Settings for a component of BOM

Dear guru ,
For a component of bom with material type quantity and value updating I want to make these settings :
-     relevant for costing
-     not relevant for mrp dependent requirements
-     only for information purpose for production order
-     not a non-stock item
How can I make these setting for a component of bom ?
Thanks in advance.

Dear
Please find the answer of your question :
- relevant for costing : In BOM  Select the component line item and double click .Goto Status Tab , you  have un-check the Check Box -Relevent for Costing
- not relevant for mrp dependent requirements  :- Goto MM02 with item code  and select MRP4 view -Keep the seting 1 -Dependent Reuirement not relevent for planning in MRP
At the same time u can keep the MRP Type : ND  in MRP1 View in case if u do not want to plan through MRP .
- only for information purpose for production order : The will be copied with this item automatically or manually based on the configuration u have kept in OPL8-Order Type dependent parameters for your Production Order Type (pp01) .Here in BOM Selection -Automatic -1/Manual -2  should be kept in order type dependent parameters.
- not a non-stock item  : Keep the item categoery in BOM as N  while creation of BOM in CS01.
Hope this will fullfill your requirement .
Regards
JH

Similar Messages

  • Missing Customizing settings for software component ECC-DIMP

    Hi all,
    While running the T-code IE4n I am getting this error:
    Missing Customizing settings for software component ECC-DIMP
    This is working fine in IDES ECC 6.0 ,Could u please tell me how to resolve it for my othersystems.
    Thanks
    Yinyan Lu

    Dear Yinyan Lu,
    Please, have a look into the SAP note 767108 (IE4N: Problems due to missing notification Customizing)
    Solution                                                                  
    To correct this error, implement the correction instructions contained    
    in this note or import the relevant Support Package.                                                                               
    In packages                                                                               
    o  DI in Release 4.6C2                                                                               
    o  DIMP in Release 4.71 and higher                                                                               
    o  EA-APPL as of Release 4.7 Extension Set 2 and higher                                                                               
    notifications are created when installing and dismantling. In this case,  
    Customizing must be complete, otherwise errors will occur.                                                                               
    In DI Release 4.6C2 and DIMP Release 4.71 (and higher),                   
    follow the following Customizing path:                                    
      Plant Maintenance and Customer Service                                  
        -> Maintenance and Service Processing                                 
          -> Maintenance and Service Notifications                            
            -> Determine Properties of Notifications for Installing and                                                                               
    Dismantling Parts                                                                               
    Always maintain the notification type for installation and for            
    dismantling.                                                                               
    Follow the following Customizing path on EA-APPL as of Release 4.7        
    Extension Set 2 (and higher):                                             
    follow the following Customizing path:                                    
      Plant Maintenance and Customer Service                                  
        -> Maintenance and Service Processing                                 
          -> Configuration Control                                            
            - > Determine Properties of Notifications for Installing and      
               Dismantling Parts.                                             
    Always maintain the notification type for installation and for            
    dismantling.                                                                               
    What must you do if you do not want to use notifications in IE4N?                                                                               
    1.  You must always maintain the notification type in accordance with     
        Customizing described above.                                                                               
    2.  Create an individual, empty implementation for the BADI               
        BADI_CCM_NOTIF_GENER. To do this, proceed as follows:                                                                               
    a) Execute transaction SE18.                                                                               
    b) Specify BADI_CCM_NOTIF_GENER as the BADI name.                                                                               
    c) Use the menu <Implementation><create> to create an individual      
           implementation with a corresponding name in the Z namespace.                                                                               
    d) You enter the BADI Builder. Name the implementation, and then      
           save and activate your implementation. It is important that the    
           methods CREATE, FILL_CUST_DATA, MODIFY, SET_HEADER_MESSAGE, and    
           PRINT_NOTIF are empty.                                                                               
    Note that these steps are required, since the BADI                    
        BADI_CCM_NOTIF_GENER is equipped with a default source code that      
        includes the use of the notification.                                                                               
    As of ECC600, Note 1368876 replaces error message IEN 126 with error      
      message IEN 026, which is more precise.                                                                               
    Caution:                                                                               
    o  The error message mentioned above indicates that Customizing is    
             missing. To correct the problem, you must perform the relevant     
             Customizing settings for transaction IE4N.                                                                               
    o  As of ECC600, you do not have to activate the DIMP switch (this    
             may not be useful).                                                                               
    o  For more information, see Note 1368876.                                                                               
    I hope, it helps.
    Best regards,
    Roland

