Shelf Life Expired Material will automatically be transferred to block stk

Hi,
We have purchased a material, RM u2013 XYZ, Qty u2013 5000 kg, Mfg date u2013 01.06.2010 and Expire date is 30.09.2011. The material was received on 25.06.2010. Presently the stock of material is lying as unrestricted type.
I want to know that when the shelf life of the material will be expired, the material will atomically be transferred to block stock. How do I configure the same?
Further, is there any standard alarming system as to know the shelf life of material is going to be expired?
Regards,
Amit

The problem is that the section of the program (QA07) that blocks the stock  runs first.  Therefor all "expired" stcok within the time frame specified is moved.  When the program runs the section to create inspection lots, it will only take into consideration stock that is in unrestricted stock.  Since the stocks have already been moved to blocked stock, there is no stock in unrestricted inventory and hence no inspection lots.
In your case, in the section "Batch status change when expiration date is reached"  you need to untick the "Block batch" and remove and values iin "Initial run in days" in this section.
In the section above that tick on "Block batch at inspection date" and maintain a value in "Initial run in days".
This will have the effect of creating lots when the next inspection date falls within the window specified and will move the material to blocked stock on the inspection date.
Keep in mind that this is all working on the "Next Inspection Date" of the batch.  Not the expiration date.  So you should have a process to keep the next inspection date and the expriation date in sync.
To cover yourself and make sure that batches are blocked if the expriation date is reached, set up QA07 to run again immediately after the above job.  In the varinat for this run, tick back on the "Block batch" and set a value in the "Initial run in days".  This will then block any stocks missed in the inspection lot creation process above.
Also see the folowing threads which explain the deadline mointoring program.  There is a lot of info on this process on the net.
http://sapfans.com/forums/viewtopic.php?f=27&t=334825&p=1016796&hilit=Deadline+monitoring#p1016796
http://sapfans.com/forums/viewtopic.php?f=27&t=250686&hilit=+deadline
FF

Similar Messages

  • STO delivery should not happen for shelf life expired material

    Hai all,
    When we are doing PGI for STO-PO. shelf life expired material should not do the delivery.The system should give the error message. but in our system when we do PGI the shelf life expired material is deliverying.
    how do we maintain the error message when we doing PGI.
    Edited by: hemanth s on Sep 12, 2008 9:37 AM

    Hi,
    In Inventory management there is a which helps you "Set expiration Date Check". This allows you to make sure that the shelf life of the material is checked before delivery.
    In Material master, you would need to enter relevant information in the "Plant Data/Stor. 1" tab page (Min remaining shelf life, total shelf life). Also in IMG settings, you need to activate the check for both Plant and movement type. The path is as follows:
    IMG Settings > Material Management > Inventory Management and Physical Inventory > Goods Receipt > Set Expiration Date Check. TCode: OMJ5
    Cheers.
    Edited by: Sowmya Mohan on Sep 15, 2008 8:43 AM

  • Return Stock -shelf life expired goods processing

    Hi Mates
    *Iam maintaining all the materials in Batches.
    *My scenerio is when customer returns the goods,matrerails has to posted to seperate storage location.This we have done.
    *But when customer returns the shelf life expired material iam unable to do PGR.Only then after changing the Date of MFG in transaction MSC2N iam iam able to do PGR.
    *But my requirement is if iam selecting return stock storage location system should not check whether that goods are shelf life expired or not.
    *Customer will revalidate the goods and change the date of mfg accordingly.
    Kindly do the needful.Thanx in advance

    The problem is that the section of the program (QA07) that blocks the stock  runs first.  Therefor all "expired" stcok within the time frame specified is moved.  When the program runs the section to create inspection lots, it will only take into consideration stock that is in unrestricted stock.  Since the stocks have already been moved to blocked stock, there is no stock in unrestricted inventory and hence no inspection lots.
    In your case, in the section "Batch status change when expiration date is reached"  you need to untick the "Block batch" and remove and values iin "Initial run in days" in this section.
    In the section above that tick on "Block batch at inspection date" and maintain a value in "Initial run in days".
    This will have the effect of creating lots when the next inspection date falls within the window specified and will move the material to blocked stock on the inspection date.
    Keep in mind that this is all working on the "Next Inspection Date" of the batch.  Not the expiration date.  So you should have a process to keep the next inspection date and the expriation date in sync.
    To cover yourself and make sure that batches are blocked if the expriation date is reached, set up QA07 to run again immediately after the above job.  In the varinat for this run, tick back on the "Block batch" and set a value in the "Initial run in days".  This will then block any stocks missed in the inspection lot creation process above.
    Also see the folowing threads which explain the deadline mointoring program.  There is a lot of info on this process on the net.
    http://sapfans.com/forums/viewtopic.php?f=27&t=334825&p=1016796&hilit=Deadline+monitoring#p1016796
    http://sapfans.com/forums/viewtopic.php?f=27&t=250686&hilit=+deadline
    FF

