I am using APO V5.1 connected to a SAP ECC system.
When I CIF across a new product to APO and use it for the first time in SNP interactive planning I get error /SAPAPO/TSM207, because of missing time series objects.
The SAP recommendation in the error help text suggests to either re initialise the planning area, or to use pgm /SAPAPO/TS_LCM_PLOB_DELTA_SYNC. But I can only resolve the problem via the former approach (ie to re initialise the planning area). The use of /SAPAPO/TS_LCM_PLOB_DELTA_SYNC does not resolve the problem.
Is this expected behaviour?
What exactly is /SAPAPO/TS_LCM_PLOB_DELTA_SYNC designed to do?
If I look at help.sap.com for SCM 7 I see mention of a transaction /SAPAPO/TSINIT, which can be used as a 'delta' planning area re initialisation. But I do not see this transaction in APO V5.1 - so is this a new transaction in APO 7?
Thanks for any advice on this...

Hi,
Please refer to he note 402046 which explains this.Eventhough the note validity is not for your release ,but the conent of
note is still valid to all releases.
Regards,
Sunitha

Similar Messages

  • APO-SNP Planning book BAPI_PBSRVAPS_CHANGEKEYFIGVAL2

    Hello experts,
    In the BAPI "BAPI_PBSRVAPS_CHANGEKEYFIGVAL" for locking and unlocking the planning area there is an error message "Locking planning area for planning book & has failed" .
    This is urgent ,can anybody please help me out why this error message appears.
    Thanks in advance.
    Sandhya

    Hi Srinivas,
    Thank you very much for reply
    This error is getting in APO SNP. In the BAPI
    The FM /sapapo/ts_dm_lock  is calling FM Enque_report and if this function module is filling the table "enq" then the locking is failing .
    Can you please tell me what this table contains.is this table is filling with the both the users who are trying to edit the keyfigure values.
    Thanks and Regards,
    Sandhya

  • Meaning of CONDET key figure in standard 9ASNP94 APO SNP planning book

    I am trying to clarify the use and meaning of the CONDET (capacity consumption details) key figure in the SAP standard SNP planning book 9ASNP94.
    Any advice appreciated...

    Hi  Frank,
    This indeed is practical requirement wih no simple solution ( at least we  did not find).
    We created a background job for deletion of the stocks ( which were updated through IDOCs like your situation) at specific periodicity. The jobs were made as per planners with specific variants and when planner would like to delete the stocks, the job will be run.
    Another option could to be copy the standard program /SAPAPO/RLCDELETE to a module program and check validation at the input screen, before calling the deletion program.
    Regards
    Datta

  • SAP APO SNP planned order

    Hi,
    I am basically from PP background and just started working in APO SNP. after running SNP optimzer,not able to see the operation details in SNP planned order ( SNP planned order has only receipts, requirements ). could you please help me how to get operation details in SNP planned order.
    Thanks
    Krishna.

    Hi,
    SNP Planned Order:
    1 . SNP Planned Orders wil give details about Order start date and finish date .
    2.  During  SNP Planned Order creation a basic scheduling will happen.
    PPDS Planned Order
    1.  PPDS Planned Orders will give details about when the actual production is start and finish.
    2.  During PPDS Planned creation the Machine time details defined in the routing routing or recepie will be take into account.
    3.  Leadtime scheduling will be carried out to calculate the exact production start date and finish date.
    Thanks,
    nandha

  • APO SNP Planning Book Show Product View alternative UoM

    Hi,
    I have a base UoM of BTL and an alternative UoM of CAS.
    I can change/save in my users settings the in transactions /SAPAPO/RRP3 (Product View) and /SAPAPO/SDP94 (Planning Book) to show the alternative UoM CAS as default.
    The problem I have is when I enter the Planning Book, load a product, right click on the product (in Selected Objects), select Show Product View and then look at the stock tab, this always shows as the base UoM BTL.  Can this be saved to show the alternative UoM CAS?