  • How to maintain alternative material in a BOM for a component.

    how to maintain alternative material in a BOM for a component.if stock for existing bom component is less then it should consider other alternative material in the same BOM

    HI,
    You can maintain alternate material for BOM Component by specifying Alternate Item group as below;
    Go to CS03/CS02--> Items-> Select Component and go to details->Basic Data Tab--> General Data
    Pls. find more details about Alternate Item group maintainance as below:
    Alternative item: group
    Consolidation of alternative items within a BOM. Every material in the assembly can be included in the alternative item group.
    Use
    As soon as you enter an alternative item group, you see an additional dialog box with the following data: ranking order, strategy, usage probability.
    You can maintain alternative items in the following situations:
    Alternative positions with specific usage probability
    These alternative items are incorporated with a specific usage probability. Enter the usage probability for each alternative item in the group, so that:
    dependent requirements are determined in requirements planning
    dependent requirements are changed to a reservation in the production order
    Alternative positions as information
    You can enter an alternative item for information purposes. This item would then, for example, only be taken into account in situations involving missing parts.
    As there should be neither dependent requirements nor a reservation for this item, enter no usage probability.
    Procedure
    Enter the same character string to denote the alternative items of an alternative item group.
    Enter the same strategy for all alternative items in the alternative item group.
    Dependencies
    Alternative items are valuated in the following way:
    Dependent requirements determination
    Requirements planning determines the dependent requirements according to the usage probabilities that have been entered.
    If the usage probability is 0%, then no procurement is planned for the item. For information purposes, however, dependent requirements with 0 as quantity are created.
    Withdrawal posting
    You can control the withdrawal posting for the resevation in the production order in the following way:
    Withdrawal according to usage probability (manual change is possible)
    Withdrawal if there is 100% availability
    (Check ranking order and strategy)
    Example: See Strategy for alternative position
    Further you can also maintain alternate material if you want to stop using this material at certain time as below:
    In material master of the material ,
    Go to MRP-4 View----> Under Discongtinued parts specify
    Discontinuation Indicator
    Eff-out.
    Follow-up matl
    So system will automatically consider follow up material in BOM as per the settings you have maintained for the material to be replaced.
    Hope this helps.
    Regards,
    Tejas

  • One pricing condition for BOM and other for individual component

    Hello SAP gurus,
    We have two pricing condition types created and assigned in the pricing procedure which has been created with reference to PR00 and condition records are maintained for both the condition types.
    But, we want only one pricing condition type to be triggered in the sales order depending on the usage of material in the sales order. As we are selling the same material individually and as well as a component in a bundle ( BOM).
    i.e, when one pricing condition for BOM component and other for individual component
    What are the configuration steps to be taken care to get this scenario?
    Thanks in advance.
    Regards,
    KB
    Edited by: K.byla on Jan 21, 2010 1:20 PM

    Hi Sagar,
    Thanks for your response.
    Yes, we are maintaining only one material. The same material is used to sell individually and also in a BOM.
    As i have mentioned earlier, whenever the material is sold individually it should pick condition type say 'YR00' and when the same material is sold as a bundle ( BOM) , it should pick condition type " YR01" in same the pricing procedure.
    For both the condition types, the condition records are maintained.
    To give the scenario details,
    A material "X" is sold individually as a single component and the same material is also used for selling bundled with other material "Y" and the bundled material as "Z"
    means, Z=X+Y
    Pricing procedure used is say ZRA000 which contains currently the price cond type YR00.
    Now for the bundle (BOM) involvement i want to use the same pricing pricing proc. and add the new cond YR01 in it so that the system will pick the cond.type YR00 when the material is sold individually and YR01 is taken as the price when the material is sold as a bundle against the item X.
    Need to know the steps for this scenario and do i need to maintain a specific requirement ? please suggest.
    BR,
    KB

  • Settings for order bom

    Dear All,
    Can anyone tell me setting for order bom so that the order BOM is exploded in sales order and MRP can be carried out on this BOM
    Regards
    Prashant

