Sample production run without bom,routing

at our client place we have a scenario where we will run sample production (before real production run) without creating bom/routing for the material...
someone suggested we use finance internal order and then post the material documents in migo against that internal order and labor costs in kb21n..
is this the only easiest way for this kind of scenario? or do you have any other ideas?

Hi Swatghi Rege,
You can create a production order without Routing and without BOM by creating a new order type.
To be able to create an order without Routing: Change the Config in OPL8 ( order type dependent parameters) as routing optional.
To be able to create the Order without the BOM you will need to:
- Configure a new BOM Application. This can be done in tcode OS30.
- Create a BOM ID in T-code OS31 with BOM Usage as Production.
- Assign this BOM ID in BOM Application.
- In the ID maintain a BOM alone without any items.
- Finally in OPL8, you need to assign the new BOM Application for your Order type.
Thansk and Regards,
Mariano

Similar Messages

  • Doesn't Create Production Order without BOM & Routing

    Hello,
    I have a requirement that Production Order is not be created without the BOM
    Is there any Customizing Setting??
    I have the option by implementing User Exit but i want to know is there any standard setting???
    Please throw some comments???
    Regards,
    Kumar

    Dear Kumar,
    1.First in OS30 - Application Specific criteria for Altern.Determination,include a
    new entry named ZP00 - NO BOM and dont include any of the check boxes.
    2.In OPL8 - Order Type Dependent parameters,Under Routing --Sequence
    Exchange must be "0" & Routing slection also should be "0".Under Bill of
    material,--BOM Application ,select ZP00 & save.
    Check with this & Revert to forums.
    If useful reward points.
    Regards
    Mangal

  • Is there a situation where we create a production order without BOM/Rtg ?

    What I see in the system, I was able to create a prod order without maintaining master data for PP ( expect material master)
    Is there a situation/scenario where we create a production order without BOM, Rtg
    Does the above situation applies to scenario like special procurement key ( 40- stock transfer from other plant )
    Please clarify

    Pradeep,
    Thank you for detailed answer
    Round robin of discussions
    When you covert a planned order to a prod order with reference to a material (CO40), it will ask for routing
    if rtg is not maintained for the material, the system will automatically pick the default rtg from OPJG
    When you create a prod order ( without ref to a material- C007), say suppose for unplanned rework we have
    maintain the rtg and BOM manually to the prod order
    Lastly, FOR SPk - 40 ( Stock Transport) for the issuing plant both BOM & Rtg needs to be maintained in the recieveing & issuing plant
    Due points have been assigned

  • Error while creating Production order without BOM

    Hi Guys,
    While creating production order without a BOM i am getting the following error in the error log.
    Error: BOM for material xxxxxx does not contain any valid items
    Message no. CO636
    Kindly help.
    Regards,
    Sid

    Dear customer,
    could you check in the master data screen of the order if one BOM has been selected?
    please coudl you check your customizing the following transactions:
    OPJM
    OPJI
    what do you have in 'BOM slection field' MRP4 view of the header material?
    Please check if with this info you can find the missing data to explode the BOM
    regards
    Maria

  • MRP run without bom explosion

    Dear All,
    Can it possible to run mrp without bom explosion against demand management & demand program for 78 weeks its mid-long term?
    BOM is not considered by client,so it possible to run mrp without bom?
    Regards
    Gajjen

    Hi,
    You Can run MRP with out BOM explosion
    Option 1: In MRP 4- Set  MRP dependent requirement - 1
    or
    Option 2: Make the BOM status to 2 In active.
    or
    Option 3:
    IF you want BOM for Other purpose such as costing, Then
    Create a New BOM status as per your requirement in OS23,  Remove the  check mark of MRP  Explosion .and assign to the BOM status to respective bom
    Regards,
    Sundaresan
    Edited by: Sundaresan . E. V on Aug 26, 2010 5:03 PM

  • Conversion planned order to production order without BOM - no message

    Hello
    Problem: during conversion planned order to production order system does not inform (warning or error) that BOM is not exist. Is it possible  to force system to any reaction by standard configuration ?
    Everything is ok if production order is created by CO01, but during conversion there is no any reaction - production order is created, released etc. I only see by system status that something is wrong (NMAT - No material components). Probably we will have to do it by User Exit but I want to know that all standard configs are exhausted.
    Thx in advance. Reg.
    Joanna

    Hello
    The BOM is not read again when a planned order is converted to production order on the standard system.
    You may implement the modification from note 391846 to force master data to be read again, therefore, an error message will be triggered during the conversion when the BOM is invalid.
    BR Caetano

  • Production order creating without BOM and Routing

    create the production orders without bom and routing
    they confirm the order
    they want to stop confirmation if production without bom and routing
    is it possible to set error or warning message
    my first doubt is how can we confirm the order without bom and routing
    i think it can be solved by production order type
    please reply

    Hi,
    You can make it mandatory by following ways :
    Go to OPPQ -> Select your plant-> Go to BOM / Routing Selection in that you need to maintain BOM Sel ID & Routing Sel ID which is having selection ID with usage 1 Production which will make it mandatory to create BOM & ROuting with usage 1 & need to be selected while creation & saving Production ORder.
    Also, you can maintain another config. for making routing mandatory at Order type level :
    Go to OPL8 -> Select Plant & Order type-> Routing Selection
    Maintain 5     Routing/ref. op. set mandatory (manual selection)
    or          6     Routing mandatory (automatic selection)
    This setting will ensure without routing your order will not be saved.
    Hope this helps.
    Regards,
    Tejas

  • Prodction order without BOM

    Hi,
    Please tell me  we have creating Production order without BOM(Bill of Material) & post the BOM Component of Production Order Manually. when developing the report Material Number wise then BOM not found in the report. So, i want to know that how to relate BOM Component with Material Number & which will be table to use in this report.
    AmAn

    Hi Aman,
    which report?
    If you don't select the BOM, then certainly there is no BOM component.
    Furthermore, BOM are not referenced in the production order, but the components copied into the order, i.e. these are saved in table AFPO.
    But if the components are not maintained manually in the production order (same table), and only the consumption posted directly as unplanned consumption, then you will have trouble getting a link. Possibly only in MSEG by identifying the production order number as the cost collector.
    Regards,
    Kay

  • Production Order for a material without BOM and Routing

    Is it possible to create a production order for a given material without routing and BOM, I know we can
    create a production order for a material without a BOM (with a default routing) just wanted to check with
    the above criteria
    Thanks in Advance!!

