SCRAP QUANTITY IN ORDER CONFIRMATION

Hi,
    When i confirm an order there is a field called scrap quantity. Supposse there is an order for 10 qty. Now while confirming the order i give in the yield field as 10 & 10 in scrap quantity where will it effect...
Will it effect costing of the order.
Can i do like this because my order is for 10 quantity & i am confirming & scarping the same quantity.
Please guide as i want to use the same field..
I am in go live satge.Please help.
regards
jimmy

Hi JIMMY 
As per your question smiltensly you can't book both as yield and scrap with same order quantity.Either you book 10 in yield or in scrap or total of this yield and scrap is equal to production order quantity.That means if order quantity is 10 then you may book 6as yield and 4as scrap.Once you have entered scrap in CO11N no material movements are automatically posted in the system. By confirming scrap you are only reducing the balance confirmable qty in the order. The order costs would increase since you would have posted goods issue for input material without goods receipt for finished goods.
Now  you want to realize the value of the scrap produced then you would have to do a goods receipt of the scrap as a by-product using movt type 531 in MB1C for the scrap material number.
It can also automate posting of this if a percentage scrap is know. You can do this in BoM by specifing a negative qty against the scrap material number. Then if the backlash is activated every time confirmation is done the 531 movement line will come automatically in goods movements screen. If no scrap arises then you have to delete that line and post the confirmation.
Hope this helps ...if so reward points and close this thread.
regards
Rajesh

Similar Messages

  • Use a different movement type for Scrap in Production Order Confirmation

    Hello gurus. I have the following question.
    Is it possible to have the "Scrap" quantity during Production confirmation in a separate movement type?
    Currently, when I type in the "Yield" and "Scrap" quantities, both of them are summarized into one backflush line under Movement Type 261. So for example: Yield: 10 pieces and Scrap 5 pieces; I only get one Goods Movement for 15 pieces with MvT 261.
    The requirement is that whatever is typed under "Scrap" goes on a different movement type (e.g. 551), because then it will be easy to follow (inventory-wise) how many pieces were used in production and how many were scrapped.
    Is it possible?

    Thanks for your reply Krishna.
    Well, I notice that when I type a quantity in the "Scrap" field, the difference with "Yield" is that I simply don't get the produced material on stock (in the case of the last operation with a GR for instance). I just get the backflushed quantity.
    But yes, I guess in this transaction, I'm scrapping the produced material, the components are still issued. I was just wondering if perhaps they could be split in 261 for normal backflush and 551 for backflush that didn't generate any finished assembly.
    Thanks for your insight.

  • Scraps during PP Order confirmations

    Hi Gurus
    I need to un-connect movement 261 from Scrap declaration during PP Order confirmation.
    This becuase my PP Department produces little plastic components and scraps are only a lettle part of row materials consumed during PP Operation. We want to declare the scrap during confirmation only for statistic purpose, but we don't want that this declaration will post automatically 261 movements. Is it possible ???
    Thanks for your help
    Claudio

    Hi TQ
    Thanks for your reply.
    I'll try to explain better my needs.
    We use the backflashing mode for post autopmatically consumptions (M.Type 261) during PP Order confirmations (CO11N).
    During the production (we mould little plastic components) we have:
    a) Fine Products (Yelds using AFRUD-LMNGA)
    b) Bad Products (Scraps using AFRUD-XMNGA)
    c) Other residues of plastic material
    Now we're confirming a) and b) quantities, and the system post automatically 261 movements for Backflushing consumptions.
    We wolud like to post:
    a) Fine products (and reletive 261 consumptions)
    b) Scraps (WITHOUIT 261 consuptions)
    c) Residues + Weight of Scraps (manually at the end of production with MIGO and 261 movement).
    Therefore I'd like to declare scraps during confirmation, without posting (automatycally) the correspondent consumptions (261).
    There's a way to solve my issue ???
    Thank for your help
    Claudio

  • Scrap During Production order confirmation.

    When I Put scrap qty in Co11 screen or co15 Screen, Is movement type 551 gets automatically activated??What are the accounting effects and by what transcation can I see these accounting effects.

