Schedule order confirm quanity check

Hello ,
We are  facing a problem, that is when we create an order in CRM 2007, we are not able to see confirmed quantity check against the schedule line because of this order is not able to be processed
how can this problem  be solved .
regards .

Hello sir,
In CO06,
for one xxxxx matrial & plant,
Different value in different field is
Receipt qnty. in which i have stock = 24mt (My total stock)
Issue qnty. = 24mt (Means this much stock should reserved against SD document)
Confirm issue = 24mt
If above value in CO06- field that means i have issued 24mt to any document
In detail item screen system should show that from which document it is confirmed but it is not showing
It is only showing in MRP element tab ---> SD totals record --> 24mt
But not showing any document number.
So when we go to create sales order then system not getting confirm quantity
However we can see the available quantity in MMBE,MD04 & CO09. (Also not any open SO/Delivery)

Similar Messages

  • Static Credit Checks - Open orders - Confirmed quantity vs total quantity

    We are using static credit checks. Credit currently only sees open orders with a confirmed quanitity.
    Customer orders 10 items we have 5 in stock. Credit check runs, credit is evaluated basd on the confirmed open quanitity of 5. The order gets a credit block. Credit rep releases the order.
    A few days later the balance of the order arrives in the warehouse. The remaining 5 are confirmed on the order. Since the confirmed quantity has been increased and subsequently the confirmed open value, the order goes back to credit.
    We frequently encounter this situatuion and are looking for ways to reduce the number of credit round trips.
    If we wanted to base the credit check on the total quantity / order value, as opposed to the confirmed quantity / value what do we need to change.
    Insights are appreciated.
    Edited by: tooCann on May 14, 2008 2:30 PM
    Edited by: tooCann on May 14, 2008 2:31 PM

    Hi cann
    As you are going with static credit checks, system will check the order and if it exceeds it will throw an message (error , warning )
    Now again , if you create another sales order , that value will not be taken into consideration , system again will check for the credit limit amount
    For example :
    credit limit - 10000
    sales orders - 1010, 1011
    1010 sales order value - 11000
    1011 sales order value - 10500
    Now when you create a sales order system will check the credit limit 10000. and once you save it and create another sales order (1011), again system will check for the same credit limit 10000.
    The credit limit gets reset  once the order is saved ,in static check
    Now any open quantities are there means and when it gets confirmed then system will check for those open quantity also
    To minimize all these use dynamic credit check
    Regards
    Srinath

  • Checks in userexits of production order confirmations from PDC in CO16N

    Hi,
    we are using PDC interface for production order confirmations. This is done by Idoc type PPCC2PRETTICKET01 (time ticket) based on BAPI BAPI_PRODORDCONF_PDC_UPLOAD_TT. Standard confirmations are working well. In case of SAP detected errors the confirmations are registered for error handling in CO16N.
    So far so good but we have some own check logic implemented in confirmation user exit CONFPP04 and BADI WORKORDER_CONFIRM. These checks are working fine whith online confirmations in CO11N but not in background PDC Idoc processing. I checked the function module EXIT_SAPLCORF_104 for exit CONFPP04 but it has got no exception. The call in SAP processing is like this:
          CALL CUSTOMER-FUNCTION '104'
               EXPORTING
                    CAUFVD_IMP    = I_CAUFVD
                    AFVGD_IMP     = I_AFVGD
                    AFRUD_IMP     = E_AFRUD
               IMPORTING
                    AFRUD_EXP     = LS_AFRUD
               EXCEPTIONS
                    ERROR_MESSAGE = 01
                    OTHERS        = 02.
      CASE SY-SUBRC.
        WHEN 0.
        WHEN 1.
          MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO WITH
                  SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4
                  RAISING CONF_DATA_FALSE.
        WHEN 2.
          MESSAGE E174 RAISING CONF_DATA_FALSE.
    How can I throw the exception when there is no exception defined in the function module interface without modification?
    As 2. option I wonder if it is better to implement the check logic in the BADI WORKORDER_CONFIRM Method AT_SAVE. This has got an exception ERROR_WITH_MESSAGE. But I don't know if this will lead to CO16N registration of the confirmation.
    Any hint how I can solve the problem to apply the online checks in CO11N also to PDC interface confirmations with CO16N in error case?