    Hi,
    Pls. find the details of Maintaining an Order BOM without Variant Configuration as below :
    Create an Order BOM :
    Prerequisites:
    You have entered the sales order for which you want to create the order BOM.
    Procedure:
    1.Choose Logistics ® Production ® Master data ® Bills of material ® Bill of material ® Order BOM ® Create.
    The Create Order BOM: initial screen appears.
    2.Enter the sales order number, the order item, the material number and the BOM usage.
    If you want to use a material BOM, or an existing order BOM to copy from, go to step 4. If you want to create an order BOM without a reference, click  and go to step 7.
    You cannot use a configurable BOM as a reference.
    3.Click  Order BOM (copy order BOM) or  Material BOM (copy material BOM).
    The Copy material BOM or Copy order BOM dialog box appears.
    4.Enter the data required and click .
    The item overview appears, for the bill of material you are using as a reference.
    5.Select the items you want to copy to the order BOM and click .
    The item overview for your new order BOM appears. The items you transferred are displayed in the item overview.
    6.Enter new items and alter items if necessary. Entering items in order BOMs is similar to entering items in material BOMs. However, you cannot enter class items in order BOMs. You can find further information in the Bills of Material documentation in  Creating New Items.
    Save your order BOM.
    Example: Creating Order BOM Without Variant Configuration :
    The material BOM for material A contains components B and C, which are themselves assemblies. The material BOM for material C contains components D and E and the material BOM for material C contains components F and G.
    A sales order is created for customer Smith, with the number 821. Material A is inserted under sales order item 10 in this sales order. At the request of customer Smith, for this sales order, the bill of material for assembly C is changed manually. Component H is added to components F and G. This change should not take effect in the material BOM, because assembly C is only expected to be produced once in this form, for customer Smith.
    An order BOM is generated from the material BOM for material C. Since nothing was changed in the bills of material for materials A and B, in this sales order the material BOM will continue to be used for these assemblies.
    Hope this helps.
    Revert if any doubt and reward if useful.
    Regards,
    Tejas

  • Component Allocation LSMW not working for materials having alternative BOMs

    Hi Experts,
    I have a requirement in Component allocation LSMW.
    Component Allocation LSMW was created using a material which do not have an alternative BOM and the LSMW NOT working for materials having alternative BOMs. Currently iam using Batch Input Recording method in LSMW.Can any one suggest me is it possible by recording method in Lsmw. Because in transaction CA02 when we click the CompAlloc button in application tool bar we get a pop up screen with alternative BOM's, we have to choose any of them. If we choose any of the alternatie BOM in the pop up screen then it will be fixed always, but depending upon my flat file value of alternate BOM i need to pick the value. It is not static.
    Can any one suggest me is there any BAPI for this requirement.
    Your hel will be greatly appreciated.
    Thanks & Regards,
    Venkat.

    Use BDC instead of LSMW, that will solve your problem.

  • Inbound delivery for subcontracting PO with BOM explosion

    Hi all
    The requirement is like this
    Normal subcontracting cycle - Subcon PO and then 541
    After that i did inbound delivery in VL31N for the subcon PO , Here iam getting the finished goods line item so that i can enter the delivery qty and  serial number for the finished componenet
    My query is , Is there any possibility of exploding the BOM and entering the serial number for the assembly level materials in the inbound delivery itself.
    After that based on inbound delivery i can do GR , Your inputs pls
    Regards
    Amuthan M

    Hi M.
    You can do that using MIGO but not through VL31N.
    For that you have to set the serial profile for component before.
    IMG -> Logistic Execution -> Shipping -> Basic Shipping Functions -> Serial Numbers -> Central Control Parameters for Serial Numbers
    IMG -> Logistic Execution -> Shipping -> Basic Shipping Functions -> Serial Numbers -> Determine Serial Number Profiles
    After that you have to set the serial profile for the component.
    Hope this help
    Regards.

  • What are the settings for datasource and infopackage for flat file loading

    hI
    Im trying to load the data from flat file to DSO . can anyone tel me what are the settings for datasource and infopackage for flat file loading .
    pls let me know
    regards
    kumar