    Hi,
    Please check production order header screen Go to --> documented goods movements.
    Regards
    Ranga

  • To reduce quantity to be confirmed by posting scrap in process order

    Hi Experts,
                       Is it possible to use MQC such that the planned quantity in each phase keeps reducing by the quantity of scrap posted in COR6N in the earlier phase. That means if planned quantity in phase 20 is 100 and i post a scap of 10 then in next phase (say 40) system should offer a quantity of 90 in the "yield" field of COR6N screen.
    Regards
    Sm.

    Hi Rupesh,
    Can you please assist for below issue
    The planned quantity in each phase should  reduce by the quantity of scrap posted in COR6N in the earlier phase. That means if planned quantity in phase 20 is 100 and i post a scrap of 10 then in next phase (say 40) system should offer a quantity of 90 in the "yield" field of COR6N screen.
    eg:- Process order 100 qty
    Phase 20 Confirmation
              Yield 90 & Scrap 10
    Phase 40 Confirmation
              Yield should be populated as 90 . (But here system is suggesting Yield as 100 )
              Can you gurus throw light here , where am i going wrong ?? , Why instead of 90 qty yield in 2nd Phase /operation to be populated it is appearing as 100 qty ?
    & how to use User Exit also if required for Use Exist XCOM0001 EXIT_SAPLCOML_001

  • Set loss quantity to a fixed percentage in Process Order Confirmation - C0R6N

    Hi Experts,
    How it is fixed the loss qty percentage at the time of process order confirmation.
    I want to set the loss quantity to a certain percentage when compared to the Total Process order quantity.
    For Example:
    If the Total processed quantity = 100
                            Yield Quantity = 20.
                             Loss              = 80.
    This kind of scenario should not happen, since Loss quantity is very much higher that the yield quantity.  I want to set the loss quantity  to a particular percentage ( say 20-30 %) of the total processed quantity so that the yield quantity will be higher than the loss quantity by a substantial amount. Are there any possibilities of doing this through configuration. If not what are the other options?
    NB: Scrap quantity is not maintained at the time of  process order confirmation.
    Regards,
    Umapathy.

    Hi Umapathy,
    Yield and Scrap are user entry fields where you can have restriction on entered qty by changing  under delivery and over delivery to error through OPK4 config as shown below. Agree that any qty can be entered in any field (Yield or Scrap)
    OR
    You can define the operation scrap. Read the below doc for more details.
    http://scn.sap.com/docs/DOC-52834
    OR
    Another option is to use exit and write your logic based on input yield and loss.
    Thanks & Regards,
    Ramagiri

  • Delivery quantity greater than confirmed quantity in sales order

    Hi experts,
    Quantity in delivery order can be changed to more than the confirmed quantity in sales order when there is sufficient stock. (Setting "Check overdelivery" in 0VLP already maintained "B-Situation rejected with an error message").
    Anyway in system to check only "confirmed quantity" can be delivered?.
    Regards,
    Liang

    Thanks Ankur for your reply.
    The "Overdeliv. tolerance" in customer master allow customer to deliver more than the quantity in sales order.
    But my situation here is to control the deliver quantity base on confirmed quantity in sales order.
    For example, i have quantity 10 for an item in sales order, and i only confirm 5 to deliver. Let's say my stock has more than 15 quantity, during DO creation, system will proposed 5 but i can manually change quantity to 10.
    I would like to control only confirmed sales order can be delivered. Is this only can control using user exits?
    Best Regards,
    Liang

  • Production order confirmed quantity

    hello!
    can i change the settings, that production order atp-check confirms quantities from e.g. purchase requisitions, not only stock in warehouse?
    best regards,
    matthias

    hello!
    every supplies are ticked in OPJJ. it works for receipts before demand from production order, but no receipts in future are confirmed.
    Date                          MRP element                           Req/rec     Confirm     ***. ATP
    04.03.2009     Stock                                                  1      0      
    12.03.2009     OrdRes     Totals record     3-     1      0
    14.03.2009     PurRqs     Totals record     1      0      1
    02.06.2009     -
    >     End lead time     0      0      0
    02.06.2009     PurRqs     Totals record     3      0      0
    i would expect that the order confirms the quantity from the purchase requisition.
    best regards,
    matthias

