Experts,
I have a situation, where in a previously created MTO Sales Order had its receipts deleted & now I want to create a manual production order with the Sales Order assignment (CO08). When I add a component & try to make it Sales Ord assigned, it works fine as long as the component's material master carries a 1 or a blank indicator on the MRP 4 Ind/Coll field. If its collective, system does not accept the SO entry on the Prodn Ord.
However, when I try to create a Prod Ord (CO01), no matter what, the system does not allow me to enter a Sales Order on any component. Is it possible to influence this behavior some way?
Thanks

Andy,
??  What behavior do you seek? 
CO01 creates a production order without reference to a sales order.  It would make no sense to assign components to a sales order, and this is not supported.This behavior cannot be altered in standard SAP.  Sales orders are irrelevant.
CO08 creates a production order with reference to a sales order.  Components' assignment is dependent on the settings in the Material Master of the component.  This behavior cannot be altered in standard.SAP. 
What behavior do your seek?
Best regards,
DB49

Similar Messages

  • Field Sales Ord. is a required field

    HI,
    While doing 412 -e movement getting this error message
    Field Sales Ord. is a required field for G/L account 1000 192006

    Hi,
    I think the order movement you have selected must have some reference/reservation with it.
    So whenever you select that particular movement, the order no. is essential.
    This particularly happens for make to order production, where order is mandatory.
    So just enter the order number in it, so the process gets completed.
    Regards,
    Siddharth.

  • Sales order based on prod order

    Hello,
    There is a sales order based on production order (one item).
    I just want to know what happens in CO once sales orde is posted?
    How many doc are created and of which record type?
    What kind of changes happens after the settlement of the order?
    Thanks

    no answer

  • MTO(Diff between complex make to order and sales order based mass prod)

    Hi
    We are using MTO...Can anyone tell me what is the Diff between complex make to order and sales order based mass prod in finance perspective?

    Hi,
    In the case of complex make to order scenario, through MRP, the Project shall be assigned to the sales order. Then there will be milestone billling and all. In the case of mass production MTO, it is only creation of production order for each sales order item and each sales order item shall have sales order cost estimate.
    Trust this helps much and do encourage our efforts!
    Cheers!
    Edited by: Ashok Singh on Oct 28, 2008 6:53 PM

  • Cost element 7000218 is not assigned to a cost component in CostCompStruct

    Dear All,
    How to change the standard price in MR21 for materials with Price Determination Control 3 ( header level V & 3) (Split level S & 3)
    In MR21, when I am updating the price for initial stock uploading.
    It throws me a error Cost element 7000218 is not assigned to a cost component in CostComp Struct 01
    Actually the cost component structure 01 is not active. we are using OP cost component structure & it is active , further the  assigned to  the company code level.
    Cost element 7000218 is assigned to the cost component structure OP.
    please suggest why it result in above error, even though we are not using cost component structure 01.
    Regards
    Subbu.

    Hi,
    Did you change the cost component structure assignment for the plant ?
    This error could be produced due to the fact that for this plant the cost component struture was changed from 01
    But ML tables makes reference to the old cost component structure.
    You can check table CKMLKEV.
    During the creation of the material the system creates data for the current, previous and last period of the last year (12 2010).
    Therefore the system tries/ needs to create also a cost componet split for the period 12 2010. For this it must used the cost component structure for this period 12 2010 (maybe 01).
    In such a case you have to define the cost element in '01' as well.
    Please do read note 434873 carefully for the side effect and correct procedure to change cost component structure.
    regards
    Waman

  • How to add "ATTACHMENTS" assignment block in standard component ERP_H

    Dear All,
    I have a requirement where i have to add the "Attachments" assignment block to standard component "ERP_H". I have taken following steps so far and i am able to display the view in the component ERP_H, however no funtionality has been defined.
    I created a component usage of component "GS_CM" in the runtime repository of component ERP_H
    and now i am able to display the assignment block in the overview page of component ERP_H
    Now i have to create a custom controller and here is where the problem lies. When i try to create a custom controller, it asks for a BOL Entity, and in order to have the same BOL entity as in component GS_CM, i have to add Model "CM" to the runtime repository of component ERP_H, however i m not able to add Model CM in the runtime repository of component ERP_H unabling me to create the custom controller.
    Any pointers would help, if there is any other way to create custom controller instead of adding bol component in the runtime repository.
    Regards,
    Pradeep

    hi,
       can you please add the solution , how u have done  it?

  • WBS with billing element but no sales order assigned

    Trying to write a SQ01 query to find WBS with billing element but no sales order assigned. Can anyone help?

