Stock updation in In process inspection

Hello everyone,
I had a question regarding In process inspection
My client requires that upon performing in process inspection ( currently inspection type:03) he should be able to automatically post the same to Blocked or unrestricted use stock as recorded
This I know is possible if I post stock first using GR (inspection type:04) As a result stock goes automatically to QC stock. But this would not serve the purpose since he again has to do quality UD again.
So is there any way I can do this?
Any help is higly appreciable.
Sincerely,
Aji

In QM view for 04 inspection type -->
An inspection type assigned to inspection lot origin 04 is active
The Control of inspection lot creation indicator for the inspection type is set so that the system will create an inspection lot for early inspection for goods receipt
This will create then inspection lot of 04 when you release the production/process order.This lot is created along with 03 inspection type but it is not stock relevant.
for more info :  http://help.sap.com/saphelp_46b/helpdata/en/60/64cae6d9b311d1953a00a0c930e04c/content.htm

Similar Messages

  • 3rd Party with stock update

    Hi all,
    I am trying to setup proces to track SO through process of purchase.
    Much like 3rd party sales processing w. shipping notification with difference that I need to receive goods on stock not on SO consumption and afterwards to ship it away.
    I tried to set up automatic Pur.Request out of Sales Order but was unable to do this without account assignment, and thus always ending up creating PO for consumption and skiping stock.
    Can somebody give me some pointers on how should I setup this.

    Yes, I am aware that in 3rd party scenario there is no stock update cos goods are shipped directly to customer from vendor.
    Mine problem is that I have to make process of tracking SO through Purchasing with stock update and I am stuck with creating Pur.Requisition out of SO with account assignment which then triggering GR on SO consumption.
    Is there a way to create Pur.Requisition automaticaly out of SO without account assignment. So that I can procure to stock and still have update document flow in SO.
    Or maybe this is wrong approach and I should take another one.

  • QM- In-process inspection Setup

    Hi all,
    My requirement is :
    - to setup inprocess inspection in the final operation in routing,
    - the operation and order can only be confirmed if the usage decision of inspection is favorable.
    - want Auto GR to happen after favorable usage decision and subsequent operation& order confirmation.
    I have done the following:
    - attached an in process inspection type with a required UD set and made it active
    -created an MIC and assigned in routing
    -assigned a control key that allows inspection and autoGR to the final operation in routing.
    The following happens when i test my setup
    - When i release the order an inspection lot is created.
    BUT, the problem i face is that when i confirm the final operation the Auto GR happens and the FG is posted to unrestricted stock even though the usage decision is not entered for the inspection lot. What i want is that on confirming the order the FG should be posted in Quality stock and once i enter the favorable usage decision it should automatically get posted to unrestricted use.
    Could you please tell me what i am missing here?
    Thanks,
    Ashok

    Hi!,
    Actually inprocess inspection doesn't involve any inventory movement. Means you can't control any goods movement with inspection type "03".  Only inspection types 01, 04 and 08 involves control on goods movements. For your requirement you need to opt for goods receipt inspection i.e. inspection type "04". For this you need to assign an inspection setup in material master with insp type "04", create an inspection plan for the produced material. Now when you make an order and confirm some quantity then system will create an inspection lot and till you give UD to that the confirmed quantity will remain in quality stock.
    I hope this will solve your problem. In case of further queries please revert back.
    Regards,
    Uday

  • In-process  inspection for rework operation

    Hi all,
    i have a production order to which the in-process inspection characteristics are assigned in routing. when a production order is released, an in-process inspection lot is created. Inspection is carried after the end of an operation.  During which rework will be carried out if the product is rejected.   Rework operations are trigged through trigger points assigned to the production order. A reference operations set indicating the rework operations is assigned to the trigger point. rework operation in the reference opeation set is also assigned with inspection characteristics.  But during the results recording, the rework inspection characteristics are not displayed for results recording.....
    pls explain the possible solution.
    regards,
    sravan kumar v

