Reorder Point Safety Stock
Dear All
Can I have a report on Rorder Point and a safety stock for the material.
Regards
Manoj
hi
use MARC table in SE16 for reorder level
MINBE Reorder Point
EISBE Safety Stock
Vishal...
Similar Messages
-
Report for Reorder point, safety stock, current stock and fixed lot size
Hi,
Purchasing Dept. is looking for a report which can give list of materials falling below the reorder point, so that they can go ahead and create procurement proposals for those materials.
They also want to see the Reorder Point, Safety Stock, current stock and fixed lot size in the same report.
Let me know if there ia any standard report availbale which displays the same or any approach to get the same.
Thanks in Advance.
Regards,
Shankar Goud.Hi,
There is no standard report because this is meant to be managed by the MRP run.
The MRP lists show all materials that have a problem (such as stock below reorderpoint) but MRP generates requirements for these anyway and so all you need to do is to look for the MRP generated requirements (requisitions?) and you have your list?
Are you using MRP?
If so then please use the standard functions in MRP to get this.
If not, then WHY NOT?
Steve B -
Dear SAP experter :
I want set my FG p/n have a Reorder Point & Maximum stock leve. when my stock & supply demand less than Reorder Point qty, SAP system will Replenish to maximum stock level . i have try to set MRP type to VM & lot size to HB in MRP1 view. but i find the result is not right as i want. could you help me find where is error & give me some good idea ! tks .Hi
The replinishment is for not FG. It should be activated for raw materials and semi finished goods. Please set parameters for roh and halb and check
krishna -
Manual Reorder point planning stock is not showing in MD04
HI,
Would any one help me when i plan for reorder point planing the details furnished below.
Mrp type: V1
Lot size :HB
ROP : 30
Max stock level :1000
in Material master settings.But when i run the MRP using MD03 system is not showing available stock in MD04.It is showing 0 stock rather it would show 4 (MMBE un restricted stock..)
What are thesettings required or any thing missing in IMG. Please help me in this.
Regards,
SriniSrini,
You may also want to check if the Unrestricted stock is in a storage location that is excluded from MRP.
On MD04 you will then see a separate line item at storage location & the Qty =4 should appear as shown below.
12/02/2009 Unrest Stock 12 12
12/02/2009 SLocSt QANN StLoc: not plnd 0 8 QANN
12/02/2009 SLocSt VEND StLoc: not plnd 0 0 VEND
Hope this helps. Good lcuk.
thanks,
Ramm -
Suppression of Re-Order Point Safety Stock Exception Messages
Hi There!
Hope someone can help!?
I need to be able to suppress MRP Exception Message 96 - Qty Under Safety Stock but for PD Only.
Is this possible?
Cheers,
KarlHi There!
We have lots of Raw materials controlled by MRP Type PD, which have Safety Stock Value.
However, quite often although the actual stock is lower than the Safety stock Planners have lots of messages (96 - Below safety stocks). However, although Purchase order reciepts may be late, there isn't actually a problem. As When the PO Reciepts actually happen there is enough stock to satisfy actual demand.
We would like to put many of these Raw materials on Re-Order Point Planning, and manage. But we would like to ignore the (96 - Below Safety Stock) for Normal Items.
Hence, Planners have exception messages for REAL Priorities.
Hope this explains all!
Cheers,
Karl -
Safety Stock (o reserved) to a Customer Cluster
Hi Dudes...
I have a need to define in our Stock Levels the next requirement:
1. We have a 2 big Customer type or kind in the Company: Self Services (supermarkets) & Wholesalers
2. In our inventory Model we are considering as follow:
- Reorder Point
- Safety Stock
3. We need to get that when the stock level fall down the safety Stock, this remaining stock stay only to Self services customer and till the replenishment be triggered then, the stock could be again for the 2 kinds of customer.
Is there any setting or customizing ti get this scenario?
This is really important to the company, I'll appreciate your soon support.
