Required reference document to issue the material from project stock

Hi All,
we have procure the project stock material with Acct. assignment Grp as "Q", now the material is laying in project stock.
the things is we can issue the warehouse material with reference to Project Reservation similarly my client wanted to use some SAP document for records purpose to issue the material from project stock.
i have checked this functionality in SAP which is not available except straight way issuing the material from project stock using MB1A( 221 Q).
please help me out to resolve this requirent.
manoj singh
we can

Hi,
Did you implement PS module in your system?  How were your project stocks reserved?
Cheers,
HT

Similar Messages

  • How to transfer material from blocked stock  to scrap location

    Dear Experts,
        Weu2019ve put some of raw material into blocked stock. Now we want to scrap these materials & for that Iu2019m trying to take it to unrestricted stock from blocked stock by MIGO (transfer posting ,Mvt type=343).
    But during that system shows an error message that u201CBest before/SLED of batch has been exceededu201D
    Due to this Iu2019m not able to scrap the material from blocked stock.
    Pls advise what to do .Is there some other way to do it??
    Thanks in advance

    Hi,
    You can directly scrap it from Blocked stock using movement type 555 . Further from the message it is observed that SLED( Self Life Expiration Date ) check is active for this material in material master . Try to scrap it in 555 mvt .
    Dhruba
    Edited by: Dhruba Charan Behera on May 18, 2011 12:51 PM

  • Transfer from Project stock(Q) to Ordinary Stock

    Transfer from Project stock(Q) to Ordinary Stock
    I 'm unable to Transfer Material from Project Stock To Ordinary Stock
    I want to issue Stock to a cost center and stock is available only in Project stock.
    Plz let me know the Mvt Type / Procedure for doing this.
    1.     Mvt Type from Project Stock to Ordinary Stock -
    2.     Mvt Type from Ordinary Stock to Project Stock

    1. Mvt Type from Project Stock to Ordinary Stock - 411 / Q
    2. Mvt Type from Ordinary Stock to Project Stock - 412 / Q
    Do it thru MB1B or U can use MIGO also.

  • Transfer the material from one plant(non valuated) to another plant valuat

    Hi All,
    How to transfer the material from one plant(non valuated) to another plant valuated.
    Which Goods Movement type we required to use.
    Regards,
    Amit Shah

    Hello,
    Please refer the link below. hope it could be a help.
    stock transfer plant to plant
    split valuation
    Regards,
    Jana

  • Activate the FIELD Cost Center while issuing the Material to Order by 261

    Dear All,
    How to activate the FIELD Cost Center while issuing the material againest Order IN MB1A?
    Thanks and regards,
    Satyajit

    Hi all,
    I'm having problems with activating the cost center field too. I've already checked OMBW and OMJJ. For OMJJ, cost center field was required. For OMBW, Cost Center field was Supressed. However, when I checked the Change Logs, no changes were performed since last year. The user who raised this issue had the cost center field activated until December 1, 2008 but now it's deactiavted. So I don't think it's OMBW responsible for this since there was no change since last year.
    Please share your knowledge on this.
    Thanks!

  • POD has to take as reference document to settle the shippment costs to the

    Hi all,
          This is my requirement flow Sales order  --> Delivery > Invoice> POD (Prof of Delivery) --> Shipping cost settlement(need to take POD as reference Document).
    For the above process how can we configure or customise in SAP.
    1.POD will need to come after Invoice
    2. Based on POD I will need to create Shipping cost settlement Document.
    2.The system should not allow  to create shipping cost settlement doc if there is no POD (Prof of Delivery) for the deliveries which I shipped.
    Please reply back as early as possible.
    Regarda,
    Murali.

    Hi Lakshmipathi,
    A very helpful answer, given by you.But in our case if at all i am trying to change it into warning message it is effecting another sales organization. In one server Client is maintaining two company codes data. So it might effect the other.
    We have developed a new routine named 901 by copying the standard 002 and maintained in the copy controls(VTAA) for that relevant Document types. We are able to take the reference by doing this. But the problem is when i am taking the reference of other sales area and document type , Document is changing but sales area is coming of the reference document.
    Example :
    1000 : SO
    11  & 13 : Dist Ch(Domestic) and 12 for Deemed
    11 : Division common
    ZFQT  : DOMESTIC QUOTATION TYPE
    ZDQT : DEEMED QUOTATION TYPE.
    I have created a Quotation by taking ZDQT Doc type and Sales Area : 1000/13/11 and Customer : 11000000(Same Customer for Dom and Deemed sales extended). 20000010(Documnet no)
    When i am taking the reference of 200000010 and creating a New Quotation  of  Doc type (ZFQT) and Sales Area : 1000/11/11 and Copy.
    Then Item and customer details able to copy and when i look into Header Sales Area is not changing , it is showing the reference sales area 1000/13/11. Butn't Sales area : 1000/11/11.
    *Why the Client is asking such type of reference is ?We have implemented for Cable Manufacturing company and in order to create a Item in Order it requires lot of Configuration/Charateristics as VC (Variant Configuration)is involved and it takes minimum 3-4 mins to create an item.
    So is there any alternative solution for this.
    Regards,
    Tilak.

