Source Location in SNP Heuristics - Planning Run

hi,
I am trying to execute a Planning Run for Manufacturing Location -> Depot model. The scenario is that a depot D1 can be supplied from 2 manufacturing locations ( M1 and M2 ).
Transportation lanes have been maintained as M1 -> D1 and M2 -> D1.
Stocks are available in both M1and M2.
When I take the planning run ( /sapapo/snp01 ), a purchase requistion is being created only from M1 ; M2 is not being considered as a source location.
Can anyone give some inputs on the same.
regards,
Anirudha

Hi! Anirudh,
SNP hueristic run on a standard logic in priority basis.
1) First it looks wheather quota is defined or not. if it finds an inbound quota it will create a purchase req to that location
2) if quota is not defined it looks for lane priorities defined
3) if there no lane priority it looks at per ton means of transport.
  Please revert in case of any doubt
Regards
Vaibhav Sareen

Similar Messages

  • Exclude stock at a storage location from the Productionn Planning run

    Hi,
    We have to exclude a storage location from the Production Planning run. We already implemented a user exit in CIF and changed the stock at the storage location to a category Z1 that is not relavant to SAP, but the stock at the location is still being consitered for production planning.
    Please suggest a way so that it is excluded from the Production planning
    Regards,
    Sireesh

    Hi Sireesh,
    Please try these following options.
    1) Filter this storage location in the programme /SAPAPO/RMSDPDEP by writing customised code with an abapper, so that it will drops the storage location stocks not getting planned during deployment
    2) Try anyof these user exists
    APOBP011 Enhancement for Stock BAPIs (BUS10504)
    APOCF011 Inbound Processing: Stock
    APOCF027 Customer-Specific Enhancements: Stock
    3) Exclude the category from the ATD receipts category group maintained in the master data
    Regards
    R. Senthil Mareeswaran.

  • Subcontract with source location in SNP

    Dear APO experts,
    finally go this message entered correctly.
    can someone shd some light for me on the subcontract process in SNP and the integration to ECC.
    Using SCM 7.0 and ECC 6.
    Set up the subcontract proces in SNP and all work weel, apart from I cannot find the help to explian

    incompolete message, please delete

  • Executing Personal cost plan run

    Hi ECM Gurus,
    We are to do budgeting through PCP, we have created our own data collection methods to load IT0666 and when we tried to Execute the Planning Run for the Period 01/01/2011 - 12/31/2011 we are expecting the same value to roll up to the org units as in IT0666. But for the New Hires after 01/01/2011 system is prorating the budget value from IT0666 whereas we have already stored prorated value for each employees in IT066.
    Can any one please guide me on how to avoid  the proration during Manage Cost Plan PHCPADMN.
    Thanks.

    All planning data that you generate in a defined period for a specific planning scenario based on a specific data basis.
    A personnel cost plan allows you to define all information that is necessary for generating planning data such as planning scenario, planning period, and data source. By performing cost planning runs you fill the personnel cost plan with data.

  • SNP Heuristics is not picking up contracts as source of supply

    Hi Experts,
      I have a strange situation here. I have integrated a vendor contract with APO, which has created an external procurement relationship and a valid transportation lane. When I create a receipt element manually through /n/sapapo/rrp3, the source of supply is determined rightly to this vendor and receipt is created.....but when I run location SNP heuristics interactively, system generates receipt element without any reference to this source of supply. Expectation is creation of receipt element with reference to vendor and contract...
    System release is SCM 5.1 with ECC 6
    Am I missing something?....please let me have your inputs...
    Thanks and regards,
    Raghav