  • Shelf life expiration dates for finished goods

    Hi,
    Is there any opportunities with in SAP to block the finished goods once it reaches the
    self life expiration goods AUTOMATICALLY.Our business requirement is particularly interested in this requirement.ONLY FINISHED GOODS,BLOCKING AUTOMATICALLY.
    UPON EXPIRY OF SHELF LIFE EXPIRATION DATE.
    With regards,

    Hi Charu Bela,
    Thanks for your reply.
    I checked your reply and found with OMJ5 settings for movement type 101 in production goods receipt,if material master data is maintained in Shelf life details in plant storage, then production date field will prompt.
    Moving forward,Once i give the production date here for any finished goods,then,I believe system will calculate the SLED (Self life expiration date ) automatically,right? accordingly system will block these finished goods.
    Also,In ware house management how these kind of materials are handled? Is there any specific transaction codes in WM?.
    Also,If you know specific tables for SLED ,Kindly help to understand.
    Your answer is appreciated.
    With regards,

  • Shelf Life Expiration Date - SLED

    Hi Experts,
    Is required to mange the material master in batch management for activing the shelf life expiration date.
    Can you briefly give the exact idea about shelf life expiration config settings and master data settings for gettin SLED.
    We want to active SLED for in-house and external procured material.
    Thanks in advance
    Vikas

    HI,
    You mean say that wthout batch management, SLED cannot be activted, right??
    It does not mean that , for activate the SLED for the plant need the batch management.
    you can activate and use the SLED for the materials for your plant.
    so when ever you do the GR for the material, system will check the expire date and if life is ther then only system alow to do te gr

  • Packing Material with Batch Management and Shelf life expiration date check

    Dear All,
              I created a packing material and activated batch managemnt with shelf life.
                At the time of GR the batch should be created automatically or if i want to create a batch manually for some materials how to do it in the system.
                         Help me

    Before going ahead with the batch creation,
    you need to activate the batch mngmnt level (i.e.Client,plant,material level)
    And also activate the Nor.ranges.
    Then Create the Classification,Characteristics and assign the Chrctstics to Class.
    Then create the batch
    T Code:
    CT04 create Char.
    CL02-Create Class
    CL24N:Assign class to material
    MSC1N:Create Batch

  • Shelf life from material master not flowing into purchase order

    Hai friend
    I have set a shelf life value in material master ( both minimum & Total shelf life). 
    But while creating purchase order, values are not flowing from material master to purchase order.
    The field is empty.
    How to configure, please help.
    Regards
    Rammohan

    1.activate batch management
    2.to calculate SLED production date/date of goods receipt is mandatory during GRN
    3.Maintain characteristic for production date MCH1 - LFWRT
    4.assign this to class
    5.Maintain this class to material
    6.Now do GR ,it will prompt for production date .based on this ,sytem will calciulate SLED
    hope it helps

  • Shelf life in material master

    Dear Experts,
    My one mateiral total shelf life is 360 days ( from date of manufacture to exipary date ) what setting I fill in material master and in receving if this material expiry is pending only 10 days . I fill the manutature date in migo.
    RC

    u fill the sled data at nMigo means u already configured the SLED config.
    now mat master is plant data/stor 1 - Total shelf life 200 days as per ur req.
    now do the Gr date , the staem will check GR - sled manufc date u mentioned and 200 days to find the xpiry date .
    reports are there to gethe details 50 days pending list , 100 days pending list etc
    regwdz

  • Any Config Option to Remove Shelf Life from Material Spec Summary Tab?

    Hi All,
    We are on PLMv6.1 and have been using a custom section for Shelf Life for both Trade and Material specs to meet our business needs while we were on 6.0. At this time, we would like to remove the "internal" Shelf Life section from Material Trade specs Summary tab and not have it included in eQ. We have found that having two instances of Shelf Life confusing for users. Is there any method for us to config the Material Shelf Life Section "Off" as there is in the Trade Spec?