Please let me know if my question is clear.
Thanks in advance
O PereaHi Dave,
Try this note suggestion, possibly help you in resolving your issue.
How to Avoid Getting Safety Stock Replenishment Too Early in an ASCP Plan [ID 301629.1]
In order to line up the safety stock supply with the changes in safety stock, a combination of the profiles must be used:
MSC: Use FIFO Pegging as yes
and the plan option
Peg Supplies by Demand Priority is checked.
The profile MSC: Use FIFO Pegging as yes will perform the following:
For all demands and supplies, it proceeds item by item and
pegs supplies to demands on a daily basis. Daily supplies
and demands are not sorted. When supplies or demands
on a given date are used up, it picks from supplies or
demands on the next date. The unpegged supplies are
pegged to excess.
The peg supplies by demand priority combined with the profile above will prevent the system to plan ahead for safety stock.
Also no safety stock smoothing is setup.
To implement the solution, please execute the following steps:
1. Please set the profile:
MSC: Use FIFO Pegging as yes and
2. Under the plan settings in the main tab the set the following options:
Enable Pegging ON
Peg Supplies by Demand Priority ON
Warm Regards
Sivaraman.G -
Difference :Automatic Reorder Point Planning and Forecast based palning ?
Dear MM Guru's,
As we See in throtical Concepts that
Automatic Reorder point planning and Forcast Based Planning Used the prevuious Historical Data.
Please explain what is difference Between them.
regards,
A. S.Hi,
Reorder Point Planning: -
Use: -
In reorder point planning, procurement is triggered when the sum of plant stock and firmed receipts falls below the reorder point.
Features: -
The reorder point should cover the average material requirements expected during the replenishment lead time.
The safety stock exists to cover both excess material consumption within the replenishment lead time and any additional requirements that may occur due to delivery delays. Therefore, the safety stock is included in the reorder level.
The following values are important for defining the reorder point:
- Safety stock
- Average consumption
- Replenishment lead time
The following values are important for defining the safety stock:
- Past consumption values (historical data) or future requirements
- Vendor/production delivery timelines
- Service level to be achieved
- Forecast error, that is, the deviation from the expected requirements
Manual Reorder Point Planning
In manual reorder point planning, you define both the reorder level and the safety stock level manually in the appropriate material master.
Automatic Reorder Point Planning
In automatic reorder point planning, both the reorder level and the safety stock level are determined by the integrated forecasting program.
The system uses past consumption data (historical data) to forecast future requirements. The system then uses these forecast values to calculate the reorder level and the safety stock level, taking the service level, which is specified by the MRP controller, and the material's replenishment lead time into account, and transfers them to the material master.
Since the forecast is carried out at regular intervals, the reorder level and the safety stock level are continually adapted to the current consumption and delivery situation. This means that a contribution is made towards keeping stock levels low.
Forecast-Based Planning: -
Use: -
Forecast-based planning is also based on material consumption. Like reorder point planning, forecast-based planning operates using historical values and forecast values and future requirements are determined via the integrated forecasting program. However, in contrast to reorder point planning, these values then form the basis of the planning run. The forecast values therefore have a direct effect in MRP as forecast requirements.
Features: -
The forecast, which calculates future requirements using historical data, is carried out at regular intervals. This offers the advantage that requirements, which are automatically determined, are continually adapted to suit current consumption needs. The forecast requirement is reduced by the material withdrawal so that the forecast requirement quantity that has already been produced is not included in the planning run again.
Reducing Forecast Requirements
- Reducing forecast requirements by consumption
If consumption is higher than the forecast requirements in the current month, then the system also reduces future forecast requirements.
- Reducing current forecast requirements by consumption
If consumption is higher than the forecast requirements in the current month, then the system does not reduce future forecast requirements.
- Average reduction of the forecast requirements
The reduction of the forecast requirements is based on average daily consumption. Actual consumption data is not relevant.
