Hello,
Please execute MF60 transction , upto the point when you get the green tick and stock reservation for each selected child material.
Here print option in available on the top of the screen within the
Pull list menu.
When person can execute the pull list , he can take the print of the Pull list which he has executed.
Another transction code --- MF63.
Here you will get the list of staged materials.
Hope this helps you.
Regards,
Ravindra

Similar Messages

  • Need the report  for staged materials in production order

    Hi
    My user is staging the materials multiple times for the one production order.Due this reason multiple TR were generated .Because of Multiple TR , user is generating  multiple TO for issuing the material to a production order.
    Is there any way to stop the  staging process for the materials already staged.I would like to know whether there is any report which give the details of staged materials and corresponding TR & TO for a production order.
    Thanks
    Sankar

    Hi
    Warehouse activity Monitor is best tool/ report , which give the details of staged materials and corresponding TRs & TOs, to stop/cancle you have to use related WM transactions.
    To setup WM moniter user below document
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/LEWM/MMWM.pdf
    Thanks
    Madhu

  • Error while staging materials into PSA

    Dear experts,
    in the following situation i try to stage materials of a production material request into my PSA. (Yes i am using the advanced production integration of EWM 9.2 )
    When i am executing transaction /SCWM/STAGE the following protocol is given:
    Does anyone know, what kind of configuration is missing ? Or other ideas what causes this error has ?
    Best regards
    Eike

    Hi irfan,
    the WT creating error just exists because of the stock determination error..
    Your tip to check the availability groups, was really good. Here are my configurations:
    Defined availability Groups:
    The non-location-dependent stock type:
    The Stock Type configuration:
    And the configuration of the storage type which my bin of the PSA belongs to:
    Do you have any idea what else could be the mistake ? Or is something wrong with my configurations?
    Kind regards

  • Multiple posting of Components in MF60 Material Staging

    Dear friends
    Greetings.
    Issue : Multiple posting of Components in MF60
    Scenario:REM Make to stock
    We are using MF60 Transaction code for Issuing  (Material staging) materials against planned order.
    User selects the components and qty to be staged and posting happens after pressing save button.
    Material issued to the production location by  911 movement
    After staging we found that in some of the material documents qty posted is several times in the excess of the
    enterd qty. ie , Multiple postings for same material
    Ex : Material document reads as below
    Sl no         Material      Qty
    1              102020      10
    2              104255      10
    3              102020      10
    4              104255      10
    5              102020      10
    6              104255      10
    7              102020      10
    8              104255      10
    Enhancements  :we are using Packet size data for tiny componet issue (ie, To issue more than the requirement quantity)
    Is there any enhancements to restrict the material postings in case of multiple lines (excess material issue)
    Regards
    Jan

    Hi,
    When you make a pull list , the system will create reservations
    for the components that comes from all the open orders collectively.
    The reqmts date will be the earliest one.
    Now you have to click the Blue lens in which the system will
    show the reqmts of components arising from various orders separately and each orders reqmts date will be shown individually.
    Regards,
    nandha

  • MF60 and COIK

    Hi gurus,
    The process to stage materials to production if I manage storage types (NOT only Storage Locations) would be appropiate to use MF60 or better to work with picklist like COIK?
    Is COIK only user for IM ??
    May I know what is COIK transaction for? is it for good issue or for transfering materials from one storage type to another or just the picklist, and how does this work?
    I need to move materials from RM StoType to production StoType but with reference to the Process order having a picklist would be great ( in this pick list system propose batch and bin for picking right) but how does this work? a TR or a TO is automaticaly generated?
    Please gurus describe the process of staging materials to process orders with WM integration, with mvt types and TCodes.
    Thanks a lot
    Regards

    If you search on the net you can find threads concerning WM material staging / WM-PP interface. Please read SAP online help under warehouse management.
    In order to use material staging you have to carry out your settings in WM-PP interface, this is an example:
    WM Staging - Supply area to Production prder
    You can do the staging in many ways. At the order creation (and release) system can create TR, TR+TO or nothing. You can also use GI via delivery option --> in this case components are picked and later issued against (technical) outbound deliveries.
    You can manage the process "manually" using transaction LP10 also.
    Using MF60 you can realize staging in IM and WM also...there are checkboxes on the top ("Staging types")...
    As for COIK I'm not sure, but you can check it yourself (I guess this is for consume components similarly to CO27 in normal PP, but as I said I'm not sure).

  • Control cycle for production staging SAP WM

    We currently have control cycle for kanban purchase orders. Do I need to create new control cycle production staging. Actually I will be using fixed bin for production consumption. Kindly confirm whether existing control cycle of purchase order can be used.

    Material Staging Indicator for Production Supply
    The material staging indicator defines the method of how needed materials can be supplied for production with the assistance of the Warehouse Management system.
    As with the location coordinates (warehouse number, storage type, and storage bin), the system files this indicator in the control cycle.
    The following staging types are supported:
    "1": Pick parts
    These materials are picked according to the required quantity specified in the production order.
    "2": Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    "3": Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "4": Manual staging
    Materials are staged manually. For example, you can transport individual components using manually created transfer orders, or you can use the bypass method to transport them directly from the goods receipt zone to production. In goods receipt posting, postings are made to the production storage bins from the control cycles.
    "0": Not relevant to WM-PP
    These materials are not relevant to WM staging. They cannot be requested using the WM system.