    Hello
    I think that the process can be mapped in one of these ways:
    - according to what you describe this is closer to a good receipt inspection and not to in-process inspection, as the trigger for the inspection is the GR and not the release of the order. So, why dont you give a chance to a 04 inspection type, with inspection lot creation for every GR ? Check the indictor in MM02, QM view for "04" inspection, and uncheck the "Stock in quality", so you dont get caught by the stock in quality and resembles in process "Non-stock relevant" inspection
    - alternatively you can define the use of inspection points ? So you are adding new results as new confirmations are made. Disadvantage: you can only give one usage decision to the inspection Lot, irrespective of the number of samples you have analyzed.
    Regards

  • In-Process Inspection material having inspection type 04

    Dear Sir/Mam
    My question.In-Process Inspection material having inspection type 04.As we accept the inspection lot we put the stock into unrestricted.But when we have to reject we convert that stock into new material or if rework to be carried out,the criteria is stock should be quality,than production people cancel the confirmation and rework is carried out through trigger point.So my concern can we put the stock in block and in background whole production order is cancelled.
    Thanks
    kunal

    Dear Kunal
    This is the process i have defined for rework. let me know your feedback
    1.Reject the material in QA32 to block stock
    2.Reverse faulty material using Tcode MB1A u2013 262 movement type against the production order
    3.if you need to scrap highly faulty materials   use Tcode MB1A u2013 551 movement type against a cost centre
    4.Create a rework order using Tcode Co01 order type (PP03)
    5.Enter the Parent production order number in the goods receipt tab in Co01. (inbound delivery)
    6.Issue goods against the rework order using MIGO
    7.confirm the rework order through co11n
    8.Move the material back from block to quality using Tcode MB1B u2013 349 movement type (activate 08 inspection)
    9.Inspection lot created
    10.Do the posting accordingly
    Regards
    Gajesh

  • Sample management with in-process inspection

    i need to know why must we assign inspection points when we use sample management in an in-process inspection ?

    Hi,
    [Kindly refer the link herewith|Inspection point] wherein the importance of inspection point is mentioned.
    In simple words, inspection point determines what system should do to proceed the inspection.
    I mean if you will enter 100 (STD SAP), system will plan the inspection, UD , Quality score procedure etc etc according to the freely defined inspection points.
    Now say if you enter 200 (STD SAP) there, then system will go in the direction of Samples, means will generate Physical Sample (Numbers), Samples size, will fetch these data to UD and stock posting screen also, then calculate the Quality score, etc etc.
    If you will enter it time based inspection point then system will drive the entire inspection lot accordingly.
    Now these is the straight and written explanation to your answer.
    Means If there is inspection point as 200--->there will be need  of SDP, Sampling procedure, etc
    But in same manner it is applicable in reverse order also, i.e. If you wanna go with SDP,Sampling procedure (SAMPLE Mgmt) then,inspection point there must be maintained accordingly.
    Regards,
    Shyamal

  • In process inspection for partial confirmation of production order

    Hi QM Guru,
    how i will do in process inspection for partial confirmation of production oder
    Senior is this  I have maintain inspection type 03 in finish material u2026..suppose production order quantity 20 kg..there are 2 operationu202610 and 20.. I have maintained MIC on operation 20u2026after release the production order  lot are generatingu2026but when they confirm operation 10 they do partial confirmation for 10 kgu2026.then again when do confirmation 20..they checku2026for quality resultu2026
    Then I do the result record ok of 10 kgu2026then they confirm 20 operationu2026.
    Now. again he do the confirmation of rest production order 10 kg..opration 10 ok..but in operation 20..system does not check for qualityu2026..
    Again I want to do the quality inspection of 10kg on 20 operationu2026
    How I will do. kindly suggest me
    Regards
    Aqueel

