Scheduling Agreement Item/Header Text

Gurus,
Where can I extract the item and header text of a particular scheduling agreement found in t-code: ME32L ?
Thanks

Texts for Scheduling agreements are stored in tables STXH and STXL with
TDOBJECT = EKKO
TDNAME = the Scheduling Agreement number (+item in case of text item)
You need to use function module READ_TEXT to retrieve the texts

Similar Messages

  • Scheduling Agreement Item not reflected as commitment item in CO

    HI SAP MM Gurus,
    Good day!
    Here is my scenario:
    We need to create scheduling agreements with Account Assignment F which needs to have the commitment items reflected upon creation of the delivery schedule. This works ok if I create the documents (Scheduling Agreement and Delivery Schedule) manually, with the field EKPO-XOBLR being set to X to have the items pass through to CO
    The problem is, due to the volume of documents processed, we need to create an upload program using the function module BAPI_SAG_CREATE. Upon observation, this does not update the commitments for the shceduling agreement items even though both the scheduling agreement and delivery schedule were created.
    Any thoughts on how I can resolve this?
    Kind regards,
    DeLo

    Are u sure the transaction code is ME33L, contracts use ME33K
    Now this is tricky.
    One way of finding the condition table used is (working backwards)...
    go to table KONH
    in the field VAKEY enter your contract<i>(10 chars as in EKKO/EKPO w/ leading zeroes or trailing spaces)</i> and contract line<i>(5 chars w/ leading zeroes).</i>
    look at KVEWE (A in my case) and KOTABNR (16 in my case) used now join the two (A<b>0</b>16 add the zero in between) now this is the condition table.
    working forward.
    if the condition table is A016
    <b>Get A016-KNUMH from A016</b>
    <b>A016-KAPPL = 'M'
    A016-KSCHL = 'PB00' (condition you are looking for)
    A016-EVRTN = <u>Your Contract Number</u>
    A016-EVRTP = <u>Your Contract Line Number</u></b>
    Select DATAB <i>(Validity Start Date)</i>, DATBI <i>(Validity End Date)</i> from KONH
    where KNUMH EQ A016-KNUMH
    Cheers!
    Rishi

  • Confirmation Control key not allowed in MM Scheduling Agreement item.

    Hi Experts ,
      I am facing an issue with Confirmation control key in MM Scheduling Agreement.
    Scheduling agreement already GRd without Conf-key and Now if am going to update confirmation control key as 0001.
    I am getting an error "Confrmation Control key is not allowed".How can I solve this problem.Anyway i have to update the conf-key.
    If you are answering me that will be very much apreciatable.
    Looking forward for your answers.
    Thanks,
    Bala

    Hi Bala ,
    We can directly update the database table field , but this is not recommended.
    Can you re-do the GR i.e Cancle the existing and again do GR with confirmation control key.

  • LSMW - Direct Input - Sales order - Header Text

    Hello,
    I upload scheduling agreement with header text.  Upload is successful and I have seen the text from both front end and table STXH.  However, this field is set mandatory, and even it is uploaded, it is still shown on incompletion log.  Only when I manually make some change it passes the incompletion check.
    Here is what i have done In LSMW::
    BTEXHKOM                       Communication fields for maintaining text header
        Fields
            OLDNR                        Document and item number of the data in the external system
                                Source:  ZHEADER-OLDNR (QAD SO no.)
                                Rule :   Transfer (MOVE)
                                Code:    BTEXHKOM-OLDNR = ZHEADER-OLDNR.
    Caution: Source field is longer than target field
            LAISO                        Language according to ISO 639
                                Code:    BTEXHKOM-LAISO = 'EN'.
            TDID                         Text ID
                                Rule :   Constant
                                Code:    BTEXHKOM-TDID = 'ZTTR'.
           BTEXLKOM                       Communication fields for maintaining text lines
               Fields
                   OLDNR                        Document and item number of the data in the external system
                                       Source:  ZHEADER-OLDNR (QAD SO no.)
                                       Rule :   Transfer (MOVE)
                                       Code:    BTEXLKOM-OLDNR = ZHEADER-OLDNR.
    Caution: Source field is longer than target field
                   TXPARGRAPH                   Tag column
                                       Code:    BTEXLKOM-TXPARGRAPH = '/'.
                   TXLINE                       Text editor text line
                                       Source:  ZHEADER-ZTEXT1 (Title of transfer)
                                       Rule :   Transfer (MOVE)
                                       Code:    BTEXLKOM-TXLINE = ZHEADER-ZTEXT1.
    I put them under same structure ZHEADER together with other header fields in SA. Is there anything missing?
    Thanks in advance.
    Susan

