SSIS UC4 Scheduler date issue

Hi
I am facing a weird issue and need your help.
At one of our client side when we run ssis package through UC4 (scheduler i have no idea )  the date implicitly converts into YYYY-DD-MM format and this is why our package is failing,
The culture setting of server is US English.
When I  run the package via batch file (dtexec command) the package runs fine and date is correctly parsed as YYYY-MM-DD (as expected)   but with uc4 it is giving problem.
If you have any experience with UC4 or any idea/ experience  about this problem please assist.
UC4 scheduler code is also inturn generating dtexec.
Hope that helps ... Kunal

Hi Kunal,
Based on your description, the package runs via batch file (dtexec command) fine and date is correctly parsed as YYYY-MM-DD (as expected), but with UC4 it fails with date converts into YYYY-DD-MM format.
It seems that the issue is caused by UC4 Scheduler that convert the date format. It is related to UC4, since I have never use this scheduler and it is out of the support boundaries of our forum, I suggestion you post the question in the following forum:
https://automationpassion.com/uc4_login.do?sysparm_doctype=true. It is appropriate and more experts will assist you.
Thanks,
Katherine Xiong
Katherine Xiong
TechNet Community Support

Similar Messages

  • Scheduling Date issue in Assemble to Order Scenario

    Hi Friends,
    I am facing a Weird issue with Production order Scheduled dates created automatically after creation of Sales Order for configurable material.
    Our availability check is set to check  open Purchase orders, for one component the delivery date in the PO is 20.12.2011, currently at the time of creation of SO the availability check shows this component as a missing part and committed date as 20.12.2011.
    Now the issue is that for one type of customers when the SO is saved, the production order gets created with basic start and finish date of 20.12.2011 with a status CRTD PRC MACM SETC.
    But with another customer group it creates the Production order with today's date basic start and finish date, with a status CRTD MSPT PRC  SETC.
    Now since in both the cases the Material is same and also the components are exactly the same, the only difference is the customer, I am unable to make out why it is happening.
    I am basically a MM  Consultant so am unaware if there is any standard setting relating to customer or something relating to that which is causing such  a issue in scheduling date of the Production Order.
    Regards
    Chandra Shekhar

    Hi Vivek,
    Yes, the availability check is working in both the cases, when I create the sales order, I key in the Configurable material code, then do the configuration, after that system does availability check, in both the cases the result of availability check is same with one component marked as a missing part, available date as 20.12.2011.
    One more thing if I try to view the Production order at the time of SO creation before saving it, the Production order shows today's date, but when I save the SO, and do Credit release, the actual Production order gives different scheduling date based on customer. Just wondering what could be affecting based on Customer, is there any other field present in Customer master which could alter the date.
    I also saw today's scheduling note in some of the cases, but its not coming up in all of the orders created with today's date and moreover the same components are getting scheduled for 20.12.2011 also for diff customer.
    I am afraid I can't provide any screenshots for this as am not permitted to publish any screenshots of the client.
    Regards
    Chandra Shekhar

  • PO date issue when scheduling replenishment

    Hello Guys,
    i'm currently experimenting an issue that i don't understand.
    when I try scheduling RWRPLPRO program (WRP1) with a timezone UTC+11 for my step user,
    the document date of my purchase order is the system date and not a user date.
    Is there someone who knows what I have to do to get a timezone based date on my Purchase Order document date ?
    Thanks in advance

    Hi Vivek,
    Yes, the availability check is working in both the cases, when I create the sales order, I key in the Configurable material code, then do the configuration, after that system does availability check, in both the cases the result of availability check is same with one component marked as a missing part, available date as 20.12.2011.
    One more thing if I try to view the Production order at the time of SO creation before saving it, the Production order shows today's date, but when I save the SO, and do Credit release, the actual Production order gives different scheduling date based on customer. Just wondering what could be affecting based on Customer, is there any other field present in Customer master which could alter the date.
    I also saw today's scheduling note in some of the cases, but its not coming up in all of the orders created with today's date and moreover the same components are getting scheduled for 20.12.2011 also for diff customer.
    I am afraid I can't provide any screenshots for this as am not permitted to publish any screenshots of the client.
    Regards
    Chandra Shekhar

  • Issue with update_task API for updating Scheduled Dates for Task..

