Return to Warehouse from other plant - Related to STO return

Hi Gurus,
We have a scenario at our client:
We had a stock transfer order from plant 1 to plant 2. In plant 2 we did the created the delivery - created transfer order - performed good issue - confirmed transfer order and the material is issue to stock in transit i.e. mvt 641. Then we do a GR in the other plant 1 (who issued the STO). Then we do a return MIGO with 122 Mvt. in plant 1. Now what should be the process for receiving back the returned material in the warehouse again? How to relate the return with deliveriy created for STO?
thanks for any input.
regards,
KHAN

Hi,
Go with below transactions:
VL09-PGR Reversal
VL02N-Delete the Out.Delivery Document
MIGO-For cancellation of GR Document ( With selection of "Cancellation-Material Document -Enter your GR document number>>click on enter button>>you will get GR Document scenario screeen >>Tick on "Item OK box">>check and post).
Your GR document shall be reverse and update your material stock also.
Hopfully your problem is solved.
Thanx-Rajesh

Similar Messages

  • Withdrawal from other plant- sales

    Hi dudes,
    suppose if i am using 70  special proc. key for semifinished materials and are planned in other plant gets consumed for FERT materials order in the main plant.
    suppose if i maintain the sales views for these semifinshed materilas in the main plant and can i do the PGI for sales order from other plant to main plant where the sales procesing is happening.
    thanks in advance
    Robert

    Special procurment key 70 is reservation from FERT plant to the supplyiong plant.
    Against this reservation you need to issue the material? Is it your scenario?
    As I know the material will be withdrawn duting backflush from the supplying plant directly
    If you want to sell the raw material from supplying plant to production plant, then you need to set up STO, in OMGN.
    Since usually we use it for inter company tranfer and billing, I am not sure whether you can do it for the plants with in the same company code.

  • MM - Daily Report of the materials received from other plants

    Hello
    I want  the daily report of all the materials received from other plants i,e by stock transfer. Is there any way to get this information from the standard reports
    regards
    Ravi Pal

    Dear Prashant
    i checked with this transaction but the problem is that this gived the report for only the GR taken against STO with SD Delivery i,e with or with out billing. the system is not picking the STO with MM delivery whan we enter the supplyiny plant as u said
    pl check this
    thnaks
    regards
    ravi pal

  • Good receipt for job work from other plant

    Dear Experts:
    1.Material Received from Other Plant for job work with challan and how to bring the Material into Stock at receiving plant.
    The same material stock number available in this plant also.
    Regards,
    Sridhar.N

    Hi,
    You could use serial number concept or bacth managment here to separate within the material code.
    Regards

  • PR should generated from only centralized plant not from other plants

    Hi Friends ,
    I am having 5 plants.
    Plant- A , B, C, D, E, F
    A is the centralized purchasing plant.
    Others are manufacturing and sales plant.
    So all my Purchase requisitions should be generated by plant A only. (Not from other plants) How can I make this?
    Regards,
    Mahesh.

    You can restrict PR creation in other plants by using authorisation object M_BANF_WRK.
    Activate this object via SU24 for transactions ME51 or ME51N and then create a role in PFCG with this object or add this object in your existing roles and then assign users to this role.
    Keep in mind do not link plants to this role which you dont want to used for PR.
    Hope this clears you.
    Njoy SAP...

  • Requirement from other plant.

    Hi Gurus,
    There are plants A and B. Plant B is in need of service parts. Plant A is also not having stock for same parts then creates Purchase order for some vendor and corresponding requirement is triggered in plant B with reference as Procurement should be carried out in plant B. Plant B then purchase required parts for plant B. How this scenario can be mapped in SAP. Is there any way to map this? Please guide with detail steps.
    Regards,
    Pradeep

    Hi
    You can do that with the help of special procurement key in SAP. You need to define your own special procurement key for your plant in t.code OPPQ. Give your plant. Then click in special procurement. Create new entries.Give procurement type F and tick with draw from alternate plant or other options as per your requirement. Then Then assign it in masterial master for the required masterials. So that requirements in one plant is reflected in other plant.
    Regards
    Antony