The system calculates the average daily requirement first using the formula forecast requirement/number of workdays in the forecast period.
The forecast requirements are then reduced by the quantity resulting from the following formula: number of workdays worked x average daily requirements.
Period Pattern and Forecast Periods
You can specify the period pattern for the forecast (daily, weekly, monthly or per accounting period) and the number of periods to be included in the forecast individually for each material. It is possible, however, that the forecast period pattern is not specific enough for planning purposes. In this case, you can define per material that the forecast requirements should be divided according to a finer period pattern for planning. You can also define how many forecast periods are to be taken into account during requirements planning. The splitting indicator is defined in Customizing for MRP per plant and per period unit and is assigned to the material in the material master.
Example: -
For a monthly forecast, the requirements date would be set on the first workday of the month because, for planning, it is assumed that the total requirement must be available at the beginning of the period. You can then divide this monthly requirement into either daily or weekly requirements. -
Automatic reorder point planning -forecast view
Hi
Our client want to implement automatic reorder point Planning.
Reorder point quantity was maitained from last 3 years but MRP type is 'ND' as they are not using MRP.
Now i am changing MRP type to:VM and in forecastting view: i maintained model as:D constant model period indicator:M
His periods:60 , forecast periods:12 initialization:X tracking limit:4000 selection procedure:2 reset automatically
Is it ok ? than can i run MP30. and the client wants to run for many materils(2000).
How can be run for many materials.?
Regards,
srihari.MDear,
In automatic re-order oint planning , system uses past consumption data (historical data) to forecast future requirements. The system then uses these forecast values to calculate the reorder level and the safety stock level, taking the service level, which is specified in MRP2 view, and the material's replenishment lead time into account, and transfers them to the material master.
Since the forecast is carried out at regular intervals, the reorder level and the safety stock level are continually adapted to the current consumption and delivery situation. This means that a contribution is made towards keeping stock levels low.
From MP30 you have to executed forecast and system has generated forecast values and updated safety stock and reorder point also. Only thing to remember is you have to maintain service level in MRP 2 view of material master when you use VM- MRP type to calculate safety stock and reorder point
Find bleow the set up following set up for automatic re-order point planning :
1.Material Master Set up : Maintain all the relevent parameters from MRP1 to MRP4 view , Forecasting View
1.MRP Type -VM , Lot Size -EX
2.Procurement Type -E for FG and F for ROH
3.Planning Startegy -10 or 40 in FG/SFG and 20 for componenet
4.Planned Delivery Time in MRP2 VIEW
5.Indiviaul/Collective Indicator - 1/2 based on your requirement in MRP4 View
6.BOM Explosion -Keep it blank
7.Service level percentage -MRP2 view
8.Maintain Forecastin view data like model selection , Histry period , period indicator , Forecast control pramaters ,
10.Make sure that you have min 12-8 monhts total consumption update in Forecasting view .
Configuration : InSPRO -MRP -Check MRP Type -VM-check the details like Re-Orde point .Safety Stock both the automatic calcvualtion box are marked .
Finally as a sample test , select any material -mm02-execute forecast in mm02-forecasting view -exectute forecast -then save .Run MRP in MD03-1,1,3,3,1.NETCH indicator and check the result in MD04
HOPE IT WILL HELP. PLEASE REVERT BACK.
Regards,
Alok Tiwari -
Calculation of Safety Stock and Reorder Point under Forecast Model T
Hi Gurus!
Happy Holiday!
I would like to ask for your assistance on how the the safety stock and reorder point was calculated with the following values available. I would really appreciate it if you could give me details on the calculation.