    Loading of transaction data in BI 7.0:step by step guide on how to load data from a flatfile into the BI 7 system
    Uploading of Transaction data
    Log on to your SAP
    Transaction code RSA1—LEAD YOU TO MODELLING
    1. Creation of Info Objects
    • In left panel select info object
    • Create info area
    • Create info object catalog ( characteristics & Key figures ) by right clicking the created info area
    • Create new characteristics and key figures under respective catalogs according to the project requirement
    • Create required info objects and Activate.
    2. Creation of Data Source
    • In the left panel select data sources
    • Create application component(AC)
    • Right click AC and create datasource
    • Specify data source name, source system, and data type ( Transaction data )
    • In general tab give short, medium, and long description.
    • In extraction tab specify file path, header rows to be ignored, data format(csv) and data separator( , )
    • In proposal tab load example data and verify it.
    • In field tab you can you can give the technical name of info objects in the template and you not have to map during the transformation the server will automatically map accordingly. If you are not mapping in this field tab you have to manually map during the transformation in Info providers.
    • Activate data source and read preview data under preview tab.
    • Create info package by right clicking data source and in schedule tab click star to load data to PSA.( make sure to close the flat file during loading )
    3. Creation of data targets
    • In left panel select info provider
    • Select created info area and right click to create ODS( Data store object ) or Cube.
    • Specify name fro the ODS or cube and click create
    • From the template window select the required characteristics and key figures and drag and drop it into the DATA FIELD and KEY FIELDS
    • Click Activate.
    • Right click on ODS or Cube and select create transformation.
    • In source of transformation , select object type( data source) and specify its name and source system Note: Source system will be a temporary folder or package into which data is getting stored
    • Activate created transformation
    • Create Data transfer process (DTP) by right clicking the master data attributes
    • In extraction tab specify extraction mode ( full)
    • In update tab specify error handling ( request green)
    • Activate DTP and in execute tab click execute button to load data in data targets.
    4. Monitor
    Right Click data targets and select manage and in contents tab select contents to view the loaded data. There are two tables in ODS new table and active table to load data from new table to active table you have to activate after selecting the loaded data . Alternatively monitor icon can be used.
    Loading of master data in BI 7.0:
    For Uploading of master data in BI 7.0
    Log on to your SAP
    Transaction code RSA1—LEAD YOU TO MODELLING
    1. Creation of Info Objects
    • In left panel select info object
    • Create info area
    • Create info object catalog ( characteristics & Key figures ) by right clicking the created info area
    • Create new characteristics and key figures under respective catalogs according to the project requirement
    • Create required info objects and Activate.
    2. Creation of Data Source
    • In the left panel select data sources
    • Create application component(AC)
    • Right click AC and create datasource
    • Specify data source name, source system, and data type ( master data attributes, text, hierarchies)
    • In general tab give short, medium, and long description.
    • In extraction tab specify file path, header rows to be ignored, data format(csv) and data separator( , )
    • In proposal tab load example data and verify it.
    • In field tab you can you can give the technical name of info objects in the template and you not have to map during the transformation the server will automatically map accordingly. If you are not mapping in this field tab you have to manually map during the transformation in Info providers.
    • Activate data source and read preview data under preview tab.
    • Create info package by right clicking data source and in schedule tab click star to load data to PSA.( make sure to close the flat file during loading )
    3. Creation of data targets
    • In left panel select info provider
    • Select created info area and right click to select Insert Characteristics as info provider
    • Select required info object ( Ex : Employee ID)
    • Under that info object select attributes
    • Right click on attributes and select create transformation.
    • In source of transformation , select object type( data source) and specify its name and source system Note: Source system will be a temporary folder or package into which data is getting stored
    • Activate created transformation
    • Create Data transfer process (DTP) by right clicking the master data attributes
    • In extraction tab specify extraction mode ( full)
    • In update tab specify error handling ( request green)
    • Activate DTP and in execute tab click execute button to load data in data targets.

  • Configuration Settings for Postal Adress Validation and Duplicate Check

    Hi,
    What are The Configuration settings for Postal adress validation and Duplicate Check for Accounts(BP'S) in CRM 7.0 version
    Can some one send me the configuration settings for Postal Adress validation and Duplicate Check
    Thanks & Regards
    Kishor Kumar

    Hi kishore kumar,
    For the Postal code Validation you need to install and configure the following
    Outside of your SAP system:
    1. Install Data Services and the Address Directories.
    2. Install Data Services Component.
    3. Install the RFC Server.
    On your SAP system:
    4. Install the BAdIs from the previous version of this product.
    5. Install the BAdIs support package from this version.
    6. Run the post-installation tasks required of a new installation of the BAdIs.
    7. Activate the IC WebClient, if desired.     
    Thanks
    Jayakrishnan Nair

