RGP issue

Hello Experts,
                        I am facing a problem in RGP. When i am sending a packing material to a vendor,i differentiate it with 3 classes A,B & C and this A,B,C is maintained in batch level of the same material, the material code is one but it has three batches. When i am sending A class material the vendor might send the B class or C class. How can i work in this situation? I don't have any optimal solution for this senerio.
Thanks
Harmandeep

Hello Ashok,
                  Thanks for taking interest in my concern.Yes i am asking for the Returnable Goods Process. Actually we send the packing material for packing to the broker and the broker purchase the material on the behalf of the company,and broker fills the material in the packing material and send it back to the company. In this the material we use is the 1 material but it differtiate on the basis of its condition i.e batches . The new bags are considered into A class,the moderate quality bags are considered in B class and the rest are considered in C class. Like if we send A class material to broker we  aren't sure that the broker will fill the material in A or B class, So it is posible that we will recieve the material as B class after sending it as A class. So what do we need to do  in that case.
Thanks
Harmandeep

Similar Messages

  • Number Range for Returnable Gate Pass.

    Dear All,
    We Issue an Returnable Gate Pass with Material .
    These RGP  has common series for all the plants.
    For example, in 1200 plant we have issued RGP with series number 4900003295 dated 21.07.08 and in 1400 plant we have issued RGP srl no. 4900003235 dated 03.07.08. The system is  generating the number from one Number series only.
    This is serious problem.
    My Client wants to get the different Number Range for RGP issued from Different Plants.
    Points will be awarded .
    Please reply.
    AV

    Hello,
    Please note that Number Range is at Client Level hence you cannot have different number range for different plants. Th same is not possible in SAP.
    However there is a workaround, in MIGO we have GR/IR field. In this field we can go in for automatic number range based on Plant. By doing this you can explain you client that though the Material Document number range will remain the same but still by looking at the GR/IR number you can easily differentiate as to which Plant.
    You can define the same in Materials Management>Inventory Management and Physical Inventory > Number Assignment > Define Number Assignment for Goods Receipt/Issue Slips
    Regards

  • RGP and NRGP

    Hi,
    Please guide me  how to configure RGP (Returnable Gate Pass) & NRGP (Non Returnable Gate Pass) Material Movement procedure in SAP.

    hi
    No, SAP doesn't provide any option for creating Gate Pass (Returnable & Non-Returnable) in standard.
    Returnable Gate Pass:
    1. MM01 - Create Material Master for every Spare Part / Machinery to be sent to Vendor for Repair as Non-Valuated (Material Type "UNBW") (Do not extend Accounting and Costing views since you don't require postings of Stock value and consumption values, you only want to track the Service/Repair Charges)
    2. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511)
    3. ME21N - Create Subcontracting PO (Here Main Material and Component will be same material)
    4. MB1B - Transfer Posting w.r.t. Subcon PO (Mvmt Type - 541, Spare Part stock will get posted to Vendor Stock)
    5. MB90 - Take Print out of this Material Doc as Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    6. MIGO - GR against Subcon PO (101 - Receive Spare Part, 543 O - Consumption of Spare Part form Vendor Stock)
    7. MIRO - LIV for Service Charges w.r.t. Subcon PO
    Non-Returnable Gate Pass: -
    1. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511)
    2. MIGO - Goods Issue > Others (Issue the quantities of these materials using Movement Type 501 / 511)
    3. MB90 - Take Print out of this Material Doc as Non-Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    Note: - If Client is not satisfied with this then you need to go for development of Gate Pass System.
    OR
    please check transaction code LECI
    Related configuration
    SPRO --> Logistics Execution --> Shipping --> Basic Shipping Functions --> Registration of Visitors and Means of Transport
    here u need to create a CHECK POINT  in transaction  CHKPT
    regards
    KI

  • Returnable & Non returnable material issue

    Dear Guru,
    Can any one explain about Returnable & Non returnable material. How its integrating with Gate entry pass. We need full cycle of that.
    thanks
    babu

