Solution Manager IP Change

Hi Gurus,
My Solution Manager IP has been changed due to ISP change , my Solution Manger Public  IP change, so request to please help to solve this issue....
(1)How to update to SAP for NEW Public IP for Solution manager.
(2)How to change IP in solution Manager.
Regards
Ashwani

Hi Ashwani,
Pls check below notes,
33953
Network providers for connection to SAPNet R/3 front end
137342
Schedule - connection to SAP extranet, OSS and SAPNet
Regards
K.N

Similar Messages

  • Solution Manager Certification -- Change Control Management

    I am planning to do the certification test on "Application Management Expert - Change Control Management" , C_E2E200_08.
    I am looking for sample questions or any study tips.

    Hello Tathagata,
    Please do the following checks.
    1) Check if the satellite system TMS is configured with three system landscape.
    2) Check both to and back RFCs to the systems. Especially check if the users are not locked. Even if the users are locked, the RFC check may give you green.
    3) Go to central configuration(/TMWFLOW/cmsconf) in Solution Manager system and check if the system are shown green.. If not there will be a check list to make the systems green. For example no changes should be permitted in the production system.
    Regards
    Farzan

  • SAP IDM on Solution Manager with Change Request Management

    Hi Experts,
    I'm facing a question. Does SAP Identity Management manage association between user in Solution Manager and links in PPOMA_CRM tree for Ticket validation on Change Request Management project ?
    It seems that it could be done using Compliant User Provisioning from GRC Access Control application.
    Thanks for your help,
    Ben

    Hello Ben,
    as far as I know currently there is no "business level" integration between IdM 7.1 and SAP Solution Manager. You only can create SU01 user data as for any other SAP ABAP system.
    I have heard that it is planned for the future to integrate the Solution Manager also in the business suite integration options the IdM product already provides for applications such as CRM, SRM and others.
    Nevertheless you could create your own implementation for your requirements.
    Regards,
    René Feister
    SAP Consulting Germany

  • Add new system to an Existing project in Change Request in Solution Manager

    HI,
    Is it ok to add new systems and remove systems to an existing Project in Solution Manager with Change Request Management activated?
    Currently, Change request is already set-up in our solution landscape, however, a new BI Dev and QA systems were created to replace the old Dev and QA systems that was initially set-up in our Charm. Can you please share with me the steps that I need to do to successfully remove old Dev and QA from Charm and replace them with the new systems? Is it safe to do this in an open project and maintenance cycle?
    Thanks!

    Hello,
    Please, check the topic "6. Changes in the logical components of a project where Charm is already activated" of the link below:
    /people/dolores.correa/blog/2009/07/22/change-request-management-scenario-usual-questions-and-known-errors
    I think that this link can help you.
    Best Regards,
    Diego Fischer

  • Solution Manager - Can support user user changes manegement ??

    Hi All,
    In solution manager can change request type as a "New user creation" or "User authorization Change".
    So that we can keep track of New user creation or change in authorization that are created in respective R/3 system.
    The process flow is same like change management for developement correction or customization correction.
    Please give me your comments. It will be very valuable for me.
    Thanks in advance.
    Ravindra Nikam

    As I said, it will depend on the scenarios you will configure.
    For the installation, you will not need any. When it comes to the configuration (SOLMAN_SETUP) you'll need the authorizations in SMP for S-User.
    You can also check here:
    Home - SAP Solution Manager Setup - SCN Wiki
    Check the prerequisites at these Guide:
    https://service.sap.com/~sapidb/011000358700001119962013E.pdf
    https://service.sap.com/~sapidb/011000358700001120342013E.pdf
    Regards

  • Error in RFC & to Solution Manager System

    Hi,
    Error in RFC & to Solution Manager System
    can anyone tells me why this error occurs???
    With regards
    kulwinder

    FYI
    We have just had same issue thaat in certain scenarios with RFC communication BACK to Solution Manager from Satellite system we got the error.  We resolved this by looking at the RFC user used in the BACK connection (i.e. SOLMAN<SID>) on the Solution Manager and changing the user type from communications.
    Hope this helps someone else, I spent ages digging around for an answer to such a simple fix
    Paul

