Reservation of material for cost center .
Explanation:
Material u2018Mat1u2019 Stock is 50 pieces. Reservation for the date 13.08.08 is 5 pieces.
Reservation for the date 14.08.08 is 15 pieces (i.e Manual reservation done in MB21 for particular cost center.)
Now the total reservation is 20 pieces.
So System should not issue the material more than 30 pieces ( i.e 50 - 20 = 30. ).
But in current status it is allowing to issue more than 30 pieces.
Q) By User exit is it possible to restrict issue quantity against reservation.
IN SPRO set dynamic availabity check
Similar Messages
-
Movement Type for GR to Post material in COST center
Hi ...
Do I need to use 101 Movement type even to Post Material into consumption...
or
in simple words if i have account category "K" in Purchase Order then which Movement type I should select to prepare GR and do I need to use same MIGO transaction.
Regards/SANDEEPHi,
Basically <b>101 Movement type</b> would mean that the Goods are being received into the enterprise (could be a Warehouse,Cost Center or a Logical Storage location).
<b>Migo</b> is a transaction which enables to document the Goods Receipt and henec this needs a reference document which could be a PO ,Production Order etc,.
In the normal Goods Receipt into a Warehouse against a PO the Goods are valuated(Inventorised in Physical & Financial Terms).
In the case of the goods received against a PO for cost center the value is directly posted into the <b>Consumption account</b> instead of the <b>Stock account</b> in case of the former
I hope the above is sufficient.
Thanks & Regards,
Nagarajan -
Procedure for return material from cost center
Is there any other Movement Type to return material from Cost Center except Cancellation of Goods Issue ?
Hi
I think no option other than cancellation.
You can try the the below scenario.
Try to receive the material into GR blocked stock using 103 if you want to use the material release it by 105
If you want to return then use movement type 124.
Hope it helps
Thanks/karthik -
Isue of material to cost center
Gurus,
Whenever i want to issue material to Maintenance order ,i want to issue material to cost center only using 201 instead of 261.How can set this?Hi!
You can create reservation in two ways either separate reservation from t code MB21 or else from order (maintenance, production, sales or network).
What is the difference, in both cases reservation is created?
difference is when reservation is generated through order you can settle cost to more than one cost center. However, through MB21 you can settle cost to only one cost center.
Still if you want to settle cost to more than one cost center at the time of creation of reservation or goods issue than you will have to go for enhancement. Please coordinate with your MM and FI consultants.
Regards,
Vaibhav Mishra
Edited by: Mishra_Vaibhav on Apr 27, 2010 10:36 AM
Edited by: Mishra_Vaibhav on Apr 27, 2010 10:39 AM -
Return material from cost center
Dear All,
Return material from cost center:- xx, Material:- yyy qty z Pc in inventory. create sales order for delivery.
They are materiel in prototype in R&D for customer loan
What is the Process that has to be follows in SAP for this can some explain.
sapuserhi
is it possible do more description
regards
R.T -
G/L Account determination for cost center
Hi,
When we issue the material with movement type 201 or when we do 202, we enter the cost center in the MB1A, then ref. to this cost center how to determine which G/L account is updated, and if we want to know how much is total goods issue is done for a particular cost center which g/l account to be check.
regards,
zafarsystem check the setting in Define Account Grouping for Movement Types
for movement type
201 what is account modifier its VBR
then it check material number and takes valuation class
then it goes to OBYC and check the gl account under GBB
and looks for Gl account for VBR and valuation clases
and pick up the Gl accoun
hope its clear now
and in case of PO
the logic for gl account determination for account assigned po is as below
for cost center u give K
for this K it goes in Maintain Account Assignment Categories and check what is Acct modification it is generally VBR
then it check if u have given material number and takes valuation class and if material ordered is with out material code then valuation class is blank
then it goes to OBYC and check the gl account under GBB
and looks for Gl account for VBR and valuation clases in case on manteria number
or VBr and Blank entry for valuation class
and pick up the Gl account
Hope now its clear -
Goods Issue for Cost Center 201 : special stock E not supported
Dear guru ,
I need to run a goods issue(trx.MIGO) for cost center using movement type 201 for a material
in special stock E (with sales order and sales order item).
The system send this message : special stock E not supported.
How can it solved this problem ?
Thanks in advance.first tranfer stock from Sales Stock to Own stock as follows
Tcode - MB1B / MIGO
Mvt type - 411 E Transfer posting sales order to own
Then issue this own stock to Cost center as follows
Tcode - MB1A / MIGO
Mvt type - 201
hope it helps]
Regards,
Rahul -
Hi Guys,
Is it Necessary to maintain the G/L A/c while procuring for Cost center??
Or Cost Center is Sufficient ??
Please guide me??Hi Rahul,
If we use any account assignement category "K", then we have to assign GL Code and Cost center. But, using automaic account determination, we can map GL code based on your material group. If this is done, then user as to maintain Cost Center only.
