Report to check project-wbs-requesting co.code-company code in assignment

Dear All,
Is there any standard report to check Requesting co.code and company code (assignment tab) by project and wbs. I tried CNS43 but there is no requesting company code.
Can we use SQ01 to create this one ? Any one can advice me how to make query for this concern.
Please advice.
Thank you
Nies

Hi,
You can use SQ01 for this. Query the table:PRPS.
The fields you require are:
PRPS-PBUKR
PRPS-ABUKR - Requesting company code.
Muraleedharan.R

Similar Messages

  • Report to check Standard WBS link to which standard network and activity

    Dear All,
    Is there any way or standard report to check standard WBS (cj93) link to standard network/activity (CN03).
    Normally we create project by using template existing, we would like to check the structure. Is there any way to check the standard template for it ( WBS template link to network/activity template).
    Thank you.
    Nies

    Hi,
    Please try this:
    1. Tcode : CN41
    2. Change database profile: In that in the origin check mark the Standard structure. Continue..
    3. At the bottom of the selection screen check mark the standard structures.
    4. In the selction area for the Project hit F4 and  select the project based on the standard WBS Element.
    5. Exceute the report.
    Hope this is useful.
    Reward points if found useful.
    thanks..

  • Project stock exist in a plant and WBS but with different company code

    Hello,
    As I know I can not create a PO in company A, but was assigned to a WBS maintained in company code B. The system will check if the WBS getting the same company code with the PO, and pop up  the error message if the company code was differect.
    But seems the project stock could exists in a plant  but assign to  WBS was maintained with different company code. For example, A material stock was in plant A assigned to company code A, and it is also assigned to WBS belong to company code B.
    Any one know it is correct?
    Thanks!

    I knew crossing company code to assign WBS element to PO is not allowed since i got the error message, and I think it's reasonable, cause the expense from the project PO should post to the same company code through the WBS element.
    But why for  the inventory crossing company code is allowed?  The stock in plant A belong to company code A, was assigned to WBS element B belong to company code B. That means the inventory is in the GL balance of company A but under the profit center belong to company B.  How to understand it? I think it's wrong

  • Report to check a transport request

    Hi community,
    I would like to write a report that checks all objects of a transport request.
    For example I would like to check if all classes in that request follow the same naming convention and start with "ZCL_".
    Any ideas how to do this?
    Regards,
    Daniel

    Hi,
    You can use table : E071
    Pass : OBJECT as
    CINC Class Include (ABAP Objects)
    CLSD Class Definition (ABAP Objects)
    You will get all request with the same object tyoe .
    to check the naming convention you can ues the next field
    OBJ_NAME .
    Kindly be generous with points if you find it useful.
    Regards,
    Gaurav

  • How to create request for extracting company code

    Hi All,
    Can any body guide me how to create a request for extraction of company code 0COMP_CODE_ATTR.
    Actually i have created a request using transport conneciton but while moving this request to quality system i am getting following error.
    DataSource 0COMP_CODE_TEXT does not exist in source system QLTCLNT440 of version A
    Mapping between data source 0COMP_CODE_TEXT and source system QLTCLNT440 is inconsistent
    DataSource 0COMP_CODE_TEXT does not exist in source system QLTCLNT440 of version A
    Field KEY1 will not be delivered from DataSource 0COMP_CODE_TEXT in source system QLTCLNT440
    Field TXTMD will not be delivered from DataSource 0COMP_CODE_TEXT in source system QLTCLNT440
    Start of the after-import method for object type R3TR ISTS (Activation Mode)
    Reference to transfer structure 0COMP_CODE_TEXT_BB not available. No activation possible.
    Start of the after-import method for object type R3TR ISTS (Delete Mode)
    Start of the after-import method for object type R3TR ISMP (Delete Mode)
    Errors occurred during post-handling RS_AFTER_IMPORT for ISMP L
    The errors affect the following components:
       BW-WHM (Warehouse Management)
    Actually i have checked in Quality system 0COMP_CODE_TEXT is availble active. But i think we have to use 0COMP_CODE_ATTR data source...
    Pls help,,,
    Regards,
    viren.

    Hi Viren,
    Glad that your problem is resolved.
    Help.Sap.com is the best reference: http://help.sap.com/saphelp_nw04/helpdata/en/b2/e50138fede083de10000009b38f8cf/frameset.htm
    Also check the "How-To" docs in https://www.sdn.sap.com/irj/sdn/developerareas/bi
    Bye
    Dinesh

  • How to prevent WBS element for other Company code to be used in WO

    Hi,
    I am new to this forum and want to try this out.
    This thread is regarding: Area: plant maintenance, create/change work order, message control in wbselement in tab "Addit data"
    Detailed explanation:
    In our SAP system we have the functionality that when a user enters a wbs element in a Work order (Addit.Data Tab) he gets an error message CJ065 if the WBS element is from another Controlling area.
    We want in addition the functionality: show error message CJ 066 when the WBS element is for another Company code.
    I have searched in message control within PM, but here is only allowed to enter messages for application area IW.
    I have also tried to search for other message classes without finding where in customizing to maintain message class CJ.
    Please help
    Best Regards
    Ellen