  • Ccmsping registration problem in Solution manager

    hi,
    I am installing CCMSPING agent to check "System Availability" from Solution Manager.
    In our system ladscape we have multiple systems on sigle host. for eg) TP7 & DW1 on single host cpafisb8.
    I have successfully registered the CCMSPING agent in Solman.
    I have followed the Availability doc for registeration CCMSPING. Following are the major steps that i have done:
    1)Download & extract CCMSAGENT from market place.
    2)Configuration of Central Monitoring system.
    3)Registration of CCMSPING using command u201Cccmsping -push -Ru201D.
    4)Configured Availability Monitoring in Central System (i.e. Solution Manager) in RZ21.
    As result i can see the stellite sytem node in RZ20 under         " SAP CCMS Monitor Templates-->Availability and Performance Overview".
    When i go to transaction "solman_workcenter" in tab "System Landscape management", i can see the staus of system as Green for the system i registered.
    Now, the problem i facing in in transaction solman_workcenter is described as follows:
    As i mentioned We have multiple systems on single host, for eg) TP7 & DW1 are on the same host "cpafisb8",
    hence if CCMSPING has been registered for TP7 the status is green for DW1 too even if DW1 has no entry in RZ21.
    Strange thing is DW1 was showing.
    I have tried following three options to make the status correct in solman_workcenter:
    1) I have maintained hostname for TP7 as "TP7.afis.chevrontexaco.net" which is alias for
    hostname cpafisb8 in RZ21 & SMSY & status is correctly showing green for TP7 but still for DW1 which is not defined in RZ21, status is showing green.
    2)I have unregistered the CCMSPING fron TP7. TP7 status has been changed to gray but strange thing happeneing was DW1 status was still green even no ccmsping process was running on the DW1 host.
    3)I have registered the CCMSPING for TP7 with its central instance profile options using command:
    ccmsping -R -push -n31 pf=/usr/chevron/TP7/profile/TP7_DVEBMGS31_cpafisb8
    and agin configured TP7 in solution manager & status changed gray to green for TP7, but no change happening in DW1 status.
    Can anyone please help on this strange behavior of Solman_workcenter.

    Hi,
    Thanks for he reply..
    But i have already followed the process that you described or CCMSPING registration. and CCMSPING is transfering the data successully from satellite system to solution manger.
    And as result of successul registration i can see the status of that satellite system as green in transaction "solman_workcenter".
    But as i described earlier we have multiple systems registered on single host.for eg)SY1 & SY2 on host1
    Hence even though the CCMSPING is not registred for SY2 & only registered or SY1 on host1 with RZ21 configuration in solution manager for SY1; SY2 status is also shown green in transaction solman_workcenter.
    I want that only status of SY1 should be shown as green in solution manger under transaction "solman_workcenter".
    I hope you understood the issue.
    thanks

  • ARIS Solution manager synchronization error

    Hi all,
    we have integrated ARIS software with solution manager for the business process modelling.
    the problem is data is getting synchronized from solution manager to ARIS. no error is coming.
    but when we make some changes in the ARIS structure and tried to synchronize back to solution manager.
    the changes are not getting reflected in solution manager.
    kindly advice in this regard.
    Regards,
    Subhashini

    Hi Solmaic,
    Thanks for your reply.
    ya that is what exactly is happening.
    we have just now started working on ARIS. so we have synchronized a project from solution manager.
    the possiblities we tried are
    1. synchronized the project and changed the name of the project. and synchronized back but nothing is changed in solution manager.
    2. Changed the anme of a scenario and changed a document and synchornized back but that change is also not reflected.
    3. we have created a VACD, made the process type as scenario. but in the log we have got an information that it has skipped the scenario.
    kindly guide in this regard.
    Regards,
    Subhashini.

