To
    M              01.01.2011    X        1                           AED (Currency)      =                         x             1                    EUR (Currency)
    Thanks,
    MS

  • In production order the cost analysis report  is not displaying correct

    Hi,
       when i create production order and do some posting activities i could not see the GR  cost row  details in the cost trend report in the production order.
    i could see the goods issue, confirmations and overhead rows segments in it. but i could not see the goods receipt tab in the <b>cost trend report .</b> where the implication lies can u suggest.
    regards
    madan

    Hi,
    In t.code oplr (order type dependent parameters) check in the controlling tab if you have given the costing variant as PPP2 for the Actual cost calculation & PPP1 for the planned cost for your order type.
    Regards,
    SDs

  • TARGET COST ZERO

    Hi
    In the production order its not shown the target cost of the order therefore it shows high WIP value. Pls, advice why is that and is there any configuration on that.
    Reg
    K

    All material cost run (Ck11n) has done propaly and GR and GI. But it is not showing the target cost in the production order.
    According to this all the actual cost taken as the production variance of the product. So It indicate huge WIP value.
    Pls advice how to get the traget cost value. Is there any other configuration change ????????
    Thanx
    K

  • Production order variance cost

    Hi,
    I know that Plan Cost is caculated based on value and
    seconds which is maintained in KP26 transaction. Workcenter
    attached to Routing.
    I want to know that how actual cost or calculated ?
    In the prodcution order CO03> Cost > Analyses, Plan
    cost is 30 and actual cost is 70 and variance updated as 40.
    The reason i heard that for higher actual cost captured in
    production, while doing confirmation they booked more time.
    But i have seen transaction co15, there is no such field in
    that.
    Could anybody explain where i can see how much time
    booked for that operation in production order ?
    Regards,
    RRS.

    Hi,
    Also check with COOIS report.
    List = confirmation
    Profile = Std profile
    Inside the report select the Field like "Activity to confirm", "unit /activity"
    This will give u operation wise , Confirmed actual activity value for Order
    Pradeep

  • Releasing of Production Order without Cost-Run

    Dear Sir,
    We want to incorporate a check in the system so that no Production-Order should be released unless the Manufactured component (component being manufactured in the Production Order)  has the proper cost run . By proper cost run mean that standard cost for the component is greater than 0 .
    Kindly guide us . Full marks are asssured for the suggested solution please .
    Regards
    B Mittal

    Hi,
      Try with user status and the conditions specified in Bs02
      Regards,
      nandha

  • In which table production order planned cost and actual cost i can see?

    Dear PP Guru,s,
    from which table i can see productuion order planned and actaul cost. i checked following tables AUFK, AFVC, AFVV, CAUFV, AFRU, AFKO, AFPO. but i did not found planned cost and actual cost field. is there any other way to get this data with respect production order?
    Regards,
    sree

    Dear,
    Planned and actual costs of prod order from COEP, COSS, COSP  S027 tables
    production order shows the planned cost based on the quantity structure.
    Please refer my reply in this thread for details,
    Re: Actual Halb Material Cost
    Regards,
    R.Brahmankar

Maybe you are looking for

  • RTF Template Issues.

    Hi, I have 2 issues with a custom rft template for Printing POs from EBS 11.5.10.2 using XML Desktop ver 5.6 Build 45. 1 I have 2 tables on the template corresponding to 2 different groups.. I will display only one table of data dynamically based on

  • Gnerics problem with Comparator

    i have to creat a program which deals with LinkedList...but I'll creat my own list which its name is "InOrderLinkedList" it's function is to take numbers and put them in the right order node i made 2 codes but one of them has an error (which i think

  • IPod reconized as camera and music

    My iPod is reconized as a camera on my windows xp, and my friend added some music to my ipod now how to I get that to iTunes

  • HT1349 I bought a used ipad how do I register the serial number in my name

    I bought a used ipad how do I register the serial number in my name ???

  • I need lot's of help, please help me

    Greetings all: I am new to FCE 4 and I am normally used to using Ulead Video Studio 11.5...I know, Ulead VS, yuck! But I am stumped with FCE, how do I create a final DVD? I have looked and read and do not see an easy way to create a DVD without doing