Project Systems Posting Problem

Hi All
When i am trying to Post to Gl Account I am getting a error "FI: Postings" is not allowed (WBS C/1000-01)"
Where C/1000-01 is my WBS. Can any one guide me on this.
Regards

Hi All,
I am getting the same type of massage while changing the Network thru Tcode CN22 please advise.
<u><b>ERROR MASSAGE</b></u>
                                                                                <b>"Change" is not allowed (NTW 902370)                                                                               
Message no. BS007                                                                               
Diagnosis                                                                               
The current status of object 'NTW 902370' prohibits business transaction
    'Change'.                                                                               
Procedure                                                                               
To process business transaction 'Change', you first have to change the 
    status of object 'NTW 902370' to allow the transaction 'Change'.                                                                               
This gives you an overview of the system and user statuses that affect 
    the transaction. A transaction can only be executed if there is at least
    one status that allows it and there is no status that forbids it.                                                                               
Transaction analysis     </b>   
Its urgent. Please help
Thanx & best regards

Similar Messages

  • Buget Exceed problem regarding material transfer in project system

    Hello Sir,
    I have a problem regarding budget in project system.
    when i do budget and release . and do any transaction
    with that budgeted wbs element in particular project.
    i get budget excced errors usally.
    however, budget remains more than exceeded buget.
    Let us touch with a example in brief, we have a buget for a L&T project 10 Lakh.
    Buget                                         Release                                          actual cost                                            total cost commitment
    10Lakh                                       10Lakh                                             8lakh                                                         1Lakh
    when i transfer a material from another project to this L&T project material worth is 50thousands.
    i get a errors for L&T project budget exceed with 40thousands.
    however in project budget remains 1Lakh remaining .
    why system shows errors for this material transfer worth rs 50thousands
    Please help me regarding this problem where is 1lakh budget
    with regards
    sanjay agrawal

    Hello sir,
    there is no any problem regarding budget supplement but if project sometimes
    remains 20lakh buget price remaining out of 50lakh.
    and need 1 lakh material price for transfer in project
    then why need to do budget supplement for 1 lakh if project
    remains 20lakh price rest.
    please guide me for above problems
    with regards
    sanjay agrawal

  • Capacity check problem in Project system

    hi,
    i have some questions for the Capacity check problems in Project System.
    1. if one Person is assigned to diffierent Work Centers, for example,  person A is assigned to Work Center 01 under Plant 01, and Work Center 02 under Plant 02, how can i do the Capacity check?
       if i want to use A of Work Center 01 in the Project, the System will only check the Capacity of  01, or both of 01 and 02?
    2.  What is the Pooled Capacity?
    Rgds,
    Liang

    hi,
    1.Capacity check takes place at plant level itself..
    2.Pooled capacity:- This is created separately in [u wil find in PP] and this capacity can be used by different work centers.
    regards
    pushpa

  • Interest Posting Periodic Allocation from Project System

    Guys,
    I am creating an automatic interest posting as part of the periodic allocations from the project system. We have new GL active and run parallel ledgers. The FI posting is into all ledgers, any idea how I can control posting to one ledger only?
    Kind regards,
    Rudolf

    Hi Anantharam,
    I tried defining an extract layout which assigned to the project type I am using and then creating an evaluation layout using the extract layout.
    However, it didn't really work as expected. In my scenario actual costs originate in cProjects (when the task is completed and the actual number of hours are entered in the confirmation field). Actual costs are not captured in the internal order. In this case if I define an evaluation will it update the actual cost if I define threshold value formula as follows (for testing I made it actual = planned just to see if I get a value).
    actual cost = confirmation * unit cost for task/role
    If the above is possible;
    1. How do I define the attribute and object types for unit cost for task/role which is based on the cost/revenue rates setup for the role? For example how do I find out the values for attribute and type name fields?
    2. I was under the impression that evaluations can only generate a report based on the existing values and update the criticality level field a threshold condition is defined. Is my understanding of this function incorrect?
    Apologies for all the questions, but I am still unclear how to update the actual cost which originates as result of cProject task confirmation to the internal order.
    Thanks for your help so far and appreciate if you provide some guidance on how I can get this working.
    Cheers,
    Lashan

  • Display to projection system problem

    On several projection systems at school I hook up my MacBook with a VGA connection and it works fine. However, there are other projectors that give me difficulty. The display on the computer changes and both the monitor and the projector displays the information much larger than usual and I have to continually scroll back and forth to show the information. I have tried the F7 key. Is there something I might need to adjust before I make the connection to the projection?
    Can anyone help me?

