Registration of systems in SLD and SMSY (Configuration of Managing System)

Hi folks,
I´m following this documentation here "How to Configure Maintenance Optimizer to Use Software Lifecycle Manager to Automatically Download and Deploy Support Packages and SAP Enhancement Packages" and on the pre-requisites are 2 things that i don´t uderstand:
1. The SLD server is running.
2. You are logged on to the Visual Administrator of the J2EE Engine as an administrator
what is it?

Oi Nelson
basicamente o documento diz para vc ter seu SLD configurado corretamente (ou seja, com todos dados do seu landscape atualizado - fundamental para gerar o arquivo XML de upgrade/support package stack apropriadamente) e para vc estar logado no Visual Admin com o usuário J2EE Admin :-)
Pelo tom de sua pergunta, imagino que vc não saiba ao certo o que é e para que serve SLD e Visual Admin. Aqui vão alguns links bem úteis:
http://scn.sap.com/docs/DOC-8042
http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/1870c690-0201-0010-fca0-b66794ea3ea3
http://help.sap.com/saphelp_nw70/helpdata/en/ee/74b3407e73c57fe10000000a1550b0/content.htm
http://help.sap.com/saphelp_nwpi711/helpdata/en/48/c46577095735b6e10000000a42189d/content.htm
e
http://help.sap.com/saphelp_nw70/helpdata/en/39/83682615cd4f8197d0612529f2165f/content.htm
http://help.sap.com/saphelp_nw70/helpdata/en/23/fa1f1e5f6841cf92c64dc19d79f290/content.htm
http://scn.sap.com/people/heidrun.reichart/blog/2006/11/24/how-to-use-sap-netweaver-administrator-with-sap-s-java-platform-enterprise-edition-5
Espero que isso ajude :-)
Abraços,
Tomas Black

Similar Messages

  • How to Configure Transport MAnagement system in CHARM

    Hi
    How to Configure Transport MAnagement system in CHARM? Here our requirement is when ever a change request approved in the background Transport request should be created automatically. We have configured all the Transport Routes in our lanscape.
    Can any one tell me the detailed process? If you have any Configuration document please share it to me
    Points will awarded for helpful answer
    Thanks
    Bhaskar

    In a two system landscape is it necessary to make development the domain controller always?
    No such compulsion as such exist(correct me if wrong),however why you want to make production your domain controller?
    This is not recommended.
    Regards,
    Ashutosh

  • Tech System in SLD and RZ70 in 4.6c and 4.7 systems

    Hi,
    We have two legacy systems R3 4.6C and R3 4.7 Systems in our landscape and we are using PI 7.1.
    we are setting up configurations for IDOC communications
    1) between 4.7 and PI
    2) between 4.6C and PI
    for registering 4.7 system in SLD, we used RZ70 transaction in 4.7, and the tech system (of type AS ABAP) got created in SLD, so we could proceed with creation of Business system for one of its abap client.
    but when we tried the same thing in 4.6c system, when we tried executing RZ70 in 4.6C system, it says "Transaction RZ70 does not exist".  Since 4.6C does not support rz70, how can we register the corresponding Tech System in PI SLD.
    Thanks in advance.

    Hi
    The ABAP-based SLD data supplier (transaction RZ70) is available for all SAP systems as of SAP Basis release 4.0B.
    For details see here: http://help.sap.com/saphelp_nwpi71/helpdata/EN/11/0dfe55e0c8fc4e910706a47ca6859b/content.htm
    Are you sure you typed in transaction code correctly?
    If everything does not help open a CSN at SMP and in the meantime - as a workaround - you can maintain the SLD manually for that system.
    Regards,
    Volker

  • Error configuring a Managed System

    Hello everybody
    When I try to configure a manged system in SMD I get this error in the SSO configuration:
    Failed to access RFC meta data of ADD_TRUSTED_TICKET_ISSUER on ABAP Host=xxx.yyy.net sys=00 client=550 admUser=job_admin rfcUser=job_admin gwHost=xxx.yyy.net gwPort=3300
    Does anyone know what this error means and how to solve it?
    Solution Manager version 701
    Thank you in advanced.
    Best regards
    Rubé

    Hello
    These are our installed SP:
    SAP_ABA     700     0017     SAPKA70017
    SAP_BASIS     700     0017     SAPKB70017
    PI_BASIS     2005_1_700     0017     SAPKIPYJ7H
    ST-PI     2008_1_700     0000     -
    SAP_BW     700     0019     SAPKW70019
    ST-A/PI     01L_BCO700     0000     -
    And the function was:
    ADD_TRUSTED_TICKET_ISSUER
    Hope this help you
    Best regards.

