Sales order control - reg

Hi,
In VA01, we should allow user to enter and change the quantity and material but once the order is saved the order quantity should be greyed out as well as user should not be allowed to add or delete any line items in the sales order thro' VA02 but system should allow users to change the text, manual pricing maintenance should be allowed.
Awaiting your useful inputs.
Regards,
Mann.

Hi Balaji
You need to go with the User Exit only as Mr. Lakshmipathi suggested. In the user exit(MV45AFZZ - USEREXIT_SAVE_DOCUMENT) only you need to give the requirement telling that error message should come so the technical consultant will include a program in the user exit telling that error will come
Regards
Srinath

Similar Messages

  • MTO Sales order controlling with valuated stock

    Hi,
    In SAP MTO with sales order controlling (sales order is cost object) with valuated stock, how to make settlement rule set to sales order so that costs will flow from production order to sales order .
    Can anybody advise me in this.
    Regards
    Rajesh A

    Hi Rajesh,
    I'm new to Engineer To Order (ETO) and Make To Order (MTO) Product Costing and my client like to implement ETO and MTO product costing with Project Systems(PS) integration.
    If you worked on these proccess? please can you guide me how to design the process or could you please forward me design and configuration documents....my client is discrete manufacturing industry.
    Thanks,
    Rau

  • The financial document and sales order control is missing at delivery order

    The financial document is assigned at sales order line. The system is not restricting to deliver the goods of cost less than or equal to value of financial document.
    Suppose a financial document with a value of 10000USD is assigned to a sales order of value 20000.In this case system is letting me to make the delivery order and PGI of cost 20000.I want the system to restrict to deliver the items of cost 10000USD.
    Note=In xd01 i have mentioned the payment guarantee procedure=Letter of credit but not the credit control area.
    Regards :Vijay

    Hi,
    1st check your FD to determine whether or not there is an allowed overdraft. If there isnt one than check IMG Tx VX52, Finnancial Document Conditions, check value:
    "Even if you do not set this switch - that is, there is no value check in the SD document -, the system subtracts the consumed values from the total value of the financial document.
    In this case, the subtracted value may exceed the total value of the financial document because the check, but not the update, is deactivated."
    Regards
    Kikas

  • Belated costs during a make-to-order/sales order controlling process

    Hello Experts,
    We implemented a make-to-order process where we collect actual costs of a repackaging process. The cost object of that process order is the sales order item (VBP, Vertriebsbelegposition). So far that cost collection works absolutely fine and the actual costs are collected in the conditions of the sales order item.
    Unfortunately it can be the case that after billing the sales order item, operations debits the process order with an activity (e.g. quality analysis). After using transaction KO88 the balance of the process order is posted to the sales order item even if it has been already billed. But when I open the sales order with TA VA02 the conditions of these sales order item are already grey and not editable anymore. And therefore it is not possible to actualize the price and the extra costs of the belated positing of operations.
    Do you know any possibilty to creat a second bill of the same sales order item to collect the additional costs?
    BR
    Mike

    Hi,
    Finance person would need to create a JV to knock off those costs. The same wont be possible through SD route again.
    Regards,
    Amit

  • Sales order updation - reg

    Hi Experts,
        I am updating schedule line item category in sale order using the user exit MV45AFZZ.
    Within that user exit I am modifying the standard internal table XVBEP with new schedule line item category.
    It is updating when I use VA01, VA02.
    But when I update sales order using BAPI, it is not getting updated. But that portion of code is triggered and XVBEP internal table is getting updated. But in sales order it is not updated. After that piece of code no where XVBEP internal table is updated.
    Kindly help me.
    Thanks and regards,
    Venkat.
    Edited by: VENKAT RAMAN on Jun 17, 2010 3:18 PM

    Hi,
    Add following line in the code which you have written in user exit.
    MOVE 'U' to xvbep-updkz.
    Regards
    Vinod

  • Sales Order Control

    Dear All,
    How can we control the Consignment Fillup Order in sauch a way that if the order quatity is not available in the plant the order should not be delivered and quantity corrected at order level
    With Regards
    Mohammed

    Dear Kapil
    if the material is partially available the system is issuing a warning based on the stock but it is allowing the delivery to be created for the partial quantity
    what we need is that if there is a shortage of quantity then the system should not let the delivery to be created.
    only complete deliveries should be allowed
    Regards
    Mohammed

  • Two deliveries required for one sales order

    Hello Friends,
    I have a quirey , I have two types of goods in one sales order, one is dangerous goods and other one is normal. How ever we are thinking to make two seperate deliveries even they are in one sales order. How can two diff deliveries gets created.
    We are planning to create new shipping point with new loading group for the dangerous goods .
    Will the above decision works or is there any simplest way to create two auto deliverys for one sales order.
    Reg.