    Such WBS elements can be identified using CN43N report also using proper filtering criteria.
    Fileting criterias:
    Billing element.
    Order accepted status.

  • Sales person assigned to an account?

    On which screen of the WEB UI can i see a sales person assigned to an account?

    Hello!
    Within the Account Overview Page there is the Assignment Block u201CRelationshipsu201D. Here all Employees related to this Account are listed here with the Relationship u201CHas the Employee Responsibleu201D.
    In addition the u201CMainu201D Employee Responsible is visible in the Header of the Account Overview Page directly.
    The main Employee Responsible is also visible directly in the Account Search-Result-List.
    Within the Employee Overview Page you can see the other direction of the Relationship. Here the Relationship is u201CIs the Employee Responsible Foru201D.
    Best regards
    Arno

  • Assign patch levels for component versions of system: Maintenance Optimizer

    Hello,
    I am trying to have Maintenance Optimizer check for what files I need to download.  However, I get the following error:
    Assign patch levels for component versions of system SXM.
    I susepect that the problem really lies in the fact that the "SP Levels" in the "Software Components" tab is not populated in SMSY.
    Does something read that information from the child system and populate the data automatically?  This is a new system install, and perhaps a step was missed in solman.
    Thanks,
    John

    Hi John,
    MOPZ directs you to SAP Software Download Center in order to show you the lastest status and available packages.
    If you are not seeing the packages perhaps you created you satellite system at solution manager pointing to the wrong product/version.
    MOPZ is created to point you to the available Support Package Stacks for its products.
    Normally one creates a system in solution manager defining it as an ECC server ( this does not have a download page for MOPZ ) when the correct assignment would be SAP ERP ( this last has a download page for MOPZ ).
    If this is your case, you´ll need to redefine the satellite system again in our solution manager.
    hope this helps.
    Valdecir

  • Sales Order Assignment not seen in Production order after MRP Run

    Hi,
    I am running a Scenario with Strat 50.
    I am maintaining Strat 50 thru MRP Group in MRP 1 View.
    Creating Production Order through Sales Order.
    When i am running MRP thru MD02 I am able to convert it to Planned Order but when i convert Planed Order to Production Order, i am not able to get Sales Order assignment in production order
    Please guide me,
    Thanks in advance,
    Harris

    Dear Harris,
    Sales order planning is done via MD50 not MD02.Hence,please execute the MRP run via MD50.
    This will copy the requirement from SO and the appropriate procurement proposal will be generated,say planned order.
    Here we will be able to view the sales order assignment.
    Regards,
    Joseph Charles Vaikathussery
    Edited by: Joseph  Charles on Nov 3, 2010 4:26 PM

  • Multiple Sales group assigned with sales office to Sales area

    I need to know whether i could be able to assign different sales groups to Sales area in BP master.
    Eg  Sale grp 1 assigned with sales office 1 to Sale org 1, DC1,DIV1.  
          Sale grp 2 assigned with sales office 1 to Sale org 1, DC1,DIV1.
          Sale grp 3 assigned with sales office 1 to Sale org 1, DC1,DIV1.
    The standard system is not allowing to maintain more than one combination if the same Sales Area. In the practical scenario, there could be more than one sales group can look after the sales in Sales Area thats attached to one sales office. Is there otherway to check this requirement?
    Another requirement is i need to read the sales group value during processing the transaction ( Remember still i have not saved the transaction and i am processing it). I have found the some BADI which is not helped me lot. Eg i am processing the lead by entering existing BP/ prospect, i need to read the sales group assigned in the transaction.
    Any body can help me out.
    Thanks
    Edited by: K Srikrishna on Feb 20, 2009 12:17 PM

    Hello,
    As of release CRM 4.0, it is possible to use the "Enhanced Backend
    Integration Model", where you may assign a sales office to more
    than one sales org, and a sales group to more than one sales office
    However this assignments are shown in a different way as in the
    standard model: multiple assignment are not viewed in the tree
    structure but in tab "FUNCTION".
    This is the standard design of the system. You can find more
    information about this new model in symptom of the note 691015.
    Also Please go through the documentation under following path:
    Customer Relationship Management
    Master Data
    Organizational Management
    Data Transfer
    Convert Org. Model to Represent Multiple Assignments in SAP ECC
    ( Documentation).
    I hope this information helps you.
    Regards,
    Sri.

