QA lot Status "UD   ICCO SPRQ STUP"

Hello all,
We're facing troubles in calculating inspection stock due to two qa lots with system status "UD   ICCO SPRQ STUP".
UDs are reversed for both lots (using ZQMB, sap note: 175842) but status says SPRQ (stock posting required) and the lot quantities are shown added in MMBE report.
Please help me to change/fix system status for both lots.

Yeong-Chul Jeong wrote:
Dear Muhammad IIyas.
When you cancel the UD status and stock posting using SAP Note 175842. You can/must try again
for transfer the stock on the screen/tab of Inspection lot stock.
==> Must be Change mode..  you can see the field for entering the posting quantity
and then when you complete this insp.lot , Insp.lot status will be changed.
Regards,
Jeong, Yeong Chul
Lot status is reversed to status before UD but I don't think SAP did so in this case. Changes are not allowed once UD posted.

Similar Messages

  • Inspection Lot Status UD ICCO SPCO ORRQ

    Hello Experts,
    Please share your thoughts on the System Status "UD ICCO SPCO ORRQ". Not sure on why the Lot getting the status ORRQ "Order record required"
    What is the Condition in which the system triggers this Status? how to complete the inspection processing once we get this status? Is it a Particular Configuration setting that expects a Process Order Record?
    Is there any setting in Production that sets the Inspection Lot status as ORRQ.
    Appreciate your quick response.
    Regards
    Raja

    hi,
    Check ur MM- QM view whether QM order is assigned or not. if QM order is assigned then process your order and confirm it and provide the settlement also against that order. Or check any other order is opened against that lot or not Like PP order or PM order which is controlled by ur QM- status profiles.
    once ur order closed technically ur inspection process completed.
    Regards

  • Inspection lot status CRTD CHCR SPRQ

    Dear Expert
    I created inspection plan for a material and generated inspection lot after GR from PO. But it's status is coming as CRTD CHCR SPRQ, release status is not coming, pls suggest where i want to look for this?.

    Hello,
    I am having a similar issue with inspection lots. The information provided has been very helpful, but I have not been able to resolve my issue. Forgive me if my terminology is not clear as SAP is very new to me. Here goes:
    When my inspectors try to enter an inspection lot with transaction QE01, they receive the error "The function you selected cannot be carried out."  When you click the detailed info button, a transaction analysis box appears with the following info:
    Influence of System Status on Transactions
    Stat       Description         Influence
    CRTD    Created             Disallowed 
    If you click on status display instead detailed info, there is a system status tab  with CRTD, PREQ, CHCR & SPRQ. All four options are checked, but to the right of the first two there is a grayed out piece of paper with an arrow. It appears the system is checking for these features, but they aren't properly set up.
    As of now, we have no inspection plans, so material is simply checked to drawings and specifications and and an accept/reject usage decision is entered by receiving inspectors. My immediate concern is to get the material released that is stuck in inspection. If I click on the inspection task list, there is no task list created for the material.
    Our receiving inspection supervisor was the only one trained in QM and he left the company this week. Is anyone familiar with this error?I'm desperate for a solution.
    Regards,
    N. King

  • Quality Management - Insp lot with status CRTD CHDR SPRQ

    I am not able to do usage decision for Insp lot with status CRTD CHDR SPRQ but I can do usage decision for status REL CALC SPRQ.
    Can anybody know why ?

    Hi
    pl check the lot is assigned for inspectioon plan ore not.
    got QA02 check in inspecion specification TAB.
    If there is noe inspection plan (group)
    you need to create a inspection plan, and then come to QA02
    then you need clickon TAsk list/spec button in insp.specification tab.
    Pl check and try
    -ashok

  • UD ICCO SPCO STUP- unable to clear the stock in Quality View.

