Raw material in decimals in order

Hi,
I am facing a problem with consumption of packing materials  .The BUM is RO1(Roll).
In bom i have maintained in decimals the requirmet for 1 FG. But when i make prod order the quantity  is rounded to integer '1 '
What are settings which control this  ?
Regards
ShankarR

Hi Shankar,
I think ur Base unit of measure is not roll, Please check in material master Basic data 1, the base unit of measure is is ROll or kg?
While proposing in the order system always proposes in BUM.
If it is roll in basic data. then In CUNI for ROLL, check weather decimal places are active.
sree

Similar Messages

  • Raw Material Consumption to Process Orders

    Hi Friends,
    I need help with changing the way how we consume raw materials in our manufacturing organization.
    Current Process:
    A.     Receive product A in Warehouse, movement type 101. Debit Inventory Account, and Credit GR/IR.
    B.     Move product A to a storage location (out of Warehouseu2019s custody). Movement type 311. No impact to P&L, as no accounting entries.
    C.     Consume product A in a u2018Process Orderu2019 from that storage location 311. Debit Consumption Account, and Credit Inventory Account.
    Product A is listed in Bill of Materials and has to be issued to process orders for final consumption u2013 to give production variance as we are on standard costing system.
    Desired Process:
    We want to have stronger controls in our organization. We want to hit P&L in step B, as soon as Warehouse issues items out. This can be done using movement type 201 GI for Cost Center.
    But we also desire to see final consumption happening in process orders, as all our BOMs and standard costs account for the consumption of product A.
    Please advice how do we issue items to a process order that have already been issued to a Cost Center. What is it that I am missing?
    Thanks,
    Meet A

    I believe we will stick with our current process. See Ajay's reply on the link below:
    Raw Material Consumption to Process Orders
    Thanks and regards,
    Meet A.

  • Stop excess raw material consumption against production order

    Hello
    Please Guide
    Is there any  control to Stop the excess or less consumption of raw material against the Production Order confirmation.
    Eg
    Prod order Qty - 10
    Ram material reqd A- 10 piece & B- 10 Piece
    So now Order confirmation Qty - 10
    raw material consumption A - 10 & B- 10
    so for A or B if i want to issue (261) excess or Less qty than system should not allow this. System response to be as an error message in case I increase or decrease the Qty of A or B other than 10 against the prod order confirmation of qty 10.

    Hi,
    You have to use user exit only to avoid it.
    1.CONFPP02 - for checking good issue during confirmation
    2.MBCF0002 - for Checking Confirmations during the Goods receipt.
    For this you need to Use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Sep 9, 2008 12:41 PM

  • Raw material -scrap-against production order

    Hi all,
              I withdrawn 10 qty of raw material for production order using mvt type :261. Due to some wrong machine Operation  2 qties of the Raw material is become unusable(scrap).
    I want to return this 2 qty of raw material to warehouse.
    what is the movement type can i use?
    Please advise me in this....

    Hi Kumar,
    Please make your question clearer.
    Have you made a confirmation against a PrdORd? I mean:
    1. confirmed 10 pcs of FGs
    2. withdrawn 10 pcs of raw materials
    3. Later you recognized that 2 pcs of FGs were not good because of the wrong quality of raw material.
    In this case you can cancel your confirmation in CO13 (and do it again only for 8 pcs of FGs and scrap the 2 pcs of wrong raw materials) or you can ask for 2 pcs of raw materials from WH and produce the missing 2 pcs of FGs (physically). In this case you can scrap (MB1A 551) the latter 2 pcs of raw materials.
    Other option is that after getting 2 pcs of raw material and producing the 2 pcs of finished goods you book an excess consumption in MB1A + MVT 261 + PrdOrd reference. It based on your concept...(in which way you want to handle the scrap).
    BR
    Csaba

  • Excess Raw Material  issue & FG reciept in Make to order Production

    In MTO Scenario I have created sales order for 10EA.After MRP run planned order of 10EA was created.I converted to Production Order.GI of raw material & GR for FG happens during order confirmation.If for that customer during Production physically 11Ea was produced.How i will show that extra FG (1EA) production & raw material booking against the order..

    Can you clarify, does it  mean you have consumed raw material for 11 EA FG, or you consumed only equivalent of 10 EA and due to production efficiency increase you gtot 11 EA output.
    In any case you can post this as a normal production order output. For additional 1 EA you can add this in Tolerance.