  • Shop Floor Statuses - Assign Shop Floor Statuses - Component Pick Release

    Hi,
    is there someone who knows the use of the following forms in WIP module:
    - Shop Floor Statuses
    - Assign Shop Floor Statuses
    - Component Pick Release
    We are in 11.5.10
    Please provide also an example of a business scenario where this functionality could be used.
    Thanks in advance
    Regards
    Riccardo

    hi,
    shop floor statuses are created which will allow/disallow moves and assigned to particular operations in the job.
    they are normally used in OSP operations to control the movement of material thru intraoperation by the users when the material is gone for OSP.
    and they can also be used to hold the job when its moving in operations (may be due to quality problems etc..)
    Component pick release is used to issue the required components to a particular job based on pick slip report.
    its another way of issueing material to wip apart from backflushing thru wip material transaction form.
    hope that u can hav idea abt these.
    if u need any clarifications, ols reply

  • Does sales order assigned to WBSe increases plan value of WBS element

    Hello Experts,
    In my project, planning is done using activities, so ideally CN41 report displays the plan values (Proj.cost sched.000) for the network and the WBS assigned to the netwok is same.
    E.g. 1000 USD planned for network = 1000 USD planned for the WBSe.
    But for one of the project, I see the WBS planned value is more than that of Network though we plan only in NTW.
    I can see a sales order assiged to this WBSe for which sales order billing value 1500 USD displayed in CN41 in revenue plan column.
    Is there anything like sales order planning? the billing value is for revenue generation but does sales order planning also required? like to complete the sales order, how much is my plan cost? does the sales order plan cost gets updated in the WBS plan cost?
    I am asking this question becasue if i look in CJ41 (Display WBS planning) I can see all the cost displayed in the column Order/network
    Please clarify me on the sales order assignment.
    Regards,

    Thanks for the reply and clearing my doubt on sales order.
    my problem is as below:
    Cost planned on the network: 1000 USD
    as in my project, planning is done only on NTW, CN41 report should show:
    Project Object---- Proj.cost sched.000
    WBS.0001------ 1000 USD
    Network --- 1000 USD
    however, CN41 report is showing as below:
    Project Object---- Proj.cost sched.000
    WBS.0001------ 1100 USD
    Network --- 1000 USD
    I can see that the 100 USD are directly planned on the WBSe if I see the values as non aggregated but I am not able to understand how 100 USD are planned on the WBSe.
    If I see CJ41, I can see Planned 1100 USD under the column Order/network
    This means that all 1100 usd's are planned using orders/network.
    Please help me understanding why there is a difference of 100 USd's at network and WBS level and how to find out where the additional 100 USDs are planned on WBSe.
    Thanks

  • CK11N alert:"Costing item 00001 is not assigned to a cost component"

    Hi,
         When I use CK11N, fill in all the necessary field, there will appear a alert.
          The detail as follows:
    Costing item 00001 is not assigned to a cost component
    Message no. CK 334
    Diagnosis
    No cost component is assigned to costing item 00001.
    System Response
    The costs for the costing item are not shown.
    Procedure
    Go into Customizing for Product Cost Controlling and check the assignment of cost elements to cost components.
           I have used KA03,KL03,CR03 to checked previous datas, but I find no errors?
    What is the problem?

    Hi,
    Use OKTZ to create cost component structure.
    Check for some of these settings also
    Configuration:
    Define costing sheets
    OKTZ create cost component structure
    OKK4 Define valuation variant
    OKKN Define cost variant
    Master Data:
    KP26 setup activity rates
    CR01 setup work centers
    MM01 setup material masters
    CS01 setup Bill of Materials
    CA01 setup routings
    Regards,
    Murali

  • Cost element  is not assigned to a cost component

    Dear All,
    On trying to run costing for finished good having one BOM component, system create error in costing log as-
    Message no-239-Cost element 954001 is not assigned to a cost component     1
    On seeing details:
    Cost element 954001 is not assigned to a cost component
    Message no. CK239
    Diagnosis
    The system attempted to generate the cost component split for the material, but discovered that no assignment has been made in cost component structure Z2 for cost element 954001 and possibly for origin group .
    System Response
    The cost component split is incomplete. The cost of goods manufactured in the cost component split is therefore less than in the itemization.
    ProcedureGo into Customizing for Product Cost Controlling and carry out the assignment for cost component structure Z2 and chart of accounts AICA.
    where i am missing the required setting.
    please guide
    regards

    Hi,
    Use T.Code OKTZ for the relative cost element has to be assigned to one of the components there in
    the cost component structure. Choose the nature of assignment for eg. raw material, choose the source and give the cost element.  Then choose Assignment and give settlement through Cost center, Order.While coming back activate the cost component structure and save.  Try for the Costing.
    Regards,
    Sadashivan