    Hi all,
    Many thanks for the suggestions.  One of our expert developers got involved and provided the solution.
    In order to have item level text populate, the VBAP-PSTYV  (the sales document item category) field also needs to be populated.  The VBAP-PSTYV field value is dependent on the sales document type.  (Or, at least it is for the configuartion set up in my example)  The sales document type is VBAK-AUART.
    Stuart

  • Header conditions for scheduling agreement

    Dear Expert
    I am facing one problem we are creating Scheduling Agreement in the scheduling agreement at header level i m not able to find any condition , where as item level my pricing procedure is working fine but when i select at header level i got this message
    Not possible to determine a condition type .I am using the same prcing procedure which i m using for PO where it is working fine .
    Regards

    Dear Expert
    Please help me in this regard

  • What is the procedure for scheduling agreements, for manual entry

    dear sirs,
    pls explain the procedure for scheduling agreements(manual)  creating and invoicing.

    From the Purchasing menu, choose Outline agreement ® Scheduling agreement ® Create.
    The initial screen appears.
    Enter the necessary data. Any data you enter under Default Data: Item will appear as default data in each item.
    In the Agreement type field you specify whether you are creating a scheduling agreement with or without release documentation, for example. The agreement types LPA (with release documentation) and LP (without release documentation) are defined in the standard system.
    Press ENTER.
    The header data screen appears.
    Enter the duration of the scheduling agreement. Check the other fields on this screen. Make any necessary changes (e.g. the terms of payment) and define the header conditions (see Maintaining Conditions).
    Press ENTER.
    The item overview screen appears.
    Enter the necessary data for each item (material number, target quantity, price, receiving plant, account assignment etc.).
    Material without material master record: leave the field for the material number empty and enter the following:
    – A short description of the relevant material or service in the Short text field
    – The material group to which the material belongs
    – The account assignment category (column A)
    – The target quantity and the order unit
    If you specify an account assignment category, you must enter the relevant account assignment data for each item of the scheduling agreement. To do so, choose Item ® Account assignments.
    (See also Account Assignment.)
    If necessary, review the details for each item. Select the item(s) to review. Then choose Item ® Details to call up the item detail screen.
    Enter the desired conditions for the item (discounts, surcharges etc.). To do so, select the item and choose Item ® Conditions.
    Enter further text for the item if any additional instructions to the vendor or to Goods Receiving are necessary. Choose Item ® Texts ® Text overview.
    Save the scheduling agreement.
    Fi you want to use firm zone then
    On the scheduling agreement item overview screen, select the item for which you wish to define delivery schedule time zones.
    Choose Item ® More functions ® Additional data.
    In the Firm zone field, enter a number of days (calculated from the current date) defining the period after whose expiration the firm zone ends and the trade-off zone begins.
    In the Trade-off zone field, enter the number of days (calculated from the current date) defining the period after whose expiration the trade-off zone ends and the planning zone begins.
    If the firm zone is to cover one month, enter the value 30 (days) in the Firm zone field. If the trade-off zone ends one month after the firm zone, enter the value 60 in the Trade-off zone field.
    In the Binding for Materials Planning field, specify whether Materials Planning may change schedule lines that fall within the firm or trade-off zones.
    Save your data.
    Delivery schadule
    Choose Outline agreement ® Scheduling agreement ® Delivery schedule ® Maintain.
    The initial screen for the creation of delivery schedules under scheduling agreements appears.
    Enter the document number of the scheduling agreement and press ENTER.
    The item overview screen for the scheduling agreement appears.
    Select the item you wish to schedule. Then choose Item ® Delivery schedule.
    Enter the following for each schedule line:
    - Date category (Month, Week, or Day) and the corresponding date
    - Delivery time-spot (if applicable)
    - Quantity to be delivered (the unit of measure is the same as in the scheduling agreement)
    Referencing a purchase requisition: Choose Sch. agmt. schedule ® Create w. reference ® To purchase req. to adopt the delivery data from an existing requisition.
    Save the delivery schedule.
    Invoice is same like PO

  • How are deliveries automatically created from scheduling agreement?