    Hi All,
    We have a requirement to update the project and task dates to a specified period from the current dates. I dont want to update all the tasks, and hence using the update_task API. The scheduled_finish_Date is the column from "pa_proj_elem_ver_schedule" which we want to update. As, this is the date which is shown on the Workplan tab for the tasks for (Scheduled Start and Scheduled Finish Date). I want to extend this scheduled_finish_Date to some days , say for eg. 60 days.
    To achieve, that update_task api is being used and the parameter for the scheduled_date is : p_scheduled_finish_date, this is passed as call to pa_project_pub.update_task API.
    We are also updating the completion data, which is happening fine and is updating the pa_tasks : completion_date column.
    Problem is with scheduled date, Please let me know how to go about this issue.
    Here is the sample code for calling the API :
    pa_project_pub.update_task
    (p_api_version_number => l_api_version_number_i,
    p_commit => l_commit,
    p_init_msg_list => l_init_msg_list,
    p_msg_count => l_msg_count,
    p_msg_data => l_msg_data,
    p_return_status => lt_return_status,
    p_pm_product_code => l_pm_product_code,
    --p_structure_updates_flag      => g_no,
    p_pm_project_reference => l_proj_reference,
    p_pa_project_id => p_project_id_i,
    p_pm_task_reference => p_pm_task_reference_i,
    p_pa_task_id => p_task_id_i,
    p_task_name => p_task_name_i,
    p_task_number => p_task_number_i,
    p_pa_parent_task_id => p_parent_task_id_i,
    p_task_completion_date => p_tsk_actual_finish_date_i,
    --Transaction Date (shown on the screen)
    p_scheduled_finish_date => p_tsk_sched_end_date_i,
    -- Scheduled Date (shown on the screen)
    p_out_pa_task_id => l_pt_task_id,
    p_out_pm_task_reference => l_pt_task_ref
    I am really not sure if I am missing anything here, please suggest as to how to update the Schedule Start and Finish Dates using the API.
    Waiting in anticipation!
    Thank you
    Anand.

    Hello,
    Make sure the wf is active in QA (re-activate if possible), check the transport for errors, check authorizations for WF-BATCH perhaps delete and recreate via SWU3?), refresh the buffers (SWU_OBUF).
    Please let me know if any of this helps.
    regards
    Rick Bakker
    Hanabi Technology

  • Delivery schedule dates are coming in Past dates

    Hi Friends,
    In the Scheduling Agreements the delivery schedule dates are coming in the past dates even tough the scheduling agreements are having new schedules. There is also open quantities there for the scheduling agreements.
    please kindly explain me what is the delivery schedule date in Scheduling Agreement.
    Thanks in advance.
    Regards,
    Kannan M

