Regarding Creation of Invoice Verification Document Using Idoc

Hi All,
I am using Idoc INVOICE01 which is getting triggered from one SAP system after Invoice (VF01) is saved.
However this Idoc at the receiving SAP system is not getting posted and is giving error.
I want to post invoiceverification document in the receiving system.
The FM used is IDOC_INPUT_INVOICE_MRM for processing incoming Idoc with process code INVL.
Also I am using Logical System(LS) with ALE Setup fo communications bewteen the two SAP systems.
What sort of functional configurations I need to do to post the Idoc successfully.
I have done the configration for Tcodes OBCA, OCBD, OBCE ??
Do I need to maintain any entry in OBCB ??
Any sample example for this Invoice01 Idoc execution would be of great help.
Waiting for your replies.
Thanks
Jitendra

Hi Jitendra
I did not understand your question at all except your idoc is not posted. Without telling us your error message how can we provide our inputs 
What exactly have you done and searched please provide those detail along with error detail rather than these tcode
Nabheet

Similar Messages

  • Reversal of the Invoice Verification Document

    Dear Freinds,
    The users are trying to do the reversal of the Invoice Verification Document, but the system gives the error message 'No Reversal possible, Reverse Value must be reset'. When we look at the diagnosis, it suggests that the qty is same but the value is not the same as Invoice. The PO history for this item in the PO does not show any credit note passed which would result in the difference in the value.. What else could we check to resolve the issue.
    Thanks!
    Regards,

    Hi Jeya,
    Thanks for the help, we haven't used in BADI or User Exit, how else can we find this out and resolve the issue?
    Regards,

  • How to post parked (invoice verification document)

    Hi All,
    We have created a document through MIRO and in GOTO tab selected "switch to parked document ". the document get parked.
    When we are going to post the document system is not showing up the "post" tab.
    Can any body tell me how we can post the invoice verification tab.
    Thanks

    Hi,
    Try to post the parked document thru FBV0 transaction code.
    Hope this will help you.
    Cheers
    Raja

  • Problem to add the Note for Invoicing Document using Idoc

    Hi All,
    I would like to use the idoc to create the Invoicing document (MIRO). it seem can't use standard segment E1EDKT1 to create the standard text.
    Anybody have any suggestion to create this standard text?
    Regards,
    Luke

    Hi Krishna,
    I checked WE60 and tried use the E1EDKT1 to create the standard text for invoicing document.
    Document created successful but can't add the standard text in this document.
    also i try to find some exit for update the standard text. i can't find out any exit after creating the invoiceing document.
    would you please give more advise to me ?
    Regards,
    Luke

  • How to print the invoice(Billing document) using program RSNAST00

    Hi,
      I want to print the invoice using the program RSNAST00,
    but when i fill in selection screen with the following details,
    Output Application : V3
    Object Key : Billing Document Number
    Output Type : ZPFM
    Transmission Medium : 1
    But it is throwing an Information Message "0 outputs were processed in total (0 successfully,0 incorrectly)
    So please guide me, what are settings i have to do and what abap code i have to write to overcome this error.
    Regards,
    Shasiraj.C

    Hi,
      As you told I am using the function module RV_MESSAGE_DIALOG in my program when I directly execute my program its not printing invoice,but when i keep the break point and execute a pop up comes in which i click on the PRINT button that time it is printing the invoice.
    But I dont want to click on Print button manually, my code should automatically take care of printing also.
    Can guide me in this issue.
    Regards,
    Shasiraj.C

  • Tcode: MR8M---Logistic invoice verification'document can't be reversed

    Dear Experts.
    I have a logistic invoiceverification' document and use tcode:MR8M to reverse it ,but can't be reverseed ,the system issue the wrong information :"No reversal possible. Reverse value must be reset".please tell me how  I  should do? thanks!
    Fanny.