    How are deliveries automatically created from the schedule line of the scheduling agreement? Can anybody explain this step by step? Can we use the code VL10BATCH for this purpose? If we can, how is this code used?
    Thanks in advance.

    hi
    A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity.
    The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
    Document Types
    To configure document types for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Header -> Define sales document types in Customizing for Sales and Distribution.
    The R/3 System contains the following document types for component suppliers:
    LZ - Scheduling agreement with delivery schedules (no external agents)
    LZM - Scheduling agreement with delivery orders
    LK - Scheduling agreement with delivery schedules (external agents)
    ED - Delivery by external agent (consignment issue)
    EDKO - External agent correction
    RZ - Scheduling agreement returns (no external agents)
    KAZU - Consignment pick-up for external agents
    KRZU - Consignment returns for external agents
    Item Categories
    To configure item categories for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Item -> Define item categories in Customizing for Sales and Distribution.
    The system determines the following item categories for the related document types in
    documents containing materials with item category group NORM:
    Item category LZN for scheduling agreement type LZ
    Item category LZMA for scheduling agreement type LZM
    Item category LKN for scheduling agreement type LK
    Item category KEN for document type ED
    Item category EDK for positive corrections (or the manual alternative EDK1 for
    negative corrections) for document type EDKO
    Item category REN for document type RZ
    Item category KAN for document type KAZU
    Item category KRN for document type KRZU
    Schedule Line Categories
    To configure schedule line categories for scheduling agreements, choose Sales -> Sales Documents -> Schedule lines -> Define or Assign schedule line categories in Customizing for Sales and Distribution.
    The R/3 System contains the following schedule line categories for component suppliers:
    L1, BN, L2, and CN for item category LZN
    E4, E0, E5, and BN for item category LKN
    L2 for item category LZMA (standard for delivery order processing)
    Schedule Line Types
    To configure schedule line types for scheduling agreements, choose Sales -> Sales Documents -> Scheduling Agreements with Delivery Schedules -> Define schedule line types in Customizing for Sales and Distribution.
    Creating Scheduling Agreements
    To create a scheduling agreement with delivery schedules:
    1. In the Sales menu http://Ext. choose Scheduling agreement ->Create.
    2. Enter scheduling agreement type LK (standard) or LZ (external agents) and the
    relevantorganizational data.
    3. Choose ENTER.
    4. Enter the following data:
    Sold-to or ship-to party number
    Purchase order or closing number
    Material or customer material number
    You can use the Description field to identify the scheduling agreement. For
    example,
    you could enter the model year for a particular production series.
    The system allows up to 35 digits for a customer material number.
    Rounding quantity
    Usage
    Choose Goto -> Header -> Sales to enter the usage at header level, or Goto ->
    Item-> Sales A to enter it at item level. The system proposes usage S, for series, as default in both cases.
    Planning indicator
    Choose Goto -> Header ->Sales.
    Target quantity
    Mark an item and choose Goto -> Item -> Sales A
    Partners
    For scheduling agreements with external agents , choose Goto -> Header
    ->Partners to enter the external agent as forwarding agent and special stock partner
    on the partner function screen.
    5. Create a delivery schedule
    Mark an item in the scheduling agreement and choose Goto -> Item -> <Delivery
    schedule>. Enter:
    A delivery schedule number and date
    The cumulative quantity received by the customer
    The last delivery confirmed by the customer
    A schedule line with date, time, and quantity
    To enter additional data in the delivery schedule, choose DlvSch.Hdr (delivery schedule header).
    configuration:
    img->SD->Sales->sales document->scheduling agreements with delivery schedules->
    step1: define schedule line types
    schedule line types are not schedule line categories. Schedule line types are used for information purpose only.
    stds are 1. fixed date 2. backlog 3. immediate requirement
    4. estimate
    step2: maintain planning delivery sched. instruct/splitting rules
    The planning delivery schedule is an internal delivery schedule used to plan requirement s more efficiently.  It is sub divided into 3 parts
    2.1 delivery schedule splitting rules
    2.2 dly schedule instrusctions
    2.3 assign dly schedule splitting rules
    step3: define sales documents type
    step4 : define item categories
    step5: define schedule line categories
    step6: maintain copy control
    PROCESS
    step1:  create scheduling agreement
    VA31
    enter SP,SH valid from, valid to,
    goto ITEM OVERVIEW tab
    enter material, rouding qty
    select ITEM  click on FORECAST DLSCH
    enter different dly dates and qties
    save it.
    step2: create sales order with reference to above
    step3: create delivery
    step4: create billing
    regards
    krishna

  • How to get GR posting date for schedule line of scheduling agreement?

