Project server 2013----new custom field value is not synced between my work assignment view and project professional

Hi All,
I would like to add a new custom enterprise field in project server to caculate the effective work. I hope it can work as the default field "work" and "overtime work". And I add my custome enterprise field to my work assignment and the
related details view. User can update the values in "my task" but after PM accept the updates, these values are not synced to the project center as well as project professional. Any idea?
Regards,
Anna

Yes, I am saying that the PM cannot see the updated values in the enterprise project in Microsoft Project 2013. It is a task custom field. No errors for it. Would you please help create a task custom field on your side to see whether you can reproduce
this issue? After creating the field, please add it to the "My task" related views so that project members can update the value for the task when they update the task information under "my tasK" page. After that, open the project plan as
project manager to see whether you get the updated value. Thanks a lot!
Regards,
Anna

Similar Messages

  • Issue with new Custom field value in Material UI (EHP5)

    Hi
    We added new Custom field (country) in material UI for Routing the WF based on country.
    we added this new field in material general data, When user press the "check" button in the header the value disappeared in the UI.
    This field value  required only in MDG CR level, this field value will not be updated in ECC active area.
    Request your inputs to solve this problem.

    resolved myself:
    PROCESS BEFORE OUTPUT.
    *                      Verarbeitung vor der Ausgabe
    *MS17092009 Non eliminare modules standard.
      MODULE set_propriety.
      MODULE INIT_SUB.
      MODULE GET_DATEN_SUB.
    PROCESS AFTER INPUT.
    *                      Verarbeitung nach der Eingabe
    MODULE GET_DATEN_SUB.
    CHAIN.
          FIELD MARA-ZBARCODE.
    ENDCHAIN.
    MODULE SET_DATEN_SUB.
    FIELD MARA-ZBARCODE MODULE BARCODE_0001 ON INPUT.

  • Project Server 2013 - Remove user from resource pool via sync

    Hello everyone,
    has anyone managed to configure their Project Server 2013 box with a resource pool sync that will actually remove user from the resource pool (disable "User can be assigned as resource" or deactivate users) when the user is removed from the AD
    group(s)?
    Setup: Single box, SQL 2012 SP1, SharePoint/Project Server 2013 + PU March + CU April. 2 PWA instances, 1 in SharePoint and 1 in Project permission mode. Tried on 2 different machines (different setup, accounts, domains).
    Proceedings:
    Create AD user U, AD group G. Add U to G.
    Go to PWA, setup resource pool sync with G, sync.
    U is now in the resource pool, has no PWA permissions.
    Remove U from G. Resync resoure pool.
    U is still in resource pool, still a resource, still active, can still be assigned as resource.
    Adding U back to G an repeating the whole spiel with a resource pool and a PWA group sync of G will result in U being added and removed from the user list (as expected), and U being added but not removed from the resource pool.
    Having read
    http://technet.microsoft.com/en-us/library/gg982985.aspx and
    http://technet.microsoft.com/en-us/library/gg750243.aspx, there does not seem to be an omission on my part.
    The first article states:
    Note:
    The corresponding Project Server User Account is not deactivated based on this synchronization. If the same Active Directory user is configured to synchronize with a Project Server security group, the Project Server user account will be inactivated when
    that synchronization occurs. For more information, see
    Best practices to configure Active Directory groups for Enterprise Resource Pool synchronization in Project Server 2013.
    Unfortunately, this deactivation either does not seem to occur even with a PWA group sync or I misunderstood the article.
    So, did anyone manage to setup their resource pool sync in a way, that new resource will be added, but also be removed from the resource pool?
    Kind regards,
    Adrian

    Hi Adrian,
    you tried to sync the same AD group that you used for the resource pool sync also with a Project Server permission group?
    And on removal of the user of the AD group the project user/resource is not deactivated? Only removed from the group
    Regards
    Christoph
    Hi  Christoph,
    even though I might have tried that before, I tried it again in several constellations. It didn't change anything. The the user will be properly added to and removed from the PWA group whenever I remove them from the AD group, the use will also stay active
    (but cannot logon without permissions). However, the user will always remain in the resource pool, i.e. the "User can be assigned as resource." checkbox will remain unless it is cleared manually.
    Having re-read the technet articles, none of the scenarios actually seem to descibe or address the process that I require, or maybe I'm just misunderstanding. Let me just try to outline the core issue:
    Add user to AD group. Sync AD group with resource pool. User is now a PWA resource and PWA user.
    Remove user from AD group, but do not deactivate/delete user from AD.
    (Magic happens!)
    User cannot be assigned as ressource in PWA.
    So, is there anything to make this step 3 happen, or is it just not possible to sync users out of the resource pool anymore unless they are deleted/deactivated in AD?
    Kind regards,
    Adrian