  • System RQ1 is unknown in the Transport Management System

    <b>Hi
    Please assist I am getting this screen dumbs on st22 about my TMS running this function "TMS_CI_CHECK_ACCESSTOKEN". the problem is that my RP2 is checking RQ1 which is no longer on my systems land it is now replaced by RQ2.
    below is the error and suggested procedure but it's not working.
    Please provide any suggestions.
    </b>
    Diagnosis
    An error occurred in the TMS communication layer.
      System: RP2.DOMAIN_RD2(000)
      Function: TMS_CI_CHECK_ACCESSTOKEN
      Error: UNKNOWN_SYSTEM (RQ1)
    System Response
    The function terminates.
    Procedure
    Log this system on to the Transport Management System.
    If this error occurs in the function TMS_CI_CHECK_ACCESSTOKEN, then the TMS configuration was deleted in the R/3 System RP2.DOMAIN_RD2(000).

    So, just in case someone need more feedback, the help on error message is::
    System XYZ is unknown in the system landscape
    Message no. AI_SOLAR11080
    Procedure
    Create system XYZ in the System Landscape transaction .
    - the system is created in SMSY.
    Generate RFC destinations from the local system into the system XYZ in the Clients tab in the transaction Setup System Landscapes.
    - RFC destinations generated (and tested successfuly) but not in SMSY_SETUP. This tx is named "System Landscape Maint. Settings" in SAP Easy Access, but once entered, it has a "Setup System Landscapes - SAP Solution Manager" title. However, this tx is dedicated to define an Automatic Data Transfer type:
    TMS/ RFC (this one is my case), or
    SLD
    So, the RFC's are generated in SMSY also, well - some of them. I used SM59 and SMT1 and SMT2 to finish it propertly.
    Alternatively, you can assign an existing system to the logical components, in the System Landscape/Systems tab in the Project Administration.
    +- The (existing) system is assigned to the logical components, it can be seen on "System Lanscape - System" tab in SOLAR_PROJECT_ADMIN
    However, when I try the "System Lanscape Check" button in the same transaction, I get this very message as well...+
    You can suppress this message by putting the system in the exception table in the Plug-In List, but you should only do so in exceptional circumstances.
    I am not quite sure how this could be a solution to my problem. I suppose it would just suppress the message, and not solve the problem...
    Now, what confuses me is that I have done it once with no problem with other system in this very project, and now I can't find a solution...
    Any help is highly apreciated.
    Thank you in advance,
    Nenad

  • Errors integrating ABap system in SLD and PI

    Dears,
    I need informations about how to include an Abap system to the SLD , installaed on a different machine, and to make it available for the communication with a PI system.
    It's a silly question but I'm quite confused about the step should be performed. I partially did the integration following the documentaion in my knowledge, but something is missing.....and does not works.
    regards

    Hi refer these links
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b09fe69e-46be-2a10-9fb0-9c11aeaa3557
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/40328fc8-4844-2b10-b7a2-8930c16df2ba
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b00462bb-b7a0-2a10-8da6-f6b89834f8b4
    regards,
    Surya

  • Managing Consumer Proxies and related configuration in the System Landscape

    Hi,
    I have successfully created and tested the Consumer proxy in our development server.
    Scenario background: A Java Web Service has been developed and deployed on the Portal server which i am consuming in ECC6.0 in ABAP.
    We would soon need to move it through the system landscape concerning which i have the following queries:
    1. The Consumer Proxy was created with the WSDL URL of the Development Portal server. I checked the Consumer proxy and did not find any signature of the WSDL URL in the Consumer proxy object generated. Can we therefore transport this consumer proxy to QA/Production without any issues?
    2. The Logical port configuration - What's the standard used in its maintenance across the landscape? Will we need to manually do it in every system? Can this also be made generic and transported across the landscape?
    regards
    Nitesh

    Hi,
    Logical port you can create in two ways.
    One using LPCONFIG and other is using the SOAMANAGEr.
    When you create a logical port using LPCONFIG you get the Customizing transport request which is client dependent. you can move this to any land scape. Only the thing we need to do change in the port is just accessing URL.
    But the latest transaction SOAMANAGER does't give any transport number. I guess there should be a way for this too. If not then there is only one choice left is configure on each client.
    Thanks,
    Kishore.

