Hi All
I have excluded material from planning run by putting storage location  exclusion indicator in MMSC for material.
Iam using kanban replenishment.
In material master, production storage location is same as  that of put in MMSC.
I have created Planned independent requirement in MD61, when i do MRP system created planned order.
Please inform if storage location is excluded from MRP in MMSC then why system  is considering requirement for that material at that storage location.

Hi Krishna
Please read help for Storage location MRP indicator
Storage location MRP indicator
Indicator that you use to exclude storage locations from material requirements planning at plant level.
If you do not set this indicator, stock, requirements, and receipts are included in MRP at plant level.
Use
You can exclude storage locations from MRP at plant level in one of two ways:
By excluding storage location stock from MRP
If storage location stock is excluded from MRP at plant level, no receipts for this storage location will be created in the planning run.
By planning storage location stock separately
If storage location stock is planned separately, the storage location is replenished with goods if the stock falls below the reorder point.

Similar Messages

  • Storage location exclusion from MRP run

    Dear Experts,
    please how do i exclude a particular storage location from being considered in MRP Run? and from which table(s) can I get the list of open production orders

    Dear Vincent,
    in OMIR you can exclude particular storage location. input values as 1
    MRP - 4 view For storage location option input value as 1
    in MMSC - same input value as 1
    For your scond query what exactly you mean be open Prd orders
    You can get all details in COOIS by inputting system status
    Regards
    Madhu

  • Storage Location exclusion from MRP problem

    Hi all,
    I have added some Storage locations to exclude from MRP, via SPRO cust.
    (Production>MRP>Planning>Define st. loc. MRP per Plant)
    However, when I want to verify it, I go into MD04 and for a material, the excluded storage loc. lis does not show up in the end.
    What additional cust. do I have to do?
    Thanks,
    Screens:
    https://picasaweb.google.com/koray.tulumen/Paylasacaklarim

    Hello,
    To exclude the storage location from MRP Run
    Check the following settings:
    1.In OMIR you can exclude particular storage location. input values as 1
    2.MRP - 4 view For storage location option input value as 1
    3.in MMSC - same input value as 1
    Hope the iformation is useful
    Regards

  • Lot size exclusion from planning run

    Hi Gurus
                   My scenario is some materials are maintained with lot sizes as EX , VB, HB ,  when planning run executed , the system should not consider the VB and HB lot sizes ( these are not bom components) and no procurement proposal should exist , we are not following storage location MRP ,
    Pl come back in full thanks in advance
    Regards
    Ram

    Hi ramki
    VB is MRP type not lot size. VB consumption based planning with manual reorder point. The planning proposal will be created based on your reorder level.
    HB is lot size of " Replinishment to maximum lot size "
    Normally oils and others are procured where the storage tank capacity is restricted. The max replish level will be your max tank capacity.  You can define them as cosumable materials or bulk materials.
    Regards
    J . Saravan

  • Excluding certain storage location stocks from planning

    Hi experts,
    We have a requirement as under:
    A plant contains certain stocks of a product.  Part of this stock is kept in a separate storage location.  This stock is reserved for local "over the counter" sale at the plant gate.  So this stock should not be considered as available in planning as well as in deployment.
    Can we exclude this stock at particular storage location during transfer to APO?
    Thanks in advance.
    Nitin

    Hi Nitin,
    I don't think we can exclude any stock at particular storage location during transfer to APO.
    In APO, we always have stock at plant level which is the lowest possible level.
    And even logically thinking it should not be possible. Least I can say is, this is not the standard APO functionality.
    But, we can always explore customer exist.
    Instead of doing that, what I would suggest is to make this stock a "Special stock" in ECC.
    So, it will not be used for the purpose for which it is not meant for.
    Hope this helps. Let us know if it refrain you from making it as a special stock.
    Regards,
    Abhay Kapase

  • Replenishment between Storage Location with MRP Planning

    Dear PP Gurus,
    I need you expertise on the below question.
    I have a plant with multiple Storage Locations. One Storage Location is Main Warehouse and another ilocation s External Warehouse (3PL) where excess stock are kept due to storage capacity in the Main Warehouse.
    Now the requirement is replenish the stock to Main Warehouse from the External Warehouse with Stock Transfer using MRP trigger the Stock Transfer.
    I know the setting in MRP 4 View in the material master, the Indicator to set to 2, maintain a reoder point in the Sloc: 1200 and Replenishment Qty: 1500 and Special Procurement Type: (what should be the setting)
    My question is where to set the target Sloc and source Sloc, then only system will trigger the replenishment Stock Transfer?
    The storage location which is plan separately, will have a different segment. Therefore, in terms of the availability check for the Sales Order it will consider as normal based on the scope of check.
    Appreciate the reply
    Thanks & Regards
    Pooja

