Safety Stock Planning not completing - /n/SAPAPO/MSDP_SB T-Code

While running Safety Stock Planning (/n/SAPAPO/MSDP_SB transaction) in SCM for products at a particular location, the system hangs and never completes the process.  The message at the bottom is u201CDetermining Demand Information: <location> <product>u201D.  This process works fine when running on any product at another location. 
In order to avoid the above infinite/endless loops, in the Safety Stock Planning Profile, the checkbox for Execute Cycle Test was selected.   While this did resolve the endless loop that the program was running, it now results in an error.. Now, it gives an error message "Cycle found for product <product> at location <location>".
Any ideas on how to resolve this issue?

Hi,
Thanks for the reply....it was really helpful.
We verified T-Lanes by using t-code WUF. There was transportation lane between location 6000 and location 6010 and vice -versa with all products selected. So, we put a block on all products on one T-Lane.
Thanks.
Naveen

Similar Messages

  • Safety stock planning and use of CTM in APO

    I want to use advanced safety stock planning and CTM in APO for a range of finished products.
    For advanced safety stock planning, the available safety stock methods are AS, BS, AT, BT.
    For CTM, I want to use time based safety stock method MB.
    So how can the use of these different methods be reconciled?
    Ady advice appreciated...

    Hi,
    Please check following SDN threads:
    Re: CTM ignores Extended Safety Stock Methods (like BS, BT etc...)
    Please also check OSS note 426563 .
    For Planning a  time phased safety stock ( e.g. when using advanced safety stock methods from SNP) CTM provides two alternative methods  which have their own restrictions:
    1. Standard saftey stock  Planning .The standard safety stock method of CTM consists of two internal runs of CTM engine which are not visible for the user. Because of this two runs it is not possbile to consider decreasing safety stock. CTM interval planning can be used herein.
    2. Alternative saftey  stock  method (Control parameter SSTOCK_MODE). This method carries out only one run.  However there are some restrictions. For details of the above, please check oss note 1413545.
    regards
    Datta

  • What is Formula for 'BS' Method of Extended Safety Stock Planning ?

    Hello SNP Experts,
    I have a Important Question regarding Extended Safety Stock Planning Calculation in SNP Module.
    I have read the SCM Help, SDN Forums and SNP Training Course help, but am unable to find the Formula to Calculate Safety Stocks using the Beta Service Level (Method 'BS') for the Extended Safety Stock Planning Methods. 
    Reading the help, training material, past SDN Questions I do understand the Standard Formula for Safety Stock is ...
    S.S  = ServiceLevel x SQRT (ReplLeadTime) x StdDevDemand
    However there are Factors like below that are definable in the Location-Product Master ...
    1.  Forecast Error %
    2.  Replenishement Lead Time Error %
    3.  Min & Max Safety Stock Levels
    4.  Beta Service Level
    5.  Max. Stock Level
    How are these Factors used ? What is the Formula using these Parameters to Calculate the Safety Stock ? The Calculation in SCM-APO is not clear from anywhere.
    I am specifically interested in the Method "BS".
    Can anyone Guide me ?  Points Guaranteed if a reply covers the exact question above (I have done some research before raising this question on Forum).
    Regards,
    Ambrish Mathur

    Harish,
    I'd seen these forums already.  Thanks for responding.
    This 'secretive' calculation is quite annoying.  If SAP does not Publish any documentation around the Formula, how can the Customer be convinced to use SAP's Safety Stock Calculations (no wonder many SAP Customers are going the 'ToolsGroup' way of Safety Stock Calculations).
    On Safety Factor (I saw in your notes) I am aware that
    a factor of 2.33 equates to 98.6% service Level from long back based on Normal Distribution.  The Formula as known much earlier is this ...
    SS = SafetyFact x SQRT (RepLeadTime) x StdDevDemand.
    based on Normal Distribution.
    However there are new Fields in APO since ...
    Is there no documentation whatsoever on how the 2 Fields -  1. Forecast Error %
    2. Replenishement Lead Time Error %
    are used at all in the SS Calculation ?
    Where do these New MasterData Parameters Plug-in ?
    The other change now is in SS Planning, the SSs could be different for each Time Bucket in Future.  How does Beta Service Level also impact the Calculation ?
    Is there a URL / Book someone can point me to ?
    Regards,
    Ambrish