  • Upgrade SP09 to SP14 SLD and CMS configuration lost

    Hi all,
    I have upgraded the Java Infrastructure successfully, but I had to reconfigure the SLD (object server etc.) as well as the CMS track information in order to get the Infrastructure working again. Luckyly I only had a test track with test components set up otherwise I assume I would have lost my work.
    Is this supposed to happen? I can't imagine that this is the way an upgrade for a development infrastructure should work. Somehow the configuration data should be stored and reimported after the upgrade.
    Maybe I missed something during the upgrade regarding the preserving of the configuration data.
    Has anyone made the same/a better experience during the JDI upgrade?
    Any input is greatly appreciated.
    BR Helga

    Hi Helga,
    I did several updates of NWDI yet and never had such a problem.
    My updates
    Java & ABAP Stack: SP07 --> SP09
    Java Stack: SP09 --> SP11
    Java Stack: SP09 --> SP12
    Regards
    Helmut

  • Configure Document Management system in ECC.

    Hi,
         We have an ECC 5.0 system, and need to configure DMS. Our concern is to upload documents ( type PDF ) and allow the users to access these documents.
         We want to import the documents into the R/3 system.
         We are new to this. Kindly do help us with the process.
    Best Regards,
    Anil.
    Edited by: Anil PM on Mar 30, 2009 2:51 PM

    HI Sanjay,
    Here is the documentation on DMS,
    http://help.sap.com/saphelp_erp2004/helpdata/en/c1/1c31a243c711d1893e0000e8323c4f/frameset.htm
    Regards,
    Azaz Ali.

  • Managed System configuration in Solman 7.1 sp11??

    Hi All,
    I have done new installation of solman 7.1 and upgraded to sp11.
    I did system preparation and basis configuration in solman_setup.
    I have one query how to add ERP production system to SLD and how to do managed system configuration for that.
    I want to add ERP Production system and Managed configuration for that and MOPZ,EWA configuration ERP Production system.
    Please help me in this...
    Here i attached screen shot for your reference.
    Presently in managed system Only Solman system is visible.
    Thank in Advance
    Chandra

    Hi,
    Please chekc th ebelow guide
    Step By Step Process to configure SLD, MOPZ & EWA in Solution Manager 7.1 SP 8
    https://websmp104.sap-ag.de/~iron/fm/011000358700000209862011E/012002523100005267752014WRK2?TMP=1407918324257#bkm_show1_…
    go to Configuration of SAP Solution Manager
    Normally y this demo and guide will be available  http://service.sap.com/rkt-solman
    #sapadmin:: How to assign Product System in SOLMAN 7.1 & How LMDB, SLD, SMSY and Landscape Verification  work in SOLMAN7.1
    Normally after addition in SLD ,system will adding the system in LMDB ,then added in smsy automatically. check the Job LMDB*
    Update the CR content in SLD , check th below note fpor the smae.
    Note 669669 - Updating the SAP Component Repository in the SLD
    LMDB FQA:
    Landscape Management Database (LMDB) – FAQ
    Product system Editor in LMDB:
    New in SP05: Product System Editor in the Landscape Management Database of SAP Solution Manager 7.1
    Maintenance of Product in the System Landscape - SAP Solution Manager Setup - SCN Wiki
    Rg,
    Karthik

  • What's different between busniess system and technical system in SLD?

    I can enter product(ect.ERP r/3) , components(ect.FI-CO module) to technical system , then enter technical system to busniess system  but ,who can explain  what's different between busniess system and technical system in SLD, exactly?
    THANKS!