    Dear ,
    1.You need  to set up the MRP for Plant with group of storage location  and run MRP-MD01 .You can try SCOPE of planning -OM0E.
    As an information : In standard MRP I, f you have several storage location for your plant, you cannot plan for them separately unless you assign them to a separate MRP area.If a storage location (alone) is assigned to an MRP area, it means you wan to plan for it separately. If several storage locations are assigned to an MRP area (or let's say to a plant), it means you want to plan using all of them - and you cannot choose only one and plan for it (you can exclude a SLoc from planning w/o assigning it to MRP area).
    2.Find steps for config for activating Sloc to Sloc transfer within plant using STO : -
    follow path: SPRO--> Materials Management -->Purchasing -->Purchase Order -->Set up Stock Transport Order -->Set Up Stock Transfer Between Storage Locations
    1. Activate Stock Transfer Between Storage Locations
    2. Assign Delivery Type and Checking Rule According to Storage Location
    purchase document category 'F' , here use PO type UB, supplying plant, issue sloc and delivery type , (prefer to create new delivery type by copying delivery type 'NL' replenish delivery
    3. Define Shipping Data for Stock Transfers Between Storage Locations
    for plant defind sales org and distribution chenal and devision
    select the pline and go to sloc
    assign there customer (created for sloc)
    4. Define Rule for Determination of Shipping Point
    for newly created delivery type set L storage location specific shiping poing determination
    5. Assign Shipping Points According to Storage Location, assign her sloc based shiping poing determination
    at last when you will create PO put issue storage location, system will determine shiping data based on config done.
    after this process will be same as STO plant to plant using shiping.
    You will need to mention the issuing storage location during posting the delivery,
    ie, ME21N - Create STO
    VL10B - Create Delivery
    VL02N - Post Goods issue - here you will need to mention the issuing storage location
    Refer : STO process -Std in SAP
    Hope it is clear to you .
    Regards
    JH
    Edited by: Jiaul Haque on Jul 7, 2010 10:23 AM

  • How can I include the minimum stock of storage location in the mrp run.

    Hi all,
    I have in plant 1030 storage location 1001 and 1006.
    MRP1  Lot Size = EX
               MRP type = PD
               Reorder Point = 5
    MRP2  Safety Stock = 5
    MRP4 for 1001 is not filled
    MRP4 for 1006 Sloc MRP Ind = 2
                             Reorder point = 2
                             Replenishment qty = 3
    If no stock and I run the mrp I get
    a PurRqs for 8 with a automatic MtlRes of 3 going to storage loc 1006
    If I create a reservation in 1006 for 10 units and run the MRP again
    a PurRqs for 15 with a MtlRes of 10 going to storage loc 1006.
    I want the result to be PurRqs for 18 with a MtlRes of 13 going to storage loc 1006.
    10 for the reservation and 3 to fill storage loc 1006 with the replenishment qty.
    How can I acheive this?
    Best Regards!
    Curtis

    Hello Curtins
    Please observe what is stated on question 6 of FAQ note 550954, regarding storage locations planned separately:
    6. Question:
        A storage location should be planned separately. Is it possible to
        consider external requirements?
        Answer:
        No. The storage location MRP is a very simple reorder point planning
        procedure, during which only reorder point and replenishment
        quantity are defined. More complex settings can be implemented via
        storage location MRP areas.
    Therefore, I'd suggest you to use MRP areas to map this scenario.
    Best Regards
    Caetano Almeida

  • Storage location consideration during MRP Run

    Hi All,
    Within a company code, i am having 2 plants namely PS12 & PS13. In plant PS12, i am  three storage locations namely 1201, 1202,1203. Similarly in plant PS13, i am having stores 1301,1302,1303.
    During MRP run, i do not want to consider the stock in all the storage locations of PS12. The storage location 1203 to be exclued during MRP run. How to set this?
    Your input will be appreciated very much,
    Thanks
    Kumar

    Hi Kumar,
    Goto SPRO>Production>Planning>Define Storage Location MRP per plant, add the storage location to be ignored during MRP and select indicator '1' against it. Thereafter, all the materials created with this storage location will be defaulted with value '1' in the field 'SLoc MRP indicator'. However this can be modified later if required.
    For existing materials, select indicator '1' in the field 'SLoc MRP indicator' avaialble in MRP view under the column 'Storage location MRP'. Go for a mass update for a huge list of materials.
    Check this and revert for any clarifications.
    Regards,
    Murali