  • Advanced safety stock Planning -

    Hi,
    Is their any method to do the advanced safet stock planning depending on the stage of Product life cycle.
    i.e. intial stage the safet stock planned should be less, should increase during Maturity stage and should gradually decrease to ero during the decline stage.
    Please respond if anyone has done this in past or if any standard SAP functionality exist for the same.
    Thanks,
    Sanjog

    Hi Sanjog,
    Mainly In DP area Phase-in and Phase -out of the product life cycle are planned. So using the advanced Safety stock planning your safety stock should balance the demand and supply variability.
    Generally if you look your Safety profile, it will be the offset of your demand plan and also in areas where you expect phase-out and spike in demand safety stock will be constant based on the strategy Alpha/Beta you use in advanced safety stock planning.
    Also, I think you shouldn't treat this case anything specific as the KPI's will correct the model you are using anyway, unless the Lifecycle is very short.
    Hope this helps.

  • Your registration is not complete. please enter your zip code

    where should i put that zip code? there is no slot for it at registration form of itune.. please help...

    We wouldn't know - this is a user to user technical forum. If it is telling you to contact iTunes support, then that's who you need to contact:
    https://getsupport.apple.com/GetproductgroupList.action
    Cheers,
    GB

  • Exception message 10 and safety stock

    Hello
    When I have a ressource in the past (we have this case), and if the safety stock is not complet, the exception message is "10" (reschedulling in) without date.
    Normaly the result should be exception message "15" (rescheduling out) with a date.
    Why have I an exception message "10" without date ?
    Is it the custo, but I found nothing ?

    Hi Christian,
    I've seen this myself, and believe that it happens only if you allow start in the past and have got insufficient coverage for safety stock.
    I guess it doesn't have a date because of the start in the past, which will set availability date even today. Try to change the "start in the past" indicator, and see what happens.
    Regards,
    Mario

  • MRP Planned % Safety Stock Not Generating Supply in R12 ASCP

    Playing with MRP Planned Safety Stock in an unconstrained plan. See safety stock in the horizontal plan. See safety stock in the pegging tree. Yet this type of safety stock is not generating any supply recommendations. However with "regular fixed quantity" safety stock the plan is. Thanks in advance.

    Hi
    If I understand your qn correctly., user defined SS is working and MRP planned % is not. Have you setup MRP planned % such that you gave the SS method., bucket days and % for the item attributes?
    Also make sure that you have demand for the item since it looks at your demand in future,adds up demand within the bucket days and applies the % .
    Thnx
    Partha

  • Safety Stock Issue

    Hello Gurus,
    We are in SCM 4.0 and currently we are facing an issue in safety stock calculation.
    We run a macro to calculate the safety stock. The safety stock for a particular bucket is calculated by the sum of total demand of next consecutive 4 buckets. The problem is that the macro works fine if we select a single product-location combination but when we select a product at multiple locations combination (aggregated level) the macro doesnt work. The value is not displayed in the planning book. However, we could see the total demand value for that particular bucket.
    Hope I am clear and please help me on this.
    Thanks,
    Sai

    Hello all,
    I have a quick question:
    Do we need to maintain the data at Location-Product Group level to go for Aggregated Safety Stock Planning?
    Let me explain my case:
    We have the following selections at Location-Product level:
    Sel1: Prod1 at Loc1
    Sel2: Prod1 at Loc2
    Sel3: Prod1 at Loc3
    When I make either of these selections individully in the Planning book the safety stock macro works fine but if I make any of these two selections or all the three selections at a time, then the values does not show up at the Total but I can see the values at 'Details' level if I select Location at the Header Information.
    We are thinking of Aggregated Safety Stock Planning and We do not mainatain the data at Group level. Can we still go for Aggregated Safety Stock Planning?
    Could anyone give me some suggestions on this?
    Thanks
    Sai

  • Safety stock error

    Hi Experts,
    Pls check the below screen shot of planning book, the issue is related to safety stock.I have maintained safety sock method AT,service level,Demand Fcast Err&RLT Fcast Error and run safety stock planning but system didn't create any stock . Can anyone help to know the reason for it?
    Best Regards,
    Vijesh.