  • Solution Manager Workflow

    I would like to know if there is any standard workflow template available in Solution manager for Change request management. My requirement is to trigger a workflow when the status of the change request is made to Assigned. I have to send a workitem to a the approver and he changes the status to the next status and then the workflow should send a workitem to next approver and so on. We have two options to do this
    1. One is using the status management(BSVW).
    2. Using Action profiles(similar to one in CRM).
    I would like to know which one is the best option to use for custom workflow development.  Please advice.

    Hi,
    We have two options to do this
    1. One is using the status management(BSVW).
    2. Using Action profiles(similar to one in CRM).
    Use any of these options to trigger the event.
    One the event triggering in SWEL, then mapped your workflow to it.
    Can you tell which BO you are using?
    Regards,
    Surjith

  • Solution Manager ChaRM Issues when Upgrading Satellite System

    When upgrading a satellite system that is connected to Solution Manager's Change Request Management, is there anything that we need to be aware of?
    Will Change Documents still be able to go to completion (Production status) if we modify the landscape from the time the Change Document is In Development to the time it is moved to Production?
    1. Normal Correction (In Development)     Development (ECC 5.0) -> Quality (ECC 5.0) -> Production (ECC 5.0)
    2. Landscape is changed to                    Development (ECC 6.0) -> Quality (ECC 6.0) -> Production (ECC 5.0)
    3. Normal Correction moved to To Be Tested -> Consolidated -> Production
    Will the Normal Correction be in error because the landscape changed for the iBASE?
    Are there any other lessons learned that anyone has experienced with Change Request Management or Implementation during and after an upgrade?
    Thank You,
    Carlen
    Edited by: Carlen Yuen on Jan 13, 2009 1:50 AM
    Edited by: Carlen Yuen on Jan 13, 2009 1:51 AM

    Thanks Subhashini!
    We had issues updating the Task List in the past. After we update the landscape and refresh the project and update the Task List, do you foresee any other problems?
    Are there any additional items we should look out for? For example, we understand it is a requirement to release all transports prior to beginning the upgrade. However, since the release of the transport locks the change into the cycle for the next production move, this will present a problem if the change is not yet ready to be moved into Production. Do you have any further insight to any additional issues such as this?
    Thanks again!
    Carlen