  • After Migrating to project server 2013 some of my Mpp are not opening in project professional

    After migrating to project server 2013 from 2010. my some of mpp are not opening in project professional. 
    project professional taking some time and then showing checkin error. There are no logs on project server to this issue.
    but you can see these project in project server 2013 without issue. I have also tried the EditLink function. but result is same project professional not able to open. Check in error.

    Hello,
    Can you try this:
    Open one of those Projects in PWA to edit in the browser
    make a slight change (new dummy task etc.)
    Save and Publish from the web
    Close and check in from the web
    Wait for the jobs to complete
    Open project professional
    try and open the same project again from there
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS

  • Custom Field value is not getting populated in Display mode

    Hi Experts ,
    I have created a custom field on sales tab for BP Role Bill to prty in BP transaction in SAP CRM. The problem i am facing is that , after i chose my sales area field value is not populating in first time no matter whether i am in display or change mode but the moment i switch to the other mode the value is being populated. Kindly help me in solving this.
    Regards,
    Ameet

    Dear Chetan,
    If the field is added through AET, can you please check the Get & Set Methods?
    If the field value has fixed values which you have defined while creating, then check GET_V & GET_P methods.
    Thanks & Kind Regards,
    Ravi Kumar A R

  • Custom Field values are not saved. when MPP imported from another instance.

    Hello Mate-
    Currently I am merging one small instance (I2) of PWA in our corporate instance(I1). as the corporate instance is huge, we are doing manual merge of groups, securities, users, custom fields etc. also downloading the MPP as xml from I2 and then planned
    to publish from I1.
    There are few project level custom fields which are being used in MPP. and those fields may have formulas too.
    I created same custom field in crporate environment(I1) but while trying to open the projects in our corporate environment(I1), the project custom fields are gone.
    Could you please guide me here, I am lost. I can not do a data base migration ans it would override all data from I1 instance so need to do it manually.
    Many thanks
    Deb
    Dev EPM Consultant

    Hi
    You may not be able to do this as the custom field GUID's are different in both the instance.
    You may write a macro to copy the custom field data from one to another one
    refer :http://msdn.microsoft.com/en-us/library/office/ff867798(v=office.15).aspx
    --Happy Troubleshooting
    Thanks --Ajith

  • Discussion About The Use Of Project Server 2013 Timesheet Custom Billing Categories (Post SP1 and April 2014 CU Install)