    Thanks for your feedback Narendra,
    I have thought of that solution (using customer exit at save), but hoping maybe there was a setting in Customicing eather in CO or in PM to make message CJ066 appear. When looking at the source code it looks tlike there is a setting in customizing to be triggered, but I cannot find out where..
    BR
    Ellen
    Edited by: Ellen Ødegaard on Apr 29, 2008 2:08 PM

  • Report to know activities in customer accounts at company code level

    Hi All,
    Any idea about any report available in SAP to get the balance in customer accounts (total) with the break up in terms of activities at overall level. Activites means sales, payments, debit note, credit note etc...(any kind of posting in customer account).
    The break up is not required at customer level, it is required at company code level which means that it contains all the customers under that company code. We plan to do some trend analysis from this report. Report in GL accounting / AR will do.
    Thanks in Advance,
    Regards,
    Mayank

    Try this report S_ALR_87012169, This should show you the information
    Assign points if helfpul

  • Avaiability check across All Plants for all company codes

    Hi
    How to Check ATP in Availability Check in Sales Order across plants in all the company codes.
    Currently its showing me only one company code plants when i click on other Plants Button in Availability control
    Reg.
    Amol

    Hello Amol,
    In sales orders, when you write a item material SAP makes it an automatic determination for the plant who belongs to master data information. The first step for SAP search strategy is find over the Customer Material Information, if it does not have information it makes the second step and search information over the Ship-to party, and the third step its search in the master material. If it does not find information, SAP does not propose a plant for that item material.
    Taken this process in consideration and for this reason, the item material made the Availability Check for one particular plant.
    If do you like to know more about your material stocks, one option its search the quantity available for sales in the plants using the MB52 transaction; and other option could be over your sales order, in the Availability Control, go in the menu to u201CGo tou201D, u201COthers Plantsu201D; or if your prefer you can use u201CShift+F5u201D.
    Regards

  • Report to check the WBS "system status"

    Hello friends,
    Would anyone know for a standard report where I can check for the WBS "system status"?
    i.e.: I want to know everything I have in AVAC status
    Thanks and Regards
    Alex

    You can get the system status of WBS in CN41, Execute the report , after it use the change layout option, select status.
    System will display you user / system status for all the PS Objects.
    With Regards
    Nitin P.

  • Standard report to check Equipment-WBS-Material-Asset No

    Hi All,
    Is there a report to have a look equipment no, which is belong to WBS, material and Asset no.
    Normally i open using IE03. Any standard report to shows all part in 1 report ?
    Please advice.
    Thanks a lot.
    Nies

    ok

  • CJ20N project builder restriction on plant or company code

    HI there
    I hope this is in the right formum..
    I just cannot seem to get the transaction CJ20n to check on orglevel Plant (WERKS) or Company code (BUKRS).
    When displaying or changing a project people should not be able to  access projects from differents companies (or plants). When I look at the basic data, organisation fields of the project, there are CO area and Business area, as well as Company code and plant. On one of the last (company code or plant) I want to have an authorisation check wether the user is allowed to display or maintain the project
    when I trace the actions, I only find checks on
    C_PROJ_KOK (controlling areaa)
    C_PROJ_PRC (profit center)
    C_PROJ_VNR (project manager)
    but they are not company specific here
    I activated object C_PPBD Authorization for maintaining planned independent requirements SAP note 635612), but this is not being checked on transacton start or when changing project meta data e.g. description.
    Has somebody any ideas/tips on howto get CJ20n to check on WERKS (plant) or BUKRS (company code)? I would be very thankfull
    Jos

    Jos,
    It looks like your question got hijacked, so a shot at your original question regarding CJ20N:
    If you want the check upfront and not inside the transaction, then you could add it in transaction SE93. but this will only prevent the user from starting the transaction, not using it.
    If the check on F_BKPF_BUK or whatever is not coded anywhere in CJ20N, then adding or removing SU24 indicators will not help. You could try to look for a user exit ("Enhancement transactions CMOD / SMOD)). I would ask this question in the CJ20N forum.
    You could open a development request with SAP, but there would most likely need to be a few more customers with the same request or a realy good reason to add it before this materializes.
    If all of those fail, you can get yourself an object key for where ever it is that you want an additional check to be coded and change it yourself. After this, CJ20N or the check function will belong to you (not SAP) and anybody with a developer key could also change it using normal developer authorizations.
    Good luck,
    Julius

  • WBS for two company codes

    Dear Experts,
    This requirement is for an IT service project.
    The process is - I have two company codes Comp code 1 & Comp code 2, In which Project is created in company code 1. Employees are assigned to project to onsite & offshore from company code 2. This means the employees are created in the company code 2. But working for the project in Comp.code 1. Comp code 2 get revenue thru intercompany billing based on number of hours/days the employee worked in the project created by the com. code 1. The employee books the timesheet in comp code 1 against the project id.
    To acheive this
    1)  i need to maintain same project for two company codes?
    2) Or same project, one wbs for one company code & other wbs for another company code?
    Will the above two possible to work in SAP? or
    anyother we i can workaround this
    Please advise
    Regards,
    Deepu Pillai