Hope this information will be useful.
Regards,
Muralidhara -
Fld selectn for mvmt type 561 / acct 900040 differs for Cost center (010)
hi all
while uploading raw material i find " Fld selectn for mvmt type 561 / acct 900040 differs for Cost center (010)" this error. please help me to solve this error.
thanksHi,
I do not have system now, but the above error happens due to wrong Field Selection of G/L & Movement type and not matching.
Option-1: Check Field status group in the create/bank/interest TAB for G/L in FS00 & check its assignments in OBC4 & Field Selection for status of cost center like optional/required/suppress
Use OMJJ t.code - 561 mvt - field selection and check additional account assignment (here cost center is optional/required/suppress.)
Option-2: Can also run the programme RM07CUFA through SE38 to update.
Regards,
Biju K -
Activate text for Cost Center for ME51N, ME52N, ME53N
Hi, experts
As a requirement on T/C ME51N, ME52N, ME53N is needed to activate on "Account assignment" tab, the text for Cost Center field, how can I do this?
Thanks in advance.
Is there any path or exit could help with it?I need to add on Tabstrip "Account assignment" for fields
CO Area and Cost Center text field description ( right side ) for each one.
How can I do this? Thanks in advance. -
How to run GR55 reports in background for cost center hierarchies
1. I have been asked by our users to create batch jobs to run in the background for some GR55 reports, that can then be sent directly to cost center managers via email.
I have figured out the process to do this as long as the cost center manager only needs to see a single cost center at a time. However, if they are in charge of multiple cost centers, we also want to send them a summarized report using the hierarchy we have set up. I can't seem to make this work, as the job only seem to recognize the last cost center in the group and the report is for that cost center.
Example. cost centers 100, 200 and 300 belong to hierarchy abc. If I run the job just for cost center 100 it is fine. But if I have a variant to run hierarchy abc, or even if I use the range 100 to 300, all I get is a report for cost center 300.
We cannot use BW because we only have revenue in BW. I am being asked to make this work from standard R/3 within the GR55 realm of reporting.
2. In addition, the report selection criteria includes two separate plan/forecast versions. They need to update these each month prior to running the reports and sending them out. I looked at the variables associated with the versions and tried to set them up with default values that I hoped would update automatically so that they don't have to manually change 50 or so variants each month. But I don't see any dynamic variables that I can use to have the system make that change without going into each variant individually.
3. There is another piece to this equation as well. There is another report they want sent out in batch, but it is several pages wide in SAP and several pages long. So when you run it in batch and either spool it or get it sent as an email, it is very ugly in the formatting due to all the page splits horizontally and vertically. If anyone knows how to get the report to stay together like it would if you had excel integration turned on, it would be very helpful. I have tried running it with that integration turned on, but the jobs are set up with user batch_mgr and not my id, so it isn't working well. The batch_mgr id is just a system id, not a dialog id. We also don't want the jobs set up with a regular user id because if people leave, then the jobs all need to be changed.Kim,
I may have options for issues 1 and 2. In case of 3, what I can tell you is I understand the concern, but this is what typically happens in some standard CO reports that are not ALV compatible, I don't think there is not much there to do unless you add some custom code for the output.
In regards to point 1, yes, I have noticed that this happens in some standard and custom reporting, not sure what is going on. I came up with a work around that made the trick for my client in a similar scenario; which is editing the cost center groups. For instance, instead of having the group set as a range from 100 to 300, the groups are have listed the cost centers, 100, 200 and 300. Obviously, the disadvantage of this option is that it would require a bit of more cost center group maintenance.
In regards to point 2, I understand from your note that your users already have set up selection variants for the report. One option for you is to get the help from a developer to create a custom period variable and tiny program that runs in batch every month that would update that variable accordingly. Once that's done, you may have to update at least once, the selection variant attributes to change the period to a selection variable, so everytime from that point of time forward that the variable gets updated, it will be ready with the right value for every selection variant that uses it.
Hope this helps.
GG -
KO88 - Error when settling for Cost Center AND Auc for the same Internal Or
Hi Experts,
We need to configure Investment Internal Orders that could settle to both Cost Center and Auc, but each assignments with different Source Cost Elements
We did the following:
1. Created Auc Class
2. Created Investment Profile "IMOBIL" and assigned to Auc Class, flagging Auc
3. Created Allocation Structure "CV" with two assignments:
01, Source = Cost elements 7000000000 to 7999999999, receiver AUC "by cost element"
02 Source = Cost elements 4000000000 to 4999999999, receiver CTR "by cost element"
4. Created Model Order, filling the Investment Profile IMOBIL created in step 2.
5 Created Settlement Profile ZCV0001, assigning Allocation Strucutre CV, allowing CTR and AUC for receivers, default receiver is "FXA", doc type "AA".
