QM- In-process inspection Setup

Hi all,
My requirement is :
- to setup inprocess inspection in the final operation in routing,
- the operation and order can only be confirmed if the usage decision of inspection is favorable.
- want Auto GR to happen after favorable usage decision and subsequent operation& order confirmation.
I have done the following:
- attached an in process inspection type with a required UD set and made it active
-created an MIC and assigned in routing
-assigned a control key that allows inspection and autoGR to the final operation in routing.
The following happens when i test my setup
- When i release the order an inspection lot is created.
BUT, the problem i face is that when i confirm the final operation the Auto GR happens and the FG is posted to unrestricted stock even though the usage decision is not entered for the inspection lot. What i want is that on confirming the order the FG should be posted in Quality stock and once i enter the favorable usage decision it should automatically get posted to unrestricted use.
Could you please tell me what i am missing here?
Thanks,
Ashok

Hi!,
Actually inprocess inspection doesn't involve any inventory movement. Means you can't control any goods movement with inspection type "03".  Only inspection types 01, 04 and 08 involves control on goods movements. For your requirement you need to opt for goods receipt inspection i.e. inspection type "04". For this you need to assign an inspection setup in material master with insp type "04", create an inspection plan for the produced material. Now when you make an order and confirm some quantity then system will create an inspection lot and till you give UD to that the confirmed quantity will remain in quality stock.
I hope this will solve your problem. In case of further queries please revert back.
Regards,
Uday

Similar Messages

  • Inspection setup in view quality management update in material master

    Hi all,
    We are using BAPI_MATERIAL_SAVEDATA for our material master updation.
    Here one  of the change in the program is to update the inspection setup in the view quality management.
    Can anybody tell in which stucture of the bapi BAPI_MATERIAL_SAVEDATA  i can pass the values of the inspection set up fields.If not is there any other bapi through which can be done?
    Thanks in advance.
    regards
    Nazmul

    Hi,
    To deactivate the Inspection Types for materials, you can use transaction QA08.
    Here use tab "Deactivate insp. type" and specify the inspection type which you want to dactivate.

  • Production order should be confirmed before in-process inspection UD

    We guys,
    I have activated the In-process inspection for one Finished goods and inspection lot is getting created when Production order released. This production order can be confirmed without UD for In-process inspection lot.
    Please let know How can I control that Production order should not be able confirm before UD of Inspection lot for in-process inspection.
    When production order released it means an production has just starded. Then What is the meaning in getting the inspection lot created on release of production. I think it is supposed to be on completion of each opration.
    Please give your inputs.
    Thanks
    Dhanu

    Hello
    inprocess inspection are used to assisst you to record results , defect , rework, during the production operation. It is defined to get created during the release of the order. It gives QM personnel a control over the quantity confirmation. You can do the result recording based on time and quantity.
    Operation confirmation and UD are independent and it will not be possible to do confirmation once you do the UD.
    The controls that can be brought in 03 inspection for a better usage
    1) Result recording mandatory for all inspection points
    2) QM operation can be confirmed only by QM personnel
    3) At the time of GR of the order check whether UD for the lot is given. Make UD mandatory for GR of the order
    4) Only after QM operation confirmation the next operation can be confirmed
    5) make use of Rework to capture rework cost and First Pass Yield
    Hope this gives some picture to you
    Regards
    gajesh

  • In QM view Inspection Setup data tab is not coming

    Hi Friends
    I want to assign inspection type to a material, plant combination but in QM view Inspection Setup data tab is not coming
    Thanks & Regards
    Gajendranath

    Hi gajendra,
    Inspection set up data in QM view will appear only when you select quality view & maintain any plant releted data at the time of material creation .If you dont maintain any plant releted data then QM view then insp set up data will not appear. so please o through mm01 once again select QM view & maintain plant data, then next time insp set up data will appear.

  • Inspection setup maintained while stock in quality inspection

    Dear Consultants,
    While having stock in quality inspection we were still able to maintain the inspection setup in QM view of that material in that plant.
    Actually the system should have thrown error "To activate QM, the inspection stock for the material must be empty". But some how this is not happening.
    Kindly provide solution.
    Regards,
    Ninad.

    Hello Ninad,
    You can activate an
    inspection type under the following conditions:
    If it is not stock-relevant
    If it is stock-relevant and at least one active stock-relevant inspection type exists
    If it is the first stock-relevant inspection type and no inspection stock exists, or if you set the indicator Activate despite insp. stock
    above lines are copied from
    https://help.sap.com/saphelp_46c/helpdata/en/2d/350ef6448c11d189420000e829fbbd/content.htm
    Your scenario falls in 2nd condition. You can activate inspection type if it is stock-relevant and at least one active stock-relevant inspection type exists.
    Amol.