    Hello
    I think that the process can be mapped in one of these ways:
    - according to what you describe this is closer to a good receipt inspection and not to in-process inspection, as the trigger for the inspection is the GR and not the release of the order. So, why dont you give a chance to a 04 inspection type, with inspection lot creation for every GR ? Check the indictor in MM02, QM view for "04" inspection, and uncheck the "Stock in quality", so you dont get caught by the stock in quality and resembles in process "Non-stock relevant" inspection
    - alternatively you can define the use of inspection points ? So you are adding new results as new confirmations are made. Disadvantage: you can only give one usage decision to the inspection Lot, irrespective of the number of samples you have analyzed.
    Regards

  • Material return(sales return)-default stock updation

    Daer Gurus
    While material return(sales return), default stock updation is possible through Transfer posting or some other transcation...pls help me to give a Soln
    Regards
    Ragesh

    If a customer returns goods , you must first determine whether or not a returns delivery exists for the returns in the Sales (SD-SLS) component. You then enter the return with or without a returns delivery.
    Since returns from the customer are usually examined, the quantity returned is first posted to blocked stock returns. As is the case with goods receipt blocked stock, blocked stock returns are neither valuated nor do they count as unrestricted-use stock.
    If an examination proves that the returned quantity should be taken over into unrestricted-use stock, you enter the transfer to unrestricted-use stock in a second step. It is at that time that the valuation of the goods receipt occurs.
    If a returns delivery exists, the return should be posted in the Sales (SD-SLS) component, not in the Inventory Management component.
    Depending on how Customizing for Sales is configured (the movement type is configured in the step Define Schedule Line Category), the delivery is posted to the following stock:
    Blocked stock returns (non-valuated, not unrestricted-use) (movement type 651)
    Unrestricted-use stock (movement type 653)
    Quality inspection stock (movement type 655)
    Blocked stock (movement type 657)
    If the given quantity is posted to blocked stock returns first, you can make a manual goods movement posting in the Inventory Management component to transfer the quantity to valuated stock.
    If blocked stock returns are to be transferred into your company's own stock, you enter the transfer as a transfer posting. Choose movement type 453 (to unrestricted-use stock), 457 (to stock in quality inspection stock), or 459 (to blocked stock.
    If helps rewards points.
    Regards
    TAJUDDIN

  • Open stock updation not performed with MB1C

    Dear Frieds,
    While performing open stock updation with MB1C T-Code, an error message will appeared as " Material xxxx does not exist in warehouse xxxx". Kindly give the solution.
    Regards,
    Gopi

    Hi,
    Go to MM01, select warehouse - 1 & 2 views, specify the warehouse nos & extend the warehouse views for this material. Once the above is done, you can proceed to use MB1C.
    Regards,
    Vivek

  • POS DM: Stock updates in SAP Retail

    Hi!
    We are implementing SAP Retail (ERP 6.0 EHP4 stack 3), SAP PI (Netweaver PI 7.1 SP 8) and SAP BW (NetWeaver 7.0 ehp1 stack 4, incl BI content 704, SP 3 ) for a client. Their POS system is a 3rd party system, i.e. not SAP POS, and it does not contain any stock information.
    This issue concerns stock updates in SAP Retail using POS DM:
    On the busiest day of year, my client has 347 000 POS transactions in total from all stores, and in one year they have 30 mill POS transactions. My client requires that SAP will provide them with near-realtime information on stock availability, as this is an important way of providing good customer service. The stock information should be available in SAP Enterprise Portal and SAP Retail Store, as well as standard SAP gui transaction. In addition, the webshop (external system) should have as accurate information about stock as possible, at least it should be updated once every 30 minutes.
    My client also has a requirement to be able to create purchase orders during office hours (store opening hours), based on MRP runs. This means they must have as accurate stock levels as possible for running MRP. Stock levels are also used in ATP checks, when deciding whether to pick customer orders from store inventory/stock or to create purchase requisitions.
    All these requirements have led us to believe that the best way to solve this, is alternative A:
    - to update stock continuously during office hours, using WPUBON to create material documents, one for each POS transaction. Sales and tenders will be updated in SAP Retail using WPUUMS and WPUTAB.
    Some challenges this will create:
    a)     It will create 347 000 WPUBONs on the busiest day of year, all within 10-12 open hours.
    b)     If we have same amount of material docs and FI docs, they will use 30% of the available 8 digits within their number ranges per year.
    c)     The idocs will fail if there are article locks simultaneously. (However, this can be handled by updating products only at night time (using batch jobs) and using batch job to handle failed idocs)
    Edited by: Øystein Emhjellen on Jan 4, 2010 2:15 PM