    I would suggest checking the display settings in System Preferences when this happens. You should be able to adjust the settings there.

  • Problem regarding SAP Project System & Material Management

    Hello Experts,
    please check our process as below:
    Order confirms than sales order and project will create
    material of BOM is assigned to any activity in project so these material (RM) will be procured and consumed
    assign activity for all work done on material to produce FG or SFG.
    confirm activity whenever any work done like fabrication done so confirm and its cost comes to WBS.
    than we have to subcontracting process so dispach SFG from this and receive after activity done by third party.
    than more work is done and confirm these activity. than after all work done we get FG in stock. than delivery from project.
    We are facing issue in above business process of our client as below:
    1. process of subcontracting using project system as we are not using production planning. how we get any SFG for subcontracting process.
    2. if we confirm all activities and consume all Raw Materials than how we will get finished good in our project stock for delivery.
    3. after delivery from project how sales order affects with regards to completeness of this sales document.
    Please help for this.
    Note: Remember we are not using PP cos customer require detailed report of these process and capacity planning etc.
    Thanks
    Sunil

    Hi Sunil,
    Assume this is my project structure & attached components. I will procure this components externally. After GRN, This components will be issued to network with 581 Q movement type.
    Now we need to assemble this raw material to produce our FG, As these SFG are in our project stock. What we need to do for assembly process through PS.
    Also throw some light over benefit of using PS-BOM interface ( CN33 ) for attaching material components.
    Project
    WBS
    Network
    Activity A
    Gears
    Qty - 1
    Activity B
    Blades
    Qty - 2
    Activity C
    Stand
    Qty - 1
    Activity D
    Connectors
    Qty - 1
    Regards
    Gaurav Ahuja    

  • Problem with Project Systems authorizations

    Hi All,
    We are implementing project systems module and are facing several authorization issues. The SAP default values do not seem to work and there are several objects which showup as "not checked" in SU24 showup in the SU53. e.g. tcodes are CJ20n, CJI3. Are there any steps for activation / pre-requisites, etc?
    Thanks for your inputs
    Vijaya

    Hi
    There are chances that some of the transactions codes will call other tcodes while execution.
    in this case also CJ20N is calling many tcodes, those auth check would not be inserted as check points in SU24 , hence you should identify them in the testing phase or using the TCDCOUPLES table.
    You can check the calling & called transaction values in the table TCDCOUPLES in SE16, according to that you can build your SAP roles.

  • Project System Cash Management in combination with statistical WBS element

    Hi,
    within  a customer project, we have to solve the following issue:
    Customer runs projects and statistical projects in combination with internal orders.
    We want to use the PS Cash Management for planned and actual payments.
    With statistical projects we have the following problem:
    Invoice and actual payments will be processed with the transaction CJFN.
    Actual payments are shown only on the internal order (transaction CJIA), but not on the statistical WBS element.
    We want the information about the actual payments with in the project system reporting (S_ALR_87013574).
    Projects, not flagged as statistical will deliver the expected results.
    Many thanks for your ideas, to solve this problem.
    Steffen

    are u posting to some other cost object also. normally they wud have to be posted to a COPA also with the cost element being 11 category.
    the wbs will receive the statistical posting, so there needs to be a real object also.
    see whether the real object is getting derived.
    the system is nt finding the real object and trying to post with the WBS in real, but since its statistical, the error.
    any other calrifications. plz post.
    regards
    anantha

  • Project Settlement @ Project Systems

    Hi Experts
    I am working on how to settle a Project in Project Systems.  Could you please provide me guidelines how to do it.
    I am also looking for the connection/relation between Project Systems and Result Analysis of Product Costing.
    Thank you
    regards,
    S. Habib Pasha.

