We are trying to create multiple master recipes in a row using ECC5.0. Why does saving in c201 take you directly to the main c202 screen?

Ken,
I suggest you post the same in the ERP forums....
Since there has been no reply for close to a month , I will close this as answered , please repost the same in the ERP forums and provide a link to the same...
Arun

Similar Messages

  • In LSMW which method is exactly suits for Master Recipe Creation (TC-C201)

    Hi All,
    I am unable to find which method suits for Master Recipe Creation in LSMW.
    Please send me in detail if any method suits.
    Can any body help me in this.
    Points will be awarded for correct answer which helps me come out of this problem.
    Regards,
    Shobha

    Hi shobha,
    if  there is code u have to do before uploading go for BDC or BAPI,
    it not go for LSMW (recording method) --> in this its very difficult to code.
    Thanks

  • BAPI: Master Recipe creation

    Hi,
    Is there any BAPI available for
    - create/ chage "Master Recipe"?
    - "work center" creation?
    Best regards,
    Abir.

    Hi Mangesh,
    In the function module BAPI_ROUTING_CREATE, I'm not able to see the field for Superordinate Operation and Constrol Recipe Destination.
    Is there a separate BAPI to create Master Recipe?
    I also looked at the other message where somebody have mentioned to use, following BAPI to create Master Recipe's
    Business Object BUS1194 General Recipe
    Method SAVEREPLICAMULTIPLE Save PPE Objects for General recipe
    Message Type PPE_GREC Save PPE Objects for General recipe
    Basic Type PPE_GREC01 Save PPE Objects for General recipe
    But even this doesn't have the structure details to define Phases and Control Recipe destinations.
    Thanks,
    Mangesh

  • Process order creation without master recipe creation

    Hi, i have created a finished product and i dont want to create the bom and master recipe for this finished product. when i create the process order for this material, i want system to copy the master recipe of the similar products either manually or automatically. please advise how to achieve the same.

    Dear Raju,
    Check these threads,
    Re: Create Process order without Production Version
    Production Order for a material without BOM and Routing
    Regards
    Mangalraj.S

  • BDC for C201(Master Recipe Create)

    Dear,
    Please help me in the following situation:
    I have written a BDC for transaction code C201 for Master Recipe Creation. Its running ok.
    But I have doubts like
    for the 1st table control:
    1) if for one operartion there are more than 1 phases
        then what precautions are needed for page down.
    for the 2nd level inner table control:
    1) I am in the process of coding pagedown for this 2nd table control. If I have to code for it what all precautions will I have to take?
    And in total what all precautions will I have to take?
    How feasible is this BDC?
    I have searched for BAPI, but did not find one.
    Kindly help me. I am under client pressure.
    Thanks.
    Regards,
    Shambhavi.
    Edited by: Shambhavi Salunkhe on Jun 23, 2008 9:40 PM

    Hi,
    In C201 transaction we have a table control in the operations screen. below the table control we have some push buttons and a input text field, we can make use this field to handle the table control. If you are insertinga first operation, enter the value in first row of the table control. for the second operation onwards enter max valye like 99999 in the input text box and click on enter. all the previous rows will scroll up and always second row of the table control will be free, so you can put the data in the second row. in the same way you will have some button to handle the other table control too .I hope this will help You
    Thanks,
    rajinikanth
    Edited by: Rajinikanth G on Jun 23, 2008 6:53 PM

  • Mass creation of BOM and Master Recipe for Plants

    My client wants to do Mass BOM creation and Mass Master Recipe Creation from a Generic BOM and Generic Master Recipe for all 10 Plants by just a click of button.
    He does not want to use copy function using CSO1 or C201, and do for plants 'one by one'. He finds it very time-consuming. He wants to copy for all ten plants all at once. Please advice how this can be accomplished in the best possible manner, and if by standard SAP.
    Thanks,
    Sac

    Dear Sir ,
    What is LSMW ?
    I want to Copy some bill of material from another plant .I had used T code CS01 for it but only the header bill of material is copied .
    The copy field in CS01 is only for first level boms the subsequent Boms are not copied .
    so is there any other way to do it ? if possible please give the detail procedure .
    Regards
    Pankaj .
    Edited by: pankaj.001 on Mar 9, 2011 10:55 AM

  • Master Recipe by LSMW

    Hello gurus,
    Is it possible to use the LSMW for Master Recipe (TCODE c201) data migration? If so, is there a document or a web site which can guide me? Please help

    Hi,
    Unfortunately, i could not found any LSMW for master recipes.
    What I have done past is in LSMW create a screen recording of C201 and use the LSMW structure to do the rest (the mapping, conversions, etc). This work very well. It may take a few recordings to get all the data loaded (one for the operation/phases, one for the material assignment, etc) but it will work.
    Or you can try with BDC For master recipe both in creation and change mode.
    hope you will find this useful !!
    Pradeep

  • Material Assignment in Master recipe

    Hi,
    Is there any FM/BAPI to assign material into a master recipe? Currently, we are using BDC to call C202 transaction for this purpose. This process takes long time for material assignment which leads to performance issue.
    Thanks in advance
    Senthil Kumar A

    In LSMW , object BUS1012 is offered for routing creation and change .
    Unfortunately there is no object for master recipe creation & change and there is no standard batch input, nor BAPI/IDOC, nor   direct input. You should create your own batch input or CATT.
    Here is a possible procedure:
    Please record a Batch-Input with transaction SHDB and try if this work. If not please try with TOFF as described in the notes.
    Read carefully SAP note 142022.

  • Relation with Master Recipe

    How Process order is related with master recipe?