    Hi all,
    I have yet another proposal - using copy control and adding there dangerous goods profile LIPS-PROFL as split criterial. This field is populated originally from material master MARA-PROFL field.  You can check for example routine FV50C201. Split criteria are defined in likp-zukrl field.
    I think that is better solution then introducing new shipping point. Because there are some determinations and dependencies related to shipping points. So the more shipping points you have, the more additional config you have. If it is needed by business to have separate shipping points - then fine. But if the goods are shipped from the same place, then I would rather modify copy control instead of multiplying config and master data. I say duplicated effort in master data - because with 2 shippiong points you would need to maintain DG profile field and additionally loading group.
    Kind regards
    Witek Prawecki.

  • How to Make Settlement Rule Mandatory in Sales Order(In Acct Assigt Tab)

    Hi Gurus,
    I have a business requirement. For Free of charge 3rd party orders (yes they have FOC orders delivered by third party) the business wants to ensure that the Settlement rule should be mandatory. They enter cost center & receiver in the settlement rule.
    i.e the order should not save till Settlement rule is maintained in the line item in the Acct Assignment tab.
    Please let me know how this can be done.
    1: Applied my brains on incompletion procedure but does not seems like it can be done there.
    2: Is there something in CO where some setting can make it mandatory to enter settlement rule in Sales order?
    3: I s there any other way in user-exits or ABAP?
    4: Is there any setting in Item category(I could not locate any)?
    5: Can this be done via Requirement class.
    Please assist to resolve this one.

    Dear,
    It depends on settings in Requirement Class (OVZG) and Account Assignment Catg (AAC) in OME9
    If your AAC is E in Req Class, then your sales order is a CO object.
    Requirement Class in IMG can be checked - IMG > Controling > Prod Cost Planning > Cost Obj Controling > Prod Cost By Sales Order > Control of Requirement.
    Or any filed any you can Make mandatory through Transaction variant SHD0.

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • Sales Order/Item as Account Assignment in Accounting Doc.

    I have a scenario where we are selling some services. Process is to create sales order --> Create billing document in reference to sales order & then release it to accounting. I am using materials of type DIEN( service) for the purpose and have customized the sales order / item category. Process is working fine till creation of accounting document but the accounting document is missing sales order/item in it [as account assignment]. I am not sure what config I am missing.
    Attached file shows where I am expecting the sales order / item to be seen.
    Please provide hints on this.
    Thanks in advance.
    Sonal

    Hi Sonal
    If you want the billing doc to post in the sales order as cost object, then your GL has to be cost element and the account assignment category in Sales order must be E
    Check the Requiremebt Type in the Procurement tab of sales order.
    This RT is assigned to a Requirement Class and the RC is mapped to Acct Assgn Catg.
    Spro - Cost object controlling - prod cost by sales order - control of sales order related.....
    In this node you can see which RC is assigned to RT
    Br. Ajay M

  • Sales Order -Valuated, non valuated

    Hi,
    I am getting an error while saving a sales order containing Variant Configured Material. The Error description is " Sales Order is non valuated".
    Where do we make the config settings regarding valuation of a Sales order?i.e.valuated or non valuated? Is this valuation of Sales order  controlled at item category level?
    Regards

    Hi Mrinal,
    Following links may help you :--
    http://help.sap.com/saphelp_470/helpdata/en/90/ba6cba446711d189420000e829fbbd/content.htm
    http://help.sap.com/saphelp_40b/helpdata/en/90/ba6cba446711d189420000e829fbbd/content.htm
    http://help.sap.com/saphelp_pserv464/helpdata/EN/90/ba6db1446711d189420000e829fbbd/content.htm
    http://www.siliconlabs.fi/files/SL_SD_ACCT/SL_SD_Accounting.html
    Thanks & Regards
    Rajesh

  • Product cost by sales order with Valuated Sales order stock

    Hi Gurus,
    I am working on Poduct cost by Sales Order with Valuated stock. but i have doubt ragarding to Cost estimation.
    1.In sales order scenario also Standard Cost estiamtion (CK11n and CK24) and Marking, Releasing is Mandatory? if not how can we estimate the cost?
    2. If we are estimating the cost by using Standard Cost estimate, when can we estimate the cost?
                can anybody please give me the steps which we are following in Poduct cost by Sales Order with Valuated stock from starting to end Settlement
    Thanks&Regards
    Prasad

    Hi,
    there are 3 types of scenarios in MTO.
    In Two scenarios Sale Order would be cost object - (Non-Valuated Sale orders stock and Valuated Sale Order stock with Sale order being Cost Object)
    In third scenario (Valuated Sale Order Stock without Sale Order controlling), Only Production Order is the Cost Object.
    In all the cases wherever the Sale Order is the cost object, Sale Order is the final Receiver.  Only the difference is that in valuated sale order stock, stock entries would be passed to FI and in non-valuated sale order, no goods movement for FG will be there.
    Please let me know if you need further details in this regard
    Surya

  • Sales order some line items are showing not relavant

    Hi SD Guys,
    In sales order some line items are showing not relavant.
    Why are they showing a status of not complete or "not relevant"?
    Thanks
    Sunny

    Hi sunny,
                     plz check the each line item in the sales order controls by the item category, so check the item category , depends on the item category, pricing,delivery and billing takes place.
    regards,
    ram.