  • MM01 -- Update Was terminated while copying the material from one plant

    Hi Experts,
    While I am trying to copy the material from one plant like ETPE to another plant ETPZ , its telling that material created.
    But when we try to display the created material in MM02 for plant ETPZ , it says that material does not exist.
    Note : After creating the material , if we try to move any transaction code it shows the error message box and  says that Update was terminated .
    Kindly help us to resolve this.
    Regards,
    Vijay

    Hi rob,
    we have put the debugging , if there is any badi , enhancement the debugger would have gone to exit or enhancement line but its not going to any where.
    and I have checked in sm13 ..
    its giving the error like update was terminated
    from funtion module : MATERIAL_UPDATE_DB
    Report name :      LGRAPU37
    row : 360.
    ABAP/4 processor: POSTING_ILLEGAL_STATEMENT
    but if we go and see in the row 360 ...
    CALL SCREEN 100 line only
    is there , even if we put the breakpoint in this line , while we are debugging , debugger is not going to that line .
    Note : if we see the screen 100 it shows the empty screen.

  • Errors Message while issuing the material in MB1A i.e unrestricted material

    Hi Expert,
    I want know the Message while issuing the material in MB1A we are getting the error unrestricted material, so what is the reason of error.(i.e there is no stock available or any other give me the reply as soon as possible)
    Regards,
    Ram Rathode

    You are not clear. What is the error message that you get?

  • How to return material from Project which is already charged?

    Hi,
    In our implementation we are using project manufacturing and hence we are using locator to charge task for inventory transaction.Suppose there are two tasks
    in my project , task1 and task 2. At the time of creating the PO we are using task1 and the material is received in an asset type of subinventory. Now the same material will be used at another task which is subcontracted by another supplier. At this point we issue the item from locator(project-Task 1) to an expense type of subinventory which is having the locator as (project-Task2).But in some cases total material issued is not used and it may be returned from task2.As this item has been returned from an expense sub inventory system is not allowing to give rate. Is there any way out to reduce the cost of task 2?

    hi,
    we are using Project Transfer Transaction to issue the material to task 2. Basically we are transferring from an asset subinventory to an expense subinventory. In asset subinventory the locator is task 1 and in expense subinventory the locator is task2.So the task cost is shifting from task1 to task2.Now what happens sometime is, there is return from the expense subinventory hence the cost of task2 gets reduced.but system does not give any option to give rate when transferring from the expense subinventory to asset subinventory because when any item is taken to expense subinventory it does not have any cost,only quantity remains.So the cost of task2 does not get reduced.

  • Problem with the% deviation from Project Server 2010 field

    hello
    I have a problem with the% deviation from Project Server 2010 field.
    Within a file or project, this project contains tasks.
    Each task has completed the field% deviation.
    Within the row "Summary" in the field of% deviation does not perform the sum of all fields of tasks.
    Only occurs on certain projects, these projects have the view of PR Progress Report
    Anyone know happens?
    thank you very much

    Hi
    Sorry, I'll be more specific now.
    Within the field% deviation. Your settings in PWA is:
    The formula for field% Deviation:
    Str (IIf ([Job baseline] = 0; IIf ([Working] = 0, 0, 100); IIf ([Working] = 0; -100; Int (100 * ([Job] - [Work Online base]) / [Working baseline])))) + "%"
    Under the heading rows Calculation Summary:
    > Use formula.
    Within the field Allocation Calculation of rows:
    > It is labeled the "Apply unless you manually specify".
    The field [Job] and field [Job baseline] are fields Pack project server.
    The error is in project, in the list of tasks.
    In the top row, this row summary makes the sum of the ranks of the tasks of the file.
    But in my case only in the summary field the same value appears in the tasks.
    In all the cells in column% deviation appears the same value.
    I hope it helps.
    thank you very much

  • Delivery from project stock

    hello!
    i have following requirement
    - sales order -> creates a requirement to unrestricted stock
    - delivery -> creates a requirement to unrestricted stock
    during delivery processing the materials are booked manually to project stock.
    - at goods issue i want to book automatically from project stock
    as i do not want to create requirements for project stocks, i cannot use a matching requirement class.
    can someone think of a solution?
    thanks!
    matthias

    Hi Fortain ,
    I did bit of analysis to track it down and i noticed that when you run availability, system check for Checking Rule "B".  I think if we want to enable WBS element field, it should be "BQ". I am trying to figure out. But no clue.
    Let us keep trying.
    Regards
    Vinu

  • Can we delete the material from SRM ?

