Scrap of material in subcontract and Excess material issue

Hi,
         I want to know is there any setting such that ,  for mfg. a finish good material,  some qty. of raw material is scrap   the qty which is scrap i have add as negative qty in BOM  and  but after making the GR for Finish material , all positive qty. are consume by deduction of qty which i have mention as negative but scrap is not done automatically,  i am doing scrap sepearetely  so it is possible  whenevr i make the GR for finish good material then ,  the material for which i have maiatain as negative should get automatically scrap,  as the raw maetria are consum using 543 materials,
second thing  the negative  qty of material i have mention in BOM of finish good  but insted of maiatining -ve qty in BOM  is it possible   to add the excess qty in PO  as -Ve qty  because  when we select the finish  material in Subcontract PO  all BOM components appear in PO   but there there is no option to add some addition material in PO.
  can we make the above settings
  regards,
    zafar

Hi,
  Thanks for your reply.
  Just want to know one more think, as in subcontract  we are issue the material as per BOm,  as suppose, total qty of one raw material required is 4500,  which is to be consume for making the finish good but due to std. packing of raw material i want to issue the qty 5000,  but while making the GR  only 4500 should be consume and the reamining 500  should be shown as in vendor stock  after getting material back  we will take that as 542 movement.
  regards,
    zafar

Similar Messages

  • Billing Document and Material Document number and Date (Goods Issue)

    Dear Experts,
    Is there a way I can find the relationship between a billing document and a material document number and Goods issue date?
    Thanks

    Hi Abid
    Is there a way I can find the relationship between a billing document and a material document number and Goods issue date?
    You have to follow the flow from the billing document to the material document. This will only work if the billing document comes from a delivery note.
    Billing document => Delivery
    LIPS-VBELN = VBRP-VGBEL
    and LIPS-POSNR-VBRP-VGPOS
    So you have LIPS + LIKP with the LIKP-WADAT_IST as the goods issue date.
    Delivery => Material Document Number
    You can use the table VBFA with the delivery item as the preceding document number (VBFA-VBELV) and item (VBFA-POSNV) ; you will also have to define the preceding document type as J (delivery) and the document category of subsequent document as R (material document).
    Because in SAP nothing is simple, there might more than one material document, because the goods issue (601) movement might have been canceled and issue again. So you will have to decide what to do in that case.
    Best Regards,
    Franck

  • Report for Material at subcontract AND PO number

    We are preparing for Inventory verification at subcontractors.
    My boss believes it would be easier for the SC vendor if we could supply the PO number for which the material was shipped.
    I haven't found such a report.  Is there one?
    If you know the tables and links, I can write a ABAP query
    Thank you for any help that can be provided.
    Althea

    Hi,
    ME2O works fine if you want to track which subcontracting PO's are still open and what is the current stock at vendor.
    ME2ON is another version of the same basic ME2O report.
    Try also MBLB - Stocks at subcontractor.
    As far as PO to 541 link is concerned, I do not think it is possible to find it unless there is some specific business process being followed which is supported by custom code.
    The reason is that when you issue against 541, you are simply providing materials to vendor that the vendor needs.
    There might be multiple open SC POs for same material/batch and there is no point in tracking against a particluar PO. Its the same material/batch the vendor receives.
    When you post a PGR for a SC PO, then the stock from vendor premises is consumed by 543 and the track to your SC PO is maintained.
    I tried maintaining EBELN as required in OMJJ for 541 but still no MSEG-EBELN is populated. Maybe I am missing something.