    Hi Michael,
    First, I think that the BAPI that you are looking for is: BAPI_PRODORDCONF_CREATE_HDR
    Second,
    I don't think that in the framework of such a forum it can be explained in detail how to use BAPIs; nevertheless, here are some highlights:
    A BAPI is an executable piece of code that can be called from either an external program within SAP (Z program), or called from an external system either via RFC, or as a web service (depends on your NetWeaver  release).
    As such, it has input (import) data that you transfer when you call it, and output (export) data that you recieve when it ended processing.
    More detailed information, documentation, and a description of the import/export parameters, as well as error handling, one can find in SAP by calling transaction BAPI.
    Regards,
    Mario

  • Sales Order: confirmation status at item level

    Hi,
    I am trying to locate a status field in sales order tables which truly reflects the item level quantity confirmation. I have checked table VBUP. In some cases field BESTA, COSTA shows the status correctly. But I am not able to find a table which is true in all cases. I can do it by checking confirmed quantity at schedule line level, but trying to avoid that since it involves addition of schedule line confirmed quantities etc.
    Any ideas?
    Thanks
    Anil

    Hi ,
             Check VBUK-GBSTK , and also VBFA for individual status check for sales , delivery and pick up...
    Regards,
    Vind.

  • Sales Order Confirmation when sales order goes for Credit Block

    want Sales Order to be Confirmed , i e Schedule line Confirmation , when sales order goes for Credit Block
    How i can Achieve this?
    Even when set for Sales Document typpe credit check as 'D' and credit group as ;03; ie at Goods Issue still order is not getting confirmed.

    I am not sure, why you want schedule line to be confirmed for credit blocked sales orders. Re-confirm with the client.
    There are controls when defining delivery blocks.
    Goto IMG - Log.Execution-Shipping - Deliveries- Define delivery blocks( check menu path in system, may not be same as shown here).
    Select 01- credit block " untick" from "Confirmation" Column.
    Now test with & see how ti works.
    Regards,
    Reazuddin MD

  • Schedule lines confirmation based on item category(TAN and TANN)

    Hi All,
    We have a problem with the schedule line confirmation in the standard sales order. Suppose if I give the item category as TAN, the schedule lines are confirmed for that line item. If I change the item category from TAN to TANN, then there is no confirmation of the material(No confirmed schedule lines).
    How Item categories influence the schedule lines? Are schedule lines also depend on customer?
    Thanks & Regards,
    Pranil.

    Hi Pranil,
    When you change Item Category then most likely in your case Schedule Line Category is also getting redetermined.
    Schedule Line category is determined by the Combination of Item category and MRP Type of Material.
    Hence please check your Schedule Line category after entering new Item category.
    Open VOV6 and check the Schedule Line Category. In that if Item Rel for Delivery Check Box is Unchecked then it means that
    your schedule line will get unconfirmed.
    Do let me know if this helps.
    Regards,
    Madhukar

  • SUS Purchase Order Confirmation notification (or alert) is possible ?