    For RGP & NRGP follow the following steps
    Creation of RGP with reference to Purchase Order with item category u2018Lu2019.
    Step 1:- Create a PO with item category u2018Lu2019 assigns the same material as component at
    Material tab.
    Step 2:- Issue the material to the vendor with movement type 541 with reference to PO
    by using T- code MB1B
    Step 3:- Take the print out by using T-code MB90.
    Step 4:- Receive the material from vendor to our stock by using movement type 101
    Please Note: -
    For both the above mention process you have to create the material with Material type UNBW - Non valuated material.
    For the second process purchasing view is mandatory along with basic data and accounting view
    1 .Create Material with mat type UNBW
    Select the following views from material master
    u2022 Basic data 1
    u2022 Basic data 2
    u2022 Purchasing
    u2022 General Plant data /Storage 1
    u2022 General Plant data /Storage 2
    u2022 Accounting 1
    u2022 Accounting 2
    2. Upload the Material by using MB1C at 0 (zero) price
    Use Movement type 561
    Enter 0 (zero) price as Loc. Curr.amnt
    Save the doc
    3. Create Purchase order by using movement type ME21n
    Use document type RGP u2013 Returnable Gate pass
    Enter all the mandatory fields
    Please use the field Requisitioner as Indenter and Tracking No. as Approver
    Note: Please check the box of u2018Free Goodsu2019
    Enter the same material as component at item level under material tab
    And save the document
    4.
    Issue the good to vendor by using T- Code MB11 with 541 mvt
    Create the Material document with reference to PO
    Note: - No accounting document will be generated
    To check the accounting doc use T- code MB03
    5. Good Receive from vendor
    Create Material document with reference to PO
    Use T- code MB01 with 101 mvt

  • Setting for printing RGP

    Hi all,
    If I want to use MB1B for transferring material to vendor for servicing with movt type 541, and want to print that material document generated at the time of MB1B as RGP, what setting shall I need to maintain or its purely ABAP development?
    Regards,

    go to NACE
    click ME
    after that click condition record
    or
    mn21
    HI,
    enter condition type wa03 for cllective slip
    or wa01 indivisual slip
    transaction type WA
    print version -3
    after that execute
    printing of document -3(subcontractor receive or issue)
    medium-1
    dispatch time -3
    after that save
    after that
    TCODE MB90
    Enter document number
    then execute
    click the doument number
    then click out put
    Hope this will clear ur answer

  • Non- Returnable gate pass issue

    Dear All
    Kindly explain the process for sending an item outside the company on NRGP/RGP/Invoice for which item code is not available in SAP e.g., a machine part which comes out a machine; or a door which comes out of buiding.
    Rgds
    Srini

    hi
    SAP doesn't provide any option for creating Gate Pass (Returnable & Non-Returnable) in standard.
    Returnable Gate Pass: -
    1. MM01 - Create Material Master for every Spare Part / Machinery to be sent to Vendor for Repair as Non-Valuated (Material Type "UNBW") (Do not extend Accounting and Costing views since you don't require postings of Stock value and consumption values, you only want to track the Service/Repair Charges)
    2. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511)
    3. ME21N - Create Subcontracting PO (Here Main Material and Component will be same material)
    4. MB1B - Transfer Posting w.r.t. Subcon PO (Mvmt Type - 541, Spare Part stock will get posted to Vendor Stock)
    5. MB90 - Take Print out of this Material Doc as Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    6. MIGO - GR against Subcon PO (101 - Receive Spare Part, 543 O - Consumption of Spare Part form Vendor Stock)
    7. MIRO - LIV for Service Charges w.r.t. Subcon PO
    Non-Returnable Gate Pass: -
    1. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511)
    2. MIGO - Goods Issue > Others (Issue the quantities of these materials using Movement Type 501 / 511)
    3. MB90 - Take Print out of this Material Doc as Non-Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    Note: - If Client is not satisfied with this then you need to go for development of Gate Pass System.
    please check transaction code LECI
    Related configuration
    SPRO --> Logistics Execution --> Shipping --> Basic Shipping Functions --> Registration of Visitors and Means of Transport
    try making a zprogramme and z transaction
    regards
    kunal

  • RGP,RRGP, NRGP functinality

    Hi experts,
    We have business scenario as under:  NON-EXCISABLE CASE
    1) RGP (Returnable Gate Pass): We send material to outside vendor or other plant for some repair / testing activities and receive back at sending plant.
    2) NRGP (Non Returnable Gate Pass): We send material to outside vendor or other plant permanently and do not  receive it back.
    Can you please suggest the steps for RGP & RRGP (Return of Returnable Gate Pass) and NRGP transactions.
    thanks and regards,