    Hi,
    This is possible through Resouce Related billing in PS.
    For e.g. Consider business scenario, where we have created T-10006 as a customer project.
    Now this project is mapped using a work breakdown structure that contains activities.
    The activities define the flow of the project and form a quantity structure for determining costs and payment data automatically.
    The project cost plan is used to create quotations.
    When the sales order is received, it is assigned to the project. This means that it can be used to plan revenue and then post this revenue.
    Actual costs are entered when activities are confirmed, components are purchased and when invoices are assigned. Actual revenue is posted to the project by means of milestone billing.
    Two companies are responsible for executing project T-10006.
    Company 'A' is mapped using company code 1000 and performs all services except for those planned in WBS element T-10006.1.2.
    Comapny 'B' is mapped using company code 2000 and performs some of the engineering services. (WBS element T-10006.1.2).
    Here Comapny 'B'  bills its services to Company 'A' on a resource-related basis.
    A results analysis is carried out for the billing elements T-10006 und T-10006.1.2 in the project.
    The results analysis values are settled to the profitability segment.
    Regards
    Tushar

  • Hungary VAT report in HUF - company code currency is EUR

    Hi,
    We have the below requirement from our client.
    Company is incorporated in Switzerland and is having a plant in Hungary.
    We have decided to have 2 company codes one with country key as CH(switzerland) and the other with country key as HU (Hungary).
    The client wants to have the currency for the Hungary company code as EUR (Company code currency)
    Requirement: VAT report generation in currency HUF for the Hungarian company code. While accounting should consider the European bank rates for converting foreign currency Invoices into EUR, the VAT report should consider the Hungarian Bank Rates for converting all Invoices into HUF. This conversion should be on daily rates for all the invoices.
    There is an option to activate report generation in an Alternative currency (RFASLD15). However, the translation is made on a fixed translation date to be given in the report selection criteria.
    Any suggestions to meet the requirement would be of great help to us.
    Many Thanks
    Hema

    Hema,
    Please activate hard currency(Local currency 3) as HUF, so that you can have transaction amounts in HUF also eventhough your company code currency is EUR.
    Please check F.12 report for your VAT requirement.
    Here you have to capture BSEG-DMBE3 value as per your requirement.
    Rgds
    Muarli. N

  • AP - One Check for Vendor from two Company Codes

    Our Company would like to issue one check  for a vendor in two company codes.
    Configuration has the paying company code = sending company code.
    So the payment proposal will want to create two checks, one for each company code.
    Question --- Is there a way to generate one check for the one vendor in two company codes.
    Thank you,
    Jeffrey

    Dear Jeffrey,
    Let say there are two company codes 100 and 200, in the config, you will need to make paying company code for company code 100 = 100 and
    Paying company code for company code 200 = 100.
    you will need to set the Intercompany balancing account in Tcode OBYA.
    Once you do this, the other process remains the same. Should you have questions, let me know.
    Thanks
    Raghuram

  • TEM : Report based on Company Code.

    Hi All,
    We have a requirement where the client want to have the report of the training conducted based on the Company Code.
    Please let me know your suggestion.
    Thanks & Regards,
    Deb

    Hi Rohini,
    What he wants is to have a list of training programmes conducted under any company code.
    If you have some inputs then please share.
    Regards,
    Bhupesh Wankar

Maybe you are looking for

  • How to get USERID system parameter in the report

    I can pass the user id, password and connect string through the USERID parameter, but how do I get it in the report? (I need to pass the USERID to a different report, I got a error when I use :USERID). Thanks. WJ

  • Laptop editing with Premiere Pro CS4: what are the most important specs

    Laptop Editing: What are the MOST important specs? Hello everybody, I have been a long time lurker, but I decided to join in and share my voice. I've been editing, for a while now, various projects of various lenghts shot on my HV20, on an IMac using

  • Problem with selection-screen of program RFEBKA00

    Hi, When i execute the program RFEBKA00, some the text appear weir, or better, some texts does not appear... Like it misses some translation or something, but i check the data elements of the fields and everything is fine... Does anybody have any ide

  • Process chain transport

    Hi Gurus i hve created a process chain to load data to cube. All the objects are already in prod. like cube, IP, DTP. Now the question  is --> The DTP which is in the prod. system is not same as in dev. (may be somebody has deleted it) So should i tr

  • Oracle8i client on Linux, oracle8 server on Solaris

    Hi I have an Oracle8 server (8.0.6) on Solaris 2.5.1 running on Sparc. I installed Oracle8i client (8.1.5) on linux (Redhat 6.1) With sqlplus it works, but using proc it fails. First I thought that it was my piece of program, but it fails with the de