    Hi!
                    In a QM -Module for a particular material status is showing as "UD ICCO SPCO STUP" in QA32. Usage Decision is done for this particular item. But it is showing the stock in MMBE Tcode. Its unable to clear in QA32.
    I tried QA12 and also QVM2 for this stock moving from Quality Inspection to Unrestricted stock. but i am unable to do so.
    Could any body plz help me to clear the stock from the Quality View.
    Thank you!
    -M.Suba

    Hi,
    Since lot status is "UD ICCO SPCO STUP", the stock posting against that lot is already done.
    Is batch management active ? is so then check whether you are getting  stock of that batch in Quality in MMBE.
    Chances of some other lot for same material  having status SPRQ are more, go to QA32 put specific material  and select all lots, then apply the filter to status field  and search for SPRQ status availability. You will find some lots of same material  for which UD given but stock posting not made.
    Please check and revert.
    Best Regards,
    Shekhar

  • Inspection lot status to be fetched into BW

    Hello,
    First of all; I am aware that, there are many forums/discussions with regard to fetching of Inspection lot status. I have gathered the points as well.
    Our requirement is to, to extract the Inspection lot status into BW as we are already staging the Inspection lot numbers.
    I got 2 ways to do this,
    1) There is a BAPI FM in ECC to get the Inspection lot status. "BAPI_INSPLOT_GETSTATUS".
    2) Else, we can take QALS-OBJNR & pass it to JEST to get the status numbers. And this needs to be passed to TJ02 for descriptions.
    However, I have doubts about how to extract this status into BW. (As I need to filter out the status' LTCA, CRTD, ICCO).
    1) Can we have an extractor based on the Function module & get data into BW? Is this possible, because since it is a BAPI FM; I wanted to have a clear picture on how to get it.
    2) Can I build a view on top of JEST & TJ02; And apply selection conditions of whatever is necessary & extract it into BW?
    And I don't want to stage the complete data in BW side for JEST & TJ02, as I noticed that there is uncertainly huge amount of data in JEST.
    So, any inputs on how to stage the status into BW will be very helpful for me. Please let me know, if I have missed out any documents/links regarding the same.
    Thanks again,
    Vikranth.

    Dear Madhav
    Here is my approach for this requirement
    1) Create  infoobject for each of the status you required for the inspection lot. (It can be flag indicator kind of info object
    2) Make these status navigational attribute of Inspection lot infoobject
    3) Create a generic datasource on QALS . You can use createdon and changedon so as to manage a pseudo delta. Append the datasource extract table with Z fields required to capture your Inspection lot status
    4) Write a Exit in the source system to fetch up the status field for each inspection lot from the JEST table. You can hardcode the status field for eg If Qlot has status I0002 then mark the corresponding append field with X.
    5) Map the append datasource field to the Inspection lot info object through transformation.
    Hope its clear for you
    Regards
    Gajesh

  • Table for Inspection Lot status

    Hi,
    In which table is the inspection lot status stored?
    Kindly suggest.

    Bapi
    BAPI_INSPLOT_GETSTATUS
    Tables
    JEST
    TJ02T
    1. Goto table QALS with PRUEFLOS = inspection lot
    2. Goto table JEST with OBJNR = QALS-OBJNR
    You will receive one or more records of status. Then - table TJ02T.

  • Inspection Lot status not getting changed to LTCA from REL for SubCon scenario

    Dear All,
    For ERSA material 01 inspection type is active with indicator Post to inspection stock only as it can be purchased. No other indicator is set.
    This material can be sent for repairing outside with DAMAGE valuation type (stock provided to Vendor with DAMAGE valuation type).
    For SubCon scenario, Purchase Order with Account Assignment Category F and Item Category L has been created.
    Once GR using MB01 with 101 movement, consumption posting takes place and as Insp type 01 is active Inspection lot is getting created with status REL CALC.
    At this time, DAMAGE stock against Vendor is getting reduced with Qty of 543 movement.
    Now when, reversal 102 with MB01 is done against Purchase Order and details are adopted with reference to 101 material document, reversal is taking place, but at the same time respective material doc's Inspection lot status is not getting changed to LTCA. It remains REL only.
    For 122 return to Vendor using MBRL also, Insp lot status is not getting changed.
    Has anybody faced such issue? Is this standard SAP?
    Kindly throw light on the process, is correct process followed?
    Regards,
    Tanuj Parikh

    Thanks.
    Thru MBST Inspection Lot status changed to LTCA.
    Why system is not cancelling thru MB01? 