    Hi Khan,
    Just check this thease might be the reasons to get correct the delivery schedule.
    To access a delivery schedule, mark a scheduling agreement item and choose Goto ® Item ® .
    The following data is displayed in the delivery schedule tabstrip:
    ·        Delivery schedule number and date
    ·        A wide range of standard cumulative quantities
    ·        Delivery information
    To display deliveries for the delivery schedule, choose Deliveries on the delivery schedule tabstrip.
    In scheduling agreements involving external agents, the system displays deliveries made to the customer by external agents as consignment issues.
    ·        Correction delivery information
    To display or create correction deliveries, choose Corr. delivery on the delivery schedule tabstrip.
    ·        An analysis function
    ·        Information at a glance
    To display a summary of delivery schedule data, choose Short disp. on the delivery schedule tabstrip.
    ·        Schedule lines
    Choose DlvSch.Hdr on the delivery schedule tabstrip to access the delivery schedule header. The following data is displayed here:
    ·        Information on quantities received by the customer
    ·        Information on the customer fiscal year and cumulative quantities reset due to a year change
    ·        A wide range of cumulative go-ahead quantities
    ·        Notes on the delivery schedule
    Correcting Cumulative Delivered Quantities
    Prerequisites
    You correct cumulative quantities in scheduling agreements:
    ·        In case of returns
    ·        When there has been a processing error
    ·        When there has been a year change
    ·        When you are transferring initial quantities from a legacy system into the SAP System
    To do this, you create a correction delivery within the delivery schedule itself. This delivery is not relevant for requirements planning, shipping, goods issue, or billing.
    Correct cumulative quantities only when the customer has not posted goods receipt.
    Procedure
    To create a correction delivery (document type LFKO):
           1.      Choose Corr. delivery on the delivery scheduletabstrip.
    The system displays a dialog box in which you enter a:
    -         Correction delivery date
    For help on deciding where you want to position the correction delivery, choose Display. The system lists delivery dates in chronological order.
    -         Correction quantity
    Enter a negative correction quantity by placing a minus sign after the quantity.
           2.      Choose Enter and save the scheduling agreement.
    Result
    When you save the correction delivery, the system updates the cumulative quantities in the delivery schedule.
    To display correction deliveries, choose Deliveries on the delivery schedule tabstrip, or  Environment ®  Display document flow.
    Example
    Your customer returns 200 pieces of material from a delivery made on 7/10 because of damage during transport. Several other deliveries have been made before you prepare the correction delivery, so you view a list and choose an appropriate date. In this case you decide on 7/14 because it occurs after the delivery on 7/10 and before the delivery on 7/15.
    Regards,
    Murthy V.N

  • Sales order schedule date is a (working) day before Scheduled ship date

    In MRP/MPS planning, the forecast consumption is occuring for all sales orders at a date (sales order schedule date) which is always a working day before the Scheduled Ship Date (SSD). What is the logic?
    Time fences are not used.
    E.g. Sales order is scheduled to ship (SSD) on 30th Nov, in forecast set > Forecast items > Consumptiion > Detail, the sales order schedule date is a day before SSD.

    Hi,
    This is a complex issue; best solution is by using APO/GATP.
    If not, then in ERP only, the second best is:
    1) Work with assembly processing in SO, meaning that a production/planned order is automatically created in the customer order during order creation.
    2) Then, after the order is created it is scheduled, and the delivery date proposal is based on that.
    3) Now you can check in the order that there are no capacity overloads, and all capacity required to produce on the proposed date is available. If yes, you're done. If not, it gets a bit complex, since you actualy need to switch to capacity planning, do capacity leveling and dispatch (PP), and the you get a new feasible schedule proposal based on that.
    APO/GATP could do all that automatically!
    Regards,
    Mario

  • Update scheduling data in material master

    Hi,
    How to update scheduling data from Process order to master recipe in mass. As I can schedule recipe in C202 and update the sceduled data in material master by CA96 & CA97 transactions. But i wants to schedule master recipe in mass. Is there any way to mass update it ?
    Regards
    Amit

    Hello
    I have tested in my internal test systems and system correctly updated the material master using CA97, without aky kind of previous scheduling of the master recipe.
    Can you please provide a more detailed description of the issue? What is happening if you try to run CA97 without running the scheduling of the mater recipe? How are you running CA97?
    You may also try CA97N, which is a newer version of CA97.
    BR
    Caetano

  • Editing of scheduled dates in Process Order Operations

    Hello,
    I have a requirement, in which the client would like to change the Scheduled dates in the operation details of a process order.
    In the header screen of a process order, if we change the basic start / finish dates (depending on forward or backward scheduling), and reschedule the process order, the process order is rescheduled, with the new dates.
    The client's requirement is, they should be able to change the Scheduled dates in the tab "Operation - Dates", of the "Operation overview" screen, in a process order. Normally the field is not editable, and the system calculates the dates, based on the start / finish dates, entered in the process order header.
    I would like to know, what is the way out, to meet this requirement.
    Thanks.