    Hello,
    We work on a SRM 5 release with a classic scenario.
    We use the EBP-SUS supplier collaboration scenario (clients are different for SRM and SUS).
    The purchasing document flow is describe below:
    1- SRM Shopping Cart
    2- R/3 Purchase Request (then, SRM SC history is updated with the PR number)
    3- R/3 Purchase Order (then, an IDoc is sent to XI which generates a XML document sent to EBP-SUS in order to create the corresponding sales order - SRM SC history is updated with the PO number).
    4- Then, supplier can confirm or reject the PO received. So, the SUS Purchase Order Confirmation is generated and sent back to R/3 ( via XI)
    5- R/3 PO is updated with the posted PO confirmation (you can see the confirmation control key AB in the 'Confirmation' tab of the PO item concerned).
    My request is to send a notification to the requester's mail client in order to inform him that supplier confirmed or rejected the PO.
    I noticed that notification receivers definition is possible in SPRO, but only for "Process Purchase Order Response". I guess this notification is for BUS2209 (SRM POR) and not for BUS2232 (PO confirmation for SUS).
    That's why i cannot use it: can anyone confirm this ?
    As alternative, i tried to use alert management in SPRO (in the SUS client) for BUS2232 with sub-category of event SRM_SUS_PO_CONF in ALRTCATDEF transaction for SRM Alerts, but it does not work (even if i schedule report RSALERTPROC ).
    Does anyone have a suggestion regarding my customizing ?
    Finally, when PO confirmation is posted in R/3 (step 5 seen above), the SRM SC history is not updated with the PO confirmation number: is this the standard way ?
    If yes and that the described notification (alert) customizing i indicated above are not possible, does it seem i will have to develop a specific notification process in R/3 when R/3 PO is updated with its PO confirmation coming from SRM-SUS ?
    Thank you for your help.
    Regards.
    Laurent.

    Hello Nagarajan,
    >
    >  Looks like your intent is to notify the  Shopping Cart requestor about the PO response that happens in the Back end system!
    > This looks strange but then it is really required if you have a common buyer in SRM and MM.
    >(...)
    Requester being the initiator of purchasing document flow, custumer request is to alert him about supplier POR.
    If i send my notification from R/3, i will get Requester name at R/3 PO item. Then, by a RFC call to SRM, i will get his data to generate my e-mail.
    >
    > The following approach can be adopted:
    > 1.Purchase Oder  Response Message can be pulled out of the XI thro a technical routing into the SRM which will post the Purchase Oder response in the SRM ( SRM PO will be updated)..There could be some issues with the variance POR and the status of the POR but that can be handled..
    >(...)
    I cannot do this: PO does not exist in SRM as we are in classic scenario.
    >
    > I am unsure of the Alert Management.. but I heard there should be a way for that also..
    > (...)
    I carry on checking this solution
    >
    > You can raise an OSS Message for the same pls.
    >(...)
    Don't have time for this and SAP will answer that this is consulting and not support
    I will also verify if i can find a BAdI dedicated to SUS Purchase Order Response and use it to generate my e-mail from SUS client (or maybe some enhancements).
    Regards.
    Laurent.

  • Printing sales order confirmation if order changes

    Hi all,
    I have to implement some changes in output control to achieve a particular requirement.
    Business wants sales order confirmations to get re-printed if and only if some changes in the sales order were cought.
    For example if the quanity of  a position changes then, the sales order confirmation must be re-printed.
    I was thinking to use requirement routine for sales order confirmation but in the structure komkbv1 and kompbv1 there are not all the fields i need to understands if in the sales order, any changes have been performed.
    Another way would be the user exit save_document_prepare in which i can use xvbak and yvbak in order to gather info about the changes in the sales order, but i am not sure this is the right way to achieve what business has asked to me.
    Do you have any ideas? Please, any suggestion is welcome!
    Regards,
    Fabrizio

    Hi gurus,
    My idea is:
    -user exit save_document_prepare: check chenges in SO using xvbak, yvbak etc.. If a change occurs i will set a particular parameter using "SET PARAMETER".
    -user exit USEREXIT_KOMKBV1_FILL: i will fill the communication structure with respect of the instruction of "GET PARAMETER"
    - requirement routine for sales order (vofm): checking of the communication structure to understand if sales order confirmation has to be re-processed or not.
    What do you think about this solution?
    Thanks,
    Fabrizio

  • Batch Order Confirmation

    New to SAP through attrition and have found a wealth of help here! 
    My current situation is a customer is requesting a single emailed PDF containing all Order Confirmations for each respective day.  Is it possible to do this and where would I start?
    Thanks

