Release of Multiple Production Orders

Hi All,
Does anyone know of a process that would enable the release and close multiple production orders?
Best regards
Earl

Hi Gordon,
I was sure that was the case. However, I thought I would put it question out there hoping that someone may have devised a solution. SDK it is.
Best regards
Earl

Similar Messages

  • Planned order to multiple Production Orders

    Dear Gurus,
    I would like to split planned order qty and convert into multiple production orders in CO41, is there any user exits or BADI which makes it possible?
    Many Thanks!
    //Sreenivas

    try the following function module
    CO_AB_CONVERT_PLANNED_ORDERS
    CO_SD_PLANNED_ORDER_CONVERT

  • Multiple production order

    Hi Gurus,
    I am facing a problem that sap system generates in one sales order multiple production order in mto cases,now from table i want to find out the multiple production order against one sales order pl tellme the selelection criteria.

    Dear ,
    The best way to address this issue to check the report
    1.MD4C-Give Sales Order  , it will display all the Planned Order , Production Order etc
    2.COOIS-Order Header -Stantdar Profile -Enter Plant Code /Order Type , Sales Order Number and Execute , It will diplay all the Sales order with respected line itme .
    Please make sure that all the sales order have credit realsed (VKM3-Sales Order ) .
    4.You can also check thriough COHV/CO46 etc .
    Try and revert
    Regards
    JH

  • Query for releasing and closing Production order ststus in bulk

    Hi
    Releasing planed to released
    1. i want to release all those production orders entered in system which are in planned status.I want to apply one query for that which should change the status of Prod orders to release in systems automatically by applying this query.Please give me that suitable query and how to use it for proper result.
    closing released to planned
    2. Same like above i want to close all those Production orders whose receipt quantity is equal to planned quantity. i.e i want one query which should change the status of production order from release to closed on condition that receipt quantity is equal to the planned quantity.Please give me that suitable query and how to use it for proper result.
    Thanks

    For point 1 and 2:  It should not be tried and using a Query does not comply with SAP Support policy.  Doing so would lead you to lose SAP Support.

  • Gneration of multiple Production Order from multi level BOM

    Hi Experts,
    My customer has multi level BOM. meaning child item also has its own BOM - 4 Level.
    FG-Pack - Make
          FG - Make
               SFG - Make
                    RM - Buy
    Their process is once they create Production Order for final Finished Good, System should also create Production order for child which it self are of make type and has own BOM defined in system.
    They wish that once the create Production order for FG-Pack, system should automatic generate production order for FG and SFG as both of these has BOM defined and are of procurement type Make.
    So first they will close the chile production order and receives qty. in ware house, they will issue this child qty. against main production order, and then completes the main production order.
    So they remains informed about the child item stock.
    My question is SAP Business One supports creation of multiple Production Order?
    BR
    Samir Gandhi

    Hi Samir Gandhi,
    There is no build-in function for this task. You need add-on or SDK for the job.
    If the sub level BOM items are phantom, you can create a big production order including all sub BOM components. That is system supported.
    Thanks,
    Gordon

  • Need transaction similar to KKBC_ORD but for multiple production orders

    HI all,
    Have been scouring the system looking for a report which displays production order variance information for multiple production orders.
    The best way to describe what we need is KKBC_ORD but with the option to select multiple production orders or a range.
    This transaction gives us exactly the results we want, but we have a long list of orders to analyse and to be able to get a list of them all rather than have to go into each individually would be fantastic.
    Do you think we're looking at a custom development here ?
    Regards
    Helen Smith

    IN these situations, I have sometimes written a "wrapper" program, with a Z version of the transaction....Get the list of documents via user input to your selection options, then loop at that pick list and do a call transaction for each document.

  • Single Sales Order Multipler Production order

    HI
    I need to create multiple production order for a single item sales order. Is it possible ?
    for Eg. i have received order for qty -- 100 & i want to create 10 different production order of qty 10 each. IS it possible ?
    I need this to be done automatically.
    Please susggest.
    regards
    Rupesh
    Edited by: Rupesh Shah on Sep 2, 2008 11:08 AM

    Hi Rupesh,
    If you maintain max lot size system always create the planned orders in the same multiples which we mentioned in the material master to satisfy the requirement and if at all any left over qty is there (less than the multiple qty),system will create separate planned order for that qty.
    In customization for lot size t code OMI4 FX open the details screen of the lot size which u are using
    in the details screen there is a indicator LAST LOT EXACT now if u tick this indicator then the system will create thelot exact
    Ex:
    order qty 100 pcs,
    as per ur reqment the system will create 4 lots of 25 pc each Run MRP Try this if u get the solution,.
    Please note Strategy group 82 or 83
    With this strategy , When creating a sales order, you can Create a production order directly.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Sep 5, 2008 1:02 PM