  • In-process inspection in repetitive manufacturing

    Hi,
    My client handles assembling of electronic products.  product passes through different set of operations where in it proceeds to the next operation only when the prior operation is approved in terms of quality.
    We are trying to go with repetitve mfg but we are unable to understand in-process inspection operation wise.  Pls advise is this feasible or we only need to go with discrete mfg with production orders.
    Regards,
    Sravan Kumar V
    Edited by: SRAVAN KUMAR on Oct 6, 2008 6:45 AM

    Dear,
    1. Setting up inprocess inspection
    for inprocess REM you have to maintained inspection type 13 in material master. and select task list. for that you have to maintained inspection point in your rate routing for ex for partial lot quantity based.
    2. GR Inspection from production
    then you go for result recording for inspection point and do the reporting point backflushed through result recording of every inspection point.
    3. At what stage the QM lot is generated .
    for that you have to create inspection lot in t code MFPR for your production version and for that inspection lot you have do above work.
    Please refer this link also,
    http://help.sap.com/saphelp_46c/helpdata/en/8a/a5aadd4adc11d189740000e8322d00/frameset.htm
    Regards,
    R.Brahmankar

  • In Process Inspection for Repetitive Manufacturing

    Hi All,
    I'm trying to perform in-process inspection for repetitive manufacturing. I have a semi finished material which has the inspection type 13 activated in the material master. Rate routing for it has also been created. Characteristics have been assigned to its operation and the routing is attached to a production version. When I o to MFPR to create a lot, I specify the material, plant and production version with QM active (tried the other 2 options as well) but when I execute, nothing shows up in the list. When I click on create inspection lot, it says, "either select versions or place cursor on versions now" but there's nothing in the list?
    Regards,
    Bilal

    Hi,
    Please check whether the repetitive manufacturing check box and REM profile is defined in the MRP4 of material master.
    Please define that and try to run the transaction MFPR.
    It should solve your problem
    Regards,
    Sumit Gupta

  • Creat inspection setup entries in quality View using BAPI_MATERIAL_SAVEDAT

    Dear all,
    I am using BAPI_MATERIAL_SAVEDATA to extend Material from one plant to another.
    I am able to extend Quality view to another plant
    But unable to create inspection setup entries for the extended view.
    Please help.
    Regards,
    Gaurav sood

    Issue Resolved

  • Inspection setup key

    Hi,
         While making gr goods automatically updated in to quality inspection stock.
    But inspection setup key is not activated in the material master for that material.
    So inspection lot  number is not created for this Goods receipt entry.. how can i
    inspect that quality inspection stock without lot number.. pleae find out the
    solution.
    -Sathya..

    HI,
    There is a Quality Block (Block.reason: quality) check Box active in the MIRO,untill we have cleared the Stock from quality inspection.
    So we have to write in the Exit below
    EXIT_SAPLMRMP_010-ZXM08U16-----MIRO
    if this indicator SPGRC is "X" Configure an error message that material is in Quality inspection.
    Hope so it helps
    Regards
    Anjanna.

  • Inspection setup chkbox not checked while inspection details exists

    i am facing a wierd problem.
    i have craeted a MM01 bapi -->> using FM BAPI_MATERIAL_SAVEDATA.
    it is working perfectly fine.
    also to update the inspection setup in quality managment tab.
    m using FM -->> BAPI_MATINSPCTRL_SAVEREPLICA.
    here is the code snippet:
      WA_VT_INSPECTIONCTRL-INSPTYPE = '03'.
        WA_VT_INSPECTIONCTRL-MATERIAL = WA_DATATAB-MATNR.
        WA_VT_INSPECTIONCTRL-PLANT = WA_DATATAB-WERKS.
        WA_VT_INSPECTIONCTRL-IND_INSP_WITH_TSK_LIST = 'X'.
        WA_VT_INSPECTIONCTRL-IND_INSP_BY_CHARAC = 'X'.
        WA_VT_INSPECTIONCTRL-INSP_PERCENTAGE = 0.
        WA_VT_INSPECTIONCTRL-IND_SKIPS_ALLOWED = 'X'.
        WA_VT_INSPECTIONCTRL-IND_SINGLE_UNITS_POSSIBLE = 'X'.
        WA_VT_INSPECTIONCTRL-AVE_INSP_DURATION = 0.
        WA_VT_INSPECTIONCTRL-QUAL_SCORE_PROCEDURE = '06'.
        WA_VT_INSPECTIONCTRL-IND_INSPTYPE_MAT_ACTIVE = 'X'.
        WA_VT_INSPECTIONCTRL-PREFERRED_INSPTYPE = 'X' .
        APPEND WA_VT_INSPECTIONCTRL TO VT_INSPECTIONCTRL.
        CLEAR WA_VT_INSPECTIONCTRL.
        CALL FUNCTION 'BAPI_MATINSPCTRL_SAVEREPLICA'
          TABLES
            RETURN         = RET_INSP
            INSPECTIONCTRL = VT_INSPECTIONCTRL.
    this FM also ding well,
    here is the wierd thing starts:
    after BAPI_TRANSACTION_COMMIT:
    when in MM03 I SEE AT QUALITY MANAGMENT VIEW -> INSPECTION SETUP CHECKBOX IS NOT CHEKCED
    But when i click on inspection setup pushbutton,inspection details are displayed.
    And after clicking yes on this inspection detail pop up window.
    Inspection setup checkbox is checked .
    I want inspection setup is checked initially.(no need to open the pop up window just to check the checkbox).