    Technical Systems are of following types:
    Technical systems are application systems that are installed in your system landscape. An example of an application system is a Customer Relationship Management (CRM) server. In the SLD, there are five types of technical systems:
    1.)WEBas java,
    2.)Standalone JAVA
    3.)Third party
    4.)Web as ABAP
    1) Web AS Java
    Web AS Java systems consist of one or more instances and each instance is installed on a separate host. An instance itself consists of cluster nodes that can communicate with each other.
    2.)Standalone Java
    Standalone Java technical systems are standalone Java applications that are installed in a computer system from an administration perspective. They can also be installed as an operating system service or as a daemon
    Web AS java belongs to the NetWeaver Comes with both ABAP and Java, Standalone instread comes separate from the netWeaver.
    3) Third party technical sytem
    It can be any of the technical sytem. let us say if you want to send a file to R/3, here the file reside in your local system. for that you can define your local system as a third party technical system.
    All those machines that comes under non sap, belongs to the third party.
    4.) Web AS ABAP technical systems, ranging from any SAP system to an APO server or CRM server, are based on the same Basis Component (BC), which includes the ABAP interpreter, ABAP Dictionary, ABAP Workbench, and so on. A dedicated database, which stores most of the data of the BC and the application components, is associated with the system.
    Also refer : http://help.sap.com/saphelp_nw70/helpdata/en/24/8fa93e08503614e10000000a114084/content.htm
    Business systems are logical systems, which function as senders or receivers within XI. Business systems can be SAP systems or third-party systems.
    Depending on the associated technical system, the following types of business systems are defined in the SLD:
    · Web AS ABAP
    A business system, which is associated with a Web AS ABAP.
    A business system, which is associated with a Web AS ABAP, can play the role either of an application system or an integration server. An integration server is the central component of XI, which provides a framework for the exchange of information among various internal and external entities of a company. The integration server facilitates the interaction between the different operating systems and applications across internal and external networks.
    · Web AS Java
    A business system, which is associated with a Web AS Java.
    · Standalone
    A business system, which is associated with a standalone Java application.
    · Third-party
    A business system, which is associated with a third-party technical system.
    http://help.sap.com/saphelp_nw70/helpdata/en/24/8fa93e08503614e10000000a114084/frameset.htm

  • Solman_setup and central&local solution manager SLD

    Hello,
    I'm configuring our solution mananger system with transaction solman_setup. The local SLD of the solution manager will also be the central SLD of all our systems. After finishg the basic configuration in solman_setup, and go to "managed system configuration", I  can only see the only solution manager system, as ABAP and as JAVA, but no more systems (right, as I haven't defined more systems).
    I cannot create more ABAP  system with the link "maintain technical systems", the ABAP option when I select create isn't there.
    If I create another type of system as a test, for example, third party, the transaction SMSY can see this new system, but the SLD in http://<my_solution_manager_system>:50000/sld doesn't show this new system at all.
    Where must I create the systems? and how can I connect the SLD and the SMSY transaction? Should I "add SLD" at the Administration in http://<my_solution_manager_system>:50000/sld and put the suolution manager itsefl system?
    Thanks in advance for your help and best regards,
    Ana

    Hi,
    To ensure a system is registering into the SLD and synchronising with SMSY, go to transaction RZ70 and define the Host and Service.
    Also, set up a user for accessing the SLD in transaction SLDAPICUST. The user has to exist in the Java stack to log into the SLD.
    Also ensure your RFCs are correctly set up for LCRSAPRFC and SAPSLDAPI as per this link:
    https://cw.sdn.sap.com/cw/docs/DOC-37953?treeid=DOC-7936
    Then use transaction SLDCHECK to ensure your connection is working.
    Finally enable SLD synchronisation into SMSY by transaction SMSY > Goto > Setup System Landscape Maintenance. Define the same host and port of your SLD and schedule the data transfer.
    This should pick up the system once the landscape_fetch background job executes into SMSY.
    You can use this approach for all your managed systems and is the most logical way to connect systems to the SLD.
    Regards,
    -Rohan

  • Adding BO System in SLD

    Hi,
          For ABAP systems we add it in SLD through RZ70 & for Java through Visual Admin.How to add BO system(SAP BusinessObjects Enterprise XI 3.1 ) in SLD?Is there anyway we can add it through CMC?

