Scheduling time not coming as required

Hello All
I have an FG whose routing contains two operations, whose time are as under:
Optn       Base Qty       Processing time
0010       1EA               20 MIN
0020       1EA               15 MIN
As per my calculation the sys shall wind up the order of 2EA in 55MIN, but when am making an order of 2EA sys schedule it for 70MIN. System gives the operatino start time of 0020 operation after 40MIN have elapsed whereas this operation shall start only after 20MIN.
Looking forward to your valuable inputs to resolve the issue.
Regards,
J K Tharwani

Hi,
For this you need maintain overlapping in operation details of routing,
first goto operation details of operation 0010 - Maintain overlapping, i.e, select required overlapping, minimum overlapping time: 20 min, Minimum send ahead quantity as 1 EA.
if you do like this then system will schedule like this
0010, 1EA, 20 MIN HERE You Have 2 No's. After producing first component it will be sent to 0020 operation immediatley.
0020, 1EA, 15 MIN.
So first product after completing 0010 operatioon in 20 Min it will comes to operation 0020 and completes in 15 Min, so total time for first product is 35 Min.
Next Second productwill comes to operation 0010 immideatley after completing first product operation 0010 and again second product will comes to operration 0020 immediatley after completing first product operation 0020.
eg: at 10 AM we start.
Operation 0010 Product 1 Start Time : 10:00  AM  End Time :10.20 AM
Operation 0020 Product 1 Start Time : 10:20 AM  End time:10:35 AM
Operation 0010 Product 2 Start Time : 10:20  AM  End Time :10.40 AM
Operation 0020 Product 2 Start Time : 10:40 AM  End time:10:55 AM
In this way system schedules.
Regards
Jagadeesh K

Similar Messages

  • Cisco LMS 4.0 Graph some time not coming

    I have installed cisco lms 4.0.
    I have added 10 devices, previously it was working fine, Since last few days some time syslog and graph are not coming. after every reboot on server it started working. It is happening on daily.plz help me out with permanent solution
    and also i have added manualy one device 7609-s router but not able to see cisco view
    Error:-
    Cannot find applicable device package for 10.133.224.131.
    This error could be due to one of the following:
    - The device package for this device type is not installed.
    - Device support for this device type is not available.
    - You are trying to open a component inside a device.
    To correct the problem, either install a device package for the device type, or open the parent device to manage the component.
    In device attribute it is showing 868 integrated router, I had try to delete and add again but problem is still same...
    Windows 2008 r2 standard
    RAM-16 Gb, Swap memory 8096

    Evrything looks good. Are you able to access LMS in the server itself? Try to install another browser on your server and try to login.
    Try both :
    http://x.x.x.x:1741
    https://x.x.x.x:443
    Share NMSROOT/MDC/tomcat/logs/stdout.log and stderr.log.
    -Thanks

  • GR Processing Time and Delivery Time not coming in CS11 Output screen

    Hi,
    I am executing a BOM explosion report using CS11.
    In the CS11 report output I added columns for GR Time and Delivery Time using change layout option.
    After changing layout when I see the details in columns of GR Time and Delivery Time all the values are ZERO '0' for all the components in BOM.
    I checked the material master for component items and find that in MRP view values are maintained in GR Time and Planned Delivery Time field which are also seen in MARC table.
    I do not know from where CS11 is fetching the values for display of GR Time and Del. Time.
    How can we populate the values in CS11 report out put for GR Time and Delivery Time? Am I missing some master data maintenance apart from Material Master?
    Regards...

    Hi Prasobh,
    I looked at the note 101262 and it seems that it is suggesting us to create a new Z report by copying existing report and then modify the WRITE Bloack in new report to display GR Time and Del. Time.
    Is my understanding correct? If yes can you share with me the steps in some more details then mentioned in note 101262 that I need to follow for addressing this requirement.
    If no can you suggest any solution that you know by which it is possible to include GR Time and Del. Time in CS11 output without Z development.
    Regards,

  • Date format in CSV file not coming as required

    Hi,
    I have a problem in date format after it is downloaded as a CSV file. In CSV file it is coming as 2/6/2009
    but the format i required is 2009/02/06. Im using GUI_UPLOAD FM for file download. In the internal table im having the date in this format YYYY/MM/DD only.
    How can i bring the date in CSV file in required format?
    Thanks in advance,
    Srilakshmi.