    In support of a consulting company using timesheet custom billing categories to designate project time as billable onsite, billable offsite, and non-billable, I've encountered a series of issues which appear to be associated with the custom billing category
    timesheet lines.  These issues cause timesheet users to get frustrated, and contribute to misalignment between project actuals and timesheet actuals.  We're in Single Entry Mode, no pre-population, SP1 and April 2014 CU Installed.
    I'll enumerate the issues here and pose the question to the community as to whether others are experiencing any/all of these things, and if so,  ask if any workarounds have been discovered.  We're working with Microsoft to validate these independently,
    but I am posing the questions to the community to gather additional information, and hopefully save some folks time in troubleshooting similar issues.
    1.When time is entered on an assignment into timesheet lines of multiple billing categories, only time entered since the last save is getting saved and ultimately sent, on timesheet submit, to the approval center.  Although the previously entered and
    saved time appears in the application interface when the timesheet is re-opened, only data since last save is actually saving to the server or processing through the approval center.  We believe this is the primary cause for timesheet and project actuals
    being out of alignment.
    2."_ Error Loading".  When assignments are added, deleted, or changed after a timesheet has been created, standard timesheet lines are added, deleted or changed (i.e. synchronize) with the assignments. However, for custom billing category
    timesheet lines, they do not change when the assignments change, and they aren’t removed if the assignment is removed.  We believe this causes secondary errors, like the "_Error Loading"  (and others as will be described below).
    3.When a timesheet with time in a non-standard billing category is deleted and recreated, time is arbitrarily moved to standard timesheet lines for the same assignment. If the task assignment is subsequently removed, the timesheet line causes the timesheet
    to break.
    4."Error Communicating with Server". When trying to submit a timesheet, a pop-up box appears indicating that there is an error communicating with the server.  This error appears because a timesheet line is no longer associated with a project.
    In order to submit the timesheet the orphaned timesheet line must be identified and manually removed. One technique we found which helps to identify an orphaned timesheet line is to select a task and submit task progress. Repeat for all timesheet lines until
    you get an error.  The timesheet line(s) with the error can be manually removed from the timesheet, fixing the error.
    5. Unable to Open Specific Timesheets without Error. There are certain scenarios when the "Remove Task" feature is used or an assignment is otherwise removed after creation of a timesheet with custom billing category lines, which causes orphaned
    timesheet lines. These orphaned lines can cause issues when trying to open a timesheet. The issue can appear when timesheets are in progress in multiple periods. In the problematic scenario, time is entered and submitted in one period and subsequently
    the task is 'removed' from another period before the PM processes the first approval request. Process governance can certainly help here, but improvement in the way synchronization occurs between project assignments and custom billing category timesheet lines
    would be great. The error can often be resolved by re-adding the assignment for the problematic timesheet user to the project (which creates a new assignment), and then allows you to open the timesheet.  Then time can be moved from the old timesheet
    line to the new timesheet line, and the old one can be removed.
    In 4 and 5, sometimes we can't open a timesheet without error, and other times we can open it but not submit it. We are not 100% clear on all the different causes for each. Each of these issues are suspected to be contributing the the misalignment of
    data between project actuals and timesheets, which can be a real problem for external projects for which time collected through timesheets are being used to generate invoices.
    Although these may seem like separate issues, warranting separate questions, I decided to post them together because they all seem to be related to synchronization of project assignments and timesheet lines for custom billing categories.
    Any thoughts or suggestions from the community would be appreciated.
    Best regards,
    Justin
    Justin Naughton

    There are many causes for each of the errors mention.  It would be best to put one issue to the forum at a time.  For example, some of these issues occur then tasks are deleted from projects but a timesheet has been submitted.   Depending
    on the scenario, some of these issues have been fixed with the latest service pack.
    Other issues are due to bad scheduling habits with the project managers and so first determining what they have done can help resolve some the issues.
    _error Loading, is because something is NULL in the data and the jave is choking when it build the form. Again, these may be because of delete tasks, resources, projects  or someone doing copying and pasting of rows.
    cheers!
    PS.  Train your PM to not COPY and PASTE rows in project schedules.  It can be done, but it can create problems.  There are over 500 fields and some have unique data and the copy paste creates havic.
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • [Project Pro 2013] User Custom Field w/ Formula does not calculates on Group Tasks

    This issue happens only on Project 2013. When I make a formula (using Duration, Cost, Number, etc...) on a custom field and set "Use formula" option in "Calculation for task and group summary rows",
    works fine without groups, on resume tasks. But when I Group the tasks, the group tasks values disappear.
    When I open the same file on Project 2010, it works correctly.
    Thanks in advance.