    At this time, there is no config to turn this off. You may want to consider submitting an enhancement request. you could try utilizing section level editing to disable it, however, it will still be visible. this would not affect eQ, however.

  • Shelf life Expire Mail

    Hi
    All MM experts is it possible in batch management when the shelf life of particular product  Expires, it will Go to Restricted Area through 341 movement .Is There any setting the Auto mail is Generated to concern person when it is moved to restricted Area from unresticted.
    How the Qm Works in this flow
    if any Document Please mail At [email protected]
    Regards
    Sanjay

    hi,
    as for as setting is concerned i am not aware,
    but table: MARAV will give u some information
    TC is: MB5M

  • Disable Shelf Life Expiration date for Movement Type 311

    Hi All,
             Whenever we run the transaction MB1B with the movement type 311, it copies the batch and its shelf life expiiration date. Due to this, there are time when the user unknowingly enter a differrent SLED and hence change the batch unknowingly. We want to stop this. We want that while we are doing 311, the batch record and the SLED should get copied from the batch master BUT the field for SLED should be grayed out or the user should not be abale to enter ANYTHING in the SLED and the system should take the default SLED from batch master. Can we achieve it through config ? Please suggest.

    Please get a user exit developed and add it to the program SAPMM07M which is used in MB1B which will solve your purpose. The User exit should be fired when using 311 movement type during copying of Batch Characteristics. Hope this helps you.

  • Self Life expired material

    Dear Mates
    In my case system picks the Self expired batch with warning.How can I convert warning  into error message and system picks the next batch(based on self life)

    As I understand you re speaking aout shelf life in sales...in tis case you can solve your problem via batch determination:
    http://www.renet-web.net/2008/09/05/sap-batch-determination-made-easy/
    Some useful OSS notes: 33396, 78235, 120319,, 72771
    Regards,
    Csaba

  • Shelf life expiration date.

    Dear All,
    I have one query regarding the batch management.
    For materila XYZ in the material master,storage1 view I maintained the total helf life as 365 days.
    But the shelf life is different for different plants.
    For example for material XYZ for plant ABC the total shelf life is 365 days.Where as for plant ABC1 the total shelf life is 325 days and for plant ABC2 the total shelf life is 255.
    How can I fullfill this requirement.Is there any way the SAP provides to satisfy this requirement.
    Thanks to all.
    Rgds,
    Babu

    there is no plant specific total shelf life in a material master.
    Your scenario is not possible.
    Maybe you can achieve it with a Z-table and userexits to determine this plant specific.

  • Shelf Life of the Batch Material

    Hi,
    The shelf life is maintained for the batch material during GR process .IF the shelf life expired how to bring the stock under quality inspection for re-checking?
    Thanks in Advance.
    Regards,
    Renuga.A

    Hi Renuga,
    Kindly go through these threads it will surely solve your query.
    [Link - 1|Re: Inspection type 09 process]
    [Link - 2|Recurring inspection problem;
    Regards,
    Shyamal

  • Material shelf life expiry

    Hi All,
    While Making GR for an Material (10001) I am not getting the date Date of Manufacture and Shelf Life Expiry Date under the BATCH TAB in MIGO Screen.
    For that i need to activate anywhere?
    IF yes Please guide me the path where I have to activate?
    Note:
        1. I just created the shelf life expiry days in Month under plant data/storage 1 View against the material.
        2. Only the field is not displaying while making the GR.
    Thanks in Advance,
    Priya

    Hi,
    Yes Mr Ravi. You are right I given full points to u.. I just made tick on
    "Indicates that the shelf life expiration date check at the time of goods receipts in the plant is active"
    Now its displaying those fields.
    Thanks.
    By
    Priya.

Maybe you are looking for

  • Error while Release Invoice to Accounting in VF02.

    Hi Dear all,      While relesing invoice document to account in VF02 tcode , System is throwing "Posting Key For account determination for transaction EXD( Account Key ) do not exists" this error. Please anybody explain...... Thanks in Advance. Pradi

  • Ipod to tv mirror

    is there a cabel that mirrors the ipod screen to the tv

  • Macbook pro to HP w1907

    I just bought an external monitor and mini-DVI adapter for my macbook pro 13'( latest model)   I got everything connected correctly, but when I tried to use the external monitor, all I got was a message saying "No signal", and the display promptly we

  • Delegation model?

    What is delegation model in java? What actually does it do?

  • Images as anchors for answers

    Is it possible to use images as anchoring points for answers? For example, instead of seeing the choice "very good", could one use a smiley face  like this as a choice ?