    HI
    The moment you say that the settlement to GL account, it is an external settlement i.e CO to FI ( WBS element being a cost object ) . In the allocation you need to have settlement element as an external settlement element with category "22" . When you are settling to a GL account and if it is a cost element then it will ask for a co object still as the system simultaneously needs to post to controlling as well. Yo make this setting for the GL account through automatic account assignment in transaction OKB9.
    I this will solve your problem
    Anand

  • Material To be Valuated in Project System

    Hi All,
    We are implementing PS,MM,SD,FI &CO for a companay which works essentially on engineer to order scenario and using vlauated projec stock & actvity account assigned networks
    Inhouse production is through typical assembly processing process - Where input & output materials are transferred through BOM PS Transfer from WBS BOM.
    Input materials are issued to activity; work performed by work centers are entered by confirmation; at completion of work out put materials is 'Received from activity'. Both material issue and receipt are done wrt reservation.
    When this is done, as per standard process, the cost addition (and hence value addition) is to activity and thereby to WBS element. The output material is not valuated. All the cost(or values) become project value which will reflect in WIP calculation. WIP is calculated as month end process.
    At month end if the company wants to know the current asset from project and relevant stocks:
    = WIP of project + Inventory value of the mmaterials.
    Pl. note that only input materials i.e. raw materials and Bought out materials will have inventory value; the output material will not have any value.
    The process is alright and I think we are alos complying to Accounting stanadard for project system - directive from Institute of Chartered accounts - India.
    This process was first aceeptable to customer; but now they say -  the out put materials should be valuated. So that, when inventory value is taken - it is RM+BO and valuated semifinished +valuaed finished materials
    One big reason they say is that they have to show inventory value to the Banks.
    Now I need clarification in following points
    1. How to valuate the out put material when working only with project system. (apart from using user exit )
    2. If this is done, the project cost/WIP calculations will show ups amd downs - as goods receipt with valuated value will be with sign - this will reduced the cost. This will cause variuos problems - almost no standard SAP PS cost report will reflect the reality - WIP can not go up and down...This is illogical.
    3. Have you faced similar situation in implementation - that - Banks can not be conviced about this PSway of WIP calculation? Taking into consideration that project implementation is in India - an experienced reply can be very helpful
    Thanks and regards
    A.Saravanan

    Dear Pradeep,
    When we work with network/activity/wbs element, Finished material is assigned to activity with sign. This means GR can be done. Technically system treats lke by-product. This material will not be valuated with in put costs...since there is no logic...For our convention, one WBS element, one network or one activity can be used to book all related costs..but still GR will happen with valuation as per valuation variant in NW only. This is quite logical and correct.
    So...customer wants to know the cost of manufacturing a complex project assembly..then process under one WBS element..cost accumuated at that WBS element is cost of mfg. I have kept such finihed material std price at Rs.1. (Ideally it should be '0'.). Meaning material will not valuated.
    Now if customer wants to knwo the cost ...look at WBs element
    If needed, you can do unit costing and update the value in a suitable field in material master.
    Therefore, I have kept all the semifinished/finished material std price at Rs.1.
    This way..std functions of PS like RA, costforecasting are work properly.
    For WIP calculation, this is of standard method and WIP will be current asset of company..this will be acceptable to Banks...one concern I had..cross checked with a Banker.
    Another issue was sub-contracting. In India during S/C..we have Delivery challan and legal requirement of excise. We developed a program integrating dc, excise challan, transfer posting, goods issue against reservation and mateials assigned in activity. For user it will appear as one transcation, and system will propmt/list appropriate excise challan No. based on dc no & material as input...(I hope i remember right).
    Again here GR of seni/finished naterial was atRs.1. since Service cosst, matarial issue cost get booked at activty.
    Thanks and regards
    Saravanan.A

  • Wrong Selection of Project Profile, how to rectify - Project System

    Dear Gurus,
    I have problem in Project system, wherein by mistake i have selected customer project profile instead of Capital Investment Project profile.
    I have incurred some costs in Network alread in this project & posted.
    I am not able change the CJ07 the project profile from Customer Project to Capital Investment, due to which the costs booked already in Network are setting in Network and not able to CJ88 from Network to WBS from WBS to AUC.
    I have changed the CJ12 the WBS element from customer to capitable investment, but not able to change the project profile in Project Definition level.
    Kindly help if u have any solution.
    Thanks in advance
    Srihari Ediga

    no one responded,hence closed to post new thread.