    Hi,
    As every body else is explaining it is not possible for standard SAP ,  as of normal business or any business scenario why would a client want to change the operation dates from Production order ( still not understood.....)
    There are two options to do that:
    1) Copy the whole transaction ( programmes ) into some Z - transaction and in the programme you can change the object ( CO_VG_OPR_*) from being grayed out.
    This will alllow you to change the dates.
    2) you can go for enhancement with the following FM
        BAPI_ALM_ORDER_MAINTAIN
    I suggest you to clear these things with client.These things require more of ABAP work.
    And as said changing the standard behaviour of the system can cause performance issues.
    Please close the thread if satisfied.
    prakash

  • Changing time-out for scheduled data refresh

    Using a Power Query connection, is it possible to extend the time-out time for scheduled data refreshes? The amount of data to be retrieved is rather limited, but there's thousands of rows (NAV server).
    If not, any suggestions to how to reduce latency?
    Thanks.

    Thorm,
    Is this still an issue?
    Thanks!
    Ed Price, Azure & Power BI Customer Program Manager (Blog,
    Small Basic,
    Wiki Ninjas,
    Wiki)
    Answer an interesting question?
    Create a wiki article about it!

  • Remediation Schedule - Date Specific

    In my organization, we are only allowed to patch computers from 10:00 pm until 6:00 am the next morning. I want to use the Remediation Schedule - Date Specific function for deploying patches and stay within my narrow window of time, and I thought I could use the "Start at a random time between Start and End Times" feature.
    For example, I wanted to start patching on 02/25/09 starting at 10:00 pm, ending at 6:00 am, and I wanted the same schedule for 02/26/09. I added 02/26/09 and 02/27/09 as Start Dates, checked the "Process immediately if device unable to execute on schedule" option, selected the "Start at a random time between Start and End Times" feature, and set the Start Time for 10:00 pm and the End Time for 6:00 am. Unfortunately, I have computers patching at 11:00 am on 02/26/09, which is not at all what I intended.
    Do the Start and End Times have to fall on the same date? Based on how I did it above, what logic is ZENworks using to determine that it's ok to patch at 11:00 am? I was trying to mimic the old-style blackout schedule we used to have with PatchLink. Is it even possible to do it without having to specify a content blackout schedule, which would effect not only patch bundles, but my bundles, settings, and policies?

    mdstewar,
    It appears that in the past few days you have not received a response to your
    posting. That concerns us, and has triggered this automated reply.
    Has your problem been resolved? If not, you might try one of the following options:
    - Visit http://support.novell.com and search the knowledgebase and/or check all
    the other self support options and support programs available.
    - You could also try posting your message again. Make sure it is posted in the
    correct newsgroup. (http://forums.novell.com)
    Be sure to read the forum FAQ about what to expect in the way of responses:
    http://forums.novell.com/faq.php
    If this is a reply to a duplicate posting, please ignore and accept our apologies
    and rest assured we will issue a stern reprimand to our posting bot.
    Good luck!
    Your Novell Product Support Forums Team
    http://support.novell.com/forums/

  • Obtain Job invoker for a SSIS job scheduled in SQL Server Agent

    Hello,
    I was required to tell the job runner of a particular SSIS job scheduled in SQL Server Agent (in SQL Server Management Studio 2008 R2). I noticed that after running the job, a record can be found in msdb.dbo.sysjobhistory in the [message] columm saying that
    the job is invoked by 'Domain\User'. Is there anyway I can acquire and upload that information into an audit table by adding some additional script into the job? I heard about using token to get job_ID, but what about the actual user name who runs
    the job?
    Thanks

    Just add retry attempts to whatever number you want (2 as per your original explanation) in Job step properties as below
    Have a logic to include a delay of 10 mins . You can make use of WAITFOR function for that
    see
    http://www.mssqltips.com/sqlservertip/1423/create-delays-in-sql-server-processes-to-mimic-user-input/
    Please Mark This As Answer if it helps to solve the issue Visakh ---------------------------- http://visakhm.blogspot.com/ https://www.facebook.com/VmBlogs