    Hello Irish,
    There's a standard order confirmation that can be send thru email (external send) for sales order, however this is per sales order basis.
    If you want to have the list of sales order or batch of sales order to be in one order confirmation then you have to ask ABAP to do a customized report / program. You can refer to VA05 screen to get / retrieve the list of sales order per customer per day, then generate an order confirmation for those sales order and send it as external send.
    To start, you need to have a new Z*** output type for order confirmation. Example from RD00 to ZRD0, the Z will state that this is a customized or specific output type as business requirement. Creation is via SPRO>SD>basic>output controls>sales documents (not sure of the exact path as I do not have connection to SAP today) or see tcode V/32. Aside from this, there's a configuration for other procedures, look for it inside SPRO.
    1. Create Z*** output type.
    2. Request ABAP to create a Z****** program (this is a print program where ABAP put the logic) and Z***** sapscript (where alignment, forms, fonts, actual illustration of the layout like fonts, size of fonts, specific alignments or columns)
    3. Create a program where in the system will call the list of sales order per day per customer. This program will then be called by a scheduled job (via SM37, ask your Basis team to do this for you) at the end of each business hours. The system will send the output via email to the customer by calling the customer email address specified in the customer master data email field.
    Hope this helps. Most important, you ask your ABAP if this is feasible so they can check the complexity of your requirement.
    Thank you and regards,
    Ria

  • Loss % in process order confirmation

    Dear all,
    During process order confirmation,loss should not to take above 10%.
    It should be within 10%.
    Kindly let me know hat customization to be done for this scenario
    Regards
    Rajasekaran

    Hi,
    In the confirmation parameters in OPK4 in the checks option in the under delivery maintain error when quantity falls below under delivery tolerance and in the material master in work scheduling view in tolerance data maintain under Underdely tol as percentage and check...
    Thanks
    Kumar

  • Shift wise process order confirmation

    Hi Guru's
    My client is asking about shift wise confirmation of process order.
    wht r the step will I follow to maintian the desire requirement.
    Please explain with example upto order confirmation, wht r the field to be check & wht should be the input I give the field.
    If any body sent me the doc related to the problem
    I'll be thankful to him.
    My ID:- [email protected]
    Parminder

    Parminder,
    Basically your shift definition is for capacity planning/scheduling in the desired way
    Create a process order ,Hope you would have also maintained your recipe with timings
    "<b>wheer the impact will be come of this configuration.either Process order creation or order confirmation</b> "
    The proces order will be scheduled(<b>at the time of order creation</b>) as per the timings mentioned in the recipe & the shift definition in the resource
    Then you do phase wise confirmation-Time ticket/Time event
    As per your reply what i understand is that in 3 shifts your process order will get over
    So your shift supervisor will confirm accordingly
    Hope this is useful
    Revert back if you have any further queries
    Reward points if useful
    Regards,
    SVP
    Message was edited by:
            SVP

  • Order confirmation output is triggering twice

    Hi Gurus,
    I am facing the issue with order confirmation.After saving the sales order system has giving two outputs for order. I have checked the ExtrasOutputItem the output type for order confirmation has displayed two times.I have checked NACE settings for the output type there it has not checked for Multiple messages.But still I am facing this issue.Please let me know how to rectify this error.
    Regards,
    Hari Challa.

    Hi ,
    Check how output is triggered manual or by scheduled job. Alos check settings in output determination procedure and check if any requirement is set.
    Order confirmation can trigger when ever you make any changes in sales order and save so that the customer can get latest order confirmation.
    Trust these inputs can help.
    vivek

  • Goods Issue- Process Order Confirmation

    Hi,
    During Process order confirmation, in Goods Movement tab the BOM components with qty are displayed. But some components OTHER than BOM items ISSUED for the process order is not displayed in the goods movement tab. Why?
    Is there any additional configuation to be done?
    Thanks....
    JK
    Edited by: J K on Apr 15, 2008 6:04 AM