  • Plan material/labour quantity and total variance issue

    in KKBC_ord report, the plan cost of :
    raw material plan cost  is 3000,000 MYR, actual is 29600,000, variance is 400,000 MYR, with raw material A plan qty 9700, actual quantity is 10000, I want to know how the 9700 is calulated, any formula and how it is calulated in table CKIS?
    labour plan cost is 1386,000 MYR, actual is 1356,000, variance is 30,000 MYR, with labour  plan qty 38, actual quantity is 36, I want to know how the 38 is calulated, any formula and how it is calulated in table CKIS?
    we use process order, costing bom and  receipe
    except raw material and labour activity, we have no other cost.
    our raw material variance+labour variance is 430,000
    when we do goods receipt, actual qty is less than plan qty, thus yield variance is 700,000
    but our sap total vriance is 750,000 in settlement, I want to know why 750,000 is not equal to 430,000+700,000=1130,000
    what is relationship between 750,000 and 1130,000, we don't have remaining variance or scrap variance. thanks

    Hi
    1. Plan cost is calculated based on the Prod Order BOM and recipe
    2. Variance is a difference between Actual Dr and Actual Credit... Plan cost has no role to play in variance calculation
    Though Actual Cr is more or less equal to the target cost, the actual variance in the order is always equal to Actual Dr-Cr (COGM)... Whats the difference between Actual Dr and Cr (COGM) in your case?
    Before settlement, if the Order is marked as "Delivery Complete", then the Order balance would be equal to Variance
    there are many other categories of variance like Lot Size Variance, Usage var, etc.. Plug in the all the columns of variances in COR3 and the sum should be equal to the Variance settled.. I have never seen a case of mismatch in this
    Br, Ajay M

  • Materialized View Refresh and I_SNAP$ Indexes issue

    At the time of doing REFRESH of the Materialized View, we are getting error like -
    SQL> EXECUTE DBMS_MVIEW.REFRESH('MV_TEST.MY_VIEW,'CF');
    BEGIN DBMS_MVIEW.REFRESH('MV_TEST.MY_VIEW,'CF'); END;
    ERROR at line 1:
    ORA-12008: error in materialized view refresh path
    ORA-00001: unique constraint (MV_TEST.I_SNAP$_FIN_RESULT_EXPENSE1) violated
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 2545
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 2751
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 2720
    ORA-06512: at line 1
    I tried to drop and recreate the index I_SNAP$_FIN_RESULT_EXPENSE1 but it didn’t helped.
    Later I dropped the index I_SNAP$_FIN_RESULT_EXPENSE1 and refreshed the materialized view and it was successful (obvious). But when I tried to recreate the index, I got the following error –
    SYS_OP_MAP_NONNULL("FIN_MULT"), SYS_OP_MAP_NONNULL("FIN_CD"))
    ERROR at line 8:
    ORA-01452: cannot CREATE UNIQUE INDEX; duplicate keys found
    When I look at the value of SYS_OP_MAP_NONNULL('FIN_CD'), it seems to be unique.
    SQL> select SYS_OP_MAP_NONNULL('FIN_CD') from dual;
    SYS_OP_MAP_NONNULL('FIN_CD’)
    46494E5F5650545F4C564C5F335F434400
    My questions are:
    1.     Why are the indexes (I_SNAP$_*) automatically created for?
    2.     What is the purpose of these (I_SNAP$_*) indexes?
    3.     What harm can be there if we drop these (I_SNAP$_*) indexes?
    4.     Why it is complaining about the Duplicate records / Uniqueness?
    5.     How to know where exactly the problem is in this case?
    6.     What is the solution for this problem? How to recreate these indexes successfully?
    Thanks!

    This forum is for the OLAP Option (which supports a cool featured called cube-organized materialized views). If this question if about table-based materialized views you should post it the General Oracle Database forum. Good luck.

  • Having changed computers and now wishing to complete download of material already purchased, and watch material on the new computer, what is the process for verifying the new computer as able to access, download and watch that material?

    All I need is advice on how to register a new computer for using old material and material that was only half downloaded.

    iTunes Store: Authorize or deauthorize your Mac or PC - http://support.apple.com/kb/HT1420 - and another helpful post: https://discussions.apple.com/message/17828050
    iTunes application window (not Finder or a browser) > menus at top >  Store menu > drag down to Authorize This Computer. (In earlier versions of iTunes access this option from the Advanced menu).  Step-by-step instructions - https://discussions.apple.com/message/16569470
    Image of where this is in iTunes 11: https://discussions.apple.com/message/20585561