    Hello,
    In ECC, With MM06 & with MM17 we have marked the materials for deletion but can not completely delete it. still client users shop for those materials and
    We have the requirement to permanently delete the materials from respective SLOCs so that those deleted materials will not be available at all  to requester for shopping.
    Archiving is out of scope. Can we delete the materials from SRM also in commpr01 ? or Suggest any other pointers
    Thanks & Regards / Pankaj K

    Hi Pankaj
    Issue during S.cart creation for mtl which are flagged for del at sto locn
    as really said, if you delete a material at SL level , srm not validating but SRM validates at Plant level deletion.
    Are you in classic oe ECS, However it would have thrown error while creating PO.
    How did you delete the material inSRM ?
    After you delete a material in SR, what is the status of material ? Is it blocked, Archieved.
    BR
    Muthu

  • The system does not get Storage Location of the material from the Contract

    Hi to all,
    We are encountering a problem now regarding the PR to PO conversion.  Our ABAPer has made a background job for the User to convert a PR to PO using ME59N. 
    Background Job : ZPTI_MM_PR_PO_CON
    Program : RM06BB30
    Tcode: ME59N
    Variant : SAMPLE2_ME59N ( Plant, Vendor, POrg, Pgrp.)
    Rule : When the PO is converted the STORAGE LOCATION of the material should be gotten from a CONTRACT/AGREEMENT instead of the SLoc defaulted in PR.
    Problem:  When the backround job is finished, the PO is converted but the STORAGE LOCATION did not get from the CONTRACT.
    Steps done :
    1. Create a Contract (ME31K)
        1.1 Specify the SLOC of the material
    2. Create PR (ME51N) and enter the Contract Number inside the PR
        note : In the PR the material has a Storage Location which defaults from the Material Master.
    3. Run SM36 and enter the job ZPTI_MM_PR_PO_CON
    4.  Set the job to "Immediately"
    5. Click Steps icon and enter the program RM06BB30 and variant SAMPLE2_ME59N
    6. Save
    7. Go to SM37 and check the job if finished.
    8. When the job is finished, check the PR if it has a PO.
    9. Display the PO.
    10. Check if the storage location in PO has gotten from the Contract
         The problem now appeared.
    We have tried to use ME59N alone and not using the background job. The system has gotten the correct Storage Location, thus it got from the Contract.
    Please help what should be checked on our side.  Our ABaper is also currently debugging the program but we
    are seeking help to fasten the solution.
    Best Regards,
    Elynne

    Hi Elynne,
    Definitively, it is a problem with ME59N background process.
    It is better if you can create a message to SAP asking for the solution.
    I only found the next SAP note:
    Note 1287723 - ME59N in backgound does not populate PR details in PO.
    But, I do not know if it will help to resolve your issue.
    I hope this little information can help you in anyway.
    Kind regards,
    Sandra

  • Extending the Material from FG Material to Semi Finished good.

    Dear All,
    I am doing the STO (INTRA COMPANY) from plant 1 to Plant 2 for FG
    While receiving the material in plant 2, I have to take as Semi finished good (SFG).
    Is it possible? Bcz the Material Type is FG in Plant 1, so we can't change Valuation class of the Material while extending in Plant as SFG. How can I achieve this with same Material code?
    While selling the same Material from Plant 2, I will add some part and I will it as a FG.
    Please guide me.
    Thanks & Regards,
    Ramu

    Hi Sudhir,
    Thanks for your reply.
    But my requirement is in Plant the Material type should be FERT(FG) and while extending the same material in Plant 2, the Material Type sholud change to HALB(Semi finished).
    As per ur answer I can change the Material Type for the Material in bith the Plants.
    Plz guide me.
    Thanks & Regards,
    RAM

  • Material Confirmation date in future though the material is in stock

    Dear Gurus,
    Please tell me why the system is giving the material confirmation date in future though the matl is  available in stock.
    System creating two schedule lines one for 15/10 (15 oct) and the second one with the confirmation of quantity on 22/11 (22 Nov) as I have enough stock than the required for this order. In MRP1 view of same  matl Master of same material delivery planning time is 28 days. and in MRP3 view the Replenishment lead time is 20 days.  please tell me what date system considering to shift  the confirmation date in future. the factory calender has Sat-sunday off.
    please tell me the possible reasons for confirmation date change.
    regards,
    Sandesh

    Hi ,
    Please check the  value at MM03-> Sales: General plant Tab ->Availability Check is '02'.
    u201802u2019 will consider all the u2018Individual Requirementsu2019 done before and during the creation of Sales order for the combination of respective Material & Plant.
    Even though Material stock will be visible for you at MMBe for respective plant double click on the Quantity, it will show you multiple Row with one of it will be " On Order Stock" these are the other orders for which Quantity is already confirmed but respective PGI is not yet done.
    The next schedule line date always generated based on the Factory calendar (based on Holidays/Weekly Offs if any).
    AT MD04 Tcode, based on the selection made at Material master for Availability Check you could see all the requirements related to Goods Issue Sales Orders , STO & Production Orders for Goods receipts.
    Hope this will solve your query.
    With Best Regards,
    RB.