    Hi Aparna,
       Thank you for your response.
    I have checked the note, but it is applicable till SCM 500 SP 13. Our's is SCM 5.1 and this is inclusive I suppose. As per the SAP SCM standard documentation, external procurement relationship between vendor and receiving plant can be created through following 3 docuements:
    1. Purchase infor record
    2. Scheduling agreement
    3. Contracts
    Additionally, as per documentation, even source list between plant and vendors can be integrated by enabling the same through R/3 transaction 'CIFPUCUST01'.
       I have worked with first two and SNP considers these for source determination. When I tried to integrate the contract, though it is creating TL between 'vendor --> receiving plant' and an active external procurement relationship, SNP is not found considering this for source determination. When I tried to use the source list for creating TL and esternal procurement relationship, the same is not creating any.
    What type of contracts can be used for SNP planning and what else required to be done for integrating source list? I have enabled source list in R/3 material master. Source list is maintained as 'MRP relevant' in R/3.
    Thanks and regards,
    Raghav

  • Replenishment upto max. stock level during SNP heuristics run.

    Hi Experts,
    As per the requirement from client, we need to configure the setting of replenishment upto max. stock level during SNP heuristics run.
    I am using below settings in R/3 for achieving the expected results.
    (R/3 ) MRP1 u2013
    Lot size                       HB               Replenish to maximum stock level
    Maximum stock level       20,000
    (APO) Targ.Stk Lvl Methd   5 u2013 in APO u2013 product master -   lot size tab.
    Still, after heuristics run, the requisitions are getting created equals to forecast value. It should get generated as max. stock level maintained.
    Could anyone share their experience regarding this? Am I missing some additional setting?
    Inputs are highly appreciated!
    rgds/Jay

    Dear Jayprakash ,
    If the requirement is that  you have to replenish upto a certain stock level then instead of maintaining the  Max Stock level you can simply maintain
    SB : Safety stock from product master
    and in the  Safety stock field maintain the quantity as desired ( in this case 20000 ) . This probably will solve the problem  in your case . You may not require  to maintain Max stock level .
    Target stock level in heuristics also works fine with the following settings
    make sure you maintain
    Target stock level method as =5
    In Maximum Stock level  = maintain the quantity desired  ( 20000 in your case say )
    do not maintain  any safety stock method keep it blank .
    then location heuristics generates PR according to the  the maximum stock level.
    If still it is not working plz let me know what other settings you are maintaining probably we will find a way out .
    Hope it helps .
    Thanks
    Debsankar

  • Reorder Point Planning via SNP heuristics based on ACTUAL stock

    Hi All,
    In R/3 there is the option in reorder point planning to take into account external requirements (MRP type V1) or not to take into account external requirements (VB). When using reorder point planning in APO SNP Heuristics, the reorder point is being determined in time based on the PROJECTED stock (so taking into account external requirements) so the result is the same as in R/3 when using MRP type V1. In the future horizon, everytime the projected stock goes below the reorder point, a replenishment is triggerd via a planned order or purchase requisition.
    I would like to know if (and how) it is possible to perform reorder point planning in APO SNP via heuristics (can be location or network) only taking into account the ACTUAL stock (and no external requirements in the past or in the future). So, the same behavior as the MRP type VB in R/3. The difference is that only on the short term, 1 time replenishment is triggered (via planned order or purchase requisition) if the current stock is below the reorder point.
    Remarks: this needs to be able to be set product specific, because not all products at the location will need to use this logic.
    Any help or thoughts for a solution direction (preferably without programming or user exits) are appreciated.
    Thanks in advance,
    Dennis

    If you really just want a pure re-order point scenario based on current stock, I'd suppose that you'd want to create a new data view and modify the total demand macro so that it doesn't generate any sort of future requirements (total demand will essentially be zero).  Then the reorder point will be the only thing driving planning when compared to the initial bucket SOH, which is presumably calculated through the standard macro and according to the stock cat. group you indicate in the location/product master.
    You could set some specific filter in the material master using the MATLOC freely definable attributes to create selection profiles and govern in which data view you process the planning for certain materials.  That is to say, you'd assign all materials which are pure current stock ROP and tag them with some attribute and use that to create selections for your Heuristic variants.