Below are the values:
Basic data
Forecast date 01.12.2009 Unit CTN
Forecast model T Service level 0.0
Period indicator M Paramtr profile
Control data
Initialization Tracking limit 4.000
Model selection A Procedure selection 2
Parameter optimizatio Optimization level F
Alpha factor 0,10 Beta factor 0,10
Gamma factor 0,00 Delta factor 0,30
Basic value 5.464- Trend value 5.603-
MAD 4.758 Error total 4.722
Safety stock 1 Reorder pnt. 1
No. of values
Consumption 6 Forecast periods 1
Initial. periods 0 Fixed periods 0
Periods per season 12
Historical data
Period Original Corrected value
11.2009 3.000 3.000
10.2009 0.000 0.000
09.2009 0.000 0.000
08.2009 9.000 9.000
07.2009 21.000 21.000
06.2009 20.300 20.300
Forecast results
Period Original Corrected value
12.2009 0.000 0.000
Appreciate your assistance!
Thank you and Happy Holidays!
JiSweth, you are asking for consulting, and in my opinion it is way beyond what can or should be reasonable to achieve in such a forum. You are asking complex questions, that most probable have more than one possible answer.
I suggest that you get on-site help from a knowledgeable and experienced consultant. These are crucial business issues, and should be dealt seriously. -
Safety stock and Reorder point calculation in inventory planning
Hi,
How System does the calculation of own safety stock, and Reorder point, maximum safety stock level at parent and child location while running inventory planning services in SAP APO SPP. does anyone about the calculation please let me know
Regards
PuneetHi,
How System does the calculation of own safety stock, and Reorder point, maximum safety stock level at parent and child location while running inventory planning services in SAP APO SPP. does anyone about the calculation please let me know
Regards
Puneet -
Automatic reorder point and safety stock caluclation- MRP type:V2
Hi,
I want the system to calculate reorder point and safety stock. To simulate this i created one material with
MRP type:V2, service level as 97%, Forecast model:D,Hist. period:12,Forecast periods:12, and I entered
the historical value for past 12 months as 100 nos in material master.
04.2009 100
03.2009 100
02.2009 100
01.2009 100
12.2008 100
11.2008 100
10.2008 100
09.2008 100
08.2008 100
07.2008 100
06.2008 100
05.2008 100
Then I went to MP30 and executed the forcase.When I checkd the material master the system has calculated the reorder point as 14 nos. But there is no value updated in safety stock field.
Now I have two questions.
1) How the system has arrived the reorder point value as 14 nos.
2) Why there is no safety stock updated in material master.
Could u please clarify this.
Thanks and Regards
PurushothamanHi,
This is further to my preivous mail. I have changed the consumption values and now i am getting the safety stock.
MRP type:V2, service level as 97%, Forecast model:D,Hist. period:12,Forecast periods:12, and I entered
the historical value for past 12 months as.
04.2009 100
03.2009 80
02.2009 110
01.2009 85
12.2008 90
11.2008 95
10.2008 125
09.2008 90
08.2008 90
07.2008 92
06.2008 101
05.2008 100
After executing the forecase the sytem has calculated the below parameter.
Basic value:95.759
MAD:11.448
Safety stock:10.252
Reorder point:23.658.
Can anyone explain me how these calculation arrived.
Thanks and regards
Purushothaman -
Static or Dynamic Reorder Point and Safety Stock
Hi,
In a retail scenario, what would be the advantages over the other of setting a static or dynamic reorder point and safety stock?
The MRP type used is Time Phased Planning, but whether to let the system automatically set the reorder point and safety stock is the question. What should be considered in implementing this?
Regards,
Leehi,
As far as i know is static means manual entry of reorder point.
The dynamic or automatic reorder point is used for Forecast based planning...
the sysstem wii automatically calculate the reoder point evrytime there is the forecast run.
So, it dependig on ur scenario , select either manual or automatic.
First entry for both is always manual entry....
hope u got this..
Regards,
Smitha -
Is there any bapi returns dynamic value of reorder point and safety stock
Hi all,
Is there any bapi returns the runtime value of ROP and SS by passing changenr/objectid taken from CDPOS.
if exists please send me with code.
Thanks
PRR Rhi,
As far as i know is static means manual entry of reorder point.