  • Project Systems - Transaction CJ20N

    Hi all,
    In the transaction CJ20N(Project builder) for the creation of the WBS element, client has enhanced 2 fields, Investment program name(PRNAM) and investment program indicator(posid),apart from the standard fields available in PRPS table. Is there any BAPI/BADI/FM to create multiple WBS elements and the BAPI table should include these both fields PRNAM and POSID apart from the fields available IN PRPS table.  
    I used BAPI_BUS2054_CREATE_MULTI. But this BAPI table doesnot include PRNAM and POSID fields.
    Kindly post your solutions.
    Or is there any other method to solve this problem.

    Hi ,
    u have to make use of Extensions of that BAPI to populate Customer Fields.
    FU BAPI_BUS2054_CREATE_MULTI
    Text
    Create WBS Elements by BAPI
    Functionality
    WBS elements can be created for a project with BAPI "BAPI_BUS2054_CREATE_MULTI". To do this, parameter "I_PROJECT_DEFINITION" must contain the project definition for which the WBS elements are to be created. The individual WBS elements with all required values must be entered in table "IT_WBS_ELEMENT_TABLE".
    The WBS elements are created next to each other, in the same sequence as in table "IT_WBS_ELEMENT_TABLE". A WBS element under which the new WBS elements are to be created can be specified in parameter "I_WBS_UP". A WBS element that is to be located directly to the left of the new WBS elements can be specified with parameter "I_WBS_LEFT". If "I_WBS_LEFT" is not specified, the new WBS elements are added on the left-hand side. If I_WBS_UP is also not specified, the new WBS elements are added on the left and on the first level.
    Before anything is created, the following is checked:
    Is another project already being processed in the LUW (Logical Unit of Work)?
    Can the project be locked?
    If one check is not successful, nothing is created. Otherwise, each WBS element is changed individually in "IT_WBS_ELEMENT_TABLE", although the following is checked first:
    Is the data consistent?
    If all checks are succussful, the individual WBS element is created in the document tables. Afterwards, the hierarchy is updated, that is the new elements are added in the appropriate place as described above. If an error occurs while this is being carried out, the new elements are created on the right-hand side, on the first level, and an error message is generated in the return table. An error can occur if the WBS element in I_WBS_UP and I_WBS_LEFT does not exist in the specified project, or I_WBS_UP is not directly above I_WBS_LEFT if both are specified, or because an inconsistency occurs in the hierarchy for another reason.
    As soon as a LUW (Logical Unit of Work) is completed with BAPI BAPI_PS_PRECOMMIT and COMMIT WORK, the WBS elements are finally changed.
    Only one project or WBS element from a project can be processed at a time in a LUW.
    The return parameter RETURN displays first an error or success message that shows whether the WBS elements could be created. The first message variable contains the object type, the second contains the object ID, and the fourth contains the GUID (if it could be read). All related messages that were generated during processing are listed underneath the error or success messages. The parameters of the individual messages are filled with the object ID.
    Notes
    1. Definition "Processing Unit"
    In the following, the term "processing unit" refers to a series of related processing steps.
    The first step in a processing unit is initialization, which is done by calling the BAPI BAPI_PS_INITIALIZATION.
    Afterwards, the individual BAPIs listed below can be used several times, if required.
    The processing unit ends when the final precommit (call BAPI BAPI_PS_PRECOMMIT) is executed with a subsequent COMMIT WORK (for example, the statement COMMIT WORK, the BAPI "BAPI_TRANSACTION_COMMIT" or the BapiService.TransactionCommit method).
    After the final COMMIT WORK, the next initialization opens a new processing unit via the BAPI "BAPI_PS_INITIALIZATION".
    In principal, the following applies to each individual processing unit.
    2. Creation of a Processing Unit
    Each processing unit must be initialized by calling the BAPI "BAPI_PS_INITIALIZATION" once.
    Afterwards, the following individual BAPIs can be used within a processing unit - they can also be used more than once, taking into account the "One-Project-Principle" explained below. This also means that an object created in the current processing unit by a CREATE-BAPI can be changed by a CHANGE-BAPI or STATUS-BAPI.