    Hi,
    I can not see the screenshot. AT is an extended safety stock method. It needs the uncertainties in the supply chain are statistically independent from one another. AT is using alpha service level and reorder cycle methods. The alpha service level is event driven. Crucial here is the number of periods in which no shortfall quantities are expected. For example, if there is a service level of 90%, no shortfall quantities are expected in 90% of the periods. In the reorder cycle method, it is indicated that purchase orders can only be made for all t periods.
    BR

  • Safety Stock Methods SB, SZ and SM - When to apply what method?

    Dear Experts,
    i have searched the threads for a good explanation of safety stock methods (especially for safety stock methods SZ, SB and SM). I have to admit that i did not fully understand how the SM method works exactly. It would be great if you could possibly share an easy-to-understand example. Furthermore i am looking for a way to determine for what rawmaterial_location combination we need to use what Safety Stock Method (SB, SZ, SM). Maybe you could share a few examples in terms of raw materials, characteristics for these raw materials, what method to choose and reasoning for choosing this method.
    Thank you very much for your support in advance!
    I am looking forward to your answers!
    Best regards,
    Christian

    Hi
    Please refer OSS note 504253 . This will give you an idea about the safety stock methods. This note also has links to other notes that explain safety stock planning
    Thanks
    Aparna

  • How to use forecast and safety stock

    Hi
    We have below business case for MRP case  and scenarios , please guide me how to use safety stock in this case.
    Requirement : System should always raise PR for quantity of forecast only , if forecast in not available then for the safety stock 
    Planning cycle
    100 (Monday)
    Deliver cycle
    500(Friday)
    Forecast model
    S
    Lead time
    4
    Safety stock
    10

    Hi
    Did anyone have idea how to use safety stock with forecast in such a way that System should always raise PR for quantity of forecast only , if forecast in not available or less then the safety stock quantity PR will be raise with safety stock quantity

  • Safety stock and min safety stock

    Dear all,
    CAn anybody explain me the functional difference between safety stock and min safety stock?
    And what is the meanng of safety time?
    Karthick

    Hi,
    Safety Stock:
    The quantity of stock to satisfy high requirements. The purpose of the safety stock is to prevent material shortage.
    Safety stock as the name suggest is the stock level till which the dead stock or stock out situation will not arise (probable figure based on past data maintained in master).
    As such this figure is not stock, it is cut-off figure maintained in master which is used for Planning and once the stock level dips below this value, you can configure system to generate PR, orders automatically. It has its relevance in MRP and CBP.
    Safety stock is not used in production.
    Minimum Safety Stock
        The quantity that defines the lower limit for safety stock. This value cannot be exceeded.
        The safety is checked to see if it is greater or equal to this lower limit.
        The lower limit is checked if you use an availability indicator which shows, according to customizing settings, if the safety stock is to be calculated again in a forecast. If the safety stock is lower than this level in forecasting, the safety stock is automatically increased to the value of the lower level.
    The safety stock must always be greater or equal to this lower level (minimum safety stock)
    Hope this will help help you.
    Regards,
    Pavan

  • ASCP and Safety Stock Pegging

    Hi,
    in our ASCP plan, currently we have items with Safety Stock values manually inserted valid over all planning horizon.
    Therefore all the safety stock is NON-TRANSIENT.
    Actually we have Priority Based pegging with:
    MSC: Include Safety Stocks in Priority based Pegging: YES.
    What is appening is that ASCP peg On Hand quantities to FORECAST DEMAND, then pegs other supply type to SAFETY STOCK Demand.
    I would like ASCP to peg OH to Safety Stock Demand (DUE on the plan start date) before Forecast demand (due in the future).
    Someone knows how to obtain this "feature"?
    Thanks in advance.
    Giacomo