    Hi
    Step to be followed
    RGP (Returnable Gate Pass): This functionality is used for material is sending out side of Plant in both cases Excisable & Non Excisable. Basically you need to have track record for material movement.
    1) Non Excisable, create Z movt type by copying 541 & 542. Then with ABAPer develop smart form to print Non Returnable gate pass, Material, Qty to receiver and expected return date.
    Once material is issued with MB1A use this movt type (Z21) to this movt type Link the smart form developed. Then go MB90 to take print of material document.
    2) NRGP (Non Returnable Gate Pass): Create Z movt type by copying 201 & 202. Then with ABAPer develop smart form to print Non Returnable gate pass. You can info cost center/ user name responsible for send this material out side.
    It will have complete info of both material movement.
    Rgs

  • RGP & NRGP

    hi,
      pls. guide how to configure RGP (Returnable Gate Pass)  & NRGP (Non Returnable Gate Pass)  Material Movement procedure in SAP ECC 6.0.

    hi
    No, SAP doesn't provide any option for creating Gate Pass (Returnable & Non-Returnable) in standard.
    Returnable Gate Pass:
    1. MM01 - Create Material Master for every Spare Part / Machinery to be sent to Vendor for Repair as Non-Valuated (Material Type "UNBW") (Do not extend Accounting and Costing views since you don't require postings of Stock value and consumption values, you only want to track the Service/Repair Charges)
    2. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511)
    3. ME21N - Create Subcontracting PO (Here Main Material and Component will be same material)
    4. MB1B - Transfer Posting w.r.t. Subcon PO (Mvmt Type - 541, Spare Part stock will get posted to Vendor Stock)
    5. MB90 - Take Print out of this Material Doc as Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    6. MIGO - GR against Subcon PO (101 - Receive Spare Part, 543 O - Consumption of Spare Part form Vendor Stock)
    7. MIRO - LIV for Service Charges w.r.t. Subcon PO
    Non-Returnable Gate Pass: -
    1. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511)
    2. MIGO - Goods Issue > Others (Issue the quantities of these materials using Movement Type 501 / 511)
    3. MB90 - Take Print out of this Material Doc as Non-Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    Note: - If Client is not satisfied with this then you need to go for development of Gate Pass System.
    OR
    please check transaction code LECI
    Related configuration
    SPRO --> Logistics Execution --> Shipping --> Basic Shipping Functions --> Registration of Visitors and Means of Transport
    here u need to create a CHECK POINT in transaction CHKPT

  • New DVR Issues (First Run, Channel Switching, etc.)

    I've spent the last 30 minutes trying to find answers through the search with no luck, so sorry if I missed something.
    I recently switched to FIOS from RCN cable in New York.  I've gone through trying to setup my DVR and am running into issues and was hoping for some answers.
    1.  I setup two programs to record at 8PM, I was watching another channel at the time and only half paying attention.  Around 8:02 I noticed a message had popped up asking if I would like to switch channels to start recording.  I was expecting it to force it to switch like my old DVR, but in this case it didn't switch and I missed the first two minutes of one of the shows.  I typically leave my DVR on all day and just turn off the TV, this dual show handling will cause issues with that if I forget to turn off the DVR.  Is there a setting I can change that will force the DVR to choose one of the recording channels?
    2.  I setup all my recordings for "First Run" because I only want to see the new episodes.  One show I setup was The Daily Show on comedy central, which is shown weeknights at 11pm and repeated 3-4 times throughout the day.  My scheduled recordings is showing all these as planned recordings even though only the 11pm show is really "new".  Most of the shows I've setup are once a week so they aren't a problem, but this seems like it will quickly fill my DVR.  Any fixes?
    Thanks for the help.
    Solved!
    Go to Solution.