  • What tasks I should select in NWA Configuration Wizard for PI component

    Hello,
    I'm in the stage of setting up the NetWeaver 2004S SR2. I've logged to the Net Weaver Administration console. According to documentation, to properly configure PI component I should execute Configuration Wizard task. The problem is that documentation is not very specific on what exact tasks I should execute, so I would like to get some advise from the community.
    All tasks I can see are:
    BI_00_This wizard will execute Postinstall steps of technical configuration of BI-Java Initial  
    DI_Allinone_This wizard run all post installation steps for DI, CBS, CMS and DTR. Initial  
    DI_CBS_This wizard run all post installation steps for CBS. Initial  
    DI_CMS_This wizard run all post installation steps for CMS. Initial  
    DI_DTR_This wizard run all post installation steps for DTR.
    DI_This wizard sets the Oracle Parameters as per CSN note: 848708 Initial  
    MI_00_This wizard will execute Postinstall steps of technical configuration for the NetWeaver Mobile Infrastructures
    MI_01_This wizard will create User and Assign Dedicated roles  for the NetWeaver Mobile Infrastructure Initial  
    MI_02_create JCo Initial  
    MI_03_create TCP/IP
    MI_04_register Connection Initial  
    MI_05_set profile in ABAP Initial  
    MI_06_schedule MI Job Initial  
    NWA_01_This wizard will execute configuration for local SLD Initial  
    NWA_02_SLD system : Connect SLD to CEN (if CEN present)
    NWA_03_Creating a connection to the SLD and Setting required authorizations for SLD (CIM client settings)
    NWA_04_Creating a connection to the ABAP stack of CEN and Starting heartbeat monitoring Initial  
    NWA_05_NWA system : Store access data per each managed Java system (optional) Initial  
    NWA_06_NWA system : Register each managed ABAP system to SLD Initial  
    NWA_07_creates Destination for Data Supplier Bridge
    PI_00_This wizard will execute Postinstall steps of technical configuration for the PI Usage Initial  
    PI_01_This template checks if the necessary services are started Initial  
    PI_02_This wizard will test the BAPI call to SWF_XI_BPM_AUTO_CUSTOMIZE Initial  
    PI_03_This wizard will assign the Application roles Initial  
    PI_04_This wizard will Maintain_Technical_System
    PI_05_This wizard will configure the integration server for sld Initial  
    PI_06_This wizard will create the necessary Destinations in ABAP Initial  
    PI_07_Create_RFC_Destinations_in_Java Initial  
    PI_08_This wizard will Maintain Http Destination Initial  
    PI_09_This wizard will configure Role of Integration server
    PI_07_Create_RFC_Destinations_in_Java Initial  
    PI_08_This wizard will Maintain Http Destination Initial  
    PI_09_This wizard will configure Role of Integration server Initial  
    PI_10_This wizard will Register_Queues_NA Initial  
    PI_11_This template services are started
    I guess I need to mandatory execute PI_XX tasks, but what about others - do I need to execute anything else (I need only PI component to be installed and configured)? Not sure if that makes any difference, but this is the very first time I get into the NWA, so no previous configuration tasks were executed from the Configuration Wizard.
    My full system configuration: NetWeaver 2004S SR2 ABAP+Java, Windows 2003 32-bit with MS SQL Server 2005.
    Thanks in advance.

    Hi Maxim,
    Please follow this procedure:
    1) Using Config tool Modify VM setting as per requirement (OS and H/W Dependent) Refer note 723909 Java VM settings for J2EE 6.40/7.0.
    2) To set Environmental Variable refer Note 314530 - Number of RFC/CPIC connections for external clients. These parameter should be taken care while installing templates
    Set these:
         1) gw/max_conn 2000
         2) gw/max_sys 1200
         3) gw/max_overflow_size 40000000
         4) gw/max_shm_req 200 (this is to adjust the memory   allocation)
    Profile parameters
    rdisp/tm_max_no 5000
    rdisp/max_comm_entries 200
    ITS
    CPIC_MAX_CONV 5000(Should be taken care that it should be set for <sid>adm user
    3) Installing Template
    Go to home page
    http://hostname:portnumber/webdynpro/dispatcher/
    Click Deploy and change
    4) After This Click Configuration tab and then click Install
    For the next tab select scenario PI
    And configure template and finally install
    5) In case you face any problem while importing please read these notes for altering parameters
    Note 314530 - Number of RFC/CPIC connections for external clients
    Note 923359 - Collective Note: Configuration Wizard - Template Installer
    Hope it will Help you at this stage at development stage
    You need to import SAP BASIS Software Component Version into Integration Repository based on your SP Level & XI or PI.
    You need to download it from [service market place.|https://websmp205.sap-ag.de/~form/handler?_APP=00200682500000001943&_EVENT=SEARCH&HIDE=&SEARCH_SPAT=X&SEARCH_BPAT=X&SEARCH_CD=X&SEARCH_P=X&SEARCH_PV=X&SEARCH_C=X&SEARCH_CV=X&SEARCH_TA=&SEARCH_V=&HIDE_EXPERT_SEARCH=X&SEARCH_MAX_RESULT=20 ]
    Regards,
    Gagan Deep Kaushal