    Hi, if you read the document END-TO-END ROOT CAYSE ANALYSIS (System Landscape Setup Guide) V 2.14    section 4.40. You can read the following information :
    >>4.40 SAP BusinessObjects Enterprise XI 3.0 & 3.1
    Latest up to date information for SAP BOE 3.x is available in SAP Note 1357901.For Business Objects Enterprise XI 3.0 and 3.1 an automated creation of the technical landscape via SLD is not available. Therefore you need to create the technical landscape manually using the transaction SMSY and afterwards perform the managed system setup for all BOE Technical Systems created.
    Hope it's help

  • Update integration directory and repository content after PI system copy

    We are on PI 7.1, We are trying to figure out the best way to update the contents in sld, integration directory and repository after system copy. currently we delete everything in sld, ID and IR then reimport all the content to get everything in-sync. Is there an easier way to do it, ex. just update the system in sld and the matching contents in IB and IR?
    Thanks,
    Jane Zhou

    Hi Jane
    This completely depends on the nature of the system copy and your SLD architecture and operational requirements
    Will the source system remain available or operational ?
    Is the target SLD proposing to use satellite systems already defined in the source SLD ?
    When doing a system copy the following should be considered
    1) If you create an import line from a previous SLD via export or sync
        - that SLD has to continue to be available for further updates or sync
    2) If you create a system copy, any target specific configuration like hostname, port, SID
         may needed to be adapted in target landscape
    3) Further considerations are needed if 1 satellite will point to 2 SLDs at the same time both for operational use
    Its very easy to take a back-up or full or partial import from one SLD and put it into another or indeed sync between SLDs
    however the key is to ensure the target SLD content is consistent and useable in the same way as the source SLD
    Hope this helps
    Stuart

  • SLD to SMSY synchronization - Which product version do we have to choose ?

    Hello,
    We do have a CPP system running on SAP ECC 6.0 version.
    1. In SLD, we do have the list of all "Software Components" used in CDP.
        We do not have the "PRODUCT VERSION" of the managed system.
    2. With job SAP_SLD_DATA_COLLECT (RZ70), all data are sent from CDP (managed system) to SLD.
    3. With LANDSCAPE FETCH job, all data are synchronized between SLD and SMSY.
    Now, how can we choose the right "PRODUCT VERSION" to set in SMSY ?
    As far as there is not "PRODUCT VERSION" defined in SLD, do we have to set manually a PRODUCT in SMSY ?
    Is there any guide or OSS Notes which describe, step by step, the full workflow process synchronization
    from (1) Managed System to (2) SLD to (3) SMSY ?
    Thanks
    Best regards
    PC

    Hi,
    As I have observed, when the data sync happens between SLD and SM system, the product versions are also assigned.
    Sometimes, the product assigned through SLD sync may not be correct or may be irrelevant to your scenario,
    In that case, you should always manually edit and assign the correct product version in SMSY, to avoid any conflicts arising in further setup of EWA, SMD setup etc.
    For ECC 6.0, you can goto SMSY>systems>search for SAP ECC-->your system CPP/CDP should already be present under SAP ECC through SLD landscape fetch job.
    Select that system, and in the header data tab u can see the Installed product versions.
    There you can always change the relevant products for your systems.
    Hope this helps.

Maybe you are looking for

  • Invalid security code?

    I have bought about 12 games off the app store, but now it asks me to sign in my billing info, the only thing that was giving me problems was the security code, it constantly tells me "Invalid security code" and it's the right one, I know where it is

  • How to hide a hard drive

    Does anyone know if there's a way to not have a hard drive show up on the desktop? In my case, the Time Machine backup drive sits there. But I really don't need to access it. I'd like to simply hide from view.

  • Change in back button behavior

    We are upgrading from ColdFusion 9 to ColdFusion 11.  We noticed a change in back button behavior.  On pages running CF 9 the back button works, but on pages running CF 11, when clicking the back button, we get a browser "confirm form resubmission" m

  • Need to crawl a graphic and make it dissapear

    Here is a little poser I stumbled on...and I wonder how others would do this in PPRO (CS5). I have a base line title created in PPRO Titler  ( "a string of six words capatilised") I need to make them crawl right to left across the baseline and then d

  • Reg. Error in INCL_EEW_PD_ITEM_CSF and INCL_EEW_PD_ITEM_CSF_SC

    Hi, I am trying to add a custom field in INCL_EEW_PD_ITEM_CSF and INCL_EEW_PD_ITEM_CSF_SC using APPEND structure. It is success while trying to do it in INCL_EEW_PD_ITEM_CSF. When i try to do it in INCL_EEW_PD_ITEM_CSF_SC, i am getting the error as "