    Hi Debasish,
    Master Recipe is a task list used in the process orders like routing in the production orders.
    In master recipe, we define operations and phases required for manufacturing a finish or semifinish product.T code for creation of master recipe is C201.
    Regards,
    Rajarao.

  • Create classification of a Master Recipe

    Hi Expert,
    I need to create classification of a Master Recipe in C201 transaction. Can any one provide me the FM/ BAPI name which does the same.
    Pls let me know if you want any further details.
    Thanks

    Hi Nabanita,
    Is there any BAPI to upload Master recipe ( C201 transaction ) to SAP.
    Please let me know.
    Thanks,
    Varma

  • BDC for C201 Master Recipe

    Hello,
    While in the process of creating a master Recipe we go through Material Components Assignment Screen.
    In this each Item of the BOM is assigned to a Phase. Once we goto the detailed view of that particular item after assigning it to a phase, we donot see the product flow id while creating BDC Recording.
    The subscreen for this is SAPLCMDE - 4301.
    But while creating master recipe via online transaction the field Product Flow ID appears on the screen.
    What is the solution to get field on the Recording Screen?

    Hi Abhijit,
    I have to upload recipe using t-code C201. I would appreciate if you tell me what method u have used exactly.
    Any hint will be appreciable.
    Thanks in advance
    Ramgopal

  • Creation of Process Order without assigning master recipe

    Hi,
    I want to create a process order without having default master recipe for the given material or default operation for the given order type. I want the user to select the master recipe manually in process order. We do not want to use production version also.
    We can define the default operation for the order type (OPJG) so that we can create a process order. I do not want a default operation in the process order but the user should select a valid master recipe. If we have default operation in the process order, it serves no purpose as it is never used anywhere.
    Is there any way we can achieve this?
    Regards,

    Hi,
    Please find the required details and conditions for creating process orders without master recipe.
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
    Regards
    Kannan

  • Regarding creation of BOM through Master Recipe

    Dear all,
    I am trying to create a BOM but system is giving a message as BOM can be created through Master recipe only
    Please guide me where do we set this and what is to be done to avoid this
    Regards
    venkat

    Hi,
    Refer the answers from thread mentioned below.
    Re: BOM can only be extended via Master Recipe
    Regards,
    Lodhi.S

  • Does master recipe have function for splitting phase?

    does master recipes that create from T-code C201 have funtion for splitting operation/phase? since i can't find the function splitting in master recipe.
    if it has, could anyone explain me?
    thanks
    kanapon

    Dhaval Choksi
    I'm sorry if my question not clear so splitting that i meant is,
    In routing,for example assumes that only one person/machine will be working on a job at a time. If it takes one hour to make one, and the order is for 10, the system will schedule the job at that work center to take 10 hours. However, if in the operation in the routing, you select "Required Splitting", then you put in "number of splits" as 2, then the system will assume you are having two people/machines work on the job at the same time, hence it will only schedule the job to take 5 hours, not 10
    thanks

  • Master recipes operations not getting transfered in SNP PDS to APO from R3

    Hello APO Gurus,
    I am trying to transfer SNP PDS for master receipes from R3 to APO.
    Issue description::
    The operation is not getting transfered correctly , some system default operation "010 generated Operation (from Planned Delive)" is getting generated in APO, also activity and resource capacity is not getting transfered. This situation exist for one plant 1000, for other plant 1100 the SNP PDS created correctly.
    i have following points:
    1. Is there some customizing setting missing on R3 or APO side  for plant 1000 tbefore SNP PDS transfer
    2. What need to be checked on master recipes data in R3,
    i have checked on below points
    1. FG Materials and all the Component Material to be in APO in a Active Integration Model.
    2. BOM & Routing and Production Version setup correctly.
    3. The Routing Operations have to Relevant to 'SCHEDULING'.
    4. Try deleting the existing Integration model for materials & re-create new IM & activate.
    Please help me to send SNP PDS correctly to APO to take heuristic run.
    Regards
    Gajendra
    Edited by: Gajendra_APO on Aug 23, 2011 1:14 PM

    Hi,
    It is good that you have given your already checked points.
    Please check the following things also and try to retransfer the PDS.
    1. Check your resource in ECC, whether you have maintained the Process formula.
    2. Check you have maintained some values in Master Recipe for processing time
    3. Check whether the resource has been transferred for your plant 1000 to APO and an active IM exists.
    4. Also check the type of the resource transferred to APO. It should be a single-mixed/ multi-mixed or bucket resource.
    Hope this will help you to solve the issue.
    Regards,
    Manimaran M.

Maybe you are looking for

  • How to format external drive as NTFS?

    I have a lot of files on my mac, and my external drive is formatted in FAT32. I can't put files larger the 4 GB on there. How can I format the drive as NTFS? All help appreciated!

  • After iphoto update i can't delete pictures

    Yesterday after the new updtae i can't delete pictures and after some time iphoto gives nor respones. can someone help please? sorry for bad english

  • Toshiba 24LV411U TV/DVD combo turns off

    I have a Toshiba 24Lv411u TV/DVD combo. When turn it on the red light turns green for about 10 seconds then it turns itself off again. I unplugged it for a few months...went back to it today and it worked fine for a few hours. Now it's back to the sa

  • I want all the numbers to be bold in AdvancedDataGrid

    I use inline item renders for a data grid for a couple of columns in an AdvancedDataGrid. Theses style the numbers in the cells red if the number is negative However at the last row I have a row which has the total of the above rows and where I want

  • What does a blue screen with B807edoc mean?

    My Photosmart 5550C is giving me a blue screen with a B807ED0C error. Since I can't find what that means anywhere on the web, I'm hoping I can get it answered here?