The dynamic or automatic reorder point is used for Forecast based planning...
the sysstem wii automatically calculate the reoder point evrytime there is the forecast run.
So, it dependig on ur scenario , select either manual or automatic.
First entry for both is always manual entry....
hope u got this..
Regards,
Smitha -
MRP with reorder point and safety stock and planning calender issue
Hi,
We are using currently MRP type PD and using Scheduling agreements and after the demand management changes when ran MRP the delivery quantities are fluctating in higher range and vendor complains about it so to avoid this we are constantly changing GR Processing days in material master? how can we avoid the drastic changes on the order quantites on scheduling agreements with out changing GR processing days.
For example : we constantly manufacter 480 vehciles per week and some time because of holidays it will be 320 or 560 per week then the forward scheduling agreement quantites instead of 480 parts week(twice a week delivery) goes up and down and vendor needs a at least a range for his prodcution?
I was thinking to use Reorder point but when i changed the MRP type VB then i cannot see forward scheduling agreements at MD04? does MRP type VB or V1 will allow forward scheduling also like 120 days ahead of planning?
Appreciates everyone time and help.
Thanks and Regards,
Sivayou can use MRP time fence to restrict the changes in planning data for specified horizon. For example If MRP time fence = 30 days, no changes in planning data will be allowed for coming 3o days unless you manually intervene.if any new requirements came in this period , they will be planned automatically at the end of this period only.
-
How much to order , reorder point and Safety stock calculation in SAP?
Existing Client is Distribution company , the Challenge is how much order , when to order and how much safety stock we need to keep for Material in SAP?
Limitations with Client System:
u2022The existing system does not enable purchasing to have visibility to firm (open sales orders) and planned (customer forecasted) demand for a material.
u2022If a sales order is placed that consumes all of the inventory available, the purchasing department is not notified automatically to replenish the stock
u2022The system in place currently does not enable the organization to maintain a level of safety stock.
u2022If inventory is logically allocated to a priority customer based on their forecast, there is no way to ensure that inventory is reserved for the priority customeru2019s orders u2013 other sales orders often consume it.
u2022If a material is backordered with several sales orders waiting for parts, the sales orders are allocated based on earliest requested delivery date upon receipt of the part; there is no way currently to allocate the stock across the open sales orders if it is determined that is the appropriate course of action.
Thanks
SwethSweth, you are asking for consulting, and in my opinion it is way beyond what can or should be reasonable to achieve in such a forum. You are asking complex questions, that most probable have more than one possible answer.
I suggest that you get on-site help from a knowledgeable and experienced consultant. These are crucial business issues, and should be dealt seriously.
Maybe you are looking for
-
A #1 after some contacts on phone after sync
I have a motorola krazer and it was syncing fine with isync. Now at last sync it is putting a the number "1" after some contacts on the phone. I sync it with my MacBook pro. Recently I copying the address book application support folder from my G5 to
-
Zen Vision M video convertion problem: image upside d
Tried to copy .avi videos to my ZVM, but after the required convertion?(via Creative converter to .wmv format) the video appeared upside down. Tried several times with different files -- same result. Any idea?
-
Right,I have a 30 GB Creative Zen Vision M,and recently it froze while in use after resetting the unit it automatically booted in recovery mode. After trying the clean up function it where it stopped on scanning disk I tried formatting where all I go
-
Make a PDF with a Mac, NOT using Mac PDF maker
I am suffering from blurry text when making a PDF in Mac OS 10.6 (using "Save as PDF" in the Mac printing dialogue). The software company has confirmed the problem. They suggested using CutePDF to make a PDF because it does a better job. CutePDF is W
-
Link between batch stock and stock transport order no.
hello all, my client want the report for stock in hand against batch and sto no..in standard tcode mb52(stock in hand) we can see the stock against batches.but i want the report for which sto no. stock is recieved corresponding to batch. pls tell me