  • Multiple production orders for sales order line item

    hello Guru's
    In our case Requirements are created in 2 ways
    Case 1:
    1)     Sales Orders are created at Plant level with schedule line category CP
    2)     Sales Orders are created at Depot level
    In the above mentioned 2 cases the requirements are taken as inputs and the process is carried at plant level 
    Step 1: Automated MDO3.
    Sales Orders are created if there is short fall of the Quantity at the Depot and Plant Sales Orders are raised against the plant for which the requirements are generated and MRP run is carried out at Single Item single level.
    Step 2:
    For the results of the step1 are then transferred and Production orders are created for the planned Orders.
    The issues is whenever there is change in confirmed quantity or change in confirmed  date the requirements are considered again as inputs and the multiple production orders are getting generated for the single requirement
    Actually we dont want this to have multiple production orders
    regards

    Hi,
    Can you let us know the strategy group used for this material ? If i understood the query correctly, each time there is a change in the sales order (i.e. increase in qty), there is a triggering of new planned orders to meet that demand.
    Regards,
    Vivek

  • How to release a collective production order in CO05N with MSPT?

    The issue was: I want to release a collective order by co05n, e.g. the structure of this collective production order 10000 like this:
    10000----20000
    30000---40000
                                 ---50000
    if order 50000 with material shortage, keep the customizing OPJK  release order=3, how to release this collective
    order. If it is not possible in standard, can the parallel order 40000 be released??
    Thank you, all.
    Edited by: Stephen Wang on Apr 15, 2010 3:12 PM

    Dear,
    In Transaction CO05N, you execute a collective release. For one of the orders, the availability check determines missing part although it has been set in Customizing of the availability check (OPJK) that a release can be executed for missing part per user decision. Therefore, a dialog box is processed on which options a.) 'Release order', b.) 'Missing parts list' and c.) 'Cancel' are displayed.
    If you first branch to the missing parts list and then press 'Cancel' on the dialog box there it self
    Else you can do this with these options,
    1)Use T Code COHVOMRELEASE here select order as you want and release accordingly.
    2) Use Transaction SE38 to create the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE if want in background.
    3) use BAPI BAPI_PRODORD_RELEASE
    Please try and come back.
    Regards,
    R.Brahmankar

  • Release time for production order

    HI
       Want to know  the release time of the production order.Is it possible in any of the base reports
    regards,
    PradeepM.

    Display the production order, press the "I" icon on the status line, position the cursor on the "REL" status line, and go to menu option "Extras", choose "Change Documents --> for status".
    Mario

  • Multiple production orders  are generated for same requirement

    hello guru's
    For a MTO (make to Order) scenario, where the Material requirement quantities are generated from Sales Orders.
    Ex: Sales Order created for 500 Qty.
    I had run the MRP using MD03 with the following parameters
    Processing key              NETCH      Net Change in Total Horizon
    Create purchase req.     1                  Purchase requisitions in opening period
    Delivery schedules       3                  Schedule lines
    Create MRP list            1                  MRP list
    Planning mode              1                  Adapt planning data (normal mode)
    Scheduling                    1                  Determination of Basic Dates for Planned
    System had generated Planned Orders for Qty 500 and these are converted to Production order for Qty 500 for which the Purchase Order for 500 are created.
    Goods receipt of 480 has been made against the Purchase Order for the Ordered 500 Qty.
    When I re-run the MD03 the system is generating the new Production Order Qty 0f 20 which is not supposed to be as this 20 Qty was already part of the existing Purchase Order and yet to be delivered .
    Could you please explain me why this is happening?
    regards

    Dear,
    MRP will consider the firmed PR for the completion date contained in the PR. If the requirements date is different, then MRP will create a new proposal (PR).
    If you wish for MRP to RESCHEDULE the dates of existing firmed purchase reqs, instead of just creating new proposals, you have to set the Rescheduling horizon. OPPQ> Rescheduling (plant) or OPPR >Recheduling Horizon (MRP Groups). Start with a small horizon,  Also check the tick mark for firm reciept there.
    Are you getting any expection message in front of PR?
    MRP will 'assume' rescheduling by configuration, by managing the rescheduling horizon, and by setting the rescheduling tolerances. These config can be found in
    OPPQ select Rescheduling
    or, for MRP groups
    Please check and come back.
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/f4/7d2c9744af11d182b40000e829fbfe/frameset.htm
    Regards,
    R.Brahmankar

  • Close Multiple Production Orders?