    Members:
    Thank you for your valuable replies and time
    Santosh:
    Tried what you have mentioned, but system still picks up a default routing
    Kaushik:
    Maintained Default values in OPJG for the given order type, but system still picks up
    default routing
    Mangalraj:
    have no issue in creating a production order without a BOM, but I am trying to see
    is there a way where I can create a production order without a BOM and routing (not
    even default operation )
    Any suggestions on how to create a production order for a material without a BOM
    and routing (not even default one )

  • Selection Of BOM & Routing at the time of production order creation

    Hi guys,
    Please clarify how i can go about for the following mentioned scenario
    I have one Master BOM(Finished Product Level) & alternative BOMs for that,similarly i have one Master Routing & alternate routings for the same finished product
    At the time of production order creation is it possible for me to choose one of the BOMs & One of the routings of that particular finished product without creating a production version?
    Awaiting for a quick response
    Vijai

    Hi vijai prasad shanmugam ,
                                              In the material master MRP-4 view under the BOM selection you can maintain on what fatcors you want the BOM to be selected  Viz. Selection by order quant.,Selection by explosion date.Selection by production version etc.
    As far as the master recipe is concerned ........ I guess that if there are more than one valid master recipe maintained then SAP will prompt to select the one manually.........
    But it the standard practice to maintain the production version ....... for the similar situation to the one that you have mentioned.
    Please Let me know if I can help you in any way regarding this........
    Please reward the points......... in you find the ans helpful.....
    Thanks
    Kaushik

  • MRP run including Alternative BOM & Routing in sequence.

    Dear Experts,
    My client has maintained alternative BOM & Routing for there In house production materials.He wants to execute MRP run which can include all BOM's & Routing in sequence. Like, first MRP run should check material requirements as per first alternative followed with second & third alternatives.
    Regards,
    Rajesh.

    Dear Rajesh,
    ur req is not possible in that way. coz MRP run select only one PV or BOM and routing at a time and if stock is not available then it will genrate the req.
    You can try with this rather craeating an alteranative BOM create alternative group of material so when u run the MRP system will check the stock of first matrial and if short fall is there it will go for next.
    Regards
    Sachin

  • Can I run a parallel router to apple TV to watch the Amazon product?

    Can I run a parallel router to apple TV to watch the Amazon product?

    You can't watch Amazon content natively, if you have an IOS deivce you can use airplay.

  • Down Loading the BOM & Routing Data from Production client

    Hi,
    Is there any method to download the ALL Material BOM & Routing data in excel sheet from Production client.
    Thanks
    shiv

    for hearder material u can use CA51 for routing in the plant
    For bom header material
    go to cs02
    click F4,
    select the option material by Bill of material
    u will get the list of bom material in the plant
    so that page u can directly download to the excel
    Edited by: sukendar neelam on Mar 5, 2009 8:27 AM

  • Production Orders without routing

    Hello,
    I would like to know If it is posible to create a production order for a material without a routing and have the posibility of introducing the operations directly in the production order.
    Regards
    Laura

    Dear,
    Yes possible go to OPL8 select your order type and plant then in do setting as Routing Selection :-  0
    Also you can create the reference  operation set in CA11 so if you don't have routing then system will ask you for the ref. operion set.
    Hope it will solve your problem.
    Regards,
    R.Brahmankar

  • Creating Job Order without Assembly Routing

    How can you prevent Users from Creating Job Order without creating routing to the Assembly used
    Regards

    Hi Laxmikant
    Please note the steps
    Create a BOM Application in OS30
    Create a new BOM ID in OS31 with BOM Usage as Production
    Assign this BOM ID in BOM Application
    Ensure that ID is responsible for Production planning alone.
    Then in that ID maintain a BOM alone without any items.
    Assign this BOM Application in Order type dependent parameters in OPL8
    Now u can create a production order w/o BOM
    Rgds

Maybe you are looking for

  • Closing the browser - new problem

    Hi Experts,                   I had this issue of closing the browser in web Dynpro Java. i did it with the help of the experts views posted in SDN(passing the URL of the java file containing the javascript to close the browser to the exit plug). Whe

  • Switching from delimited to fixed width and had to retype 115 column names

    Hi we run 2012 enterprise.  I just changed a delimited flat file over to fixed width and had to retype all 115 column names.  Is there a way to preserve at least some of what ssis already knows (eg col names) in the flat file connection when this kin

  • Adobe acrobat 9 for MAC

    How can find ACROBAT 9 FOR THE MAC that I had previously? i have the codes!

  • MPEG or AVI in PPro CS4 - which is better to work with?

    Back when I was using older versions of Premiere Pro, I was forcefully told by people here on the Adobe forums that I should avoid doing any editing work in MPEG format.  The emphatically-worded advice was that I should do everything in AVI within Pr

  • IPad 2 - Intermittent screen flicker

    Hi all, I bought my iPad 2 at Best Buy on release day, and since then, aside from the light leakage issue, I am seeing very random screen flickers...like one or two a day while I'm using it. The flicker occurs while I'm in apps as well as just lookin