  • Material Issued from other Plants

    Hi All,
    I have 2 question here.
    I have created a STPO with delivery date say 12.09.2009 from my plant ABC to the Plant XYZ and 140 qty, For this XYZ plant has issued material on 15.09.2009 around 100 qty.,
    Now I am looking for the report ME2W to find out what are all the materials has supplied by other plant till 14.09.2009.
    but as per the report ME2W it is having I/P option as delivery date, so if i put delivery date between 01.09.2009 to 14.09.2009, it is showing  all the material which is issued on after 14.09.2009 also as i have put the delivery date and also it is checking as per delivery date.
    Question:
    1. How to get these reports ie., materials issued as per issued date or posting date not as per delivery date or not as per material code---- any transaction available for this.
    2. one more i come across here in STPO is that, if i create 100 qty of PO but it is allowing to issue more than the PO qty, say if i create Po with 100 Qty but other plant can issue more than 100 ie.,>100.
    Is thr any settings available to make such the system should not allow to issue more than the PO qty.
    Please help me out on this.
    Regards,
    Nagaraj S
    Edited by: Nagaraj  S on Oct 1, 2009 2:52 PM

    Dear Vidya Dewangan ,
    I have checked MB5B, it is not for the requirment what i want.
    See this report or MB51 would works with only 2 plants where within which these ST can occur.What in my scenario we have more than 2 plants, See i will clearly expalin the situatin -
    Thr are 3 plants-  Plant A,Plant B, Plant C.
    ST happens b/w A and B, A & C, B& C and Visa versa.
    Now I want to know what are all the ST happens between Plant A and Plant B, where Plant A has supplied some material  to plant B on some day(ie., 351 on posting day),say i dont know material i know only the dates.I cant use MB51, is thr any other report i can get.
    Pls help me out.
    Regards,
    Nagaraj S

  • Plant to Depot STO Returns

    Hi Experts,
    I am an MM guy but as the issue was not solved in MM path, I am posting to you SD gurus.
    Is there any process to get back the material sent via STO from Plant to Depot as Returned material?
    The client has done partial sale of stock at Depot and wants to return the remaining stock to Plant.
    Partial PGI for returns is not allowed in the system.
    Please suggest a way such that the material is shown against the STO as returned material. We normally suggest 301 mvmt from Depot to Plant or Reverse STO from Depot to Plant.
    Hope to get a suitable answer.
    Regards,
    MouleswaraRao.

    Dear Mouleswara Rao,
    Pls check following SD process:
    1. Create STO which must be created in receiving plant (Manuf.plant) by ME21N
    2. Create outbound delivey order) and PGI w.r.t. STO in Depot.(VL10B)
    3. Post depot excise invoice using J1IJ.
    4. Post the Goods Receipt in receiving plant.
    5. Post excise invoice number using J1IEX.
    6. Verify Invoice using MIRO.
    stock transfer from depot to plant process flow
    Regards,
    Abhee.

  • Purchase of Raw Mat by New Plant (CoCd New) from Old Plant (CoCd Old), STO?

    Dear all
    Our HQ which has an operating Plant A belonged to Company Code (CoCd) A,has acquired Plant B belonged to Company Code B.
    And due to the supply change management issue and strategic business location, HQ has decided to move both Plant A and Plant B into a new location (both Plant A and B are located quite far from each other) and these 2 plants are going to be consolidated into a new Plant C with new Company Code C. And CoCd A and B will then cease to operate.
    Now, due to the legal requirements, CoCd C will need to purchase all the raw materials from both CoCd A and CoCd B respectively at a different date due to the plant move.
    Previously, I have come out with the solutions
    1. Extend the material codes of Plant A & B to Plant C. Extend the SLOC as well.
    2. Plant C will create normal PO to buy from Plant A, with vendor = Plant A. Price will take from Supplying Plant A.
    3. Plant C will perform GR reference to this PO. Here the Stock Account of Plant C will be Debit.
    4. To reduce Stock Account of Plant A, perform GI to Scrap. Then FICO will do double entry to bring the value to Customer Account which is Plant C.
    5. Since we do not PGI or touch on SD, there is no billing doc and manual customer invoice has to be done.
    However, on 2nd thought, I think of to use Stock Transport Order. However, there are a few types of Stock Transport Order in SAP HELP:
    1. STO between Plants with 1 step
    2. STO between Plants with 2 steps
    3. STO with SD delivery
    4. STO without Delivery
    5. STO with SD delivery and billing.
    We are running against time and would prefer not to touch on anything in SD to do STO. And we do not need to monitor the Stock Transit as physical plant move will take place first, that make STO in PLant with 2 steps no applicable.
    Requirement:
    1. PO raised must take the standard price in Material Master of the supplying plant.
    2. It involves buying of stocks of 1 new plant C from the old plant A & B at the respective time. Accoutning document and relevant posting must be audited for legal purpose.
    3. If possible, we prefer not to touch on SD or the complicated solution to achieve this purpose.
    I have read a lot about the above 5 types of STO but I am unsure which one is best suit me. Please advise.
    Thanks.