6 Created ORder Type CV01, assigning Settlement Profile ZCV0001.
When I post only for Asset Expenses (Source Cost element 7, Assigment 01), the settlement through KO88 correctly settles to AUC, and also creates the settlement rule for cost center (i'm using the strategy to create from Responsible Cost Center).
But when I post for Asset Expenses (cost elements 7, receiver AUC) AND General Expenses (Source Cost element 4, receiver CTR), KO88 generates an error KD506, saying that for Assigment 02 - AUC I didnt define a settlement cost element.
1. Assignment 02 is not AUC, is CTR;
2. I flagged "by cost element", so I don't need a settlement cost element. And also, I was able to post to AUC when the source posting was only for cost element 7.
Did you face any problem like this?
I cannot find out what is the missing configuration, or if it is a program error...
Kind Regards
Mayumi BlakHi Ajay
I already created Source Structure and assigned to my Setllement profile (so I assigned Allocation Structure AND Source Structure).
I don't understand when you say that I need to assign the Source Sutrcture in each rule....because the Source structure is in the Settlement Parameters valid for both rules...
When I post to Asset Expenses only for the internal Order, the 2 rules (CTR and AUC) are created when I run KO88 (but only AUC rule is settled). This is OK.
The problem is when I post for both General Expenses AND Asset Expenses, the system is not recognizing that I have 2 source structures, neither is findind that for CTR AND AUC the Settlement cost elements are the original cost elements.
I'm thinking about changing message KD506 to warning, do you know if this can help?
Kind Regards
Mayumi Blak -
How to write a validaton rule for Cost Center and plant in PO
Hi,
I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
Thanks
Sunil>
Sunil Pal Raj wrote:
> Hi,
>
> I need to write a Validation Rule for Cost center and Plant in Purchase Order to get the error message if the Plant and cost center combination didnot match.
>
> But i am not sure in which transaction code do we need to write this validation. Kindly help me by giving T.Code or path to do validation at PO level.
>
> Thanks
> Sunil
Check OKC7
Regards,
Indranil -
Purchase Order For Cost Center
Hi,
1. Please explain as I am trying to create a PO and i gave Account type: K(Cost center). I got the following error
"Create Account 140000 as a cost element in controlling area 4000 "
How can i solve this problem. I actually created a cost center : 4000. How to assign a cost element to controlling area.
2.Is it Necessary to maintain the G/L A/c while procuring for Cost center??
Or Cost Center is Sufficient ??HI Kapil,
For any accounting entry you need to define a General Ledger Account where the details (Amount) of the transaction will be stored.
Just by maintaining cost centre will not help in completing any transaction involving accounts. So you need to maintain G/L account in the controlling area of your company code.
You can use T Code FS00 to create new G/L account in the chart of accounts.
In the edit cost element Tab you can give the cost center that you want.
I hope this helps.
thanks
rahul goel -
BPS Retraction for cost center accounting
hi guys,
When i create sender structure for retraction,need to specify the retraction target(eg UPB_RET_COPS) using drop down to find.But i can't find any value after using drop down button.So i want to know how and where to define the retraction target,in BPS or R/3?
The dictionary structure has the same problem.
And what do mean the fields of 'offset' and 'sender field lgth'?
Need your help!
thanks a lot!
frank fengHi,
Go through following links where u can get a fair idea for u r problem:
/people/praveen.mayalur/blog/2006/07/01/bps-retraction-for-cost-center-accounting--i
/people/praveen.mayalur/blog/2006/07/11/bps-retraction-for-cost-center-accounting--ii-primary-cost-qty
Thanks,
Debasish
Maybe you are looking for
-
Ever since I downloaded iTunes 11.0.4.4 (for windows 7), the program has been crashing whenever I play certain songs and at this point the problem is spreading, more and more songs that weren't problems before. I have been through just about every tr
-
New Ipad--can I upgrade to 3G?
I just received an ipad for Xmas and I wanted the 3G along with the wifi. Is there a way to upgrade to the 3G version without having to exchange the entire thing? Thanks.
-
OWB 10.1 Deploy Mgr. - Registration - schema name is grayed out, sometimes
Environment: Repository - OWB 10.1.0.2 on UNIX (AIX 5.2) Target - Oracle 9.2.0.4 on UNIX (AIX 5.2) Question: I have several locations that have been registered in the past. When I right click a location and click on 'Register' in some cases the schem
-
I have a spreadsheet of approximately 2,500 rows. Each row is one expense incurred since about last September. What I'd like to do is categorize the data across the cost centers (one column) then filter them for the current quarter (a date value in a
-
I noticed an App that looked interesting in the App Store (Cam Lock). I reviewed the information provided, and although it is apparently a new app, and had no user review information or quesitons, I remained interested. I then selected the only lin