  • Different stock value for accepted and rejected material in quality

    Hi,
    when we send the final product in quality ,some material has accepted and some material has rejected
    But system is showing the value of both accepted and rejected same.
    But we want that the value for both should be different.
    How we can get it
    Regards
    Prem

    It is not possible to valuate differently for accepted and rejected material.
    The value for material in PO for total material. So it should be same value for both.
    Regards
    Ravi

  • Reversal of excess goods issue

    Hi Friends,
    There is a requirement.
    I have created a process order for material A with 10KG and component required is B 1000GM with no data about location or batch.
    I do a goods issue of 900 GM. Now if i want to reverse issue, I use MB1A -> Cancel with reference --> To order... It will  populate the data in Material, Quantity, UnE but  Sloc and Batch does not populates..
    Requirement:
    When I do a reverse issue using MB1A -> Cancel with reference --> To order, system should populate all the fields Material,  Quantity, UnE , Sloc and Batch.
    Note: We do not have backflush concept and also in the process order component level user does not enters the batch and storage location and he does not want to enter.
    Regards,
    Narendra Bora

    Narendera,
    As explained by me, when you are doing goods Issue reversal against order or reservation system so the relevant values of the items are copied from the reservation or order. We are NOT doing reversal against goods Issue for the system to copy that values of the previously posted goods Issue. For this purpose only SAP has provided material document cancelation functionality using MBST.
    My suggestion would be to simply do goods Issue material document cancellation and then re-issue again or manually enter the required details. If this still does not suite you, then look for some user exit, check with your abap person on this.
    Regards,
    Prasobh

  • Component scrap and post material for production

    Hi guys,
    If we maintain component scrap in material master data. e.g.:10%. when we need 1000pcs "A", we will buy 1100pcs.
    But, when we post "A" for production, we only want post 1000pcs.
    Is there some method to achieve this?
    Thanks
    Dan

    Hi Dan,
    Create another material say " X "  assign this material in the Bom as component also by-product .In this way you can post
    1000 for production and  100 pcs under by -product during confirmation .
    jayavimal

  • Excess material issue against RSQ

    Hi Gurus,
    We are using repetitive manufacturing in our organization (Automotive Industry), the material staging is done based on the plan order with pull list as per the BOM, but in case excess components are required how can we stage this excess material?
    Scenario-In BOM we are having steel washers as 4units (staged against pull list printout) and during operation 2 units got scrapped, how can we stage this additional requirements of 2units at production supply area?Against which document this additional requirement can be staged in REM?
    Regards
    cs

    Hi Antony,
    Thanks for your reply..
    Yes I agree it can be done with component scrap during MFBF transaction,requirement here is the printout of required excess material issue,against which the store guy will stage the material.
    The store department want to record against which plan order this excess material has been issued.
    Please advice.
    Regards
    cs

  • Return of delivery not possible after material was invoiced and payed

    Dear all,
    currently I have the problem, that a goods receipt happend for three pieces, quality inspection was done and then the material was payed at the supplier.
    Now we realize, that one material is not required anymore and we want to sent it back to the supplier. Now I would like to make a return of delivery which is not possible anymore as the material was already payed.
    What else can I do? I would like to sent back the material and get a credit note from the supplier for the next purchase.
    Can anyone help what would be the right process to follow? At the moment we canceled all the payments and goods receipts and everything and then made a new goods receipt. But I dont think that this is the proper way.
    Thank you very much for your support,
    Bjoern

    hi,
    1. You can scrap the material at vendor's or your place...
    2. You have to cancel the Gr and make the new correct one...
    3. Post the material to blocked stock ...and scrap from there#
    4. Post to QI and send back to vendor...
    and if you do wanna send this material to vendor and want back money for wrong material, then create subsequent credit...
    Regards
    Priyanka.P