  • Return of raw material on production order

    Dear Experts
        Is there is any way to return raw material issued in production order back after issuing it

    Hi,
    Here is the solution for you( Hopefully)..
    If you proceed in 262 movement it ll reverse all the materials against the order.
    For that ,You have to reverse " to reservation". befor that change the production order BOm with the actual consumed QTY.
    In production order the reservation number will be 12356.
    For that particular material you ll have the reservation number be 12356-12( this you can get from double clicking the line item number of the material).
    In MB1A , Give the reservation number (both the nubers 12356 and 12) And find it solved..
    hope this clarifies..
    karthick
    Edited by: karthick PP on Mar 23, 2009 7:58 AM

  • Where we enter raw material reservation qnty for planned order in monthwise

    sir,
    as per client requirement in every month raw material reservation quantity fixed for planned order in monthwise.
    in sap Where we entere raw material reservation   for planned order in month wise nov, dec, jan and whre its show.
    is it possible after mrp run.can we check that raw material reserve stock in mmbe for planned order.
    pl guide me step by step

    Dear Prakash,
    1) in MMBE, you cannot see Reserved qty against plan order ( it is not a confirmed receipt )
    2) the reserved qty which is shown in MMBE is against production order
    3) only after converting plan order to production order ( Header material )
    4) dependent requirements will convert into reservations
    Regards
    kumar

  • Reg. Process cost and raw material cost added

    Dear Friends
    Please consider our below scenario
    PO is created and stock is maintained in unrestricted (Raw material)
    and then Production order is created for Cut pcs and Raw material is issued to production order through 261 mvt type
    next Cut pcs is received against the production order through 101 Mvt type. Now operation cost is not added with the Raw material cost, only the Raw material cost is represents in MIGO-> FOOTER  - QUANTITY->Quantity in LC field.  What to do to calculate the process cost too.
    When we receive the cut pcs what we attached as component to the cutpcs's cost is calculated, the charge for Cutting is not calculated. we want both cutpcs charge(10.00 per pc)+component cost(raw mat. 180.00 per 1 kg)
    Cut pcs    10 pcs * 10 Rs   = 100 Rs
    Raw mat  10 kg * 180  Rs = 1800 Rs
    the total cost is 1900 Rs should come in that field
    Thanks
    Rajakumar.K

    Please give solution
    Thanks
    Rajakumar.K

  • Reg.Calculate Raw material cost(Fabric)+Process cost(semifinished -cutting)

    Dear Friends
    Please consider our below scenario
    In AFS, PO is created and stock is maintained in unrestricted (Raw material)
    and then Production order is created for Cut pcs and Raw material is issued to production order through 261 mvt type
    next Cut pcs is received against the production order through 101 Mvt type. Now operation cost is not added with the Raw material cost, only the Raw material cost is represents in MIGO-> FOOTER - QUANTITY->Quantity in LC field. What to do to calculate the process cost too.
    When we receive the cut pcs what we attached as component to the cutpcs's cost is calculated, the charge for Cutting is not calculated. we want both cutpcs charge(10.00 per pc)+component cost(raw mat. 180.00 per 1 kg)
    Cut pcs 10 pcs * 10 Rs = 100 Rs
    Raw mat 10 kg * 180 Rs = 1800 Rs
    the total cost is 1900 Rs should come in that field
    Thanks
    Rajakumar.K

    Hi,
    Process cost is picked up though the activity you maintained in the routing.
    Pre requites
    1. Activity planning should be done through KP26.
    2. Work center should have right formula
    3. The standard value key which you using in routing should be there in workcenter formula.
    In production order ---> Goto -
    > Cost -
    > Cost analysis
    check whether you getting activity cost(In yours case Cutting cost)
    Regards,
    Vishal

  • Reservation Of Raw material

    Guru
    My Client want to resver the raw material aganist the Plan order & the production oreder Is it possible If yes what is Trax Code& 
    Customasation & configration required
    Pl Advise Me
    Thanks
    Sudhir Bilwar

    Dear Sudhir,
    1.Once after converting a planned order into a production and if you save the production order,reservation gets generated for
    the Bill of material items for that product.
    2.Once after releasing the production order,the reserved materials can be issued,which means good's movement allowed
    indicator gets set for the reservation and you can perform 261 movement against the reservation no using MB1A.
    3.No need of any manual reservation in this process,for creating additonal or manual reservation use T Code MB21,for
    movement type 311 or 201.You cannot do reservation for 261 movement.
    4.It is not required to reserve the material at planned order level.
    Regards
    Mangalraj.S

  • Report on raw material to wip for a production order

    Hi,
    Is there a report which has a list of " issue of raw materials to a production order"?
    Or how to know how much raw material is issued to WIP on a production order.
    i nee dto have a report which has material cost and material overhead an dtotal.
    how to build this report ?
    Thanks,
    Sai.