    Hi Linda,
    Try changing you user settings for a product in RRP3 Screen.
    Page Menu --> Settings -->General Tab -->General Panel -->enter AUOM value (CAS in your case).
    Note - The conversion only takes place for the products, for which the alternative unit of measure entered is also entered as the alternative unit of measure in the product master, or for the products, for which the base unit of measure has the same dimension as the alternative unit of measure.
    Caution: Test it , how its affecting for other products which doesnt have CAS as AUOM.
    All products which have BUOM as BTL will be changed to CAS when AUOM is maintained for them in product master.
    Thanks
    Vinoth

  • Drill down performance issue in APO SNP Planning Book

    We have a requirement where planners would want to do a Details All on the header for 1000+ products in selection.
    For a situation where there are 54 products to drilldown to, we get the following performance in seconds.
    Time Bkt Profile      180 Days      60 Days     30 Days
    Loading                  14           9.98           8.2
    Details All                 262            90.18           56
    So for a dataview of  180 days, it takes 262 s to do a details all on a selection with 54 products.
    We think we have the latest LC (KERNEL    7.5.0    BUILD 044-123-149-413)
    We think we have required LC config
    liveCache server has 32GB physical memory with 45GB swap space
    CACHE_SIZE= 1572864 x 8kb pages ~ 12.5GB
    OMS_HEAP_SIZE= 23GB (approx 75% of main memory)
    MAXDATAVOLUMES=16, ~ 63GB total
    Is there anything we can do to improve the response times further ?

    Thanx Charlie.
    I will check the notes and let you know.
    We are doing a forecasting at the wholeseller,SKU Level.
    We have 1 planning area, 1000 WPs, 1000 wholesellers & 800 SKUs for each wholeseller.
    Do you think that SEM 4.1 will have any problem in handling data at this level?
    For forecasting purpose we are using 3 years of past data at SKU level.

  • How to Change Component on a SNP Planned Order ( Just 1 time )

    Hello,
    We are trying to change a component on a SNP Planned Order just 1 time.
    So we do not want to change the PDS since this is one time change only.
    We tried changing it in R/3. Once we do that, R/3 shows new component but APO still shows dependant demand on old component ( May be because APO SNP Planned order is still connected with the PDS ) .
    Then we went to APO and tried to change the component in /sapapo/rrp3. Here you can delete the old component but doesn't let me add new component.
    Next thing we tried was to convert it to PPDS Order. Once converted, we went to change mode and tried to remove old component and add new component. It lets me do this. Only issue with this route is that, it puts correct start and end dates on the order dependning on the order quantity and so order moves the dates which we do not like.
    Is there any other better way to fix this issue ?.
    Thanks.
    Ketan Doshi.

    This being a very unique requirement, I would use one-off approaches usually not followed. You may need to explore the use of BAPI BAPI_MOSRVAPS_CREATESNPORDER. This will help you point the source of planned order to a PPM or a PDS that you may want to create in APO system on a one-off basis. PPMs can be maintained in APO, however PDS are usually CIFed from R3. You can try to create PDS (based on the new component) in APO system only using backend tables. Try do some little research on /sapapo/curto tables to create the PDS in APO. Then use the BAPI to point the source to this new PDS. (better you also try the PPM approach since there are no issues keeping the PPM in APO)

  • How to reflect auto-rebranding of Sales Order in SNP Planning?

    Hi Experts,
    We have a scenario wherein we have branded product and unbranded  product.
    -Customers are billed for branded product
    -Demand Planning forecast for the branded product
    -Invetory will be on unbranded product and I can say that we plan for the unbranded product.
    Sales order document will have the branded product in the document. Before the creation of delivery and GI, there will be a stock movement from unbranded to branded product..
    In terms of how to model this in APO SNP Planning, I am thinking of using either
    (1) Form Fit Function --> branded and unbranded in one class and the unbranded as leading prouct
    (2) phantom assembly --> unbranded as component of branded product.
    The trick now is that there are cases that they stock for the branded product. So in case there is stock in branded product and its enough to cover the whole quantity of sales order, there will be no rebranding and they will ship for the branded product.
    This is where I am having problem modellign in APO SNP. I hope you can help me. Thanks.
    Regards,
    Mylene

    Hi everyone,
    I created an OSS message to SAP and this is their reply:
    " A sales BOM is not a
    planning relevant BOM hence the components must not be transfered in
    standard to SCM system. This was introcued with note 398610.
    If you need to transfer this items to APO, even if the BOM is not
    planning relevant then your have to use a BADI to overwrite here the
    standard behavior. Check here note 929975 and related notes.
    The filtering is done in prgramm SAPLCUSLNTRTO
    FORM CUSLNTRTOX_CHECK_APO_RELEVANCY
    IF is_itm_data-sanfe <> marked
    OR is_itm_data-objty EQ gc_obj_3.
    ev_delete_flag = marked.
    So you have to overwrite here this value to get this items transfered.
    But anyway is is then out of standard, as a planning system needs only
    planning relevant data. "
    Hope this helps. Thanks.
    Mylene