    I came from RCN about a year ago.  Fios is different in several ways, not all of them desirable.  Here are several ways to get--and fix--unwanted recordings from a series recording setup.
    Some general principles. 
    Saving changes.  When you originally create a series with options, or if you go back to edit the options for an existing series, You MUST save the Series Options changes.  Pretty much everywhere else in the user interface, when you change an option, the change takes effect immediately--but not in Series Options.  Look at the Series Options window.  Look at the far right side.  There is a vertical "Save" bar, which you must navigate to and click OK on to actually save your changes.  Exiting the Series Options window without having first saved your changes loses all your attempted changes--immediately.
    Default Series Options.  This is accessed  from [Menu]--DVR--Settings--Default Series Options.  This will bring up the series options that will automatically be applied to the creation of a NEW series. The options for every previously created series will not be affected by a subsequent modification of the Default Series Options.  You should set these options to the way you would like them to be for the majority of series recordings that you are likely to create.  Be sure to SAVE your changes.  This is what you will get when you select "Create Series Recording" from the Guide.  When creating a new series recording where you think that you may want options different from the default, select "Create Series with Options" instead.  Series Options can always be changed for any individual series set up later--but not for all series at once.
    Non-series recordings.  With Fios you have no directly available options for these.  With RCN and most other DVRs, you can change the start and end times for individual episodes, including individual episodes that are also in a series.  With Fios, your workarounds are to create a series with options for a single program, then delete the series later;  change the series options if the program is already in a series, then undo the changes you made to the series options later; or schedule recordings of the preceding and/or following shows as needed.
    And now, to the unwanted repeats. 
    First, make sure your series options for the specific series in question--and not just the series default options--include "First Run Only".  If not, fix that and SAVE.  Then check you results by viewing the current options using the Series Manager app under the DVR menu.
    Second, and most annoying, the Guide can have repeat programs on your channel tagged as "New".  It happens.  Set the series option "Air Time" to "Selected Time".  To make this work correctly, you must have set up the original series recording after selecting the program in the Guide at the exact time of a first run showing (11pm, in your case), and not on a repeat entry in the Guide.  Then, even it The Daily Show is tagged as New for repeat showings, these will be ignored. 
    Third, another channel may air reruns of the program in your series recording, and the first showing of a rerun episode on the other channel may be tagged as "New".  These can be ignored in your series if you set the series option "Channel" to "Selected Channel".  Related to this, if there is both an SD and HD channel broadcasting you series program, you will record them both if the series option "Duplicates" is set to "Yes".  However, when the Channel option is set to "Selected Channel", the Duplicates Option is always effectively "No", regardless of what shows up on the options screen.  
    As for you missing two minutes,  I have sereral instances in which two programs start recording at the same time.  To the best of my recollection, whenever the warning message has appeared, ignoring it has not caused a loss of recording time.  You might have an older software version.  Newest is v.1.8.  Look at Menu--Settings--System Info.  Or, I might not have noticed the loss of minutes.  I regularly see up to a minute of previous programming at the start of a recording, or a few missing seconds at the beginning or end of a recording.  There are a lot of possibilities for that, but the DVR clock being incorrect is not one of them.  With RCN, the DVR clocks occasionally drifted off by as much as a minute and a half.

  • Pension issue Mid Month Leaving

    Dear All,
    As per rule sustem should deduct mid month joining/leaving/absences or transfer scenarios, the Pension/PF Basis will be correspondingly prorated. But our system is not doing this. In RT table i have found 3FC Pension Basis for Er c 01/2010                    0.00           6,500.00.
    Employee leaving date is 14.04.2010. system is picking pension amout as 541. Last year it was coming right.
    Please suggest.
    Ashwani