  • 57F4 Challan printing with Purchase order number and parent material

    Dear Team,
    As a SAP standard 57F4 subcontracting challan will have only legal entities,child materials, quantity, assable value etc.
    but as a client requirement we need to incorporate the PO number and line item in the 57F4 challan, additionally client requires the parent material also printed in 57F4 challan
    Anybody can help me how to get the PO number and parent material in 57F4 Printing, because i have already searched in MSEG table but for the material document number iam not able to find the PO number and line item.
    iam posing the GI with referenc to purchase order only. but even iam not getting the PO number with reference to the posted document number in the table.
    J Sridharan
    Satyam Computer Services Limited

    thanks for your reply hemalatha,
    i have tried with OMJ3 transaction, but it is purely a print parameter settings for J1IF form. please help me where i can maintain this settings to get the output in MSEG table.
    moreover iam creating all the subcontract material documents with ref to PO number only through MB1B transaction. please advise.
    Regards
    Sridharan

  • Reg. Process cost and raw material cost add

    Dear Friends
    We are doing subcontracting that is E  &  L combination main material is Semifinished and component is Raw material, when I do goods receipt component is going to consumption through 543 mvt type(process order consumption),but the raw material cost and process cost is not added only the process cost is comming. what to do in this case. Pls help me, how to add both of cost.
    Thanks
    Rajakumar.K

    hi,
    What is the price control in accounting view you have maintained for semifinished? If it is S then it will not get updated.  Only if it is V, system will capture raw material & process cost to the Semi Finished.
    regards,
    JP

  • In subcontracting process same material to come back from vendor how?

    hi
    in subcontracting process i want to send x material for processing purpose and same material is going to come back tell me the process how can i do
    chandra

    hii
    For  ur scenario, u have carried out external service management process.
    Because , subcontracting is nothing but , u have to X material and receivea as A materia or some different material.
    SO if u r going to receive the same material , u can do it as service process.
    Thanks
    SAP-MM

  • How to send finish material for subcontracting ?

    Dear all ,
    I per our client requirement finish materaila has to send for the drilling to the subcontractiong .
    Shall i use subcontracting method in which material which i will send & which i will receipt will be same plz reply me .
    abhay

    Dear,
    It depends on your requirement
    If the material is going and comming back after a perticular operation, and vendor is with in the company primises (no excise gate pass) then you can configure it as a external operation in a production order, but in system will not show the material sent to vendor for subcontarcting vendor, this informatoon you will get it in Production order only, not in inventory
    I this is the case, system will create a SC PR during Production order release. Then you can convert it to SC PO and send the material to vendor. It is like a servive PO...
    If you want to send component 1 and 2 to vendor and he will assemble and give it back to you and vendor is siyuvated outside your primises(excise gate pass involved), then you need to create a SC PO.
    In this case you issue (541 O ovement) raw material to SC vendor ans system will show in inventory managmenet that the raw material is with SC vendor in MMBE. When you recive the assembly from SC vendor (using 101 mov type), system isues raw material to SC PO.

Maybe you are looking for

  • Xmas Nano not recognized by iTunes and ejecting crashes iMac HARD!

    I hooked up my new 8Gb Nano and was notified I had to upgrade iTunes. Did that. Then a dialog box popped up telling me the Nano was not recognized and advising to disconnect and reconnect it. After doing this a half dozen times it was finally recogni

  • PC T'bird users having trouble with my Mail e-mail with attachments

    Lately a couple of co-workers have had bizarre troubles with e-mail I've sent them with attachments. I'm using Mail on a Mac (10.5.8), they're using Thunderbird on PCs. When I've sent them attachments ("Windows-friendly," attached at end of e-mail),

  • Applets in Mac OS

    Hi Java Guys, When I tried to open an html in the local system, that had an applet embedded, I could see the applet displayed inside the html. But when I put the same page and applet to some other machine and tried to access the html via ip address,

  • Audio Plugin for iTunes????

    Since Volume Logic doesn't work anymore, and they don't seem to be in a hurry to fix it, does anybody know of any other good audio plugins for iTunes on Windows, please. Help much appreciated

  • IE Disregards CENTER Tag

    Hello friends, I have an interesting problem. I am using DW CS3. I have created a website which seems to be fine. However one page when viewed with IE loses its (centering attributes) - CENTER and appears as a LEFT JUSTIFIED. This is (oddly enough),