    Hello Fanny Chen,
    In certain situations, the reversal of posting documents may be cancelled with an error. This may, for example, occur in the following situations:
    The specified posting date is in a posting period that is already closed.
    At the time of the reversal, the posting of the original document had not been completed.
    Account assignment objects (for example, cost centers) which were posted to in the original document are closed at the time of the reversal.
    Posting items that were created by the original document are already cleared at the time of the reversal (for example to customer and vendor accounts).
    In your case it seems that the posting items that were created by original document are already cleared so you need to first reverse the cleared document which the system is trying to mean by saying"No reversal possible, reverse value must be reset.
    UNDER THESE CIRCUMSATNCE PROBABLY YOU NEED TO USE THE  TRANSACTION FOR WHICH ALL CLEARED DOCUMENT CAN BE RESET AND REVERSE
    1)     TCODE  :   FBRA
    2)     CLEARING DOCUMENT  :  ENTER THE CLEARED DOCUMENT NUMBER
    3)     COMPANY CODE  :  ENTER COMPANY CODE
    4)     FISCAL YEAR  :  RELEVANT FISCAL YEAR
    5)     CLICK THE SAVE BUTTON
    6)     IN THE NEXT SCREEN CLICK YES
    7)     THE SYSTEM WILL GIVE ANOTHER MESSAGE BOX WITH THREE OPTIONS : 
    ONLY RESETTING
    RESETTING & REVERSE CLICK ON THIS
    CANCEL
    8)     SELECT THE MIDDLE ONE I.E. RESTTING & REVERSE
    9)     THE SYSTEM WILL  ASK FOR REVERSAL REASON.
    10)     ENTER 01 AND THEN PRESS ENTER
    11)     THE SYSTEM WILL RESET THE DOCUMENT
    After this resetting is done you can use MR8M Tcode.
    Hope I had been able to help you. Please assign points and close the thread.
    Rgds
    \Manish

  • Transfer FI Document using IDOCs

    Hi abapers,
    I am new to IDOCs. i need to transfer file with documents in external format to the ALE inbound processing of SAP R/3.
    The object attributes shown below:
           Message type: FIDCCP01
           Basic type: FIDCC1
    On the 'Start IDOC processing' work step in LSMW, i get an error msg: "FI/CO interface: object type not defined" returned by the status record.
    can anyone tell what is my error?
    Thanks in advance.

    Could yo resolve your problem??
    I have de same problem but i don´t found the information, can you help me??

  • Regarding OCMS installation and verification by using Oracle Communicator

    Hi all,
    I am new to this installation.
    I am installed OCMS in windowsXP and TimesTen as database.
    While Instaling the OCMS I created 4 test users with test.user as prefix.
    Now i am trying to connect to oracle communicator using the username and password created at the time of OCMS installation but i am not able to login into that.
    Please help me to solve this.
    I am giving some installation details below.
    Thanks in advance.
    Details:
    The following are the configuration details you selected during installation of the Oracle Communication and Mobility Server: ( these details are also stored in XML format at D:\product\10.1.3.3\ocms_1\sdp\install\installconfig.xml )
    Installation Directory: D:\product\10.1.3.3\ocms_1
    Installation Type: typical
    Installation Mode: Install standalone developer mode (does not require existing AS)
    Locale: en(English)
    OC4J HTTP Port: 8888
    Installed Components and their Configuration
    SIP Container
    SIP Port: 5060
    SIP Domain: sdc6.corp.siebel.com
    SIP Realm: sdc6.corp.siebel.com
    Subscriber Data Services
    TimesTen Home: D:\TimesTen\tt70
    Number of Test Users: 4
    Test Username Prefix: test.user
    Proxy Registrar
    Presence
    Presence Port: 5071
    Application Router

    I think you are likely to get more response via the OCMS forum here
    Communications Converged Application Server
    Chris

  • How to mass change posting date of parked logistics invoice verifications

    I was wondering if someone can help...
    We are looking if there is a standard SAP program available to mass change the posting date (to a new date in a new period) for a number of parked logistics invoice verification documents.
    Example: Invoices are parked in e.g. April 2010; relevant information is not available before month end; so invoices will probably be posted somewhere in May or June or ...; users now have to individually change the posting date on each parked invoice to the new open month.
    Is there any proces/program that could automate this task.
    Thanks in advance for all your advice, feedback and comments.
    Best Regards,
       Luc Vernieuwe.