    Hi Sai,
          You can try using MB51, use filter movement type 261. Add a filter for the posting date coverage.
    Then proceed. Click on the icon DETAIL LIST.
    Then click on the SUBTOTAL, add MATERIAL as a Criteria. The click the column AMOUNT IN LC.
    You should see the total issuances to per material.
    I hope this helps.
    Heinrick Palad

  • Process to split production order based on the raw material batches

    Hi All, below is a business situation which needs some some SAP process to help overcoming this issue.
    We are working on process industry, where the core fabric (SFG) are produced from different machines and which are used as raw material in the subsequent process (Coating).  Business wants SAP to generate individual planned orders for Coating when it uses this materials
    e.g
    Current situation.
    SFG1  is the component of SFG2
    SFG2 is  the component of FG.
    When the demand for FG is 100, you get 2 planned orders  SFG1- 100 yd and  SFG2- 100 yds
    During production, the Planned order for SFG1 is split for 2 production order  each producing 50 yds each.
    Now I have SFG1 - 50 yds ( Batch A001), and SFG1- 50 yds ( Batch A002).
    Now Business wants  SAP to automatically propose 2 order for SFG2, However based on MRP it will  only show 1 planned order of 100 yds required for SFG2 since the demand of FG is 100.
    We want to split the planned orders of the higher level to look at lower level stock.
    Any ideas or thought process.
    Regards
    Sarvan

    Sarvan,
    You can have MRP propose two lots of SFG2 based upon lot sizing.  For instance, if you always will want SFG2 to have orders of 50 each, then one way to achieve this would be to set the 'maximum lot size' to 50.  MRP1 Tab of the material master.
    There are other lotsizing methodologies that may be better suited to your business requirements as well.
    Lot-Size Calculation - Consumption-Based Planning (MM-CBP) - SAP Library
    Best Regards,
    DB49

  • Availability check of raw material during sale order processing

    Dear experts,
                           When i am entering the finished good in sale order processing,system should check the raw material availabilty.Is it possible in STD sap
    Regards,
    murali.R

    thanks to you all for your reply,
    My customer is bright bar manufacturer,They just buy the steel bar & process it & sell it to the customer.So there is only one RAW MATERIAL.
    Their all the activities are mainly based on raw material.So customer wants.....when we enter the finished good system should check the RM stock,based on RM STOCK,sytem should do the availability check...& confirm the delivery date
    I have mapped customer requirement,after modifying item category & assignment......
    Sales BOM explosion & delivery group is maintained for header material.availability check is on at component level & header level.So now system consider the raw material stock & it conform the dates when  i do availability check combinely.
    I would like to know how it will affet the MRP incase of alternative BOM....FURTHER PROCESSING
    Is it the right practise.....Please reply...............

  • List of process order for particular raw material

    Dear PP Gurus,
    Suppose we have one raw material said - X and this is used to create finished product A, B, C an D.
    Now I would like to know, In particular period how many process order is created for raw material X?
    Ex. for one month only 2 process order usind raw material X are created. 1(finished product - A and 2 (finished product- B)
    I tried COOISPI but not getting success.
    Through MB51 I can get report of process order against which material is issued. (261 is done)
    But my basic req. is to know the process order created.
    I am from MM side so no much more idea in PP area.As working for SAP support we have to look little bit in PP ara.
    Thanks all
    Rajan

    Hi Rajan,
    You can use COOISPI and select Documented Goods Movement and give the Basic Start date range as you want and execute.
    You can use filters in Movement types and get your desired result. 261 is for Goods issue of the components and 101 is for Goods Receipt of the header material.
    Hope it clears your doubts.
    Regards
    Suri

  • How to create production order for multiple items having common raw materia

    Dear all,
    We are running a sheet metal fabrication company at Vadodara Gujrat.
    Please guide us how to create single production order for multiple items using single raw material??
    For example, We want to produce baby shirt(item code AAA001), shirt with full sleeve(item code AAA002), shirt with half sleeve(item code AAA003),shirt slim fit (item code AAA004),shirt loose fit(item code AAA005) from single raw material say(item code XXX001).
    Right now we have to create 5 production order to produce above 5 items of single sales order  in SAP B1 though it is made from single raw material which is foolishness and time consuming too. (Please also note that to produce any finfish good item, raw material required for that item may vary every time in our process.)
    Kindly guide us how to solve the problem.
    Thanks.
    RUPESH  +91-9227744273
    WEB : www.gorasia.co.in

    Hi Rupesh Gorashiya,
    This is possible through MRP for that you have to put Sales Order first and Run MRP Wizard
    MRP Wizard Put Multi Production Order as per Item Taking in Sales Order just click it on and execute.
    Thanks,
    Srujal Patel