    I had hard time to tie the GR date to schedule lines. I need this information to generate vendor performance report. However, the GR date is tied to scheduling agreement item level only. One item line can have multiple schedule lines. Is there a way to link the GR date to actual schedule line? Thanks in advance!

    Hi,
    There will be icon called PO history in the over view screen of SA.Select the item and press it.May be this will be some what useful to you.
    Regards,

  • Scheduling Agreement Schedule Lines firmed after outbound delivery

    Dear All,
    We use scheduling agreement for cross-company process in our client.  After MRP run schedule lines created automatically. For the next step outbound delivery is created via VL10F (or VL10B).
    After outbound delivery creation, on MD04 or ME39, i see the schedule line firmed (*). Because firmig MRP doesn't change those schedule lines. This is a problem for our client.
    Do you know a way for MRP can change the schedule lines even outbound delivery created ? How can i manage this situation ?
    Best regards,

    Hi Anil
    The '*' that you see means that the schedule line has been changed manually and the Firming indicator (EKET-FIXKZ) is set when there is any change to the Schedule line.
    So, when a Delivery is created, the schedule line should be 'Fixed'.
    Otheriwse, MRP can delete or change this schedule line and it would cause an inconsistency in the system. This is the logically intended behaviour.
    Please see the F1 help for the field EKET-FIXKZ:
    "Schedule Line is "Fixed"
    Fixes the schedule line and determines that it cannot now be automatically changed as a result of materials planning and control/MRP activities.
    Procedure
    The indicator is set automatically if:
    .- You make manual changes to a line of a scheduling agreement delivery schedule that was created via the materials planning process
    .- You create a schedule line manually
    Dependencies
    You can specify whether Materials Planning/MRP can change delivery schedule lines within the firm and trade-off zones in the additional data for the scheduling agreement item."
    I hope this helps.
    Anna

  • How to set delivery complete in scheduling agreement automatically

    Hi. I would like to request for help on how to flag delivery complete in an scheduling agreement?
    When creating a goods receipt against a scheduling agreement, do we need a user-exit  or how is it configured in order to check the quantity receivedthe quantity in the goods receipt and compare it with the quantity in the scheduling agreement (/- de tolerance) and, in case the full ordered quantity has been received, set the flag Delivery completed in the scheduling agreement.
    Thanks.

    Hi,
    We regret that the functionality  setting of "delivery completed"       
    indicator automatically for a scheduling agreement is not included in   
    the SAP standard system.                                                
    For scheduling agreements, you must maintain the final delivery              
    indicator only in the scheduling agreement item.                             
    A maintenance from the goods receipt is useless for scheduling               
    agreements since the current schedule line situation is generally not        
    final. Even if all schedule lines are supplied, this does not mean that      
    no new schedule line might be added. Therefore, for scheduling               
    agreements,maintenance of final delivery indicator is planned only from      
    the document item.                                                                               
    Regards,
    Edit

  • Scheduling Agreement with LPA

    Hi,
    I am trying to generate schedule lines and release them to delivery schedules with doc type LPA.
    I have done the settings in MRP2 view and done the settings in source list, info record and scheduling agreement.
    I have created and Plnd Independent requirements in MD61 and executed the planning run in MD02 but unable to create schedule lines.
    Could you please advise me if i am missing any settings or config's.
    I wan to know how the zones work with LPA and how the whole cycle and the functions available with LPA.
    Responses will be highly appreciated.
    Regards,
    Mittu G