  • Error /SAPAPO/TSM 041 when loading from InfoCube to SNP planning area

    I am using APO V5.1.
    I have a 'backup' InfoCube with characteristics 9ARNAME and 9AVERSION which I'm loading to an SNP planning area via trans /SAPAPO/TSCUBE. The InfoCube is itself populated from the 9ARE aggregate of the SNP planning area.
    But I get error /SAPAPO/TSM 041when I run the load, suggesting absence of a required characteristic or navigation attribute in the Cube. Do I need 9ALOCNO for instance?
    Can anyone advise me here?...

    Hi,
    I am not very sure about the 9ARE aggregate (haven't used it in backups), but RTSCUBE is used to copy time Series (TS) KF data from cube to planning area (SNP or DP).
    Are you trying to restore some time series data from your backup cube to the planning area? If yes, then do a mapping of characteristic from cube to planning area in RTSCUBE, and also map the TS KF between cube and planning area.
    If your KF is not a time series KF, then you can't copy it from cube to planning area. You could get data to cube for some reporting, otherwise I am not sure what use the backup is for you. For SNP, most of the data would be received from R/3, so there's not much point in having a backup.
    Hope this helps.
    Thanks - Pawan

  • SNP planned order deleted in APO, but not in R/3.

    OK Guru's,
    We have a situation where during the weekend SNP planning runs, SNP Planned orders are deleted in APO, but the order is never deleted in R/3.  The change pointer is not in CPP and there are no failed queues.  Also, when you run CCR on planned orders, we will get an error on some orders saying "Not in APO" and the only option to reconcile that order is to "Send to APO".  The option that should exist is "delete in R/3" becuase the deletion never occured in R/3.
    If you send the order back to APO, the order will show in the "Production Confirmed" line of the Planning Book.  This is because APO is thinking that this order is an order that was created in R/3 when in fact is it really is a SNP planned order.
    Any clues to why this would happen?
    thanks,
    Brian

    How are you getting the SNP Planned Orders to R/3 in the first place.
    If you are transferring them using /SAPAPO/RRP7 then I guesss its a manual transfer and system does not consider SNP Planned Order deletion flag relevant for transfer to R/3.
    You will need to look into CIF enhancement to send the deletions to R/3.
    Normally SNP Planned Orders are not relevant for transfer to R/3 unless its replaced or converted to a PPDS planned order.
    Somnath

  • Error while creating manual planned order in apo

    Dear expert
    While I am creating manual planned order i am getting error as message /sapapo/rrp251
    Every thing is correct BOM and PV's no error after consistency check and it getting succesfully transffered to APO and it is also visible in APO
    But while creating manual planned orders planned order are not getting generated  I am using BLock planning with PPDS
    Please help How to resolve it
    Regards
    Virender

    Hi
    The error message /SAPAPO/RRP251 - Error occurred while creating order means While creating an order, the system encountered problems, such as, for example, no available components or components that are available late, orders that could not be scheduled, and so on.
    I think system attempted to solve the availability problems by using alternative procurement options. This was not successful. The order could not be created. Check the exceptional situations in the planning protocol, under Goto -> Planning log, and deal with the causes of the exceptional situations if this is possible or necessary.
    Thanks
    Amol

  • Error in APO Resources"'No unit of meausre was found for selected resource"

    Hello APO Expetr forum,
    IN APO resource i am not able to see any Bucket capacity in SNP Bucket capacity tab. its grayed out and blank. when open the resource with you version then i can able to see Bucket capacity.
    So her how can i update the SNP Bucket capcity for the resource. Because of this issue i am not able to load resource in SNP Planning Book under capacity view. Getting error message as 'No unit of meausre was found for selected resource'.
    Pleae suugest what could be the reason. i suspect only because of  Bucket capacity problem.
    Thanks & Regards,
    Deviprasad

    Hello DeviPrasad,
    Please check the type of the resource. This should be a single Mixed or Multi Mixed resource to maintain the SNP capacity.
    Thanks,
    Mahesh

  • How we define Supplier constraints in SAP APO SNP?