    what's you fininal solution for this problem?  I also face same question

  • Material without inspection setup goes to quality inspection

    Hello Gurus
    We have material without inspection setup, but the system say the stock type is Quality Inspection.
    Then we get problems in the goods receipt. We checked the PO has stock type quality inspection, how can we solve this situation?, please give advice.
    Best Regards
       Jimmy

    Hello,
    No changes like you mentioned, the problem is if you create a PO with some materials the system says the stock type is Quality inspection , then at GR we are dealing with problems, but the material do not have flag for inspection and also the PO has the stock type Quality inspection, so if you create a new PO it will go to Quality inspection...

  • FM for get Material Inspection setup data

    Hi ALL
    I'm looking for a Function Module or Method that we can get Material Inspection setup data. ( QMAT data )
    Please let me know if you know that.
    Regards
    Rie

    reply myself...
    I can get an answer below thread
    Function Module for get Material Inspection setup data

  • Result Recording for In Process Inspection

    At the time of taking Usage Decision for In Process Inspection, system gives warning message if Results have not been recorded. Can this Warning message be changed to Error message so that user could not able to take UD without recording the results.
    Thanks in advance
    Srini

    Dear Srini
    1)Use status profile for restricting the user to do UD without doing RR. use this link for doing it
    Link: [https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/20fbc091-ea3a-2b10-f0a3-877ffbf36436]
    2) you can use this auth object for doing the same restriction - Q_INSP_FIN
    Link: [Re: Preventing UD without results recording]
    Regards
    Gajesh

  • QM: Inspection Setup in the Material Master

    Hi all!
    A quick novice user query: In SAP ERP Quality Management, I was creating an inspection lot for a material and it prompted me to first add an inspection type for it. I went to the Inspection Setup in the Material Master, entered the material, the plant, check activate inspection, selected an inspection type and hit execute. But it keeps giving me "No entries found". Any help?
    Thanks a bunch in advance!
    Regards,
    Bilal

    Your query does not provide complete info as to what type of inspection origin you're trying.
    Anyway as a thumb rule ensure that the setup in material master exists, i.e. the relevant inspection origin type. Ensure the tickbox for active exists. Also the corresponding data such as inspection plan / material characteristic etc. exists along with the required setup.
    Once the above is in place you can proceed with the QM flow. In addition to this I would also suggest do a search in QM forums to know more about how to maintain the data, what needs to exist etc. Also go thru' SAP help.

  • Stock updation in In process inspection

    Hello everyone,
    I had a question regarding In process inspection
    My client requires that upon performing in process inspection ( currently inspection type:03) he should be able to automatically post the same to Blocked or unrestricted use stock as recorded
    This I know is possible if I post stock first using GR (inspection type:04) As a result stock goes automatically to QC stock. But this would not serve the purpose since he again has to do quality UD again.
    So is there any way I can do this?
    Any help is higly appreciable.
    Sincerely,
    Aji

    In QM view for 04 inspection type -->
    An inspection type assigned to inspection lot origin 04 is active
    The Control of inspection lot creation indicator for the inspection type is set so that the system will create an inspection lot for early inspection for goods receipt
    This will create then inspection lot of 04 when you release the production/process order.This lot is created along with 03 inspection type but it is not stock relevant.
    for more info :  http://help.sap.com/saphelp_46b/helpdata/en/60/64cae6d9b311d1953a00a0c930e04c/content.htm

Maybe you are looking for