    I just tested with Option 4: Create STO without SD Delivery.
    However, in the PO itself, it does not even have the INVOICE TAB at the item level. How am I going to perform Invoice Verfication to put the 17 % input tax which is very important?
    However, I have proceded with my testing for STO without Delivery
    1. Create PO with UB Doc Type and Item Category U, supply plant = Plant A. However, there is no Invoice Tab at the item.
    2. Perform GI reference PO, MVT 351. Here due to come missing config, I have done the following:
         a.Company Clearing Account
         b.Create customer master  CoCd CN10
         c.Create vendor master for CoCd CN50
         d.Account type D is not defined for document type WA. Go to OBA7 to tick Customer.
         e.Account type K is not defined for document type WA. Go to OBA7 to tick Vendor
        1 Material doc with 2 accounting doc generated, each for CoCd C and CoCd A
    4. Perform GR referenc ePO, MVT 101.
        1 Material doc generated with no accounting doc.
    5. MMBE Stock Overview, stock quantity of Plant A is now transferred to new plant C.
    There is no way I can do invoice as in MIRO, it said my PO contains no item.
    I desperately need my perform STO to have
    (a) Invoice Verification to capture input tax 17%
    (b) Delivery Cost maintained.
    I do not want to complicate the material master maintenance of the sales view of all my 16000 raw materials. That is why I prefer not to go for STO with SD DElivery.
    Can anyone please advise?
    Edited by: Daimos on Sep 4, 2009 12:49 PM

  • Issue related to STO return billing

    hi expert,
    1) user have created PO then created delivery
    then Invoice. now user have created return
    delivery and when user try to bill the return
    quentity. system give error" sales organisation is
    not define"
    so guid me where to check and its transection
    code.
    Alicia

    Alicia,
    Can you please explain the scenario totally, is it a intercompany transfer or intracompany transfer, based on that scenario we can have solution.
    Venkat

  • Need suggestions for Sales Order ATP for Material STO in from other Plant

    Our client does not want to stock inventory at either the DC or the Manufacturing Plant.  They receive a Sales Order at the DC and the ATP check is set up to check Stock at the DC (likely none); inbound Stock Transport Orders (likely none) and then resort to the Replenishment Lead time.
    The Replenishment Lead time for externally procured materials (F) with Special Procurement key (STO it in from the manufacturing plant) is the Planned Delivery Time in the Material Master.  The problem is the Planned Delivery time is just the 5 days it takes to get the stock from the manufacturing plant to the DC.  If the Manufacturing plant has no inventory (which is very likely since we don't maintain PIRs to stock it prior) we will promise the customer delivery in 5 days which is much too soon.
    We cannot inflate the Planned Delivery time to be the 5 days of transit plus the 30 days of total procurement and manufacturing time at the manufacturing plant because then the MRP signal will tell the manufacturing plant to buy and make much too soon.
    They don't want to ship goods directly from the manufacturing plant; they must be shipped from the DC.
    I realize that this is not a good business process but is there a solution for this?
    Edited by: AnnHustis on Jan 21, 2012 6:26 PM
    Edited by: AnnHustis on Jan 21, 2012 6:35 PM

    Ann,
    This is a common practice, and I don't think that the business process is unreasonable.
    1.  Remove the special procurement key from the RWHS Material Master
    2.  Change Material Master in the RWHS to X procurement.
    3.  Set your RWHS Material Master 'Total Replenishment Lead time'
    Next step assumes that the company codes are the same between RWHS and Manufacturing Plant.
    4.  Create Purchase Info Record for the RWHS material, that points to the vendor of the Manufacturing plant
    5.  Create quota arrangement in which 100 percent of the quota comes from the Manufacturing Plant Purchase Info Record, and is MRP relevant
    6.  Insert a step after the RWHS MRP run where the Planned orders are immediately converted to Purchase requisitions.
    Business process:
    a.  Sales order is entered.  ATP checks RWHS stock and excess inbound.
    b.  If inadequate supply, then ATP confirms to Total Replenishment Lead time (and not planned delivery time).
    c.  MRP runs; creates a planned order for the shortage.
    d.  New step in MRP job converts the Planned order to a Purchase req.  Purchase req is sourced via the quota arrangement
    e.  Purchase Req requirement (Manufacturing plant) is offset by the Planned delivery time to accommodate transit duration.
    f.  Purchase req demand now places a requirement on the Manufacturing plant, with dates and quantities that will support the Sales order in the RWHS.
    g.  Convert the Purchase Req to a STO once the stock appears in the Manufacturing Plant.
    Best Regards,
    DB49