    Thank you for the effort. This problem is a bit tricky and hard to explain without images or files.
    I'll try to explain using your example:
    - I do not coded my summary tasks with the value in the "Text1" field and
    - I do not want to maintain hierarchy on groups like you show.
    1. On "No Group" mode, the summary tasks works fine. All summary tasks shows the values calculated by the formula. Summary tasks are not the problem.
    2. However, when you group the tasks by Text1, the Group Tasks (the colored ones that appear on group mode: Group: a, b and c) do not show the values calculated by the formula, even if you set to "use formula" on summary and group tasks.
    3. When you open the same file on Project 2010 (default configs), group tasks values appears (values calculated for the groups of the detail tasks: a, b, c). If your Duration1 field stays the same or disappear, change some values and refresh the field to check
    the formula is working.
    4. If you see that everything are working correctly so far, try this on your file:
    4.1. Maintain your tasks grouped by Text1.
    4.2. Add three Fields: "Duration2", "Duration3" and "Duration4".
    4.3. On every detail tasks, enter 2 days for Duration2, 3 days for Duration3.
    4.4 Set Duration2 and Duration3 to "show Average" value on the resume and group tasks. Set the Duration4 to "use formula".
    4.5. Create on Duration4 field a simple formula, like [Duration2]+[Duration3], or [Duration2]/[Duration3].
    4.6. See that the formula works fine the detail tasks (Duration4 = 5 days).
    4.7. Now the problem: The group tasks shows nothing. Duration4 should be calculated (average duration2: 2 days + avg duration3: 3 days = 5 days).
    4.8. Save the file and open on Project 2010. If the resume tasks on Duration4 continues to show nothing. Refresh the field by clicking right button on field and going to "Custom field" and pressing OK.
    See that Duration4 are calculated on Project 2010 correctly, but not on 2013 version. That is the problem
    Thanks again. I hope it helps.

  • Project Server 2013 - New - Project, creates groups at the root site level, Server is in Project Server Permission mode

    I created an Enterprise Project in PWA and moving up to the root site settings I see there was the four basic groups created there just for this project. This is not acceptable when there will be 500 projects on the server. Is there a setting to turn this
    off. I guess we will rarely create projects with PWA, so I will see if creating a Project in Desktop has the same effect.  Still would like to understand why this is happening.  Thank you.
    Site Provisioning settings are located under Central Administration -> Manage Service Applications -> Project Application Service -> Manage ->
    Project Site Provisioning Settings
    Turning that off allows the group creation to cease.
    Then PWA Settings -> Operational Policies -> Connected Sharepoint Sites
    allows selective creation of a Project Site (Workspace)
    This set up is perfect for what I require.

    I assume that you're talking about the SharePoint security groups for each Project site? If so, then this is as designed. Each site can have different users, so this is absolutely necessary when you use SharePoint. If you do not want to create project sites
    for your projects automatically, you have already discovered how to turn off automatic site creation.
    If you turn off the Project application service, you disable Project Server. I don't think that is what you want to do. I don't understand your objection to the groups because if you are running in Project Server classic permissions mode, Project Server
    manages the group membership for you.
    Gary Chefetz, MCITP, MCP, MVP msProjectExperts
    Project and Project ServerFAQs
    Project Server Help BLOG

  • Project server 2013 - PWA: My Tasks page is not loading and disabled

    Hi
    i had an issue that suddenly occur for one of my users (just to him).
    My Tasks page is not loading, it shows "Loading" in the middle of the page and stuck that way, and also the Ribbon buttons are disabled.
    Anyone knows what could he had done to make this happen?
    The print screen is in Hebrew but i described what appears.
    Ofir Marco , MCTS P.Z. Projects

    Hi Ofir,
    I've had a similar issue in a previous version of Project Server. A corrupted assignment was causing this in my case. I found the corrupted assignment using the following procedure:
    Retrieve all published assignments & related projects for the user (in the database)
    Open each project one by one in MS Project & set the 'Publish' value to 'No' for the user's assignments and publish the project
    Everytime after publishing a project, retry to open the Tasks page
    At a certain moment your Tasks page should work again and you know now which project/assignment is causing the error, just replace the corrupted assignment by a new one and it should work again
    Hope this helps

  • Custom field values are not storing in the data base

    Hi Friends,
    We have created one  Custom field called   ZZ_APPROVER in Rfx Header , we have included this field in the below  stuctures
    1.INCL_EEW_PD_HEADER_CSF_BID
    2.INCL_EEW_PD_HEADER_CSF
    The data type of this field ( ZZ_APPROVER ) is CHAR and the length is 1 .  we have given 2  fixed values in Value Range
    1 -
    X+2 Approver
    2 --- Provisional Approver
    so when we select either 1 or 2 ( in Drop Down ), its displaying properly on RFx Screen, but when we try save this document the values are not strong in the data base.
    Can any one give me idea why its not stroring in the data base
    Thanks in Advance
    Kumar Srini

    Hi Ganapathy,
    A Record is created in table BBP_PDHSC , for other z fields, the values are stroing , but for this field ( ZZ_APPROVER ) [ drop down list ], the value is not stroring
    Thnx
    Kumar Srini

  • New custom field in MCVBAK not available for selection in RSA5

    I added a custom field to the communication structure MCVBAK.  When I go to RSA5 and select the Maintenance button to select it, it is not visible in the list.  Do I need to do something other than add to MCVBAK to make it available for selection?
    Thanks.