    Giacomo,
    I'll give you a few pointers, but this may be difficult to achieve. Try this as a test.
    I assume you have a constrained ASCP plan. This question wouldn't be as relevant in an unconstrained plan because the demands would just be calculated and priority pegging isn't that useful. .Is that correct, you have a constrained plan?
    The key point is that you mentioned is that you have NON-TRANSIENT safety stocks. This means that you are setting a value due today for 100 units and at the end of the plan, you still want to have 100 units of safety stock planned.
    ASCP priority pegging logic has these rules:
    1. Any supply quantity that pegs to NON-TRANSIENT safety stock CANNOT be used at a future date to peg to real demands. [It's not going to happen]
    2. Any Supply quantity that pegs to transient safety stock CAN be used at a future date (when the corresponding dip in safety stock occurs) to meet demands. [This means that it can release the supply and re-peg to a future demand].
    Independent Demands have a seeded demand priority by default. The first two below are set by a profile option, safety stock is always the lowest priority ( a number something like 99999 where the higher value is lower priority)
    1. Sales Order = 10,000*
    2. Forecast = 100,000*
    3. Safety Stock = 999,999 (not sure of this internal value)
    Set by a profile with a name like msc: default sales order priority
    For priority pegging setup instructions, please see the ascp user guide. The basics would be the use of two profiles mso: demand window size and mso supply window size. This determines how ascp will select and sort your supplies and demands for pegging. It starts at the first demand date or supply date and selects that many future days of demand and supply to sort and then peg.
    You also setup a priority rule that determines how ascp calculates priorities for pegging. To accomplish what you want to do, you would have a rule like
    1. MDS & Sales Order priority
    2. Schedule Date
    This is a commonly used example. The pegging process will the select the number of days you have chosen and sort the demands based on their prioirty.
    Sales orders are more important (to you) than safety stocks, but not forecasts. You want the safety stock to peg the on hand, not a future forecast. This can only happen because you have mso: demand window size set to a number of days where pegging sees the future demand in the same sort. I haven't seen this requirement (SS higher priority than forecast), so you'll need to test my suggestion.
    Set the value of MSC: Default forecast priority = A huge number (higher than 999999).
    The intent is to make the demand priority the SAME as a safety stock demand. In this case, with the priority rule I suggested, the schedule date will determine the pegging order.
    I think this will get you close. You can view the internal proirity calculated by ASCP for the independent demand by selecting that order in the pegging details and then rightclicking to select the properties. The pegging details wil show you the priority value that was used.
    Hope this helps.
    Kevin
    www.inspirage.com

  • Dynamic Safety Stock and Calculate based on past consumption

    Hello experts,
    I have set up my coverage profile in configuration for dynamic safety stock.  However, the value is going off of the current net requirements in the system.  How do I set it up so that the target stock level (DSS) is determined by 30 days of our past consumption and so many days of near future requirements?
    I assume I need to set up the MRP 3 tab in a specific way.  These materials that will be using dynamic safety stock are not forecasted, therefore, the material master had PD as MRP type (not VM or VV as discussed for setting DSS with forecasted materials), lot size of DY, and the coverage profile.
    Please let me know.
    Thanks.

    Hi,
    Hi the configuration should be like this..
    First Create range of actual coverage profile SPRO and enter the following data.
    Period Indicator - M
    Number of Periods - 2
    Type of Period length - Working days
    Number of days per period - 30
    Range of coverage in the first period - target - 30
    Then assign this profile to the material in MRP3 screen in the field range of coverage profile field.
    Regards
    Prasanna

  • Minimum safety stock

    Hi,
    I maintained minimum safety stock as-50 in MRP2 view while creating material master, my client requirement is this minimum safety stock should not be issued at any cost, without enhancement from abap consultant i need to maintain this safety stock.
    can anyone help me to cose this issue.

    Hi,
    Minimum Safety Stock
    The quantity that defines the lower limit for safety stock. This value cannot be exceeded.
    Use
    Defining a lower limit can influence the following:
    material master data maintenance
    The safety is checked to see if it is greater or equal to this lower limit.
    forecasting
    The lower limit is checked if you use an availability indicator which shows, according to customizing settings, if the safety stock is to be calculated again in a forecast.
    If the safety stock is lower than this level in forecasting, the safety stock is automatically increased to the value of the lower level.
    Dependencies
    The safety stock must always be greater or equal to this lower level.
    Hope this helps.
    Revert if you need more details.
    Regards,
    Tejas