    Except for the BAPIs explicitly named below, you can only call up BAPIs that execute GET methods or READ methods only. In particular, the BAPIs for confirming a network may not be used with the individual BAPIs named below!
    Business Object ProjectDefinitionPI
    BAPI Method
    BAPI_BUS2001_CREATE ProjectDefinitionPI.CreateSingle
    BAPI_BUS2001_CHANGE ProjectDefinitionPI.Change
    BAPI_BUS2001_DELETE ProjectDefinitionPI.Delete
    BAPI_BUS2001_SET_STATUS ProjectDefinitionPI.SetStatus
    BAPI_BUS2001_PARTNER_CREATE_M ProjectDefinitionPI.PartnerCreateMultiple
    BAPI_BUS2001_PARTNER_CHANGE_M ProjectDefinitionPI.PartnerChangeMultiple
    BAPI_BUS2001_PARTNER_REMOVE_M ProjectDefinitionPI.PartnerRemoveMultiple
    Business Object WBSPI
    BAPI Method
    BAPI_BUS2054_CREATE_MULTI WBSPI.CreateMultiple
    BAPI_BUS2054_CHANGE_MULTI WBSPI.ChangeMultiple
    BAPI_BUS2054_DELETE_MULTI WBSPI.DeleteMultiple
    BAPI_BUS2001_SET_STATUS WBSPI.SetStatus
    Business Object NetworkPI
    BAPI Method
    BAPI_BUS2002_CREATE NetworkPI.CreateFromData
    BAPI_BUS2002_CHANGE NetworkPI.Change
    BAPI_BUS2002_DELETE NetworkPI.Delete
    BAPI_BUS2002_ACT_CREATE_MULTI NetworkPI.ActCreateMultiple
    BAPI_BUS2002_ACT_CHANGE_MULTI NetworkPI.ActChangeMultiple
    BAPI_BUS2002_ACT_DELETE_MULTI NetworkPI.ActDeleteMultiple
    BAPI_BUS2002_ACTELEM_CREATE_M NetworkPI.ActElemCreateMultiple
    BAPI_BUS2002_ACTELEM_CHANGE_M NetworkPI.ActElemChangeMultiple
    BAPI_BUS2002_ACTELEM_DELETE_M NetworkPI.ActElemDeleteMultiple
    BAPI_BUS2002_SET_STATUS NetworkPI.SetStatus
    The processing unit must be finished by calling the BAPIs BAPI_PS_PRECOMMIT and BAPI_TRANSACTION_COMMIT (in that order).
    3. One-Project Principle
    For technical reasons, only the project definition and the WBS elements of one project can be processed in a processing unit.
    More than one project is used, for example, if
    You create or change more than one project
    You have changed a project and want to change a network to which WBS elements from a different project are assigned
    You want to change various networks to which WBS elements from different projects are assigned
    You create or change a WBS assignment in a network so that a WBS element from a second project is used
    WBS elements from different projects are already assigned to a network (note: this type of network cannot be processed with the network BAPIs named above).
    If you define a report for calling BAPIs, this means that:
    The report may use a maximum of one project per processing unit. The individual BAPI calls must be distributed between more than one processing unit, which use a maximum of one project per processing unit.
    4. All-Or-Nothing Principle
    If an error occurs in a processing unit in an individual BAPI or in the BAPI "BAPI_PS_PRECOMMIT" (that is, the return table ET_RETURN contains at least one message of the type "E" (error), "A" (abnormal end) or "X" (exit), posting is not possible.
    If an error occurs in an individual BAPI and despite this you call the BAPI "BAPI_PS_PRECOMMIT", message CNIF_PI 056 is issued with message type I (information).
    If an error occurs in an individual BAPI or in the BAPI "BAPI_PS_PRECOMMIT", but despite this you execute a COMMIT WORK, the program that is currently in process is terminated and message CNIF_PI 056 is issued with message type X.
    This is to ensure data consistency for all objects created, changed, and/or deleted in the processing unit.
    Note that the processing unit to which this happens can no longer be successfully closed and therefore, no new processing unit can be started.
    However, you can set the current processing unit back to an initialized status by using a rollback work (for example, statement ROLLBACK WORK, the BAPI "BAPI_TRANSACTION_ROLLBACK" or the method BapiService.TransactionRollback). Technically speaking, this means that the previous LUW is terminated and a new LUW is started in the current processing unit.
    Note that in this case, the current processing unit does not have to be re-initialized.
    Also note that the rollback also takes place according to the "all-or-nothing" principle, that therefore all individual BAPIs carried out up to the rollback are discarded. After a rollback, you can, therefore, no longer refer to an object that was previously created in the current processing unit using a CREATE-BAPI.
    However, you can close the processing unit again after a rollback, using a PRECOMMIT and COMMIT WORK, as long as all individual BAPIs, and the precommit carried out after the rollback, finish without errors.
    You can carry out several rollbacks in a processing unit (technically: start a new LUW several times).
    5. Procedure in the Case of Errors