    Hi,
    There is no standard tcode , i used Tx Shuttle tool to do this in past for one of my client. ( excel based sap transaction tool)
    Thanks,
    sudhakar

  • GR/IR Freight Clearing Account - GR & Invoice Verification

    Dear Gurus,
    I have made a PO for 1200 pcs unit price 69.20$.  (GR based IV).   (Valuation - Moving average price)
    Delivery costs - Freight (FRB1) - 1200$
    I have splitted the PO quantity in to 3 different Inbound deliveries
    Inbound 1 - 400 pcs
    Inbound 2 - 400 pcs
    Inbound 3 - 400 pcs
    I have made the Goods receipt for the 1st Inbound - 400 pcs.
    Goods Receipt 1 - 400 pcs.  The value in the GR/IR freight clearing a/c credited by 400$
    Invoice Verification1 - 400 pcs. The value in the Invoice verification is 1000$.
    The value in the GR/IR freight clearing a/c debited by 1000$
    Goods Receipt2 - 400 pcs. The value in the GR/IR freight clearing a/c got credited by 400$
    Invoice Verification2 - 400 pcs. The value in the Invoice Verification is 2000$
    The value in the GR/IR freight clearing a/c got debited by 200$ and Stock in Hand debited by 1800$
    Goods Receipt3 - 400 pcs. The value in the GR/IR freight clearing a/c got credited by 200$
    Invoice Verification3 - 400 pcs. The value in the Invoice Verification is 1500$
    The value in the GR/IR freight clearing a/c got debited by 133.33$ and Stock in Hand debited by 1366.67$
    I don't understand how the logic works for seggreating the amount to GR/IR freight clearing account and GR/IR account.
    For the first 2 GR and IV I could understand that there is a  balance in the PO condition but for the Invoice verification 3. The value debited to GR/IR freight account is 133.33$. Can anyone help me how the calculation is taking place and how the system has arrived to figure 133.33$ in the Invoice verification for GR/IR freight clearing a/c
    Strangely when I have cancelled the Invoice Verification document 3.
    The value Credited to GR/IR freight clearing account is 333.33$ instead of 133.33$
    Can somebody help me to figure out the calucation for IR after the GR for planned delivery costs.
    If any SAP notes or help files can be provided then it would be really helpful.
    Regards
    Fazal.

    Refer this note 311496 & 460244, 129066
    Symptom
    Delivery costs were planned for a purchase order item.
    A goods-receipt-based invoice verification is set.
    Several goods receipts are posted. For invoice entry, both in conventional invoice verification (transaction MR01/MRHR) and in logistics invoice verification (transaction MR1M/MIRO), the delivery costs for each purchase order item are displayed in total.
      This is the same as when, for example, only one of several GR documents/delivery notes is selected.
    Example of a purchase order history:
    Cat. Doc. no.    Itm    MvT Pstg.dt.            Qty.in BUoM       Value in local curr
    GR   5200002605 0001 101 June 16, 2000      5  PC         50,00 DEM
    GR   5200002606 0001 101 June 16, 2000      5  PC         50,00 DEM
    Sum of goods receipts                      10  PC        100,00 DEM
    DCGR 5200002605 0001     June 16, 2000       5  PC           3,33 DEM
    DCGR 5200002605 0001     June 16, 2000       5  PC           5.00 DEM
    DCGR 5200002606 0001     June 16, 2000       5  PC           3,33 DEM
    DCGR 5200002606 0001     June 16, 2000       5  PC           5.00 DEM
    Total delivery cost GR                                                 16,66 DEM
    If you only select the first GR document in the selection, you get
    the following default values for the delivery costs:
    Amount    Quantity  BUoM Itm  Decription              Vendor
    6,67         10      PC  10    Freight value        VEND01
    10,00        10      PC  10    Freight/quantity     VEND01
    (and not, as sometimes expected: -  3,33 DEM    5 PC
                                        -  5,00 DEM    5 PC)
    Other terms
    WEBRE, delivery costs, planned delivery costs, goods-receipt-based invoice verification, invoice verification
    Reason and Prerequisites
    A function such as the goods-receipt-based invoice verification is not available for delivery costs.
    Solution
    This is not an error; this is a consulting note.