  • Order confirmation and scrap gene in SL

    In Production Process - Two type sof scrap generate
    1. planned - which is maintained in BOm and update with 531 mvt type
    2. Unplanned - which is booked in scrap field while doing Confirmation. Suppose my Order material Y broke on the way/while doing maching etc , it is booked in the field Scrap while doing confirmation. ( No where found in Inventory)
    here case 2 , that scrap mat F(physically happned during prod process) is also sold . So an alternative method mentioned was with 501 will update scrap material F and ref made as Prd Order Number(order mat Y).
    It is fine , some how it meets the business req.BUt now they want with ref to confirmation But confrimation field is not avilable in Display screen for 501.
    I know 501 is not for this , but for the business [purpose it was mapped like this .
    551 will update o cost centre and not in INV
    So kindly help me to upload the scrap with 501 with Production confirmation and not with Production Order

    Dear,
         Raise Dummy production order i.e with out material in CO07 T-code, put total qty as 1,if u want to settle the order put settlement rule if not simply come back and go to Component over view and put Material (Srap Material ) and give required qty in minus sign
    EX:-10qty. put item categery as L
    save the order and do conformation in co11n the stock will build in inventary
    Regards
    Ravi

  • Scrap Quantity component  in the production order

    Dear gurus,
    in the material master of a component i insert the scrap % ( view mrp4) = 10 %.
    The field is read by planning Mrp and explosion of bom , but when i inseert this component in the production order manually the system don't read this % and the field "scrap quantity in the component detail of the production order is blank.
    Are there a setting for uograde this field ( in the production order ) when i insert MANUALLY the component in the production order?
    Example:
    1) material master of the component  > scrap % (view MRP4 ) = 10 %
    2) production order created
    3) insert this component quantity 100 pc and the system after read the material master  insert 110 pc , and upgrade the field automatically 10 % (as material master)?
    Thansk a lot
    Daniele Pistilli
    PP TEAM

    Hi Danielepistilli,
    Well there is a lot of difference is there: see you are creating production order for header material which is FG. If you maintained component scrap in material level it will be dependent on BOM quantity which you maintained for the header material.
    For example say component x quantity is 50 in BOM. How it will calculate when you run the MRP.
    component scrap % is 5% then:
                                     ===>            (5/100) * 50 + 50
    Formula is: Percentage of scrap quantity x original quantity + original quantity
      So                           ===>           52.5 quantity should be come for component
    So, the order quantity for the header material will not take this quantity or scrap but if you see individually in MD04 screen for X material you can find this quantity ok.
    I hope it clears your doubt and helps you any queries please revert me back.
    Regards,
    Madhu.G

  • Group Order Confirmation Distribution Quantity

    Hi I am implementing the IS-MILLS.
    During the group order confirmationn proces the systems distributed the quantity of the individual orders.
    Sometime the operator make a mistake and is necessary to cancel the confirmation.
    The first time the operator does the confirmation the Confirmed Quantity field in the distribution screen is fine. But after the confirmation is cancelled and the confirmation is execute againg this field has the quantity of the first confirmation (thas was cancelled already) plus the quantity of the new one.
    Does any one know if is possible to corrected or modified this behaivor in such a way that after the cancelletion the field has cero quantity.
    Example: Suppose the group order has two individual order
    First time confirmation:
    Yield quantity: 1000
    Confirmed Quantity: Individual orde 1 = 500
    Confirmed Quantity: Individual orde 2 = 500
    Distribution Quantity(Yield to Confirm)  Individual order 1 = 500
    Distribution Quantity (Yield to Confirm) Individual order 2 = 500
    Confirmation Cancellation first time: After this the order has 0 yield quantity confirmation.
    Confirmation after cancellation:
    Yield quantity: 1500 ( quantity corrected)
    Confirmed Quantity: Individual orde 1 = 1250 = ( 500 first time + 750 second time)
    Confirmed Quantity: Individual orde 2 = 1250
    Distribution Quantity(Yield to Confirm)  Individual order 1 = 750
    Distribution Quantity (Yield to Confirm) Individual order 2 = 750
    Any help will be very useful
    Thank you
    Isaias Morales