    Hi Srilashmi,
    You question really made me wear thinking cap.
    When you populate date in SAP system, it's taken in internal format i.e YYYYMMDD, though you declare date field as DATE, D or SY-DATUM, the issue comes into light, when you got to display it.
    1. Import date in internal format i.e. YYYYMMDD,
    DATA:
      w_date type d.
    2. Declare another variable w_date1(10) like C.
    3. Goto System-> User Profile -> Own Data -> Defaults -> Date Format. Now, whatever date you have set, it's gonna take the same format.
    4. WRITE W_DATE TO W_DATE1, transport imported date to char type w_date1, this makes date appear in format you want it to .
    And regarding, saving in CSV format, not always GUI_UPLOAD or GUI_DOWNLOAD works,
    TEXT _ CONVERT _ XLS_TO_SAP   -> From program to excel sheet
    ALSM_EXCEL_TO_INTERNAL_TABLE  -> Excel sheet to Program
    Hope this helps you.
    Thanks: Zahack

  • "Clip Time" not coming through properly from P2 Cards

    Hi,
    I'm using Log and Transfer to bring across video shot yesterday. I setup a custom Name Preset to include the time the clip was shot at. The clips aren't coming across with the actual time they were shot though. The first few clips were shot around 7:30AM and are coming across as "01-30-09", which I'm assuming means 1:30 and 9 seconds. I checked the time on the camera (HPX-170) and it is set properly, but the timezone wasn't... it was set at 00:00, but should have been -06 :00.
    The workflow so far:
    1. Shot on HPX-170 to two 64GB A series P2 cards
    2. Used Pansonic's P2CMS to transfer clips from camera to external hard drive (does anyone else use this software? It seems to do a good job, but is the ugliest thing ever. Any other options?)
    3. Using Log and Transfer to bring clips from external drive to internal RAID.
    Here's the Clip metadata:
    <CreationDate>2010-09-29T07:30:09+00:00</CreationDate>
    <LastUpdatePerson>stevemebs</LastUpdatePerson>
    <LastUpdateDate>2010-09-29T16:04:57-06:00</LastUpdateDate>
    It seems like maybe the problem is that the time zone isn't set properly on the camera, but is set properly on my computer (-06:00) so the clips were automatically adjusted to local time. Is there any way to adjust this on the clips so they come in with the proper times? Without going through and editing the metadata on all 50 clips preferably.

    I use ShotPut Pro. It not only will automatically create the folders, with names, and backup the cards when you insert them, but it will also do a data verification. All automated.
    After you make the disk image, do you use Find & Transfer to transfer the clips directly from the P2 cards in the camera? (I'm assuming you can't transfer from the .dmg.)
    NO NO NO! From the backup. Because you have those Unique file names, those names are your REEL numbers. So you can track the footage.
    Gotta watch this mebs... Tapeless Workflow for FCP 7 Tutorial
    Shane

  • Schedule time not saved

    Hi, In cor1 screen if i enter the time as 01:50:00 like this, when i save observed that it is going back to 00;00:00 only. could you please advise how to save the same. Thanks.

    Look at the scheduling parameters  for your production order type in configuration.
    cheers
    Rav

  • Import PO - MIGO accounting entries not coming as required .

    Dear Team ,
    During Import PO , i have completed MIRO for planned delivery costs .. i have then gone to complete MIGO
    while doing this MIGO , i find that Material - Dr and GR/IR clearing - Cr which is correct
    but the problem is the planned delivery costs for which i earlier created MIRO is also added into the material value and each of them has to get displayed separately at the time of MIGO ( as each is assigned to separate accounts ) ... but right now all these planned delivery costs are getting added to the material value and is shown as 1 figure in GR/IR clearing account .
    what settings are to made so that the planned delivery costs included in the GR/IR clearing to be shown separately ?
    example :
    __existing :__
    after MIGO ,
    Material - 50000 ngn ( Dr)
    GR/IR clearing - 50000 ngn ( Cr)
    *expected :*
    after MIGO ,
    Material - 50000 ngn ( Dr )
    GR/IR clearing - 40,000 ngn
    GIT Duty - 5,000 ngn
    GIT Insurance - 5,000 ngn
    Please suggest ..
    Thanks ,
    Mike