    As soon as an error occurs in an individual BAPI or in the BAPI "BAPI_PS_PRECOMMIT", you have the following options:
    Exit the report or the program that calls the BAPIs, the PRECOMMIT and the COMMIT WORK.
    Execute a rollback in the current processing unit.
    6. Rules for Posting
    After you have successfully called the individual BAPIs of a processing unit, you must call the PRECOMMIT "BAPI_PS_PRECOMMIT".
    If the PRECOMMIT is also successful, the COMMIT WORK must take place directly afterwards.
    In particular, note that after the PRECOMMIT, you cannot call other individual BAPIs again in the current processing unit.
    It is also not permitted to call the PRECOMMIT more than once in a processing unit.
    7. Recommendation "COMMIT WORK AND WAIT"
    If an object created in a processing unit is to be used in a subsequent processing unit (for example, as an account assignment object in a G/L account posting) it is recommended to call the commit work with the supplement "AND WAIT" or to set the parameters for the BAPI "BAPI_TRANSACTION_COMMIT" accordingly.
    8. Field Selection
    The field selection is a tool for influencing the user interface (that is, for the dialog). In the BAPIs, the settings from the field selection (for example, fields that are not ready for input or required-entry) are not taken into account.
    9. Using a date in the BAPI interface
    The BAPI must be provided with the date in the internal format YYYYMMDD (year month day). No special characters may be used.
    As a BAPI must work independent of user, the date cannot and should not be converted to the date format specified in the user-specific settings.
    10. Customer Enhancements of the BAPIs
    For the BAPIs used to create and change project definitions, WBS elements, networks, activities, and activity elements, you can automatically fill the fields of the tables PROJ, PRPS, AUFK, and AFVU that have been defined for customer enhancements in the standard system.
    For this purpose, help structures that contain the respective key fields, as well as the CI include of the table are supplied. The BAPIs contain the parameter ExtensionIN in which the enhancement fields can be entered and also provide BAdIs in which the entered values can be checked and, if required, processed further.
    CI Include Help Structure   Key
    CI_PROJ BAPI_TE_PROJECT_DEFINITION   PROJECT_DEFINITION
    CI_PRPS BAPI_TE_WBS_ELEMENT   WBS_ELEMENT
    CI_AUFK BAPI_TE_NETWORK   NETWORK
    CI_AFVU BAPI_TE_NETWORK_ACTIVITY   NETWORK ACTIVITY
    CI_AFVU BAPI_TE_NETWORK_ACT_ELEMENT   NETWORK ACTIVITY ELEMENT
    Procedure for Filling Standard Enhancements
    Before you call the BAPI for each object that is to be created or changed, for which you want to enter customer-specific table enhancement fields, add a data record to the container ExtensionIn:
    STRUCTURE:    Name of the corresponding help structure
    VALUEPART1:   Key of the object + start of the data part
    VALUEPART2-4: If required, the continuation of the data part
    VALUPART1 to VALUPART4 are therefore filled consecutively, first with the keys that identify the table rows and then with the values of the customer-specific fields. By structuring the container in this way, it is possible to transfer its content with one MOVE command to the structure of the BAPI table extension.
    Note that when objects are changed, all fields of the enhancements are overwritten (as opposed to the standard fields, where only those fields for which the respective update indicator is set are changed). Therefore, even if you only want to change one field, all the fields that you transfer in ExtensionIn must be filled.
    Checks and Further Processing
    Using the methods ...CREATE_EXIT1 or. ...CHANGE_EXIT1 of the BAdI BAPIEXT_BUS2001, BAPIEXT_BUS2002, and BAPIEXT_BUS2054, you can check the entered values (and/or carry out other checks).
    In the BAdI's second method, you can program that the data transferred to the BAPI is processed further (if you only want to transfer the fields of the CI includes, no more action is required here).
    For more information, refer to the SAP Library under Cross-Application Components -> Business Framework Architecture -> Enhancements, Modifications ... -> Customer Enhancement and Modification of BAPIs -> Customer Enhancement of BAPIs (CA-BFA).
    Further Information
    For more information, refer to the SAP Library under Project System -> Structures -> Project System Interfaces -> PS-EPS Interface to External Project Management Systems.
    Parameters
    I_PROJECT_DEFINITION
    IT_WBS_ELEMENT
    ET_RETURN
    EXTENSIONIN
    EXTENSIONOUT
    Exceptions
    Function Group
    CJ2054
    Regards
    Prabhu