  • Inspection Lot Status (CROK)not updating for Certificate Reciept

    Hi
    I want to inspect vendor materials on the basis of thier Quality certificates
    1) Config Set up:
    a) Certificate type :YA72
    Cert for each PO  item :checked
    Certificate Check reqd:  :Checked
    Enhance cert processing: Checked
    b) Control key :0005 ( Delivery release ,Certificate)
    2) Material Master (QM View)
        QM Procurement : Checked
       Control Key :0005
       Certificate Type :YA72
    3) Goods Recipt
        MIGO < Purchase Data<Cert Reciept :Yes
        Inspection lot is created
    Question : Inspection lot status is not updating for Certificate Recived or not
                      My understanding is Inspection lot status should be :CROK -Certificate Recieved                                                                               
    CTCM-Certificate Missing
    Pls correct my understanding in case i am missing something
    Thanks in advance

    Is the status in the GR document have the cert field set as 5?
    Since you set the "certificate check required" you must do an explicit check of the cert.  I included below the help screen from this indicator in SPRO.
    You should be able to review the status of your cert in transaction QC53.
    FF
    Explicit Inspection of GR Certificate Necessary
    If you set this indicator, at goods receipt the system will generally perform as described in the field "Control without certificate".
    This means that even if you confirm the certificate receipt at goods receipt, and thereby set the status "2 - Certificate received", the system will still perform as specified in the field "control without certificate". See Control without certificate.
    You must explicitly check the content of the certificate recieved at goods receipt and set the status "5 - Certificate filed and inspected ", before, for example, the inspection lot status will be set to CROK.
    You can confirm that you have checked the content of the certificate in the certificate transaction or when making the usage decision.
    Note
    If you have set the indicator and chosen an unsuitable setting in the field "Control without certificate", the goods receipt can be generally blocked.
    This security function is generally used at electronic certificate receipt to check the accuracy of the certificate contents.

  • Inspection lot status BREQ

    i am getting lot status as BREQ - batch assignment required.
    what does it mean? its not allowing me to do the result recording.
    please help.

    Dear Sandip,
    The status that you have mentioned means that batch assignment is mandatory. When the inspection lot was created probably no batch assignment must have happened. This problem i have seen generally when you are making in process inspection against production order, if the batch assignment is not done in production order then a inprocess inspection lot is created without batch and when you try to record the result it asks for the batch number as the material is batch managed.
    This problem will not occur in case of inspection lot created against  good receipt against purchase order or production order, because during the GR, the batch is a mandatory field, and the system does not allow to save the GR (against production order or purchase order) until unless one keys the batch.
    I hope your query has being clarified. Reward points if you feel so.
    Thanks & Regards.
    Santosh Joshi.

  • Inspection lot status CROK

    Hi,
    As per SAP to trigger the Work flow WS03100078, Inspection lot status needs to be CROK.  How the CROK status will be active for Inspection lot.  As per our scenario, Inspection will gets created automatically when Goods receipt against purchase order.
    Please help me
    thanks in advance
    regards
    stallin

    Hi Stallin,
    The Status CROK is updated when you confirm the certificate receipt while doing GR in Purchase Order Details in T.code MIGO and update the same as certificate received in the Tcode QC51/52 for the relevent purchase order/Inspection Lot.
    Reward if cleared and close the thread.

  • Inspection lot status MCAN - Lot marked for cancellation

    Hi QM Team,
    Once we cancel lot through QA02 or if we cancel document then system cancell lot accordingly & put the lot status as "LTCA".
    But in my system I have seen couple of lot with status "MCAN - Lot marked for cancellation".
    Can you suggest me how system has generated this lot with status MCAN?
    Thanks in advance.
    Eric.

    Inspection type is 01.
    System created lot during GRN with ref to PO document.
    Let me know if you need more infor to resolve this issue.

  • For the Inspection lot status is CRTD instead of REL status

    Dear Experts,
    Today I have observed strange behavoir of the system.
    For the Finished material 04 insp type, Every day we used to generate inspection lots automatically with MB31for 101 mov type.
    generated inspection lot status will be REL bydefault. Today we observed system status is CRTD.
    I have checked any material master/Inspection plan been change or not, but it was not changed.
    Please suggest how this behavior happen suddenly.
    Regards
    Don

    Dear Don,
                    Check in SPRO for inspection type configuration. Some body has changed the 'Task list usage' for Inspection type.
    If you are using '1' and if there is other one except '1' then system will create inspection lot in CRTD status.
    You need to change it manually in QA02 and assigne plan.
    Thanks and Regards
    Harriesh.