    HI
    check following points for your condition in M/06
    Condition class =A
    Calculate. Type=A
    Condition Category=B ( Delivery cost)
    Accurals
    and check in M/08
    Statistical
    Assign Accurals and account key
    IN po check you are assigen vendor to that condition ,click on details  of condition in po and assign vendor
    Regards
    Kailas Ugale

  • My phone is not coming out from (do not disturb mode) in the scheduled off time eg in the morning?

    scheduled do not disturb ,then it does not come back to normal in the morning and stays in the do not disturb mode till i change it manually

    Try to reset the phone by holding the sleep and home button for about 10sec, until the Apple logo comes back again.
    You will not lose data by resetting.
    Also check this article:
    iOS: Apple logo with progress bar after updating or restoring from backup

  • Scheduling Agreement -Schedule line should not pass the requirement to MRP

    Hi Friends!
    As we all know the scheduling agreements is outline agreement with future schedule lines, with this system will  pass the requirements to MRP for the schedule line which is even after 5 years, so my requirement is  if the schedule line date is above 15 days from the current date then requirement should not pass to MRP. 
    solution which we gave is, SA initially will determine the schedule line category as  CN (which will not transfer the requirement) and  a batch job program will run daily and it will check for each schedule line if any of the schedule is with in the 15 days from the current date then it will change the schedule line category from CN to CP. 
    Now the problem is , by using Batch Job which program I have to call to change the schedule line category?????
    1. we tried BAPI_SALESORDER_CHANGE but when we are changing the CN to CP it is not performing ATP where as if we do manually it is performing.
    2. we tried BDC but here also we facing some strange problem i.e. while recording the ATP screen is not populating where it is coming while doing manual.
    Can someone let me know which one program we should call in Batch job to do this change.
    Regards
    Nath

    Hi nath,
    i also failed in changing shedule line category in userexit and in BAPI.
    in one case, i succeded in doing it with a bdc after MV45AFZZ / userexit_save just bevore the datas are reset but after the commit-work is processed.
    the other possibility is, to change the accepted amount in userexit RV03VFZZ / USEREXIT_AVAILABILITY_OUT.
    3. possibility is, to block the order with a delivery - block , same as the credit-control-block. This block can be set in MV45AFZZ or perhaps in BAPI too.
    hans

  • Schedule lines are not coming for HALB after MRP run

    Dear All,
    I am not getting schedule line after mrp run, inspite of all required setting only purchase requisitions are coming.
    Material type is HALB and involve a subcontracting process (30). For raw material I am getting the schedule line but in the case of HALB, it is not coming.
    Pls let me know if I am missing something and guide me further on this.
    Thanks & Regards
    Kundan Kumar

    Hi,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.

  • Schedule lines are not coming after MRP run for HALB material

    Dear All,
    I am not getting schedule line after mrp run, inspite of all required setting only purchase requisitions are coming.
    Material type is HALB and involve a subcontracting process (30). For raw material I am getting the schedule line but in the case of HALB, it is not coming.
    Pls let me know if I am missing something and guide me further on this.
    Thanks & Regards
    Kundan Kumar

    Dear All,
    I am closing this thread. As the vendor mentioned in scheduling agreement is not a subcontracting vendor. Its a individual vendor.
    Thanks for all the reply.
    Thanks & Regards'
    Kundan Kumar

  • Planned Delivery time not considered after MRP run for scheduling

    Dear All,
    After running MRP, the planned delivery time maintained in Purchase info record is not taken into consideration for calculating start date of the schedule line of externally procured material generated by the system.
    Planned delivery time is 3 days & Requirement of parent material falls on 15/02/2010. With this, system should calculate the start date for schedule line as on 12/02/2010 considering 3 days Planned Delivery time.
    Any idea as to what might have gone wrong?
    thx for your help in advance.
    Rgds,
    Ranjeet

    Hi,
    Determination of PLD from the Purchase info record is maintained in transaction code:OMDT. Planned Delivery time is also maintained in Scheduling agreement. However, it is not calculating delivery date as well as release date.
    Rgds,
    Ranjeet

  • In-house production time not considered in scheduling

    i have a material, with an in-house production time of 7. requirements date is today, May 23. as a sap standard, using backward scheduling, it shall see that the start day lies in the past, and should switch to forward scheduling, with May 23 as the start date, and may 30 as the finish date. however, the system only proposes a finish date of may 27. why is the system behaving this way?