  • Maintenance Optimizer in SAP Solution Manager

    what is Maintenance Optimizer in SAP Solution Manager and what are its benefits

    Hi
    even this may be useful
    Ensure your Solution manager system is at the most recent Support Package Level, specifically ST 400 Patch 11, to reduce note application time
    Download from oss most recent step-by-step setup guide
    Oss note 1024932
    Oss Note 1008717 ( N/A )
    Relevant up to SP11 for Basis 700
    OSS Note 950975 support for IE7 ( N/A we are using GUI)
    Oss note 975510 – corrections for snote ( Via OSS not snote )
    Oss note 1004691 – corrections for snote *** Corrections for 975510 ( UP TO SAP_BASIS 11 ) N/A
    Common problem notes, but not critical for Maint Opt
    0998987: Maintenance Optimizer: Empty error messages
    1022072: Maintenance Optimizer: "No Data Available" message o See note 1025381 before applying 1022072.
    1020789: Maintenance Optimizer: Allow all systems to be selected
    1020802: Maintenance Optimizer List displays incomplete data
    1024105: Maintenance Optimizer: two "Cancel" buttons
    1025381: Maintenance Optimizer: Link to additional download files
    1029453: Maintenance Optimizer - Wrong status displayed
    1030405: Maintenance Optimizer: Browser opens in background
    1030498: Maintenance Optimizer - IBase is not active
    1032463: Maintenance Optimizer: Internet Explorer Script Error
    1042704: Maintenance Optimizer: Display only employee partners
    Partner Scenario SOLMAN4.0 Only
    Os note 1021275 ( RFC Destinations ) N/A ST 400 11
    Oss Note: 997780 ( N/A we are at 11 use note 939897 for ST400 SP11 Application )
    Relevant for ST400 SP09 ( N/A ST 400 11 )
    User:
    To setup you must have SAP_ALL
    General Users: ( Oss note 1032322 )
    Must be assigned to role SAP_MAINT_OPT_ADMIN
    Auth Object: D_SOL_VSBL ( visibility of solutions)
    Auth Object: CRM_ORD_PR ( for CRM stuff )
    /spro
    As of Support Package level ST 400 SP10:
    Call Transaction SPRO -> SAP Reference IMG ->SAP Solution Manager -> Advanced Configuration -> Basic Settings -> SAP Solution Manager System -> Change Management -> Set Up Maintenance Optimizer
    This IMG activity refers to the SAP Note 990534: Solution Manager Maintenance Optimizer: BC Set. Follow the instructions in this SAP Note
    N/A as of ST400 SP11
    Define a Solution:
    Solution_Manager – Select Solution Overview – New.
    Enter Descriptive Name ( Ex. GTS Landscape )
    Hit Continue
    Select Solution Landscape Maintenance
    Select System Groups & Logical Components on the Left hand Side
    Select Solution Landscapes and pick the one you created
    Define the solutions for that landscape
    Highlight each item and click Logical Component (You must have a valid license to set this up)
    Assign S-User
    Transaction: AISUSER
    Enter you user id and your SUSER ID for downloading
    Create another SAPOSS Connection called SAP-OSS with S-User assigned
    Call SOLUTION_MANAGER
    Select Solution Overview
    Select the solution you want to work with
    Select – Change Management – Support Package Stacks
    Click Maintenance Optimizer around middle of screen
    Select the solution you want to get Sp’s for
    Go to OSS and add the files to download basket
    When done return to screen and hit continue
    Select - Confirm files in Download Basket
    Error message comes if your sap user and your oss user are not setup in AISUSER screen
    Now go to SAP Download Manager ( On your local pc ) and download the files you just confirmed – of course using the same S-User id you just added them to the basket with
    Apply support packages via spam per normal process
    Return to the SOLUTION_MANAGER window select the landscape you are working on
    Hit Maintenance Optimizer List
    Choose the maintenance transaction you are working on
    You will see a list of the confirmed and downloaded sp’s you selected
    Once you apply these to the system using SPAM you will change the status of implementation to Completed and Hit Save
    This completes this activity
    If you wish to do more work you will have to create a new transaction.
    [Edit section] Add A New Instance to Maintenance Optimizer
    Sign into Solution Manager
    Ensure new instance has valid license installed and logical clients assigned
    Select Landscape Components
    Right Click Systems
         Select Create new system with assistant
    Enter
    SID / Description / Product Type / Installation Number ( Get this from SLICENSE in system you are setting up )
    Next enter Sys # & MEssgae Server and hit continue
    Next select Generate RFC Destinations & Assign Logical Components & Enter Client #
    I always get a problem saving since SLD is not setup – ignore and continue
    Highlight the system you just added under Systems – SAP Global Trade Services –
    Select Assignment to Logical Components
    Now add additional software such as Net weaver ABAP & JAVA if your primary setup was of another type ( ex. GTS )
    Highlight the system you wish to update under Systems and hit change
         Select Header Data
         Click Installed Product Versions
         In the product box add whatever you require for this system
         Select the version from the 2nd box and hit copy
    Ex. 
    If you cannot setup the trusted system here is a workaround:
    Create User in Target for Trusted System RFC from SM1
         User:      <Username>
         Pass:   <Pass>
         Type: Communication
    Use this when setting up the trusted connection, remove the trust and use this CPIC user info for the RFC.
    Generate RFC’s and ensure SMSY setup is done for SID in Solution manager
    Now Create a New Solution For your instance:
    Go to SOLUTION_MANAGER transaction
         Select NEW
         Give Descriptive name: ex. GTS Landscape
    Under Solution Landscape
         Select Solution Landscape Maintenance
         Select System Groups and Logical Components Tab
              Open Solution Landscapes
                   Select the one you just defined (GTS Landscape)
    SOLTION_MANAGER
    Select Change Management – Support Package Stacks
    Select Maintenance Optimizer
    Select the Product Version
         GTS 7.1
    Select the System Type – SID
    From here you will be prompted to go to service marketplace and add the items you wish to install. You can do this beforehand as well, be sure to use the same Suser you setup in AISUSER with your sap login
    It will ask you to confirm the basket, once you do that you install them normally.
    Download with sap download manager, ftp and apply

  • Report for Change documents in Solution Manager.