  • Product Costs by Sales Order - Settlement Options?

    Hello All -
    I am trying to understand if I need to settle to a sales order (SDI) or directly to material (MAT) or to COPA (PSG).
    If i look at my sales order, it has item category ZPSF, which product costs by sales order configuration shows a requirement class ZKE.  ZkE has a valuation of M, which means separate valuation of reference to sales document/project.
    Does this mean I need to settle to sales order first?
    Then i run vA88 to settle sales order to copa?
    if ZKE valuation is blank, does that mean its not valuated?  I have read on other sap help pages that means it is valuated.  Please clarify.
    also, when does one directly settle to MAT? what scenarios?  this confuses me.
    Thanks!
    Emmas

    I'll give this a try. When working in a make-to-order environment there are 2 settings in the requirments class that you must consider in determining how to settle the costs (and maybe the revenue as well).  The first setting is the account assignment category.  In the standard system "E" is used to designate the sales order as a cost collector.  "M" is used to if you don't want the sales order to be a cost collector.  Whether the sales order is a cost collector or not will determine your settlement options. 
    The second critical field is the valuation setting.  If you set it to "M" then the stock assigned to the sales order will be valuated (by valuated I mean that once the goods are produced they will be held in inventory as sales order stock with a value).  If you leave the valuation field blank then the stock assigned to the sales order will be held in inventory without a valuation. 
    If the sales order is not a cost collector then the cost to manufacture the order will be collected in your production order and the settlement rule for the production order will be to the material you are producing.  Since the material has a valuation, the costs collected in the production will be reduced by the material's valuation once it is received into finished goods inventory.  Any remaining costs are settled to wip or variance based on the production order's status and the RA key and variance key settings.
    If you have set the sales order as a cost collector then the production order costs can either settle to the finished material or to the sales order.  If you are using valuated sales order stock you would normal have the costs settle to the material and the production order would behave very much like the previous example.  If you are not using valuated stock then you would need to settle the costs to the sales order and all the production costs would accumalte in the sales order.
    If you are using the sales order as a cost collector than you will probably want to settle the sales order as well.  During the sales order settlement you have the option of settling the cost and revenue assigned to the sales order to COPA.  The settlement profile along with the RA key assigned to the sales order controls how these are settled.

  • Producrt Cost by Sales Order with Valuated Stock

    Hi Gurus,
    My client is having  Producrt Cost by Sales Order with Valuated Sales Order Stock. Can anybody reply me for my following issues.
    1. while calculating Sales order cost estimate thru VA02 , the same Cost estimate is appearing against with EK02 condition type in Sales order Condotions. what is the use of Sales order Cost estimate? is there any impact on production?
    2. What is Difference between Sales Order Cost Estimate and Order BOM Cost estimate?
    3.when can we calculate Sales Order Cost estimate ? whether before Production or before billing ? can anybody tell me please..
    4.while settling the production order also system picking the cost in VPRS not in EK02, i am not sure about this step.can any body correct if i am wrong
    5.I know we can caluculate WIP in Sales order also. when can we calculate ? before settling the Production order or after production ?
    thanks
    Prasad

    Hi,
    there are 3 types of scenarios in MTO.
    In Two scenarios Sale Order would be cost object - (Non-Valuated Sale orders stock and Valuated Sale Order stock with Sale order being Cost Object)
    In third scenario (Valuated Sale Order Stock without Sale Order controlling), Only Production Order is the Cost Object.
    In all the cases wherever the Sale Order is the cost object, Sale Order is the final Receiver.  Only the difference is that in valuated sale order stock, stock entries would be passed to FI and in non-valuated sale order, no goods movement for FG will be there.
    Please let me know if you need further details in this regard
    Surya

Maybe you are looking for

  • Can volume slider be locked in place?

    I do an Internet radio show and play songs directly from iTunes.  We strive to have all DJs play their music at the same volume.  The volume slider in the iTunes window does not have a number scale on it, and moves when I accidentally move the cursor

  • Logical standby process

    Hi, how can configure the logical standby process to start automatically after i restart database? thanks

  • Passing values by reference to a graph seems to be not working... help, I'm losing my mind! ;)

    I'm bordering on psychosis now. Grr.. I'm trying to pass an array to a waveform graph by reference. The array is an array of I16 data. I have verified that the data in question is correct, and when viewed view probe (RIGHT before going into the prope

  • Extract first coordinate

    I have a table with polygon geometries in. I want to extract the first coordinate of all the geometries. I can get them all using GETVERTICES but I only want the first one. Any help gratefully received. Ivan

  • Using Edge for eLearning?

    I'm at the end of a rope here. I am an AE animator with very little experience in Edge or with any code whatsoever. I have to make an interactive string of videos. The interaction is very simple (think multiple choice with all choices being correct,