    Alternative B:
    - we have considered to use WPUUMS and WPUTAB, updating stock levels only once a day. The solution we then must use for taking into account actual sales data is described in SAP Note 1088886 - Using the interface for online stock queries. If we choose this, we need to check during the day for each article any sales, to reduce stock in reporting/screens, ATP checks and in MRP runs. We must also create a program to check for articles sold before sending stock data to webshop (external system). (As we do not know which articles have been sold, we must create our own version of RFC - /POSDW/SALES_QUERY_RFC, to enable that the article number does not have to be specified. Rather, the article numbers (and sold quantities) have to be returned to ERP based on what was actually sold.)
    We consider this alternative more risky, due to the need for changing behaviour of standard programs for MRP and ATP check. It will also create a number of RFC calls between SAP ECC and SAP BW.
    My questions on this issue are:
    i)     Will alternative A be preferrable, if hardware requirements are handled?
    ii)     Do you see any additional challenges related to alternative A?
    iii)     Will alternative B be adviceable, concerning the program changes/enhancements involved?
    iv)     Are there standard implementations of SAP ECC, that includes the use of RFC - /POSDW/SALES_QUERY_RFC. I.e. standard programs in SAP ECC that uses the information from this RFC call?
    Thanks for any advice !
    Best regards,
    Oeystein Emhjellen

  • Production order should be confirmed before in-process inspection UD

    We guys,
    I have activated the In-process inspection for one Finished goods and inspection lot is getting created when Production order released. This production order can be confirmed without UD for In-process inspection lot.
    Please let know How can I control that Production order should not be able confirm before UD of Inspection lot for in-process inspection.
    When production order released it means an production has just starded. Then What is the meaning in getting the inspection lot created on release of production. I think it is supposed to be on completion of each opration.
    Please give your inputs.
    Thanks
    Dhanu

    Hello
    inprocess inspection are used to assisst you to record results , defect , rework, during the production operation. It is defined to get created during the release of the order. It gives QM personnel a control over the quantity confirmation. You can do the result recording based on time and quantity.
    Operation confirmation and UD are independent and it will not be possible to do confirmation once you do the UD.
    The controls that can be brought in 03 inspection for a better usage
    1) Result recording mandatory for all inspection points
    2) QM operation can be confirmed only by QM personnel
    3) At the time of GR of the order check whether UD for the lot is given. Make UD mandatory for GR of the order
    4) Only after QM operation confirmation the next operation can be confirmed
    5) make use of Rework to capture rework cost and First Pass Yield
    Hope this gives some picture to you
    Regards
    gajesh

  • Updating an Integration Process in Builder after making a change in Design

    Hi,
    I have a BPM defined as an Integration Process in Designer. I transferred the Integration Process from Repository to the Builder.
    Now I have updated my BPM Process in Designer/Repository but the "new" outbound and inbound interfaces do not seem to show up in the Builder.
    If I create a new integration process and point it to the BPM process then it shows the new changes but how do I update the existing Integration Process in the Builder to show the "new" outbound and inbound interfaces?
    Thanks
    Ashish

    I am on SP11 and this functionality of Updating Changes to BPM in ID is not there.
    Deleting the whole process and then adding it all over again is a potential risk as I might lost my config. I guess that is my only choice at this time.
    Thanks all for your help
    Ashish