    hi
    These are the Prerequisites befor you go on to SA with release
    Scheduling agreement releases (FRC and JIT schedules) can only be generated for scheduling agreements with release documentation (in the standard system, document type LPA).
    (In the standard system, the Release docu. indicator is selected for document type LPA in Customizing for Purchasing under
    Scheduling Agreement -> Define Document Types.)·
    If you wish to work with JIT delivery schedules, the JIT schedule indicator must be set in the material master record (Purchasing or MRP 2 view) and the Additional data of the scheduling agreement item.
    You create SA releases by means of the Purchasing menu via
    Scheduling agreement -> Create release
    Choose release type ->FRC and JIT delivery schedulesSelect scheduling agreements - Specification of plant
    Scope of selection- Changed or next date
    Creation- According to strategy in profile, Tolerance check active
    On the days on which the next FRC date (1st. Monday in the month) or the next JIT date (Monday each week) is reached, scheduling agreements with the above profile settings are selected and SA releases (delivery schedules to be issued to the vendor) created (because the next creation date has been reached).
    Reward points if useful
    Thanks & Regards
    Kishore

  • BAPI to create Scheduling Agreement of VA31

    Dear gurus,
    I need to find the BAPI or Function Module to create Scheduling Agreement of VA31 from the uploaded data. I know that I can use BAPI_SALESORDER_CREATEFROMDAT2 to create the sales order of VA01. Can I use the same bapi to create the scheduling agreement of VA31? Both of the screens seems to look quite the same but their order types are different. Any suggestion on this?
    Thank you for your help. Have a nice day.
    Best Regards,
    Hedy

    Hi,
    FM
    BAPI_CUSTSCHEDULAGREE_CONFDELV
    Functionality
    You can use this method to make a delivery confirmation in the SD scheduling agreement
    Example
    1. Generating delivery for a scheduling agreement item.
    2. Changing a delivery item.
    3. Posting of goods issue for delivery.
    4. Deleting a delivery item or a delivery.
    Regards,
    Venkatesh

  • Perform Post Goods Receipt Against Scheduling Agreement

    Dear all,
    I've weird problem here. This is concering GR against Scheduling Agreement. I've a "LPA" type Scheduling Agreement and all the delivery schedule maintained and schedule line released successfully in ME38.
    When I do GR via MIGO by entering the Scheduling Agreement #, a prompt was given with no items selected. Note: My schedule line delivery date = GR posting date.
    What I did was, inside MIGO I go to Settings | Default Values and check on "Propose All Items". Finally, the affected line item appears but with "blank" quantity. So, I key in the actual quantity per the released schedule line and complete the GR posting successfully.
    Question 1: Why do I need to perform the MIGO propose all items setting? Normal PGR against PO doesn't require this.
    Question 2: Is this a standard SAP behavior or I'm doing PGR - scheduling agreement process the wrong way?
    Appreciate any expert clarification.
    Thanks in advance.
    Steven

    Hi Jurgen,
    I've read Notes 493404 and I'm facing Question 10
    10. Question:
    For the goods receipt for the scheduling agreement the system displays error M7 064: "Document xx does not contain any selectable items".
    Answer:
    A possible reason is that the document is subject to a release strategy and has yet to be released. You can check this using transaction ME33 and release it subsequently if necessary.
    Another reason can be that although a confirmation control key that contains a confirmation category with GR assignment has been maintained for the scheduling agreement item, this category has yet to be confirmed. You can check this using transactions ME33 and OMGZ. If necessary, create the relevant confirmation.
    Another reason may be that no undelivered schedule line exists up to the posting date. If nevertheless you want to post the GR, you can use transaction ME38 to bring the next schedule line date forward, or in transaction MB01 you can select the "Suggest Zero Lines" field or in transaction MIGO the "Propose All Items" field under Settings - Default values.
    From the snapshot of the notes 493404 above:
    1. I don't have a release strategy for the scheduling agreement. Have checked via ME33L
    2. I didn't implement any confirmation control in the scheduling agreement. Have checked via ME33L
    3. I've a delivery schedule line up to the posting date. In my scenario, schedule line date = GR posting date
    Therefore, I'm still truly puzzle with the system behavior. Any further help will be most appreciated.
    Thanks.
    Steven

  • Scales definition in Scheduling agreement

    Hi,
    In a scheduling agreement, you can maintain condition with scales.
    When you do so, at goods receipt time, the system does not look at how many you just received to define the scale to use but look at the target quantity on your scheduling agreement item and choose the scale appropriate for that qty.
    Does anyone already had a requirement to calculate the quantity received since the beginning of the scheduling agreement and define the appropriate scale according to that ?
    Thanks in advance.