  • MC44 configuration for 'storage location exclusion'

    Hi all,
    I want to know if it is possible to exclude a certain storage location (1006 in my case) from the MC44 u2013 Inventory Turnover report.
    By default i can filter results by several parameters like ABC indicator or material type, but i want to exclude all materials in a storage location. Can i configure it to do so?
    http://www.kowboyz.nl/blog/wp-content/uploads/2009/07/MC44.png
    Many thanks,

    this cannot be solved thru customizing.
    you have to create Z-report

  • Storage location exclude from MRP execution

    Hi,
    I want know how to exclude any particular storage location from MRP execution .
    For example,
    1.     ABC is FERT material.
    2.     BOM of ABC is consisting of RM & PM material.
    3.      There  are  two storage location
                 a.            Central Godown   
                  b.            Shop Floor Godown
    4.     Stock of shop floor does not want to consider in MRP calculation.
    I have set from t-code OMRI storage location MRP indicator as u2018 1 u2018 .  But this is not solved our purpose.
    Please let me know me how to solve the problem.
    Regards,
    Amit Biswas

    In responce to reply ,
    Reply to first SAP user,
    1. Activate mrp for mrp area OM01
    2. Define MRP area OMIZ
    This is not clear to me. If you kindly elaborately explain then it will be helpful for me.
    Reply to Mr. Himanshu,
    I have already done through OMRI but this is not solved my purpose.
    Reply to Mr. Akil
    In your cases, in every material mrp indication has to be set.
    My objective: through standard configuration, entire material will be excluded u201C particular storage location u201C on MRP execution.
    Please let me know your valueable guidance.
    Regards,
    Amit Biswas

  • Assembly and Task list : storage location defaulted from task list

    Hi all,
    Can anyone tell me the different steps (with details) required in master data (assembly, task list,...)  to get the 'storage location' filled by default in the general maintenance task list : how assembly is used in that process?
    Thanks,
    P.

    Hi Pete,
    In the component overview for a given operation,  when assigning a component : further on the right, there is a storage location field.
    Pete.

  • Storage location to be excluded from MRP Run

    Dear Gurus ,
    We are trying to exclude perticular Storage location from MRP Run with the Configuration setting
    IMG >>> Production >>>.MRP >>>.Planning >>>>.Define Storage Location  MRP per plant >>>> Indicator 1 is set
    Still the Stock is being considered
    As I know this can be done thr' MRP4 view , but we don't want to go Part No wise ,
    Suggest better sloution
    Thanx in advance

    Vasu,
    Above IMG path is only used  for defulting the storage location exclusion in material master.
    Whenever  materials are extended to this storage nlocation in mm01 or mmsc, this defult value would be proposed automatically .
    However this does not mean setting it in IMG would change existing materia storage location extensions automatically. Also MRP will not pick from above IMG settings.
    Once again above setting is only valid from defulting the values while extending the Materials to storage locations.
    Hope it helps.

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • During MRP run unwanted plant and storage location include and exclude

    Hi There,
    During MRP run how to include and exclude the unwanted plant and storage location pls let me know the required configuration settings.
    Thanks in advance.

    HI,
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run :-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards
    KK

  • MRP run by excluding storage location

    Dear PP experts,
    I have excluded storage location e.g. storage location 0001 from MRP in OMIR and also maintained the same in MRP 4 view in material master. As far as MRP run is considered system is ignoring the stock and giving the results.
    But now we are facing the problem in quantity confirmation in sale order in transaction code CO06. The stock is existing in storage location 0001and is not confirmed for any other sale order.
    We need to exclude the storage location in MRP but it should allow stock determination in sale order.
    Pl. let me know how this can be achieved.
    Thanks in advance,
    Regards,
    Prashant

    Dear Prasobh,
    Thanks for the reply. There is no storage location mentioned in the sale order. I tried confirming the sale order by activating the No storage location check box, still it does not confirm the quantity. If we keep the check box "Check without RLT" blank then the sale order quantity gets confirmed. But the problem here is that it confirms quantity greater than what is available in stock i.e. if we enter any quantity it is confirmed.
    I would like to ask one more question. The sale order confirms quantity available as per the ATP logic. When we have excluded the storage location from MRP the quantity is seen at storage location level and not at Plant level and hence it is not proposed in cummulative ATP quantity. Should the quantity be available in cummulative ATP quantity. If yes, how can be get that quantity in cummulative ATP quantity?
    Is there any impact of MRP area? as we have MRP area activated. Within this Plant we have one MRP area at storage location level and the other MRP area as Plant excluding this storage location.