    Hi
    Customer is trading company and SNP optimizer is configured  for sourcing optimization,Following are queries
    How we can define Supplier constraints? Supplier constraints meaning Supplier is capable of supplying 5000MT  how we model this and Minimum purchase need to happen from certain suppliers of quantity 2000MT,basically Quantity constraints need to be built in SAP APO SNP.
    expecting some valuable inputs
    Thanks
    Poorna

    Hi Poorna,
    Please follow below steps to delete Product-Location combinations in APO:
    1. In ECC, deactivate Integration model for Transaction data and master data of the Products and locations to be deleted from APO.
    2. Check where used list from transaction WUF and delete dependent transaction data and Master data from APO. You may use /sapapo/rlcdelete and /sapapo/sdorder_del.
    Also delete dependent Master data objects like CVC, PPM, Transportation lane, PDS etc. from APO
    Ensure deletion of transaction data in all existing versions in the 000 Model.
    3. Set the deletion flag for Product / Product-Location combination using transaction /sapapo/mat1
    4. Once the transaction data & related master data is deleted and deletion flag is set, it is possible to delete the location-products by running the report /sapapo/delete_products
    To delete Locations from APO:
    Follow same steps as above. In cases of deletion of Locations, all products in that location should be deleted using the Product-Location deletion flag optionJust change the report in step 4. For locations, use report /sapapo/delete_locations
    To answer your other question on change in location type, I think it is not possible to change once you CIF location master to APO.
    Regards,
    Ravi

  • SNP Planned order error

    Hi,
    During the immediate transfer of the SNP planned orders after the planning run, some orders are not moved immediately, they went to R3 during the next snp run in the background.
    do you know any reason for this?
    Thanks,
    Dhanush

    Hi Dhanush
    To answer your query in block size, the block size can be maintained in customizing settings. You can navigate with the following navigation path
    SPRO --> Integration visa APO Core INterface --> Basic Settings for data transfer --> Publication --> Manitain Object Specific Settings
    You can define an optimum block size for both external procurement and In house Production. But before you do that I would request first check if there any queue blcoks exisitng which are preventng the smooth flow of data from APO to ECC. You check this through /sapapo/cq transaction. Depending upon how you have queue set up (inbound/outbound), you can select the apprpriate drill down and see if any queue blcoks exist. If you can afford to delete the queue blocks, then please delete them and then run heursitcs again.
    Also in your intial part of the query you have mentioned that the planned orders are not getting transferred. However in the latter part you are refering to purchase requistions. Are you facing problem with both the types of transaction data?
    Rgds, Sandeep

  • SNP - Planning Book/Data View not showing up in /SAPAPO/SNP94

    Hi All:
    I created a planning Book out of a custom SNP planning area. While I could see the Planning Book in the list of Planning Book in the /SAPAPO/SDP94 - Interactive Supply Network Planning (all Books)   I could not see the custom planning book in /SAPAPO/SDP94 - Interactive Supply Network Planning (all Books) .  I could ony see the SAP supplied PB there.  Will SDP94 transaction display only the standard SNP Planning book?  How can I make sure that the custom PB is displaed in /SAPAPO/SDP94?
    pl. help
    Thanks
    Ryan

    Hi Narayanan,
    a couple of simple checks..
    can you please check that you have not set a filter critera in the shuffler in planning book/data view?
    you can also check if by mistake only a limited number of users are assigned to this planning book and data view ?
    else you may want to check note : , 327371
    Let me if this helps.
    Rgds, Sandeep

Maybe you are looking for

  • "Report this post" still for level4/where are "points"?

    a privilege of level4 was to report the "abuse" of the forum; that option is still availabe only for level4 gurus.. but we don't have anymore any levels... (??) in term of use, I do read an explination of "points", but MyProfile doesn't display any s

  • Difference in partition size on different servers

    Hi! I copied my cube from one server to the other with import DB. When I processed my cube on the other server with new data, the size of one partition changed from 1.8G to 12G. When I check the original tables, their sizes are almost the same, and n

  • Change to tax on sales contracts

    i need to change the tax on trade waste contracts from 20 % to zero rated  - these contracts are set up for 10 years and we are a number of years in so there are subsequent billing docs - how do i update all these contracts to reflect this change - t

  • Installing crystal reports 9 for the first time

    Hi, I am trying to install Crystal Reports 9 for the first time.  We just received a package with 4 envelopes including Crystal Reports 9 Advanced, Standard, Professional, and Developer.  Each envelope also includes Crystal Enterprise Report Appliati

  • IPAD hooks up with wifi and site has check but i can can not open email or sites?

    My IPAD 2 will hookup to the WiFi at some sites and not others, the site comes up and is checked but I can not open Email or web sites.