    Hi Boater,
    Have you included this new field from MCVBAK in the extract structure from LBWE T-code? If you haven't, you need to do this and it will be available in RSA6. Hope this helps.
    Thanks and Regards
    Subray Hegde

  • Custom Column for Project Code Number & Search Box to search Content in Project Server 2013

    Hi all,
    I want to add a custom column in Project Center view for showing some Numerical Projects codes like 4523, 5248,8956 like that... Each code will represent Project assigned with that code in Project Server 2013. Also let me now if i can add some search box
    in Project Center page through which i can search Project Code or Project Name. Currently, provided search bar not working in Project Server 2013.
    Need it urgent..Kindly help

    Hi,
    If you want to add this column in a project center view, be careful to choose a project view in the "manage views" views' list. Also it must be a project custom field and not a task field. As Paul said, we assume that the field with the code exists
    and has been previousky created by you.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, MCP |

  • Project Server 2013 - "An unknown error has occured"

    Hi !
    Whenever I navigate to Project Center in Project Server 2013 the credentials window pops-up continuously even after entering correct admin account and after several clicks on OK button in credential window it says "An unknown error has occurred".
    This is happening at every links. Even at Resources, Tasks, Reports, etc.. Is this Project Server 2013 stable or still has bugs in it.
    I recently installed March 2013 hotfix for Project Server but still no luck. In ULS or Event Viewer I didn't got any
    relevant exceptions.
    I am even unable to connect to Project Server from Project Professional.
    Thanks & Regards.

    "An unknown error has occurred" usually means that the browser cannot resolve some data or something is missing. This can be caused by many issues. One for instance is deleting projects, but timesheets are still referencing it. Many others.   This
    is one of the harder issues to resolve, because often you don't find anything in the ULS.
    Seeing that this error is occurring everywhere on PWA, I would first try rerunning the "SharePoint Product Configuration Wizard".  If this fails at any place, that will be the first thing to fix.
    Cheers
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • Changing Master Page in Project server 2013

    hi,
    Can any one help me how to change the project server 2013 master page ?

    Hello,
    Yes i want to modify the master page for  Project Web Access . i want to change master page for
    all application page in pwa. i did this successfully  in Porject serevr 2010 by modifying V4.master page. i approached the same way
    in 2013 but could not succeed. 
    is there any way to accomplish this?
    thanks.

Maybe you are looking for

  • Problems with Adobe ID/licensing the software Creative Cloud

    Hello, I have problem with licensing the software of Creative Cloud. All programs installed on my computer and working fine. But the software keeps asking (around 1/2 days), for licensing the software. For example: when I tried to open Photoshop this

  • Crystal 8 Web Component Server ond Windows Server 2003 and IIS 6

    I am trying to get Crystal 8 Web Component and Page Server to run on Windows 2003 Server with IIS 6. I have done the following: Added the .cri and .rpt ISAPI extension mappings Have Cache ISAPI extentions selected Deselected "verify that file exists"

  • Need to get files off of a hard drive.

    I had a powerbook 17' and it crashed due to a faulty power supply. I now have a Macbook and the Powerbook is deemed useless, however I want to recovery files from the hard drive. It won't turn on at all...I plan on opening it up and taking the hard d

  • Mastering Metadata in Lightroom 4

    I have hundreds of photos that I'm trying to adjust the date, location, comments, etc on. - Is there a why in lightroom to easily do this in list format? - When I view photos in windows explorer, metadata details will show up below in a bar with: Dat

  • Automatic triggering of Lead document from another preceeding lead document

    Hi, In my project we are using two lead documents for qualification of a Prospect one will be done by call centre employees and other by the sales rep.   I want to create a Second lead document automatically from the first lead document Qualification