    This error usually occurs when the quantity at line level does not match with the sum of the distribution of that line. This you can check while selecting that line and then pressing the distribution button on the form.
    Thanks & Regards
    Ankur Dawra

  • Changr HU quantity generated via PRoduction order confirmation

    Hi gurus,
    I have created GRN of 112 quantity via production order confirmation.
    My plant andstorage location is Handeling unit managed so with GRN handeling unit gets generated.
    but packing had done for 1 quantity only.
    now how to change this quantity?  I tried HUCANC t code and gave the HU number but system is giving error that HU can not be cancelled.  first cancelled material document
    but GRN has made 112 quantity which is correct then how HU got packed with 1 only?
    I stuck up pls help

    when I am trying to change Hu in humo i am getting following error
    Storage type 111 does not allow repacking - HUs cannot be changed
    also getting following error if I am changing the quantity or emptying the Hu
    Handling unit 10016000800120555 has status "cannot be changed" - Process cancelled
    Edited by: vrunda on Jul 9, 2010 10:57 AM
    If I tried to delete
    Handling unit 10016000800120555 contains items that cannot be deleted
    Edited by: vrunda on Jul 9, 2010 10:58 AM

  • PPPI PI sheet to trigger HUM goods receipt and PI order confirmation

    Hi gurus,
    We're running into a problem when setting up our PI sheets.
    We're using Handling Unit Management for our finished products and would like to use the PI sheet to post both the goods receipt of handling units and the order confirmation. For now let's assume all activities and ingredients are backflushed.
    For the HUM section we've created a function module that combines transactions COWBPACK and COWBHUWE. When called by itself it works like a dream.
    For the order confirnation we've successfully used standard SAP message category PI13, but also only when called by itself.
    The problem is when we combine them:
    When combining the Z function module to contain both COCI_CONFIRM_ORDER (from the PI13 message) and our ZHUM function modules, it appears that the COCI_CONFIRM_ORDER blocks the process order so the COWBHUWE part of our function module cannot be executed. This has something to do with the way SAP handles the "commit" in the function module.
    Now, I noticed it's possible to include more than one message category in customizing for the PI sheet category (when configuring through the wizard).  The idea is then to process the messages with a background job, filtering through the message category so we do the HUM part immediately and the confirmation only at the end of the shift so they don't block each other.
    However, when I do this still only one message category is created after processing the PI sheet.
    Do you know how to create messages with multiple message categories from the same PI sheet? Or if that's not the way, is there a better way to set up this process?
    Sorry for the long text, just wanted to be precise.  Any help is, as usual, greatly appreciated.
    Kind regards,
    Elt

    Hi
    1. What is quantity of the waste material you get as by product? Do not you wan it to be handled as scrap? What is the %age of scrap you have defined in the BOM for the material? You wll have some data regarding this. Or else how do you arrive at decission that after subcontract processes the waste you are paying him, Is it umpsum basis or material quantity basis. The best way is to have a Subcontract PO, but for that even though you do not weigh the watse quanity you must be having so historical data for the waste quantity generated and the conversion of the sane to other SFG , definitely you can arrive that on a pro_rata basis. Have a Code for the waste mateial. Release Subcontract PO for SFG which is what you get back, and issue the components( waste) to subcontractor.
    Please remember your PO intially will be for Provisional quantity if you are unable to reach a fixed quantity. Amend the PO before GR as per the actual quanity for which you wish to pay the vendor.
    For the waste quanity stock updation you use 262(w/o refe to Prd order) after the FG is confirmed.
    Material price updation happens cirrectly in this process.
    2. You can pay the vendor as you wish by by this process but what about the price updation for the ordered material SFG. When you can receive by product in separate Txn againt FG then why can not you follow the proces no. 1?
    3. I would not liketo suggest 3 rd option as that becomes much comlicated for a simple operation.
    Best Regards

  • Scrap quantity

    Hi,
       we doing cofirmation in co11 with auto goods receipt(last operation).
       Is it possible to get production order list which having scrap quantity in COOIS
    thanks in advance