    Dear Jayanti,
    We required prorata basis pension in case of left employees and system is not doing this. This is the issue. As per our PF experts Pension amount should come on prorata basis for left employees in case they left mid of month.System is doing prorata basis last year but from this year it is deducting 541. I am giving two RT cases of different years.
    RT table for year 2010. DOL 26.04.2010
    /111 EPF Basis              01/2010                    0.00           8,750.00 
    /139 VPF Basis              01/2010                    0.00           8,750.00 
    /3F1 Ee PF contribution     01/2010                    0.00           1,050.00 
    /3F3 Er PF contribution     01/2010                    0.00             509.00 
    /3F5 Ee Mon PF contribution 01/2010                    0.00           1,050.00 
    /3F6 Ee Ann PF contribution 01/2010                    0.00          12,600.00 
    /3F9 PF adm chrgs * 1,00,00 01/2010                    0.00              96.25 
    /3FA PF basis for Ee contri 01/2010                    0.00           8,750.00 
    /3FB PF Basis for Er Contri 01/2010                    0.00           8,750.00 
    /3FJ VPF basis for Ee contr 01/2010                    0.00           8,750.00 
    /3FL PF Basis for Er Contri 01/2010                    0.00           6,500.00 
    /3F4 Er Pension contributio 01/2010                    0.00             541.00
    /3FC Pension Basis for Er c 01/2010                    0.00           6,500.00
    /3FB PF Basis for Er Contri 01/2010                    0.00           8,750.00
    /3FC Pension Basis for Er c 01/2010                    0.00           6,500.00
    /3FJ VPF basis for Ee contr 01/2010                    0.00           8,750.00
    /3FL PF Basis for Er Contri 01/2010                    0.00           6,500.00
    /3R3 Metro HRA Basis Amount 01/2010                    0.00           8,750.00
    1BAS Basic Salary           01/2010                    0.00           8,750.00
    RT table for year 2009. DOL 27.10.2009
                                                                                    /111 EPF Basis              07/2009                    0.00           9,016.13
    /139 VPF Basis              07/2009                    0.00           9,016.13
    /3F1 Ee PF contribution     07/2009                    0.00           1,082.00
    /3F3 Er PF contribution     07/2009                    0.00             628.00
    /3F5 Ee Mon PF contribution 07/2009                    0.00           1,082.00
    /3F6 Ee Ann PF contribution 07/2009                    0.00           8,822.00
    /3F9 PF adm chrgs * 1,00,00 07/2009                    0.00              99.18
    /3FA PF basis for Ee contri 07/2009                    0.00           9,016.00
    /3FB PF Basis for Er Contri 07/2009                    0.00           9,016.00
    /3FJ VPF basis for Ee contr 07/2009                    0.00           9,016.00
    /3FL PF Basis for Er Contri 07/2009                    0.00           5,452.00
    /3FB PF Basis for Er Contri 07/2009                    0.00           9,016.00 
    /3FC Pension Basis for Er c 07/2009                    0.00           5,452.00 
    /3FJ VPF basis for Ee contr 07/2009                    0.00           9,016.00 
    /3FL PF Basis for Er Contri 07/2009                    0.00           5,452.00 
    /3R4 Non-metro HRA Basis Am 07/2009                    0.00           9,016.13 
    1BAS Basic Salary           07/2009                    0.00           9,016.13 
    Now please suggest what to do. where is the problem  ? If have also checked EXIT_HINCALC0_002 but nothing written in it.
    With Regards
    Ashwani

  • Open PO Analysis - BW report issue

    Hello Friends
    I constructed a query in BW in order to show Open Purchase Orders. We have custom DSO populated with standard
    datasource 2lis_02_itm (Purcahse Order Item). In this DSO we mapped the field ELIKZ to the infoobject 0COMP_DEL
    (Delivery completed).
    We loaded the data from ECC system for all POs and found the following issue for Stock Transport Purchase orders (DocType = UB).
    We have a PO with 4 line items. For line items 10 and 20, Goods issued, Goods received and both the flags "Delivery
    complete" and "Final delivery" checked. For line items 30 and 40, only delivery indicator note is issued for zero
    quantity and Delivery complete flag is checked (Final delivery flag is not checked) in ECC system. For this PO, the
    delivery completion indicator is not properly updated in the DSO for line items 30 and 40. The data looks like the
    following:
    DOC_NUM     DOC_ITEM       DOCTYPE     COMP_DEL
    650000001       10     UB        X
    650000001       20     UB        X
    650000001       30     UB
    650000001       40     UB      
    When we run the Open PO analysis report on BW side this PO is appearing in the report but the same is closed in ECC
    system.
    Any help is appreciated in this regard.
    Thanks and Regards
    sampath

    Hi Priya and Reddy
       Thanks for your response.
                         Yes the indicator is checked in EKPO table for items 30 and 40 and delta is running regularly for more than 1 year and no issues with other POs. This is happening only for few POs of type Stock Transport (UB).
                        I already checked the changes in ME23N and the Delivery completed indicator was changed and it reflected in EKPO table. Further, i checked the PSA records for this PO and i am getting the records with the Delivery completed flag but when i update from PSA to DSO the delivery completed indicator is not updating properly.
                       In PSA, for item 30 i have the following entries. Record number 42 is capturing the value X for ELIKZ but after that i am getting two more records 43 and 44 with process key 10 and without X for ELIKZ. I think this is causing the problem.
    Record No.    Doc.No.                    Item              Processkey         Rocancel     Elikz
        41               6500000001            30                    11                            X           ---    
        42               6500000001            30                    11                            ---           X
        43               6500000001            30                    10                            X           ---
        44               6500000001            30                    10                            ---         ---
    (Here --- means blank)        
    Thanks and Regards
    sampath

