Restrict the Preventive Maintenance Order creation through IW31 for few users.

Dear Guru's,
Good Day.
My client requirement is he wants to restrict the Preventive Maintenance Orders through Transaction IW31 for few users. Is it possible through authorization? Please do the needful.
Regards,
Bhanu.

possible for order type.
create a role with all order types (optional) including Prev. Maint Order type, obviously having T.code IW31. and create another similar role excluding Prev. Maint Order type.
Assign earlier role to few users (want to give the permission of IW31 Prev.) and later role to all remaining users.
Auth. Object: I_AUART, first test in sandbox or testing client.

Similar Messages

  • Set Deletion Flag for the Preventive Maintenance Order

    Hi,
    I need to set the Deletion flag for the Service Order. Deletion flag available in the screen disabled. Please suggest.
    also I need know under which I shall be able to set such deletions.
    Thank you,
    Vijaya

    Hi Vijaya,
    Pls refer the help.sap.com related to deletion flag for PM/CS Orders. Some of the check criteria mentioned below for your reference.
    Before a deletion flag is set, the following requirements must be met:
    u2022 Any manually added purchase requisitions or purchase orders for the order must be deleted first.
    The balance of the actual costs for the order must be zero. This means that the deletion flag can only be activated if the order has already been settled, or if no actual costs were incurred for the order.
    u2022 Commitments relating to the order must be deleted.
    u2022 Unprocessed and incorrect goods movements must be processed.
    When the deletion flag is activated, all remaining capacity requirements are deleted. A deletion indicator is also set in any open material reservations.
    An order that has been flagged for deletion cannot be changed. However, you can cancel the deletion flag.
    Thanks
    Siva
    Edited by: sivakumar kasi on Sep 3, 2009 12:09 PM
    Pls set the Order as Techically completed (TECO) and check the deletion flag set.
    Thanks
    Siva

  • Creation of maintenance order directly through project.

    Hi,
    Is it possible to create maintenance order directly through project while creating network activity?
    Please let me know if it is possible and how.
    Thanks,
    Nilesh

    Hi Abdul,
    Thanks for your reply.
    Can you please elaborate few details on DIPM.
    Thanks,
    Nilesh.

  • Production Order creation through Tcode- CO10.

    Hi,
    Can I restrict new Production Order creation through Tcode- CO10 unless previous order is Techoed / closed.
    Issue : Users having authorisation for CO10, are creating multiple orders without taking them to logical closure. Since budget is getting allocated for the each & every order, in the year end reconcilation becomes difficult.
    Please suggest.
    Regards,
    Vivek S.

    Please post it in PP forum

  • Production Order creation through Tcode- CO10 unless previous order is Tech

    Hi,
    Can I restrict new Production Order creation through Tcode- CO10 unless previous order is Techoed / closed.
    Issue : Users having authorisation for CO10, are creating multiple orders without taking them to logical closure. Since budget is getting allocated for the each & every order, in the year end reconcilation becomes difficult.
    Without using an exit can we achieve it???
    Please suggest.
    Regards,
    Vivek S.

    Hi,
    You had to use the cusomter enhancement for the same
    Thanks
    SUMIT

  • Create warning message at the time of order creation

    I am looking for a  solution :- "Create warning message at the time of order creation/save if a cc is assigned in the settlement rule that crosses the company code of the order or where the company code of the plant for the order is different from the company code assigned to the cc"

    The txn code : IW32 (maintenance order) , this warning message for settlement rule creation using Cost center as a settlement receiver.  If the used cost center is belongs to some other company code, said warning message should occure.
    I tried user exit, field exit, also used std message control (KO-458).  Nothing is working.

  • Want to change item category at the time of order creation

    Hi Gurus,
    Client require to implement individual PO scenario.
    I was configured the same and working fine.
    I am facing problem at the time of item category determination.
    User using same material and order type and they are not ready to accept to create new order type.
    Now My order type is OR and item category group is NORM and right now system determine item category TAN.
    User not want to change manually at the time of order creation.
    I have specific condition on which i want to apply this logic.
    Now i want to determine TAB item category through some user exits or enhancement.
    Can anyone suggest exact in which user exit or enhancement i have to change.
    Thanks & Regards,
    Chirag

    1. Use TCode 0VVW for creating a Z Item Usage, say, ZPO1
    2. Do an item Cat determination in VOV4, as
    Sales Doc type
    Item Cat Group
    Usage
    Item Category
    OR -
    NORM -
    ZPO1 -
    TAB
    3. Maintain Customer Materials Info Record by using VD51.
    In item screen for Cust-Mat combination maintain Item usage
    Regards
    JP

  • Idoc Generation after Purchase Order Creation through trading contract.

    Hi All,
    When a Purchase Order is created via trading contract, I need to generate an Idoc and pass details of the Purchase Order created to the Partner System.
    Can anyone suggest any Function module or user exit which gets called while Purchase Order creation through trading contract, so that I can fill the Idoc with necessary details of the Purchase Order and send that to the Partner System?
    Thanks in advance.