    Dear Masters,
    In Solution manager, we are monitoring the inbound support messages through the Transaction code  CRM_DNO_MONITOR.
    Here i can veiw the status of support message as of now, but i am not able to see the changes done throughout the process.
    Is there any report where i can find the data for changes done on the support messages for the given period?
    I can find the change documents where by entering into the support message in Menu bar  under  Extras > Change documents.
    But my requirement is i required this report for the some number of support messages for the given period.
    Your help will be much more appreciated.
    Thanks,
    Panneer

    hi
    is this te one are you looking for
    [http://help.sap.com/saphelp_smehp1/helpdata/en/43/2f40b6853e0d23e10000000a1553f7/frameset.htm|http://help.sap.com/saphelp_smehp1/helpdata/en/43/2f40b6853e0d23e10000000a1553f7/frameset.htm]
    jansi

  • Solution Manager 3.2 SP 8- Change Request Management Configuration Problem

    Hi friends,
    We are in process of implementing SOLMAN 3.2 SP8 in our landscape.I am facing  problem in configuring change request management.
    When the developer is working on an urgent correction document we are facing a problem.The steps we are following are here under provided.
    Step 1 :
    Selected Action "In development" - > it created the transport request in the dev system.
    Step 2:
    Action "Log into System" -> made correction attached to the transport request manually and released the task.
    Step 3:
    Action "Release transport requests" -> The transport request in the development was released.
    Step 4:
    Went for action "Pass to correction" -> I am facing exceptions which conveys
    Status was reset by system
    A condition is not satisfied because of an exceptional situation
    Not all transport requests yet released
    And we would be thankful if you provide the authorization required for the different roles in the change request management.I have followed the help file of SOLMAN 3.2 and create the users as under
    User - Role
    SOCM_RQSTR - ZSAP_SOCM_REQUESTER
    (Derrived from SAP_SOCM_REQUESTER)
    SOCM_DVLPR - ZSAP_SOCM_DEVELOPER
    (Derrived from SAP_SOCM_DEVELOPER)
    SOCM_CHNGNGR - ZSAP_SOCM_CHANGE_MANAGER
    (Derrived from SAP_SOCM_CHANGE_MANAGER)
    SOCM_CHNGNGR - ZSAP_SOCM_IT_OPERATOR
    (Derrived from SAP_SOCM_IT_OPERATOR)
    Even then I am facing problems while developer creating transport requests and while logging into development system.
    I tried adding S_RFC,S_RFCACL auth objects to their roles but did not help.
    Pl. suggest.
    Thanks & Regards
    Mrutyunjay
    Message was edited by: Mrutyunjay Rao Dora

    Hi all,
    We are trying to implement the Change Request Management piece in Solution Manager 3.2. 
    We are facing the following issues which I think relate to the same reason:
    1)We have created a Maintenance Project in SOLAR_PROJECT_ADMIN and assigned it a logical component, which consists of our two system landscape (namely DEVàQAS). We have also created the IMG project in the DEV system and have distributed that IMG project to both the Solution manager system and the DEV system. Now we have to make the maintenance cycle and task list for that maintenance project, but as we select the project and click on “create project cycle” it shows the message "The project is not released. Hence cycle can not be created". It is showing the status of project as locked .How can we open or unlock the project to remove the error?
    2) Also after selecting the SMI project when we click on the button “CTS status switches” or “project specific Transport route” it responds with the error "Project landscape not configured; set the project status to "open" first ".
    3)When we click on “synchronize single project” it prompts for the login of connected system (Development System) and after login, it gives an error "Warning, problems during synchronization of the system Landscape".
    For Error resolution, we have checked the system landscape and it does not give us any errors. We have done that, both from the solution manager by going to the transaction SOLAR_PROJECT_ADMIN -->  >system landscape tab>selecting our logical component and doing a check by clicking the "Check system Landscape" button. It returns with "no Errors". We also did a check on the TMS configuration by logging directly on to the TMS domain controller system and checking the Transport routes. We have checked the RFC connections without any errors.
    Any help would be greatly appreciated.
    Thanks
    Abhi