  • Delivery the product from other plant directly

    hi
    we have 2 companies A, B. Company A receive order and give Company B to production, then Company B directly ship to customer. We are using deliviery plant for this scenario. However, sometimes the production will via Company A, then Company A delivery the product to customer. In this case, using delivery plant is not a good way. As the product require to stay in Company A for few days. any suggestion in this case? thanks

    Looks like its a stright forward Inter company transactions.
    in the first case it is a intercompany sale where company A receives the order and you change the Delivering plant to company B's Plant so that the delivery is triggered from company B.
    in the second case, you trigger a  Inter company Plant to Plant  stock transfer requistion from Company A to company B , and there by the stock comes to A and from comp A you can ship to to the customer.

  • System picks up price from other plant

    I have a planning plant (1000) assigned to plants 1000 (company code 1000) & 2000 (company code 2000) under one common controlling area.
    I created maintenance order in planning plant 1000 for an equipment in plant 2000.
    My planned material belongs to plant 2000. When I am doing plan cost calculation using u201CDetermine Costu201D, planning cost for stock material is zero.
    The system log informs u201CCK-040 Material xxx in plant 1000 has no valuation data.u201D.  I do not see any point in maintaining valuation data in plan 1000 as the material will never be procuired in plant 1000.
    What can I do so that system picks up price from plant 2000.
    Regards,
    VM

    hi
    Apart from checking the plant specified ,also check whether you have defined the valuation variant to your plant in IMG settings
    regards
    thyagarajan

  • Scenario Problem: Equipment in one plant and diesel issue from other plant

    Dear all,
    I have an issue in my organization.I have an equipment in maintenance plant 1000;but for 2-3 days the equipment goes to work in other project with different maintenance plant 2000 ; and it is very dynamic.
    Now i am not able to book the costs of fuel on a different cost center without changing the maintenance plant; as the equipment movement is day wise and hour wise.Equipment has to stay with the original plant but the costs have to be booked in the current plants of fuel and spare consumption.
    Regards
    Praveen Dhankar

    Dear Seran
    Thank you for the scenario clarity through fleet management.
    Regards
    Praveen Dhankar

  • MIC from one plant to be Extend in other Plant Codes

    Dear SAPians,
    I want to extend the MIC from one plant to other 7 plant codes. Please guide how can i do it?
    Thanks in Advance.

    Hi Atul,
    As suggested by Kundan, it is recommended to use the MICs created in one plant in other plants, to reduce the duplication of master data.
    If  the MIC parameters / control indicators are different in other plant, then you can change in the inspection plan or create new MIC by copying the MIC from other plant, but you cannot extend MIC from one plant to other plant.
    If your business  says all the MICs should be plant specific, then create MICs in all the plants by copying from the existing plant. You can use master data uploading tools for large volume of data.
    With Best Regards,
    Vithal

Maybe you are looking for

  • Flash capacity and hidden files

    I am about to order a new Mac Pro and am trying to work out whether to get 512 or 1TB flash storage I have an 2007 MP, 4 drives in it but looking at the main drive and its content I cannot account for all of the used space. The main (boot disk) shows

  • Update SAP BAPI already imported in XI Repository

    Hello all. I'm a XI beginner. I use a specific R3 bapi in one of my namespaces. So this RFC is already imported in XI repository and the process is today implemented in my customer's production environnement. Following a new need, I must add an impor

  • How to change the paper format in SOST tcode from X_65_80 to X_65_266?

    I got data from OTF in SAPSCRIPT and send by email. How to change the paper format in SOST tcode from X_65_80 to X_65_255? I need to change it automatically from abap. Any suggestion?

  • OVS in table cell

    Hello SDN! Is it possible to create OVS in table cells for NW 7.0 (NOT EHP1)? If yes how I can do this? regards, Lev

  • Startup Manager Error

    My eMac finished burning a dvd then i shut it down. When i turned it back on it froze on the gray screen. I retarted with the optionrp trick and my startup manager freezes too. Anyone know what i could do