  • Recursion in planning run: product T-B104 location PL1000 to be planned twice

    Dear experts,
    Please advice regarding the following situation. I execute the Production Planning Run. After this, I check the log and I get the following error : "Recursion in planning run: product T-B104 location PL1000 to be planned twice". Based on previous posts regarding similar situations, I run the trx. /SAPAPO/SNPLLC to identify the existing cycles resulting in the recursion of the planning run. After this, in the log I have the following error: "no supply sources were found for the model 000".
    Does anybody have a clue regarding the cause of this ?
    Thank you,

    Hi,
    This should be probably master data - please check if you have all the master data in APO. ( for eg PDS)

  • Storage location exclusion from planning run

    Hi All
    I have excluded material from planning run by putting storage location  exclusion indicator in MMSC for material.
    Iam using kanban replenishment.
    In material master, production storage location is same as  that of put in MMSC.
    I have created Planned independent requirement in MD61, when i do MRP system created planned order.
    Please inform if storage location is excluded from MRP in MMSC then why system  is considering requirement for that material at that storage location.

    Hi Krishna
    Please read help for Storage location MRP indicator
    Storage location MRP indicator
    Indicator that you use to exclude storage locations from material requirements planning at plant level.
    If you do not set this indicator, stock, requirements, and receipts are included in MRP at plant level.
    Use
    You can exclude storage locations from MRP at plant level in one of two ways:
    By excluding storage location stock from MRP
    If storage location stock is excluded from MRP at plant level, no receipts for this storage location will be created in the planning run.
    By planning storage location stock separately
    If storage location stock is planned separately, the storage location is replenished with goods if the stock falls below the reorder point.

  • SNP Optimiser issue (Annual Planning Run)

    Dear Friends,
    My fiscal year is 01.04.2010 to 31.03.2011, Now I am trying to run Annual planning run for the current FY.
    After the run, If i see in SNPOPLOG, all demand is showing as unfulfilled. If i run for the next FY it is planning.
    I want to run for the current FY, what settings I need to do?
    sree

    What is the time bucket profile of data view in which u are running optimizer.  If it is a single yearly bucket you cannot run optimizer in current year.  (your first bucket cannot have the start date in past)
    Choose 12 monthly buckets. and run planning.  You may 'view' the planning results in single annual bucket.
    even if you do this, there will be no plan in current month.  system will plan from next month onwards.
    Hope this helps.
    Regards,
    Nitin
    Edited by: Nitin Thatte on Apr 13, 2010 6:01 PM

  • Please advise on how I can find a source location using FM in APO-SNP

    Hi All,
    I'm able to get the list of orders using FM - BAPI_POSRVAPS_GETLIST3 but not able to find the source for the orders extracted using any function modules / BAPIs
    Please advise.
    Thanks
    Venkat

    Hi Venkat,
                     I hope you are getting purchase requisition list in REQUIREMENT parameter table of BAPI. In that you will find ORDID and PEGIN_GUID also which is nothing but the receipt at Source Location,search for this GUID in another parameter table of RECEIPTS, there you in LOCATION field you will see the source location from where that order is getting fulfilled.
    Check in PEGGING_OUTPUT_NODES / PEGGING_INPUT_NODES parameter tables also whether source location is there in location field?
    If this is not the case then, You are getting list of Purchase Requisition with their GUID/ ORDID.
    Pass this ORDIDs to function module,  /SAPAPO/OM_ORDER_GET_DATA, here you will get all the information relevant to any order in live-cache. I think first, you have to convert ORDID from CHAR32 to CHAR22 for input to this FM.
    I hope now this will help you.
    Regards,
    Saurabh

  • Use of SNP Heuristics & Optimizer

    Folks,
    Has anyone used both Heuristics and Optimizer together within the same supply network?
    If so then how was this used e.g. Network optimization on monthly basis and location heuristics on weekly basis. Idea is to come up with a monthly optimum sourcing plan using optimizer and then resolve any location specific capacity issues using heuristics on a weekly basis.
    Is this a feasible solution?