    Just wondering if there is a <b>mass</b> version of ko88 or kkax for settling orders.
    Would be nice for the 50-100 production orders that need to be closed per day to be done all at once.
    Thanks for any ideas!

    Hi,
    You can try KO8G.
    Cheers !

  • Multiple Production ordersfor one sales order.

    Hi Gurus,
    We have a typical MTO scenario where depending on the requirement, a planned order is converted in to production order using MD04 or using CO08.
    But when both are done, system is not throwing any error message or information message that the production order is already raised. Instead both the production orders are raised and in MD04 for one sales order we can find 2 production orders. i.e the required quantity is doubled. Even system is accepting the confirmation of these production orders.
    In this case an end user can raise any number of production orders for one sales order using CO08.
    Kindly suggest me any settings which could restrict the raise of multiple production orders for one sales order.
    Thanks in Advance.
    Warm Rgds,
    Ganapathi Varma

    Hy Ganpathi,
    CO08 is manual Creation , so it is difficult to put such a control.Why you are not using sales order ---> Plan order --- >Production order means proper channel of MRP?
    Pls try to control it by using Following User Exits.
    - PPCO0006 Enhancement to predefine fields in order header
    - PPCO0021    Enhancement for Order Release
    But I this type of control creates problem when you really required new prod Order due to Malfunction or any other problem earlier order gets stuck up (less yield to complete the sales order)
    Regards,
    Dhaval

  • Production order from sales order with multiple line item(for one material)

    Dear Gurus,
    I am working in MTO scenarios. If there is several line item in a sales order for one material, multiple production order( same as no. of sales order line item) is getting created against each of the line item.My requirement is,since the material code is same in each line item and sales order is one, one production order should be generated for all line item. please tell me how to do it.
    (Here for one material, multiple line item is required for some specific reason)
    Regards
    Rajib Pathak

    Hi,
    This is not possible.
    In Std SAP will create one production order for one sales order. The stock is also allocated to thet particular sales order only. Because each and every sales order may vary in any one of the parameters. Considering this, SAP has designed like this.
    Regards,
    V. Suresh

  • Automatic creation of Production order when credit limit lock got released

    It seems that production order will be created only when the sales order is created without credit lock error from the first.
    Once credit lock happened, even if user release the lock, production order will not be created automatically anymore.
    Is there a way to change the setting so that production order will be created automatically after credit unlock?
    don't want to create production order manually every time when credit lock happens

    Hello Manish
    If you have used Standard Requirement 102 in Config T code OVB5 (Maintain Requirements For Transfer Of Requirements) , then it should behave as you wish, that is once you release the credit block,  system should create Purchase Reqs/ Planned/production orders in the background. Check what you have there and/or choose appropriately here. While here, check out OVB8 (Maintain Requirements For Purchase And Assembly Orders)  if anything needs to be done there.
    Also ensure that there are no required fields ( for production order) missing, i.e.,  required entry fields that cannot be supplied automatically for this process.
    For conceptual clarity, check out OSS note 396791 - Credit release of sales orders with third-party items which deals with 3rd party transactions but draws a parallel and mentions 'Production orders' also.

Maybe you are looking for

  • Check Box Question

    Hi everyone. Quick question. I am curious if there is a way for my iTunes to shuffle and play songs that do not have the box checked. I like to keep certain songs/albums unchecked so I can switch up what's on my iPhone, but still have the ability to

  • HT1661 Install OS byTarget Disc to iMac A1145

    I replaced the hard drive on this iMac A1145, which is a PPC and accepts an OS between 10.4.2 and !0.5.8.  Not having the Leopard disc, I am trying to boot to this machine via Target Disc Mode from my PowerMac G4 running OS 10.4.11.  Once connected,

  • Req. settings in R/3 for Sales and Distribution

    Hi Friends,     Do we need to do any settings in R/3 for Sales and Distribution implementation?. If so please give me some info. Regards RogerS

  • [advance question] loading a swf in adobe Air, which loads an image with "componentloader"

    Good evening all, I think this is a complex issue. I have adobe air application which loads a SWF I made. Inside this SWF I have used the "component LOADER" to load something with "ContentPath=image.jpg" for example. But the swf loaded in the Adobe a

  • Upgrade Photoshop Album 1.0

    gibt es Möglichkeiten dieses Programm auch mit Win 7 und 8 weiter zu nutzen??