  • In-process inspection in repetitive manufacturing

    Hi,
    My client handles assembling of electronic products.  product passes through different set of operations where in it proceeds to the next operation only when the prior operation is approved in terms of quality.
    We are trying to go with repetitve mfg but we are unable to understand in-process inspection operation wise.  Pls advise is this feasible or we only need to go with discrete mfg with production orders.
    Regards,
    Sravan Kumar V
    Edited by: SRAVAN KUMAR on Oct 6, 2008 6:45 AM

    Dear,
    1. Setting up inprocess inspection
    for inprocess REM you have to maintained inspection type 13 in material master. and select task list. for that you have to maintained inspection point in your rate routing for ex for partial lot quantity based.
    2. GR Inspection from production
    then you go for result recording for inspection point and do the reporting point backflushed through result recording of every inspection point.
    3. At what stage the QM lot is generated .
    for that you have to create inspection lot in t code MFPR for your production version and for that inspection lot you have do above work.
    Please refer this link also,
    http://help.sap.com/saphelp_46c/helpdata/en/8a/a5aadd4adc11d189740000e8322d00/frameset.htm
    Regards,
    R.Brahmankar

  • In Process Inspection for Repetitive Manufacturing

    Hi All,
    I'm trying to perform in-process inspection for repetitive manufacturing. I have a semi finished material which has the inspection type 13 activated in the material master. Rate routing for it has also been created. Characteristics have been assigned to its operation and the routing is attached to a production version. When I o to MFPR to create a lot, I specify the material, plant and production version with QM active (tried the other 2 options as well) but when I execute, nothing shows up in the list. When I click on create inspection lot, it says, "either select versions or place cursor on versions now" but there's nothing in the list?
    Regards,
    Bilal

    Hi,
    Please check whether the repetitive manufacturing check box and REM profile is defined in the MRP4 of material master.
    Please define that and try to run the transaction MFPR.
    It should solve your problem
    Regards,
    Sumit Gupta

  • Last stock update Date Tab not updating in ICH

    Hi Team
    I observed that in ICH screen Last stock update Tab is not going to update every time while demand and stock information coming from ECC to ICH.
    There is no stock inconsistency. All stock tab information are updating correctly in ICH compare to ECC system.
    Only this Last stock update tab Date are not updating.
    What is the reason behind this?
    Could you please help me to resolve this?
    Regards
    Virendra Kumar
    09769396038

    Hi Virendra
    It is a bug, please report to SAP and get fix
    which version you are using and what is the patch level?
    1341691 should be helpful check out
    Best Regards
    Vinod

Maybe you are looking for

  • ITunes doesn't send my workout data to nikeplus anymore

    Hi, Did anyone face the same problem? It's really frustrating. My nano synced to iTunes successfully. I can see the last workout data on Nike+iPod page. But, it doesn't even try to send data to nikeplus. I did it many times without any trouble. Norma

  • Setting up with Ricoh MP C5000 - Help!

    Hi, I am using a new macbook pro (10.7.3) at work and we use the ricoh mp c5000 at work.  I have tried so many different drivers but nothing seems to work.  When I try to print one page, about 20 get printed with all of this garbled text,=. If someon

  • No Audio in the timeline and no sound as well using CS4

    We have installed CS4 Premiere Pro. When we imported a video clip, there was an error message "audio conforming error". the image part showed up but there was nothing (no sound, no wave length on the timeline). We can work on this video file on CS3 v

  • Exiting an Aware Piece

    Hey Guys and Gals I know that it is possible to use ExitIcon to capture the exit command and perform tasks before closing the piece, but is it possible to fully disable that "X" in the upper right corner of the program, either by turning it off or di

  • Secondary IP in WAN port - RV042 or RV082

    Hi I have an ISP that provide me 2 different segments of public IP addresses on the same fibre. So I am wondering if router RV042 or RV082 can have a secondary IP for a single wan port ? Thank you