  • Set date parameter as scheduling date

    Hi,
    I designed a report which is to be run on demand as well as batch. Report has Begina Date and End Date as input parameter. I am working in CR XI with Oracle database(SP has these two dates as input param). I am using Infoview XI Release 2 to schedule the report.
    I need to schedule the report weekly and mothly basis and at the same time Begin Date and End Date must be taken as schedule dates.
    Please help me to find a solution.
    Thanks...
    Deepak Sisodia

    Please re-post if this is still an issue to the Business Objects Forum or purchase a case
    and have a dedicated support engineer work with your directly

  • Capacity leveling, after Deallocate scheduling dates getting changed.

    Dear Experts,
    I have a issue in Capacity leveling using transaction CM25 - Online. I have created some production orders (using forwards/backwards scheduling) for overloading of WorkCentre's. When I dispatch orders it’s getting scheduled perfectly, but when I Deallocate same orders scheduled dates are getting  changed.
    Even after deallocation production orders schedule dates should be the same. Can you please help me in this regard?
    Thanks in advance.
    Prashanth

    Hello Prashanth,
    From SAP help Date Determination in Dispatching and Rescheduling - Capacity Leveling (PP-CRP-LVL) - SAP Library
    The current dispatching data is cancelled. The status "dispatched" of the operation is reversed. The order is rescheduled.
    If further operations exist for an order which has already been dispatched, the system automatically carries out midpoint scheduling. If no other dispatched operations exist, the system carries out lead time scheduling.
    If order date is in past then it schedules to current date during de allocation if you do not have enter number of past days allowed to start date in scheduling parameters.
    Br
    KK

  • Can scheduling date redetermined in Deliver according to manual adjustment?

    Hi, All
    Picking Date
    Trans. Planning Date
    Loading Date
    Planned GI Date
    Delivery Date
    As listed above, there are scheduling dates in Delivery, if I change one date manually, how could I make the other dates update automatically?
    By backward/forward scheduling in the system, the schedule is determined automatically for ATP and the date would be copied from scheduling line of SalesOrder to Delivery docuemnt.
    The duration between each two dates are calculated base on the settings of ShippingPoint and Route.
    So...any solution out there?
    Regards,
    Michael

    Hi,
    The "Pick/Pack time" & "Loading time" comes from the Shipping point.
    The "Transit time " and "Transportation planning time" comes from the Route.
    Considering the above times, system calculates the "Material availability date", "Transportation planning date", "Loading date" , "Goods issue date" and "Confirm delivery date" automatically.
    To understand how the system calculates the above times automatically please refer this below link:
    [SCHEDULE LINE DATES|transportation planning date;
    Regards

  • Data Issue

    Hi All ..
               We are facing one data issue DSO.  One record is worngly loaded with some project iD ( Ex record is having ID GE1234 insted of having LE4423) remaining details are same . we are loading the data furtherly to master data table from the DSO. if i try  for reporting for project id LE4423 ,information not avilable because it is heaving wrong ID,it is key also.But in the Source system (CFG) side Data is correct with ID LE4423.
             In update rule we are following one to one mapping for all infoobjects.My requirement is i need to have in my DSo LE4423 . I need to overwrite the record id GE1234 with LE4423 without affecting other fields in the record.
            Shall i load till PSA with the ID LE4423 ..then if load this single record to DSO will overwrite the GE1234 by choosing other field as key field.  but we are following one to one mapping in update rule.
    Please help me on this. i need to hev a correct id for record.
    Thanks ,
    Prem.

    You can use selective deletion to delete the record with Project ID = GE1234
    Load the data till PSA
    Load the data to DSO using selection Project ID = LE4423 in DTP from PSA.
    check in further data targets also for mismatch of data
    Hope it helps,
    Naveen Vytla
    Edited by: Naveen Vytla on Nov 18, 2008 10:49 AM

Maybe you are looking for