  • HP LaserJet Enterprise 600 M602 driver issue

    Hello,
    I've got issue with 600-series printers. We use the latest UPD drivrer ver. 61.175.1.18849 and print from XenApp 6.5. The error occurs every time when users try to print jpg files from XenApp session. It only happens with 600 series printers and UPD.
    Also I've tried to assign native 600-series driver ver. 6.3.9600.16384 and it works good. But with that driver system says that it's color printer and it brokes our printing reports. These reports are very important for us. So we can't use printer and that driver as well.
    Printer installed on Windows Server 2012 R2. All clients are Windows 7 x64. XenApp Servers are Server 2008R2.
    Is it possible to get fixed UPD driver or correct native driver for Server 2012 R2?
    Regards,
    Anatoly

    I am sorry, but to get your issue more exposure I would suggest posting it in the commercial forums since this is a commercial printer. You can do this at Printers - LaserJet.
    Click on New Post.
    I hope this helps.
    Please click “Accept as Solution ” if you feel my post solved your issue, it will help others find the solution.
    Click the “Kudos Thumbs Up" on the right to say “Thanks” for helping!
    Gemini02
    I work on behalf of HP

  • Windows 7 displays error message when exiting +cursor issue

    Two issues here. CS5 Phoshop on Wind 7 64 bit.
    Physical processor count: 8
    Processor speed: 3073 MHz
    Built-in memory: 12279 MB
    Free memory: 9577 MB
    Memory available to Photoshop: 10934 MB
    Memory used by Photoshop: 80 %
    Image tile size: 128K
    First issue is since the latest automatic Adobe update (why fix what isn't broken?) Every time I now exit Photoshop I get the message "Adobe QT Server has stoped working" and occasionally it happens when I exit bridge. Indesign is also behaving badly. I can no longer start a previous document from file manager without ID crashing out.
    The other is the cursors in Clone and erase lose their edge (become invisable) for no reason - well not quite. Noise Ninja crashed Photoshop when I tried to use it. I reinstalled it and all is well. The cursor issue seems to be intermittant but came back (for no reason) after I reinstalled NN. I can't seem to change the cursor, no matter what I do. The problem is now seriously affecting how I work. Almost enough to go back to Win XP which ran CS5 Photoshop flawlessly.
    Any help will be gratefully accepted.
    Doug

    function(){return A.apply(null,[this].concat($A(arguments)))}
    doug87510 wrote:
    The recent problem is the entire outline of the cursor (including the crosshair in the middle) was missing at any size of cursor. All I had was exactly what I'd get if I used a real spraygun.
    Well, that issue is simply a matter of hitting the Caps Lock key.  When Caps Lock is on, you'll see the cursor outline, and when it is off you'll see a crosshair.  That's a feature, not a bug.
    Glad to hear the 11.1 drivers are out.  I will download them and try them now myself.
    Regarding "Adobe QT" crashing...  QT brings to mind QuickTime, though that is Apple, not Adobe.  Do you have Apple QuickTime installed?
    Regarding memory usage, with 12 GB of installed RAM, you should be able to set Photoshop to use 90% or more in Edit - Preferences - Performance.
    -Noel

  • Issue in Creation of Periodicals for Contracts in CRM7.0

    Hello,
    I have a requirement to create Contracts in CRM7.0 system.
    And I am doing this using the BAPI *BAPI_BUSPROCESSND_CREATEMULTI*
    Good part is Contract Order gets created, but onlywith Header Details.
    The issues i am facing --
    1. I need to know what kind/type of data must be passed to the interface parameters, the F1 Help/Documentation is vague.
    2. I am passing data in the INPUT FIELDS structure with the Object ID, Handle Number, Reference GUID and Fieldname,
        here what does 'Logical Key' field indicate? What should be passed here.
        What does 'REFERENCE KIND' field indicate, i have been passng 'A' for everything (to be frank i dont know whats its significance is!!).
    3. With so much, My Order gets created but with less than half details, i.e. the Objects not getting created are -  Partner, Product, terms/appointments, Status, LongTexts......
    Any help/inputs would be appreciated.
    Hope my problem is stated clearly ...
    --Regards
    Dedeepya