  • Solution Manager Change Management Master Guide

    Hi
    We are looking into implementing Solution Manager 7.0 and have the
    following questions:
    - Can we implement change managment in Solution Manager with only one
    satellite system (i.e. Development) as the other systems are not ready
    yet (i.e. Test, QA etc.)?
    - Could you let us know where we can find the master or technical guide
    to setup change management in Solution Manager 7.0.

    Hi,
    it is possible to implement ChaRM even not all satellite systems are available yet.
    I am not sure how much functionality you will get using virtual systems but you may configure and test ChaRM using 3 different clients in your DEV system (need to adjust TMS config accordingly).
    Some useful information regarding ChaRM configuration can be found [here|/people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario]
    Since ChaRM relies on Service Desk you should also have a look at appropriate Blogs.
    Also you should follow the IMG documentation/steps in SPRO.
    Regards

  • IBase When Creating a Request for Change in Solution Manager 7.1

    Hello all,
    We recenlty upgraded our sandbox system to Solution Manager 7.1 SP3 and are currently investigating the new ChaRM functionality with the new CRM UI. Our company had configured ChaRM back in 2007 and has been working very well since the initial delivery.
    While I was following the Request for [Change process simulation from RKT|https://websmp208.sap-ag.de/~sapidb/011000358700000478022011E/index.htm] on our sandbox system, I had noticed that the iBase and Component that we have  created in transaction IB52 prior to the upgrade were not showing in our search when we were defining the Change Request Scope section. In the documentation that I have read leading up to the upgrade, there have been no mention of the iBase/Component data becoming invalid post-upgrade nor have I found a conversion process.  I have done a search here on SDN and on SAP Notes to see why the iBase and Components were not showing up.
    Has anybody encountered this issue since the upgrade to 7.1 or is there something I need to do in IB52 in order for the iBase/Component in the new CRM GUI?
    Your assistance in this matter would be greatly appreciated.

    Hi,
    yes in 7.0 it worked for me too, that is because in 7.0 ChaRM searched for projects based on the IBase you selected.
    If there were more than one project where this system is involved you got a pop up where to chose your project.
    In 7.1 you chose the project directly, instead of let the system search for you.
    And depending on what productive-systems are in this project you get your Ibase list.
    If you don't select a project at all you will still get a list of all Ibases in your system.
    Iif you ask the SAP, they will allways tell you that you have to have a productive system in your project, at least as you pointed out with a virtual system.
    I did not read i t though and therfore ca nnot provide any sources.
    This is all based on my experiences.
    Best Regards
    Daniel
    Edited by: Daniel Titze on Nov 23, 2011 6:16 PM

Maybe you are looking for

  • How do I connect iWeb Site back to iWeb?

    When my internal hard drive crashed I replaced it with a new one and upgraded to Leopard. Unfortunately I can't change my website because iWeb 08 doesn't know were it is located. I have found the files in my iDisk. If I delete all the files in the fo

  • Difficulty installing Oracle 8i 8.1.1.6 on Redhat Linux 7

    Hi, I am having difficulty installing Oracle 8i 8.1.1.6 on Redhat Linux 7. The installation process runs well and the last stage when the Database Configuration Assistant is running. It successfully copies the database files but when it reaches 80% (

  • Problem with the bouncing output always at 0 should be lower

    I am bouncing my mix for cd in the stereo out channel i have linear phase equ , then , multipress , than finally the Adaptive Limite which the output i set -0.1 . After bouncing the file peaked at 0 even whe i set the limiter output to -0.2 it still

  • Getting application Name

    Hi Experts, I have PCD path of portal page. Can I get application path(the full path with project path and application name) of the application that portal page is holding? Regards, Gopal

  • Unable to Resize datafile Oracle 9i.