    Dear,
    Once you have entered scrap in CO11N no material movements are automatically posted in the system. By confirming scrap you are only reducing the balance confirmable qty in the order. The order costs would increase since you would have posted goods issue for input material without goods receipt for finished goods
    Now you want to realize the value of the scrap produced then you would have to do a goods receipt of the scrap as a by-product using movt type 531 in MB1C for the scrap material number
    In COOIS,I dont think you will get all your required details.
    In case if you want to confirm scrap then enter only scrap qty and confirm the production order,
    the production order show the status as
    REL CNF DLV.
    Regards,
    R.Brahmankar

  • PRODUCTION ORDER CONFIRMATION INCORRECT

    Hi Gurus,
    The Issue I have at hand is related to a PRODUCTION ORDER CONFIRMATION INCORRECT. Ok here is what happened. A production order was put in for quantity of 3. But the confirmation against this order was posted for 100,XXX,XXX. This was scrapped and only 3 was confirmed and received into the inventory (So inventory movement is fine, only for 3). But the initial confirmation of 100,XXX,XXX caused posting for Labor & OH based on the activities to sec. cost elements. So now what happened is there are posting against sec. cost elements in millions, which have been settled to cost centers. Obviously this is incorrect.
    So now we have statistical postings to sec cost elements that are overstated and incorrect. The period for the prod order has closed. The prod order has status of released.
    Now my questions are as follows:
    1. How do we go about fixing this? Best practice?
    2. Can we manually post to sec cost elements to correct overstating?
    3. Can we do manual Journal entry to resolve discrepancy (But that would be a real posting).
    Also would had it been the best solution to just cancel the prod order with the wrong confirmation and re-issue another in the period of occurrence. If you need more information to provide help please let me know.
    I am new to product costing. Please help.
    Thank in Advance!!!

    Hi Ajay,
    I have some follow up questions, please help. Thank You so much. I am sure I will be able to resolve soon, now. Thanks
    2. The manual entries that were posted, can they be reversed, even though period is closed? You mentioned reverse in same
    period. So I can post a reversal document in the period of occurrence?
    No. For any FI posting, your period has to be open
    Q. Ok then if the period is closed and I have to reverse the postings, do I post a negative posting in the current period?
    3. Also should I run KB21N in the same period? (If I can, I should I believe?)
    Yes, in the same period
    Q. If the period is closed like I mentioned earlier, would I still be able to run KB21N in the same period or this should also be run in the current period?
    4. In KB21N I changed the screen variant to u201CAllu201D but I still donu2019t see sender u201Cproduction orderu201D, I just see sender cost center, sender activity type, receiving cost center, receiving order and etc?
    The field "order" is the field you should use.. It is same as Prod order / Int Order
    Q. Yes ok but in KB21N there is no sending order, there is only receiving order. Please help
    5. Also will the KB21N posting fix the Profit and loss posting of the loss?
    Yes, it will.. But you will have to re-run period end steps until settlement
    Q. re-run period end steps, can you elaborate a little more. Thanks
    Thanks again for all your great feedback.
    Arvind

Maybe you are looking for

  • Creating a Mat View having the same name with that of the table name

    Hi everyone, After dropping the mat view name "QQ.TRDLN_DIM_MV", I'm trying to re-create it by having the same name as that of the table but I got an error stating that "name is already used by an existing object". How can create a mat view to look l

  • Still looking for font solution

    A problem I'm trying to get resolved: I have some true type fonts. When I attempt to open their suitcase all it does is open font book and displays one version of the font. I recall in earlier OSs you could click open the suitcase and view the font n

  • How to deploy Shared Variables with aliases (Project Variable), when some machines are offline?

    Hi all, I have a distributed application (PC + a few CompactRIOs). My PC contains variables that have aliasing enabled -- they are bound to variables on the cRIOs. One of the cRIOs is currently offline. I'm trying to deploy some changes I've made on

  • Add hyperlink to Notes app?

    Does the Mountain Lion notes app allow you to add hyperlinks like you could back in Snow Leopard 10.6.8/when notes was part of the mail app?  Thanks for any insight!

  • Infotype 1050 - Job Evaluation

    Question: Anyone know of infotype 1050 is being used by or could be used by the BSP page of Job Pricing in ECC 5.0? I went through the entire process from creating survey provider -> job matching -> aging -> composite result -> salary adjustment and