    Hi
    As said by Mr sateesh,
    If u r doing confirmation phase/operation wise(COR6), then the material assign to phase/operation is only seen according to phase/operation wise.so have to check in which phase u have confirm the component quanity.
                    or
    If u confirm the process order collectively(CORK), then their must missing in OPK4 (confirmation Parameter) of All component tick at Goods Movement.
    Kindly check the same & coem back if their is any other issue
    Parminder

  • Action Profiles for Order Confirmation

    Hello,
      I need to set up basic action Profile for sending emails upon order confirmation. So I set up 2 actions inside an action profile
    1. One action to send  an email  based on partner function Sold to Party
    2. Another action to send email based on partner function Bill -to Party
    When I go to the order, I can see only the Action for Sold to Party but not the other action. I need both these actions to execute one after another/or simultaneously
    Both these actions do not have a start condition.
    Both these partner functions is different
    *Email address have been maintained.
    I tried changing the sort also to see if it would make a difference, It is just not picking up the second one action.
    Can anyone help me out!!!
    Thanks,
    Karthik

    Hi Karthik,
    U have to check u r Action setting for u r action defination tick the below check boxes:
    Schedule automatically
    Changeble in Dialoug
    Executable in Dialog
    Also tick on Partner Dependent check box
    Note : Check u r schedule condition for action condition b'cos without schedule condition fullfilled u r action condition will be appeared.
    Hope it'll help u.
    Regards,
    Dipesh.

  • GATP : Loosing order confirmation

    Hi,
    I am facing a problem where I loose order confirmation for a line item with multiple schedule lines if I change one of the confirmed lines within the frozen period.
    I understand GATP checks at item level. Then how to stop GATP not to check other schedule lines and check only the schedule line whose date is changed?
    thanks in advance,
    shan

    Hi SHAN,
    The Product Availability Checking Concept in APO is similar to that of R3.
    Only that the GLOBAL AVAILABILITY CHECK in APO includes additional features as Product Allocation, Product Availability, Check against forecast, Rules Based ATP, Multi ATP etc.
    Now when do we get multiple schedule lines:
    On the Requested Delivery Date, if there is no stock available for a material
    the confirmation falls on those dates on which there is stock expected.
    EXAMPLE:
    <b>MDO4 Screen:</b>
    Material: xxxx, Plant: yyy
    May 21, 2007: Stock: 0
    May 23, 2007: PurchaseOrder - 10
    May 24, 2007: Production Order: 10
    Now when you place a sales order with a requested delivery date of May21, 2007 for 20 quantity. ( Say the Transit time =0 and there are no other sales orders placed for this material/plant)
    You will see the following schedule lines
    May 21, 2007: Confirmed Qty = 0
    May 23,2007: Confirmed Qty=10
    <b>May 24,2007: Confirmed Qty=10</b>
    However say you had all the stock on May 23, 2007, you would have got only 2 schedule lines as follows
    May 21, 2007: Confirmed Qty = 0
    May 23,2007: Confirmed Qty=20
    Lets think why this happens: The availability check is done against the SCOPE OF CHECK( Business Event-A and Availability Checking Group =xx on the material master) at the line item so that it checks all the incoming and outgoing receipts and requirements for the material in that plant and then arrives at the MATERIAL AVAILABILITY DATE which is determined according to the Stock Availability
    The first schedule line is the date which you have requested the 20 quantity and the system gives you a confirmed qty for 0 on the date which you requested.
    Now the other schedule lines are the confirmed dates which the system has proposed based on availability check.
    Now coming to your question: When I change the date on one of the schedule lines
    Say in this example: the third line which is bold
    So in a way you are changing the DELIVERY DATE,
    When you change the delivery date, availability check happens again at the line item and new schedule lines are determined.
    The answer to your question- " Then how to stop GATP not to check other schedule lines and check only the schedule line whose date is changed?" is a BIG NO as it is against the AVAILABILITY CHECK Concept both in R3 as well as APO.
    However I would not totally decline as there is nothing which we cannot do in SAP. With customizing(ABAP CODING) anything is possible. It would not be very easy and would you be willing to spend so much time.
    If you have any other questions, please feel free to ask me.
    Regards
    Kumar Ayyagari