    Hi Anu,
    i found my solution by debugging with existing data or while creating it in CRMD_ORDER.
    Ensure that you are passing a correct entry in INPUT_FIELDS structure.
    As i haven't worked on rebates i woudlnt be able to help you, I suggest you debug to arrive at a solution.
    You can preset your break-points at :-
    1. FM - CRM_ORDER_MAINTAIN
    2. CRM_ORDER_MAINTAIN_MULTI_OW -- Debug through the complete FM.
    3. CRM_ORDER_PREPARE_MULTI_OW -- The data is set in this function module.
    Regards
    Dedeepya C

  • Issue in creation of plant related data at receiving server using BD10

    Hi all,
    This is regarding Material master creation using B10.I am using MATMAS05 message type for sending data from one system to another.Data is sent and received successfully.When i go in mm03 i can see all the views created successfully accept views related to PLANT.Please guide to resolve the issue.
    When i entered into Log-
    1)"The field MBEW-BKLAS is defined as a required field; it does not contain an entry".
    2)"No material master data exists for material AB_08.04.09(30) in plant 4001".
    My segemnt is as follows-
    ZMATMAS05                      matmas05
           E1MARAM                        Master material general data (MARA)
               Z1KLART                        KLART----
    My extention
               E1MARA1                        Additional Fields for E1MARAM
               E1MAKTM                        Master material short texts (MAKT)
               E1MARCM                        Master material C segment (MARC)
                   Z1AUSPM                        E1AUSPMDistribution of Classification:----
    My extention
                   E1MARC1                        Additional Fields for E1MARCM
                   E1MARDM                        Master material warehouse/batch segment (MARD)
                   E1MFHMM                        Master material production resource/tool (MFHM)
                   E1MPGDM                        Master material product group
                   E1MPOPM                        Master material forecast parameter
                   E1MPRWM                        Master material forecast value
                   E1MVEGM                        Master material total consumption
                   E1MVEUM                        Master material unplanned consumption
                   E1MKALM                        Master material production version
               E1MARMM                        Master material units of measure (MARM)
               E1MBEWM                        Master material material valuation (MBEW)
               E1MLGNM                        Master material material data per warehouse number (MLGN)
               E1MVKEM                        Master material sales data (MVKE)
               E1MLANM                        Master material tax classification (MLAN)
               E1MTXHM                        Master material long text header
               E1CUCFG                        CU: Configuration data
           E1UPSLINK                      Reference from Object to Superior UPS
    Thanks.
    Edited by: sanu debu on Apr 27, 2009 7:10 PM

    CREATE CONTROLFILE SET DATABASE "NEWDB" NORESETLOGS ARCHIVELOGAlso when you are setting a new database, the option should be RESETLOGS and not NORESETLOGS.
    'D:\APP\ADMINISTRATOR\ORADATA\NEWDB\ONLINELOG\O1_MF_2_7FK0XKB8_.LOG
    D:\APP\ADMINISTRATOR\ORADATA\NEWDB\DATAFILE\O1_MF_SYSTEM_7FK0SKN0_.DBFWhy underscore(_) at the end of the datafile name. Any specific reason ?

Maybe you are looking for

  • Changed from DS3 to 100mb Ethernet, routing? issues

    Just switched over to a 100mb Ethernet circuit from a DS3 and having some issues, routing issues I believe. I'm attaching a drawing to help paint the picture which I'll explain below: DS3 setup DS3 circuit connected to a serial card on Cisco 7206 rou

  • MIGO,PO,PR, Sales order Problem

    Sir i am working in an pharmicitical company .In my existing company before saving any MIGO ( GRN,Goods issue ),PO,PR, Sales order we first have to take approval from manignment ( authorised pearson ) ,if they suggest any corrections according to tha

  • Advanced LabVIEW tutorials

    Hello, I just have a fairly simple question. I'm looking for some more advanced LabVIEW tutorials. All the tutorials I can find talk about basic structures, indexed addressing, math functions, and all of the general basics of LabVIEW, but I know that

  • I'm receiving the messages twice

    Occasionally I receive the same message twice. This mostly occurs in the morning.

  • Need a good app killer app

    what is the best app killer app thats been used preferably free or cheap.