    Hi,
    Please let us explain, where u have carried out  scheduling  ie  during the MRP or in Production order.
    I hope ur asking about Production order scheduling , inthat case system will not consider the Inhouse production time. Because lead time scheduling is carried in production order.
    Scheduling will be done for routing times not for In-house  production time.
    Pradeep

  • IO assigned with Asset,but not coming at the time of PO creation

    Hello
    IO assigned with Asset,but not coming at the time of PO creation.
    I have made following settings:
    1     Depreciation - IFRS (INR)              1     0L
    15     Income Tax Act                             0
    20     Depreciation - Indian GAAP (INR)     3     1L
    30     Depreciation - IFRS (USD)              0
    31     Depreciation - Indian GAAP (USD)       0
    In ACSET-Account assignment:
    for dep area-20
    CAUFN     Internal Order     *     Generic Trans. Type     02 Depreciation Run
    KOSTL     Cost Center     *     Generic Trans. Type     02 Depreciation Run
    so currently i am using only dep area-20 only(Indian GAAP)
    CAPEX budgeting is through IO. AUC is not doing through IO,its directly from AIAB/AIBU
    AS01
    KO01
    AS02
    KO22
    KO30
    so what is the problem,why i am not getting IO (which is in display mode in PO) when assigned the Asset with category of "A" (asset) in PO.......when i assigned Asset- the GL account come automatically but IO didn't come.
    kind regards

    Hey Ajay
    thanks for your reply.....
    now i'm getting new error:
    Parallel depreciation area 31 is not posted
         Message no. AA565
    Diagnosis
         The asset to be posted does not manage parallel depreciation area 31, or
         transaction type  that you are using is limited to certain depreciation
         areas, and does not contain depreciation area 31. This is incorrect.
    System Response
         Posting is rejected.
    Procedure
         Check the asset and the transaction type.
    I have checked some configuration but not able to debug it.
    regards

  • HT3275 Since updating OS to Mountain Lion from leopard, I get the following error message when trying to backup with time machine on external drive.  Could not complete backup to media share.  The network backup disk does not support the required AFP feat

    Since updating OS to Mountain Lion from leopard, I get the following error message when trying to backup with time machine on external drive.  "Could not complete backup to media share.  The network backup disk does not support the required AFP features."  What are AFP features and how do I get Time Machine to backup to my current external backup?

    This means that your NAS does not support the required encryption. Update your NAS to the latest firmware or ditch it and buy a Time Capsule (they are the most reliable when using TM).

Maybe you are looking for

  • After upgrading to lion, cant use TM

    After upgrading to lion, I can't see any TM backups, and I do not have access to this external harddrive. In the TM backup, I can see all backups, but cant activate or use them. When I click to the external HD, an error message says: "The folder "" c

  • Incopy link will not update in InDesign and XML Story files

    So I have a couple of questions. I work for a publisher and we have a standard InDesign to Incopy workflow. Recently we have started having issues with InCopy links. First some basic info would probably be helpful. We use Windows XP =(, and we are us

  • Safari 5.1.5 connects to https but not to http

    On my iMac, running Mac OSX 10.6.8, with Safari 5.1.5, I can connect to https (SSL) sites, but not to http (non-SSL) sites.

  • LR4 Feature request: Add local noise reduction

    Hello,   I wish to apply noise reduction localy. On the backgroud apply a lot of and in forgroud (where the object/personn ist) a little.   See this example.   The current local noise reduction ist NOT the same as the one in the detail panel. It is a

  • Can I get a iPhone without a plan from Verizon

    Okay so I have a phone with Verizon already but I want this free iPhone that is posted on the apple website I was wondering if I could get the phone without another plan