  • Troublesho​oting System Recovery Problems

    A System Recovery is a useful tool to return your Windows 8 tablet back to factory defaults. However, what do you do when the System Recovery isn't working!?
    A full System Recovery can be a lengthy process as there is a lot of data being transferred. Patience is the key, as a full Recovery can take two to four hours to complete.
    For more information check out HP's Troubleshooting HP System Recovery Problems for Windows 8. This document will help you get your Windows 8 tablet back up and running.
    TIP: If you are planning on using the System Recovery make sure that you do not change or delete the HP Recovery Partition as that will make all but impossible to Restore your tablet using the HP Recovery Manager.
    Please click “Accept as Solution ” if you feel my post solved your issue.
    Click the “Kudos Thumbs Up" on the right to say “Thanks” for helping!
    Thank you,
    BHK6
    I work on behalf of HP

    Have you created this disc on your own or you use original toshiba disc?
    Do you use it for the first time?

  • WBS Elements not getting created in ECC Project System from CRM 7.0

    Dear all,
    We are trying to integrate SAP CRM 7.0 with SAP ECC-PS module. The objective is to bring in the marketing plan and elements data from the CRM system, and to create the corresponding WBS in project system. We have done most of the configuration as recommended by SAP in both the systems, and we see that the BDOCS are getting generated and sent to the ECC system. The following steps have been successfully completed:
    1.       Set up the RFC connections between the two systems
    2.       Selected the connection type as Middleware in CRM system.
    3.       Installed the cProject Add on in CRM box.
    4.       Created a project scenario (with project and network profiles) in the PS system and assigned the same in the CRM system.
    5.       The Project Scenario in PS config has the same name as the Project Type in CRM config.
    6.       Created and released the campaign ids being created in the CRM system.
    As already mentioned, we can see that the BDOCS are coming to the ECC system and are getting stored in BDOC_TRACK table. However the issue is that the corresponding WBS elements are not getting generated in the ECC system. Is there anything that that we are missing in the ECC box which would trigger the WBS element creation?
    Request you all to share your inputs which would be immensely beneficial for us in achieving this integration.
    Thanks and Kind Regards,
    Aditya Shrivastava

    Hello Aditya,
    We too are facing this issue.. if you have resolved the issue could you please let us know the solution ?
    Some inputs related to our system,
    We have upgrade from CRM 4.0 to CRM 7.0 SP07 and R/3 backend system is on 4.7 SP27, earlier we have completed the upgrade on sandbox without any issues which was upgrade to CRM 7.0 SP04 but with SP07 we are facing the problem of WBS Element not getting created in R/3.
    Your help is highly appreciated.
    Thanks & Regards,
    Sumukh Kapoor.

  • Report Painter Drilldown on Cost Element for Project Systems

    I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

Maybe you are looking for

  • Install the console design of Oraclar Identity Manager 9.1.0.2 on Linux

    Hello friends, You can install the console design of Oracle Identity Manager 9.1.0.2 on Linux Thanks

  • Recompiling attached libraries...

    Hello everybody, I'm using the FileUpload utility to upload files from client to user in oracle environment, i add the library that came with it, at runtime i got the error ora 06508, i searched the web and found this note: For Oracle Application Ser

  • How to remove a node apps listener from CRS.

    We have a node apps in type of listener offline shown from crs_stat -t: ldctrdb01|PDAMLDV11|/u01/crs/product/10.2.0/bin $ crs_stat -t Name Type Target State Host ora....11.inst application ONLINE ONLINE ldctrdb01 ora....12.inst application ONLINE ONL

  • How to include additional information in the notification emails

    Hi! As we know when Portal Admin creates a user,and if configured to send email, an email is sent to the new user informing about their username and password. Now my question is there any way possible to include additional message in those notificati

  • Getting lots of strange people on my account????

    hi  it's been a while that I get messages from strange people requesting adding me up . I am just so scared that I think my account has been hacked.One of these people called me the other day .please help me and tell how I can get rid of people. Than