  • Third party scenarioUnless & until invoice verification is done than system

    In Third Party scenario :
    1. In third party scenario Vendor supplies the Material to the customer  & Vendor sends the copy of invoice to the company. After the company did the invoice verification by using the T.code : MIRO. once this part is over than company create the invoice to the customer.
    " My requirement is, Unless & until invoice verification is done than system is not allow to create the invoice to the customer"
    How is to control & what are the configuration is required to met the full fil the condition

    Hello,
    Once you have set the blilling relevance to F (order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list (VF04) until an invoice from the vendor has been received and processed by the purchasing department.
    Yes also, if your billing relevance is F and you try to do billing to customer without carrying out vendor invoice, then you will get error message number VF032  No billing documents were generated. See log with error log as No open billing quantity has been determined message number VF147  and hence  you cannot do customer billing.
    Every time your vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order will be considered fully invoiced unless further vendor invoice is recieved.
    BR,
    Tushar
    Edited by: Tushar Patankar on Feb 15, 2011 11:47 AM

  • Invoice verification reversal

    For a PO there are 2 document for invoice verification (for example doc no A and B). I want to cancel both the invoice verification document. I have tried doing this thro transaction code MR8M. Document A is appearing with the error message “No reversal possible. Reverse value must be reset” for document B “the document is already cleared- reversal not possible”. Is there anyother way I can reverse these document although the payment document for Doc B cannot be reversed as there are more than one vendor paid through this payment document.

    Hi,
    An invoice document can only be revered if
    1. Payment has not been made.
    2. If after payment, the payment doc has been reversed in FI
    3. If the period when you posted the invoice is still open
    This is what i can think of right now
    Hope this will help u
    Plz reward Points
    Regards,
    Sarfaraz

  • Creating Physical Inventory Documents using batch job in WM

    We use transaction LX26 to create the physical inventory documents for the storage bins and the materials therein. and the new PI dates are proposed based on the cycle count indicators configured.
    We want to automate the creation of physical inventory documents using a batch job. How can we achieve this?
    I understand that the program RM07ICN1 generates PI documents only when materials are managed at IM levels and this does not work for WM. Is there any other standard program which can be set up in batch to create the PI documents for the materials at WM level? If there is something then please let me know details....
    Thanks,

    I entered following details,
    WH no.
    Storage Type
    Inventory in Period (One year date range)
    Inventory Count date (Today's date)
    The output in spool shows me the following,
    No of Records Passed ;Quant Information; InventoryProposal; Later / block; Bin Information; Empty bins; Inventory active
    The list of storage bin, material, description & inventory date is also displayed.
    Description has Scheudled and Overdue and the inventory date is some dates in next months.
    It doesnt show anywhere that inventory document is generated.Please note that I had not selected the Activate Inventory List check box because I just want the system to auto create the inventory documents based on the logic of cycle count indicators.