  • QM-SD: Sales Return Inspection lot status Error

    Hello Expert,
    I want to post Goods receipt in a Returns delivery with QM activated in the material but the following message is displayed:
    Status of inspection lot 060000000001 / partial lot 000000 does not allow good issue
    Message no. VL171
    The inspection type is 06 (Inspection for Returns from Customer).
    The movement type is the 651.
    I thought that the inspection lot was created when you post the Good receipt, not when you create the delivery, and the stock material would be Qual. Inspection. So, then I should run QA11 click on Accepted in the UD to transfer the stock to Unrestricted use.
    Summarizing, the inspection lot is being created when I create the delivery. I can post GR only after running QA11. But then another inspection lot is created and the stock is posted in Returns. I think that the standard should not work like this.
    Please let me know what could be the reason for the error for goods issue for sales return?
    Thanks in advance.
    Pablo
    Sales Return Inspection lot status Error

    Dear Nunez
    1) 06 inspection lot gets created when you create a delivery not when you do the GR.
    2) for 651 movement type only 06 inspection lot will be created and this lot will not be stock specefic. You cannot do stock posting for this lot
    3) if you need an inspection lot while doing the GR of the delivery then kindly do the following
    1) make use of movement type 653 instead of 651
    2) activate 05 inspection in the material master. (deactivate 06)
    3) for delivery type LR ( the delivery type you are using for the return ) maintain 05 inspection type in the config
    SPRO > QM> Quality Inspection> Inspection Lot Creation>Inspection at Shipping>Assign Inspection Lot Origin to Delivery Type>LR 05inspection type.
    Now create the return sales order and then do PGR. inspection 05 will be created. you can do the stock posting in this lot
    regards
    gajesh

  • SD-QM: Sales Return Inspection lot status Error

    Hello Expert,
    I want to post Goods receipt in a Returns delivery with QM activated in the material but the following message is displayed:
    Status of inspection lot 060000000001 / partial lot 000000 does not allow good issue
    Message no. VL171
    The inspection type is 06 (Inspection for Returns from Customer).
    The movement type is the 651.
    I thought that the inspection lot was created when you post the Good receipt, not when you create the delivery, and the stock material would be Qual. Inspection. So, then I should run QA11 click on Accepted in the UD to transfer the stock to Unrestricted use.
    Summarizing, the inspection lot is being created when I create the delivery. I can post GR only after running QA11. But then another inspection lot is created and the stock is posted in Returns. I think that the standard should not work like this.
    Please let me know what could be the reason for the error for goods issue for sales return?
    Thanks in advance.
    Pablo
    Sales Return Inspection lot status Error

    Dear Nunez
    1) 06 inspection lot gets created when you create a delivery not when you do the GR.
    2) for 651 movement type only 06 inspection lot will be created and this lot will not be stock specefic. You cannot do stock posting for this lot
    3) if you need an inspection lot while doing the GR of the delivery then kindly do the following
    1) make use of movement type 653 instead of 651
    2) activate 05 inspection in the material master. (deactivate 06)
    3) for delivery type LR ( the delivery type you are using for the return ) maintain 05 inspection type in the config
    SPRO > QM> Quality Inspection> Inspection Lot Creation>Inspection at Shipping>Assign Inspection Lot Origin to Delivery Type>LR 05inspection type.
    Now create the return sales order and then do PGR. inspection 05 will be created. you can do the stock posting in this lot
    regards
    gajesh

Maybe you are looking for

  • March's TechNet Wiki FIM Guru Winners announced!!

    The results for March'sTechNet Guru competition have been posted! http://blogs.technet.com/b/wikininjas/archive/2014/04/17/the-microsoft-technet-guru-awards-march-2014.aspx <- results page! Congratulations to all our new Gurus for March! We will be i

  • Search help in table view of Module pool programming

    Hi SAP all. here i have created one screen in se80 and i have created one table control. in the table control i have created one field ,for that field i just want to have the search help refer to C_KUNNR. when i entered C_KUNNR in the search help box

  • How to change Database character set?

    Hi, We are planning to make a clone of production Database which has: select value$ from sys.props$ where name='NLS_CHARACTERSET'; AL32UTF8 We have set up a new server for that purpose and installed database, but by default it has select value$ from

  • Subclips in FCP6

    I'm sending clips, about 20 [10 second]cuts from a long [20 minute] single clip, to Motion to build an open. The problem is that when I tried to optically re-time one of the clips it analyzed the entire original [20 minute] clip. I wanted it to analy

  • Change "save as" file format list

    How do I change the file format order that is listed in the "save as" file format window? Instead of having "Photoshop" listed as the default file, I'd like to have JPEG at the top, then TIFF, PSD, etc. I have to constantly scroll down the list to fi