    Hi Tejas,
    I do not know about Trading Contract but what all I can say it that Check if Change pointers are getting written Once the PO has been created, If "Yes" then probably you do not have to do anything for craetion of Purchanse Order. You can use RBDMIDOC Program to create IDOCs from change pointers.
    Refer [this|http://help.sap.com/saphelp_nw04/helpdata/en/12/83e03c19758e71e10000000a114084/content.htm] for more information on change pointers.
    Regards
    Shital

  • Changing basic finish date in Preventive maintenance orders

    Hi Experts,
    My requirement is to block PP work centre when maintenance schedule the equipment for preventive maintenance. I am making system condition as zero in generated preventive maintenance order but basic finish date is not changing in the order automatically. Can anybody please explain how to bring this? Finally my requirement is system should change basic finish date and time as time given in operation of task list.
    Thanks in advance.
    best regards,
    Srinivas M

    Hi Praveen,
    I have done all setting and tested but there is no change.
    My client requirement is like this - whenever maintenance plans are scheduled, for the scheduled dates, production capacity should not be considered by production. We could do this for breakdown orders but not happening for PM orders unless we change the finish date.
    The issue is to get the finish date automatically when scheduling maint.plans with respect to values given in operations. Please suggest how to get the  basic finish dates automatically.
    best regards,
    -Srinivas

  • Define back ground job for Maintenance Order Settlement through KO8G

    Hi Experts,
    I need to define back ground job for Maintenance Order Settlement through KO8G transaction code.
    Here are the requirements
    1. The job should run on weekly basis automatically.
    2. The settlement period and posting period should be taken care by the job dynamically. i.e. if the job runs in July, the job should pick up Settlement period and posting period as 7 automatically.
    Kindly let me know the steps to define the back ground job as per above requirement.
    Sanjeev

    To run the KO8G  each week, the a RECURRING job has to be created.  At my job, Basis/Ops department would create and schedule the job.
    To have the posting periods, dates etc dynamically determined at the time the job runs:
    Create the variant and save.
    In 5.0, KO8G does not save a variant, therefore, go to SE38 and create a variant for program: RKO7KO8G
    When you go to the ATTRIBUTES screen, to add a name and description, you will see a list of all the fields that are part of the selection criteria. 
    For an example, I frequently use the Posting Date. To the right of the screen is a field called Selection Variable, click on the drop box and select D - Dynamic Date Calculation.
    Go to field NAme of variable, click on drop box and select the variable you want.
    Each field has its own list of selection variable and name of variable depending on how it works in the progra.
    If you look at Posting period you will see:
         T: Table Variable from TVARVC
         B: User-defined variables
    I do not know about User defined variables, but for TVARC there is thread that leads to a "how to" blog
    [How create a variable in the TVARVC that calculate the last week]
    do some more searching and you should find more answers
    Good luck
    Althea

  • Prevent Purchase Order creation without shopping cart

    We have implemented SRM 5.0 Extended Classic Scenario.
    Is it possible to prevent purchase orders to be created for this scenario if there is no preceding document in the form of a shopping cart?

    Hi Marinda,
    The only ways to have a PO without SC is to create a PO from scratch from BBP_POC transaction.
    you just have to control thsi through authorizations in PFCG.
    Kind regards,
    Yann

  • Operations in Preventive maintenance order has to release then only order has to TECO

    Hi,Friends
    is there any standard in R/3 that as soon as i am not releasing Operations in Preventive maintenance order, order should not be TECO
    when ever i have released Operations then only Preventive Maint order has to be TECO
    Your response is highly appriciated
    Regards,
    Kumar

    Kumar,
    I'm still confused...
    When you release the order header (REL), then all operations are also set to released (REL). You cannot individually release operations using the system status.
    However, you can set user statuses for each operation which are configured in the IMG.
    Please give more details.
    PeteA

  • Preventive maintenance order header description

    Hi all,
    Preventive maintenance order (from Plans) header description is showing the task list title instead of Plan title.
    normally Plan header or item header short text will be the order header short text, what is the reason for this
    kind of problem.
    Pl give your suggestions
    Thanks

    Hi!
    I have checked by creating a maintenance plan with item and task list. I t is taking maintenance item header text in maintenance order. Would you please elaborate. If any user exit or any enhancement has beed done with this acivity?
    Regards,
    Vaibhav

  • Preventive maintenance order actual completion time and date

    Hey gurus,
    In preventive maintenance order the basic and scheduled start dates are picked from the maintenance plan. Now the actual start and end dates are in display mode. My client wants an overall completion time and date of the preventive order and not of individual operations. Also at the end of the month they want to see the total time spent on preventive maintenance. Can you suggest any way to sort out the above problem.
    Regards,
    Abhishek

    hi.
    the basic start date and end date is coming from maintenance plan. but you can change that dates according to your requirment. For that you have to remove the automatic schduling check in the dates header in maintenance order. Afetr that you can put basic start and end dates as per your requirement.
    Also the actual start and end dates and coming when you confirm the operation.
    When you confirm the first operation, that date the system will take as actual start date and the day you confirm you last operation or fully confirmed the order will be taken as actual end date.
    So i dont think yu have any problem. You can take basic start or basic end dates for this and change the dates as per your maintenace requirments.

  • To track the preventive maintenance work on the equipment itself

    Hi Experts,
    I have working on the requirement to track the preventive maintenance work on the equipment master data it self.
    I have thought of following way of  doing it.
    1. Create a charateristic "Plan no" having refrence to maintenance plan table & field (MHIS - WARPL)
    2. Create a charaterisic "Last completion date" having refrence to maintenance plan table & last date completion field (MHIS - LRMDT)
    3.combine these two charateristic in class say "Inspection data"
    4.Assign this class to equipment in classification tab
    5. Create a maintenance plan , generate order and complete the order.
    6. After doing this, these  data should updated in charateristic values as given above. But it is not happening.
    Am i missing something here. Or can you suggest me other way of doing this.
    Regards,
    Amar

    Hi,
         yes you are right we can use object information key and can navigate to required detail.
    But the client want the report in a tabular format.
    like Equipment no       Last testing done on   Maintenance plan no 
    There is one report in classification system that is CL30N in which you can find this kind of report provided the "Last Testing done on " and "maintenance plan no" you have used as  charateristics.
    Regards,
    Amar