    Hi,
    We are using both SNP Heuristics as well as Optimizer. SNP heuristic is not considering the Constraints, thats why it is required to be run where the demand and supply can be linked without any constraint. As in our case, we are doing it between Customer and C&F. For rest of the network, we are running Optimizer as several constraints are involved in different Supply chain nodes, like transportation capacity, production capacity, storage cost etc...
    We are running Optimizer on the whole network successfully which gives the results on a daily bucket considering various constraints.
    In your case, you can run Optimizer alone as it will consider the location specific capacities.
    Regards,
    Manjit

  • Difference between SNP heuristics,Optimizer and CTM

    Dear Friends,
    can any one explain me what are the basic difference in SNP planning methods
    1) SNP heuristics
    2)Optimzer
    3)CTM
    when should we use these  method in SNP , is all the methods are used in SNP impelemtation ?
    just give me some idea about it
    Thanks & Regards
    Raj

    Hi Rajkumar,
                      Please find the difference among three
    Comparison of the Planning Methods
    you use optimization-based planning or CTM planning if one of the following conditions applies to you:
    ·        Your business environment is subject to strict constraints (for example, you must take into account production capacities, transportation capacities, storage capacities, and/or handling capacities)
    ·        You have alternative production locations and sources of supply (locations, production process models, and external procurement relationships)
    ·        You can decide between early production and late production
    ·        You share resources, meaning that multiple products are produced simultaneously on the one resource
    We recommend that you use heuristic-based planning or CTM planning if any of the following conditions apply:
    ·        You wish to plan on an infinite basis (meaning that you do not wish to consider capacities) for the medium to long-term horizon (heuristic).
    ·        You wish to take into account predefined quota arrangements; for sources of supply, for instance (heuristic or CTM).
    ·        You wish to plan or fulfill demands on the basis of priorities (CTM).
    Optimization-Based Planning :
    http://help.sap.com/saphelp_scm2007/helpdata/en/09/707b37db6bcd66e10000009b38f889/content.htm
    The SNP optimizer offers cost-based planning. This means that it searches through all feasible plans in an attempt to find the most cost-effective (in terms of total costs). Total costs refers to the following:
    ·        Production, procurement, storage, and transportation costs
    ·        Costs for increasing the production capacity, storage capacity, transportation capacity, and handling capacity
    ·        Costs for violating (falling below) the safety stock level
    ·        Costs for late delivery
    ·        Stockout costs
    Heuristic-Based Planning
    http://help.sap.com/saphelp_scm2007/helpdata/en/a1/b60b4b2fc211d3b6270000e82de178/content.htm
    The heuristic is used as part of a repair-based planning process consisting of the heuristic, capacity leveling, and deployment. The heuristic run processes each planning location sequentially and determines sourcing requirements. The heuristic processing groups all demands for a given product at a location into one demand for the bucket. The heuristic run determines valid sources of supply and corresponding quantity based on pre-defined percentages for each source of supply (quota arrangements), or procurement priorities for transportation lanes and production process models (PPMs) or production data structures (PDS). The demands are then passed through the supply chain to calculate a plan. However, this plan is not necessarily feasible. The planner can then use capacity leveling to adjust the plan and formulate a feasible plan.
    Capable-to-Match (CTM)
    http://help.sap.com/saphelp_scm2007/helpdata/en/c4/986c39b768ca2fe10000000a114084/frameset.htm
    With this function, you can execute a multi-level, finite planning of the demands in your supply chain. Unlike the Supply Network Planning (SNP) optimizer that executes cost-based planning, CTM planning uses a heuristic procedure. In other words, CTM does not optimize the costs. Instead, you can use priorities, for example, to influence the sequence of demands and the selection of the procurement alternatives. CTM planning does not consider the individual production and distribution levels one after the other, such as the classic MRP run, but considers them at the same time. This guarantees that CTM planning generates a plan that can be executed on schedule.
    Hope these details will resolve your queries
    Regards,
    Santosh Kumar Mishra