    Sorry for the double message.  In is a mistake on my side.  It is my first time on this forum...

  • Correct usage of Scheduling Agreements?

    Hi Experts!
    One of my groups is using scheduling agreements, however I do not think they are using it the way SAP had intended. 
    Example:  They use Scheduling agreements, similar to a blanket order.  However, the blanket order quantity is fluid and the order can remain open even when the initial quantity has been fulfilled.  These Scheduling Agreements will contain many items, sometimes around 30-40 line items.
    The staff basically conducts two activities for these customers:  enter new scheduling agreements with updated validity dates and expedite releases with a less than two week time frame.  These expedites are communicated by the customer via email. 
    The customers submit a 16 week forecast via EDI as well as a firm 2 week JIT.  Most scheduling agreement activity occurs systematically, although there are daily expedites for each customer for a few parts.
    Initially, when entering a scheduling agreement, the staff does not indicate the JIT schedule.  However, they do enter into the Forecast delivery schedule, basically just to activate and allow communication from customer.
    My concern is should scheduling agreements contain that many items?
    Also, the staff makes many changes in the scheduling agreements and when it reaches the time when the period for the scheduling agreement, what ever material they did not get to ship, they ship it to the customer in one bulk.  Are you suppose to do that with scheduling agreements?
    In addition, sometimes the staff allocates some of the materials promised to the customer on the scheduling agreements to another customer, then just re-allocates it back at a later time...should this be done or is it bad business practice?
    What are good business practices for usage of Scheduling Agreements?  Any information will be greatly appreciated.  Thank you for your time in advance!
    WC

    My concern is should scheduling agreements contain that many items?
    Also, the staff makes many changes in the scheduling agreements and when it reaches the time when the period for the scheduling agreement, what ever material they did not get to ship, they ship it to the customer in one bulk. Are you suppose to do that with scheduling agreements?
    <b>you should not do that the reason is SA is use full for the JIT and promise to deliver things</b>
    In addition, sometimes the staff allocates some of the materials promised to the customer on the scheduling agreements to another customer, then just re-allocates it back at a later time...should this be done or is it bad business practice?
    <b>It's depent on the company bussiness policy - not rgiht process but if bussiness want to do then what else you can do?</b>
    What are good business practices for usage of Scheduling Agreements? Any information will be greatly appreciated. Thank you for your time in advance!
    <b>A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity. The following graphic shows the document flow for scheduling agreements.
    The same functions are at your disposal for processing scheduling agreements as there are for the sales order, including pricing and availability checks.
    In addition to the standard scheduling agreements you can also manage scheduling agreements for the component supplier industry, with their special features that include:
    Working with scheduling agreements with EDI output
    Entering scheduling agreements in a forecast or just-in-time (JIT) delivery schedule
    Using different types of cumulative quantities
    Taking into account the automatic fiscal year change used by the component supplier
    Managing engineering change statuses
    Storing packing proposals
    Creating correction deliveries for the scheduling agreement
    Working with external service agents</b>

Maybe you are looking for

  • Iphone 5 and 5s visual voicemail and call forwarding problems in UK

    Hi I am in the UK on a monthly pay 4G package with O2 with my iphone 5S. Every two or three days, visual voicemail switches off saying there is an error with visual voicemail. When this happens, voicemails are left for me, but the caller does not hea

  • Doubts in file2rfc scenario

    i am using file2rfc scenario with request and response..usingBPM. i want to create 3 communication channels, shall i use 3 business system/services for these.. or 2 business services and 1 busines ssystem. any maximum limit for using bus sys/services

  • Displaying database text to java components

    hello everyone! i d like to ask how i can display database elements in java components. For instance, i have a textarea and i d like to take the text from the database and display it in the textarea.. In addition, i d like to submit a form and the te

  • Language convertion in form

    Hi, How to convert the data picked from table into different language in form. for ex: name, street, land , region

  • Processing power for !Format Event

    I'm planning to do some slightly complex string manipulation to an Adobe Output Designer template field using the !Format event, like such: @(If ((@(Length ("@_$_.")==9))&&@(Substr ("@_$_.", 1, 1)=="A"),"@(Substr ("@_$_.", 1, 1))****@(Substr ("@_$_."