  • Same nr range in Logistics Invoice Verification for the MM and FI document

    I customised Logistics Invoce verification (on ECC6) with the same nr range for MM and FI.  That were done by changing the nr range of doc type RE (in FI) to nr range 52 andcreated the nr range for the company code for fiscal year 2007 and 2008 (our fiscal year 2008 start 1.10.07) and made it external nr assignment.  In MM I changed RD and RS to a new range 05 to which I assigned the nr range 5200000000 to 5299999999 (internally assigned).  For the vendor consignment I created a new document type and assign that to nr range 51 (as the original invoice verification settings).
    This process works quite nice with the same document nr for MM and FI, however I still do have a problem. (I work through the article on above as per FI Expert issue of Sept 07, but even in there my problem was not mentioned.
    If I do an invoice verification for previous period with price changes on the system, Sap want to post 2 accounting docs (1 for the previous month - on which I did have stock and 1 for current month - one which I did not have any stock).  The system only send 1 document nr for FI who needs 2 doc nrs.  I now get the error  message that I must use a document in the nr range 5200000000 and 529999999.
    How do I rectify this or can I not use this functionality if we allow backdating to the previous period
    Regards
    Anna-Marie Robson

    I customised Logistics Invoce verification (on ECC6) with the same nr range for MM and FI.  That were done by changing the nr range of doc type RE (in FI) to nr range 52 andcreated the nr range for the company code for fiscal year 2007 and 2008 (our fiscal year 2008 start 1.10.07) and made it external nr assignment.  In MM I changed RD and RS to a new range 05 to which I assigned the nr range 5200000000 to 5299999999 (internally assigned).  For the vendor consignment I created a new document type and assign that to nr range 51 (as the original invoice verification settings).
    This process works quite nice with the same document nr for MM and FI, however I still do have a problem. (I work through the article on above as per FI Expert issue of Sept 07, but even in there my problem was not mentioned.
    If I do an invoice verification for previous period with price changes on the system, Sap want to post 2 accounting docs (1 for the previous month - on which I did have stock and 1 for current month - one which I did not have any stock).  The system only send 1 document nr for FI who needs 2 doc nrs.  I now get the error  message that I must use a document in the nr range 5200000000 and 529999999.
    How do I rectify this or can I not use this functionality if we allow backdating to the previous period
    Regards
    Anna-Marie Robson

  • Same nr range in Invoice Verification (MIRO) and FI document

    Dear all can you please help to solve this issue?
    We would like to have the same number range for invoice verification and for financial document, what we have to do?
    Regards
    Marco

    Please follow the steps as below
    Step 1. Maintain FI document number range. Use transaction OMR4 and go to Number range for document types in FI. Select the company code for which you want to create the new number range interval and click on the change interval button. Insert a new document number range by clicking on the insert interval button on top of the screen.for example, I created number range interval 52 with the document numbers 5200000000 – 5299999999. Don't forget to set the external number range check box (Ext).
    Step 2. Assign FI number range to FI document types. The second step is to assign the number range created in step 1 to the FI document type for invoices. Again use transaction OMR4 and go to Document type. Double-click on the document type, which you are using for LIV invoices. In my example, I used the SAP standard document type RE. In the number range field, assign the new number range interval 52
    Step 3. Maintain MM document number ranges. Use transaction OMRJ and click on change interval button. Insert a new document number range by clicking on the insert button at the top of the screen. For MM documents, I created number range interval 52 with the document numbers 5200000000 – 5299999999. For the internal number range assignment, do not set the external number range check box (Ext).
    Step 4. Update MM number range assignment. The last step is to assign the MM number range to your MM transaction via IMG menu path Materials Management>Logistics Invoice Verification>Incoming Invoice>Number Assignment>Maintain Number Assignments for Logistic Documents>Transaction – Assign Number ranges. Two transactions are available. LIV contains the following two internal transactions that are used for the MM document number determination:
    RD: manual invoice entry (MIRO)
    RS: cancel, reverse invoice (MR8M), evaluated receipt settlement (MRRL), EDI invoice receipt, invoicing plan (MRIS), and revaluation (MRNB).
    You need to update the number range interval for transaction RD.
    hope now that things r clear
    reward accordingly

Maybe you are looking for