  • Procurement priorities in SNP heuristics

    Hi
    Here is a scenario in which i need some help. A product can be procured from two vendors A and B. So we have transportation lanes set up for those two vendors .
    The requirement is to keep procuring from A until the capacity of A is met. Once A's capacity is fully used (say if A can only supply 100 EA a month we want to procure the 100 EA from him ) we want to start procuring from B .  How can this be achived with SNP heuristics ? We do not want to run CTM or optimizer.
    I do understand that  we can set up procurement priorities in the transportation lane , but then how do we check the capacity of A and once it is fulfilled how do we divert the orders to B ?
    Thanks
    Saradha

    Hi Aparna,
    Since the planning is happening in APO, this can be acheived by maintaining quota in R3 and as well as using C5 user exit of publication type (APO outbound).
    What you need to do is maintain quota in R3 with quantity limitation in R3 for first vendor and then for second vendor with infinity. You need to have both transportation lanes in APO with equal priority.
    Once you have Heuristic run and then C5, now here you should write th logic to look at the quota in R3 and then add the source to the PRs until it reaches the max quantity and then assign the second vendor to the rest of the PRs within the month.
    This works, we have similar scenario, but ther is no second vendor, so the next PRs will be without source.
    OR
    You can have inound quota maintained in APO with an average percentage of supply from the first endor and then remaining from the second vendor within the month. This percentages can be vary month to month. This is simpler, but you need to have rough cut supply extimation of the first vendor.
    Hope this works
    Thanks
    Venkat DR

  • Some Purchase Requistions are not being replanned during SNP Heuristics

    Hi All,
    Has anyone experienced any issue with purchase requisitions not being replanned during the SNP heuristics run (background or interactive). I have a product location combination and about half of the PRs are not being replanned and these are not fixed/firmed.  When I say replannned I mean that they are not generating a new Purchase req. #. I have no idea why at this point. Any suggestions would be appreciated.
    Regards,
    Rumi

    Rumi,
    we faced a ismilar issue and figured out that the issue was due to the change in MoT for the Preq. The earlier Preqs were created with MoT 'Ship' which was then changed to 'Plane'. When we ran the heuristic the Preqs created with Ship were not recreated. This is a standard SAP APO behaviour.
    I am sure that after deleting these preqs all subsequent runs would be working fine for you.
    Nxet time if it happens consider what I have said, it could be a possible reason.
    Abhi

Maybe you are looking for

  • Copying & pasting changes dimension of image if it is not 72 dpi

    I have Macs since the Mac 512ke. Never I had such a problem, that copying and pasting doesn't work correctly. I scan with 300 dpi grayscale. If I copy a selection of this scanned image and paste it to pages 4.0.3, the size of the image is enlarged. O

  • Adobe Reader for Palm OS Tungston 5

    Does anyone know why my keyboard comes up when using Adobe Reader and won't go down when I tap the down arrow?  The keyboard goes up and down in all other functions, as it should, but the down arrow seems to be greyed out when ever I open Adobe.  I'm

  • Update equipment address

    I'm an ABAP developer and I'm trying to update equipment address (especially coordinates) in an ABAP program. I tried to debug CRM Web UI application and implement the same code in my program but it doesn't work. Basically I'm using function modules

  • Cursor problems with Photo shop Elem.9 on windows 7

    Help, can any one help me I have been operating Adobe Photoshop Elements 9 on Windows 7 for about a year and have found it very good but suddenly If I want to use tools such as Crop. Stamp etc I get THREE icons displayed which makes it impossible to

  • IPhoto to Photoshop

    I like to use iPhoto to scroll through all my photos, etc., but then I use photoshop CS3 to edit. After editing a photo in photoshop and saving it as a new file, it doesn't show up in iPhoto. It's in the iPhoto directory, but it doesn't show up in th