  • Report for Issued component Quantity vs Subcontracting PO component qntity

    Dear Expert,
    My client wants to know a report on issued Component quantity (what is issued against a Sub- contraction PO) with PO component quantity (what is maintained in a subcontracting PO component).
    Is there any standard report available for the same?
    Please suggest if any query report can be built or not.
    Thanks in Advance
    Regards
    Rajib Debnath

    Do you change child qty consumption in p.o BOM ?
    Check it in mb51 541 mvmt for material for issued component quantity.
    Also check reports MBLB,ME2O.
    Can you explain term
    Report for Issued component Quantity vs Subcontracting PO component qntity

  • Component in BOM with Split Valuation

    Hi all,
    Can anyone tell me how to assign component in BOM for which split valuation is activated.
    Example:
    Material ABC has two source 1) Domestic and 2) Import
    Now for production material ABC is used in following ratio:
    Domestic 10 kg
    Imported   5 kg
    Now as stock of material having valuation split will be handled individually i.e. domestic stock and imported stock, how it is to be differentiated in BOM?
    Thanks and regards

    Hi,
    What kind of differentiation you are looking for?
    If the stocks (of Domestic and Imported Product) are maintained at different storage locations, you can give two line items (with same material code) in the BOM.
    Now in the item details for components, you can specify the respective storage locations. Then while GI the system would pick accordingly.
    Hope that helps.
    regards,
    Rohit.

  • Settings for Material shortage status (MSPT) in PM orders

    For the purpose of material availability check in PM order, i have made the settings in IMG (OPJJ,OIOI).
    Still i am getting error that "No Checking group maintained for production (Component) in Plant xxxx. I have maintained the availability check in Sales: General plant data of Material change mode (MM02). then i am getting the PM order status MSPT for material status.
    To avail this status i have to maintain availability check all components? any other method to avail the same facility?

    Hi
    what else you require.
    have you tested material mass maintainance. Do you think so that people are giving solution just to get the points.
    Please don't be under wrong inmpression. We are here for knowledge enhancement and for getting help from Guru's like Rajesh sir, Pradeep sir and Reddy sir.
    Regards,
    Anand.

  • Missing namespace for XI Settings for MDM Catalog 3.0

    Hi All,
    After having a SRM and PI server up and running, I am following the XI Settings for MDM Catalog 3.0 in the Note 1177780 https://websmp130.sap-ag.de/sap/support/notes/1177780
    And I am now stuck at page 4 Interface Determination.
    The problem is that I cannot find the namespace http://sap.com/xi/SRM-MDMCatalog
    Thus, I cannot further proceed to interface mapping.
    Any ideas?
    PS: I found that if I
    1/ do not follow the guide and use Business System as service, I can have F4 help on the namespace available in the Design Builder
    2/ follow the guide and use Business Service as service, the inputs are just like text labels, and there is no F4 help on the namespace
    So should I still follow the guide ? Or I will be better off using Business System as service ?
    Yours,
    Chun Fai

    Dear Chun Fai.
    Under the menu ~
    SRM-MDM CATALOG 3.0 in integration repository software component SRM-MDM CATALOG, what namespaces are available?
    Regards,
    Jason

  • Restriction for Material Component deletion after PO creation in PS

    I want to restrict the material component deletion from the Projects once the PO is created for it. I have done the required configuration settings in OPSG (Change Profile Order Change management) where the system must give an error for material component deletion once the PO is created for it. But still it is not working.
    1) Why the configuration in OPSG is not working?
    2) Is it required to use user exit CNEX0009 or CNEX0039?
    3) Where can I locate uset exit CNEX0039 if required?
    Can anyone help on this issue!!!!

    Hi,
    Please check again the settings in OPSG.It is std functionality in SAP so i think it should work.
    Muzamil

Maybe you are looking for