  • How to manually change the material staging date

    Hi All,
    Please help me to manually change the material staging date in MF60?....
    Problem iam facing is planned order created for 30.06.2011, but when i do staging today it is not staging due to period for july not openned...
    so I manually planned to change the material staging date in MF60...
    Please help me on this...
    Thanks,
    Manikandan.P

    Hi
    Please find the code below for changoing the status in the delivery  and the standard program for updating the status  RVDELSTA
    SELECT SINGLE * from vbfa  where VBTYP_N = 'U' and vbelv = ' '.
    if sy-subrc = 0.
    UPDATE  vbfa  SET PLMIN = ' ' where vbelv = ' '  and vbtyp_n = 'U'.
    endif.
    please go through the bote  445763   if the  problem is in inter company billing proforma
    Regards
    Damu

  • Expired stock being picked for production order staging.

    Hi all,
    While picklists are being generated for production order staging, materials that are past their expiry date are being selected and allowed to be picked and confirmed. Is there a way that such expired materials can be excluded from picking?
    Many thanks in advance.
    Kevin.

    Hi,
    As mentione dby Philippe, You can make use of batch search strategy to avoid picking of expired batches be it for production or Customer delivery.
    You can use LS51 transaction to setup batch search strategy WM01 (at Warehouse level) or WM02 (Warehouse / movement type). Hope you maintain classification data for your materials (023 batch class) where you maintain expiry duration and productioninformation etc.  In LS51, select the appropriate batch class and maintain batch parameters as released and  sort the strategy by Shelf life expiration date.
    Storage type startegy search (T334T) has to be maintained accordingly.
    If this helps you kindly reward your points.
    thanks and regards
    Varadharajan

  • Production order status for wm staging for production

    Hi Friends,
    What should be the status of production order for wm staging of raw for production.
    In production order status Confirmed & delivered will I be able to do staging for the production order.
    Thanks,
    Kiran

    Hi
    Material staging should be allowed following the Release of the Production Order.
    Then, as an example, you could have your first operation in the order (OP10) to Consume Materials. This will then backflush the materials in the PSA (Production Supply Area) that the staged materials were taken to. Ensure that the materials are set for Backflushing in the material master in MRP2.
    If the OP10 is confirmed before materials have been staged then they will not appear in the LP12 staging report.
    It's all about timing
    Regards
    Darren

  • REM COMPNENT AND ASSEMBLY BACK FLUSH

    Dear gurus,
    I have the BOM as Fert (A) in st.loc 1000, Halb (B) in st.Loc 1000 and Roh (C) in St.Loc 2000.
    1) After Mrp run i had converted pur req of Roh to P.O and done Migo.
    2) i had done MF60 using Halb pld order and during this process i had given rep st.loc as 1000,
        so the Roh (X) qty is reserved against st.loc 1000.
    3) But when i done MFBF for Halb using component backflush i am getting error as
       "Deficit of St.Loc un restricted use of X qty- For Roh (c) in St.Loc 2000".
    Pls suggest the answers for the same.
    with regards,
    sekar chand

    Dear Sekar Chand,
    The error shows that there's no sufficient stock of material X in the storage location 2000.
    1.See while executing MF60,under global settings is the indicator for Stock transfer reservation is
    included or not?If it's included means then a stock transfer servation will get generated and this number
    you will get it in MB25.
    2.Using this reservation number once after physical transfer of material happens you can execute MF65
    based on this reservation number or even using MB1B.
    3.If you are not including the check box then a direct transfer of material happens.
    Create stock transfer reservation
    Creates stock transfer reservations for the required components when staging materials at storage
    location level.
    When using stock transfer reservations, the system reserves the required components at the
    replenishing storage location. The goods movement can be posted in a separate step and is, therefore,
    not carried out until the goods movement has actually taken place.
    If you do not select this field, the system directly transfers the components.
    So only after carrying out MF65 or MB1B,sufficient material of X will be available for backflush when
    posting for the HALB.
    So if you want to do transfer posting of X from one storage location to your prod.storage location (for
    backflush) there's must be sufficient stock in the issuing storage location.
    Tell me why do use component backflush?
    Regards
    Mangalraj.s

  • Reservation iscersue in material staging MF60

    Dear experts,
    Our users having issue regarding material staging for production order. Before proceed please take a look of activities performed by users for order confirmation.
    1)      Production order creation – co01
    2)      Material staging - MF60 – As some of materials are not available to require storage location and available to different one. Here system generates the           reservation no.
    3)      Pull list posting- MF65 – post the reservation for stock availability at storage location.
    4)      Once stock available for order, order confirmed by t. code ck11n.
    Now issue is lying in stage 2 as follows with example –
    Order 1 and order no. 2 has been created for material A and B respectively. These both material consist of some of identical/Similar component like A having x, y and z whereas B having x, y and m. here X and Y are identical in both BOM.
    Now when user stage the material with MF60, he must have to stage first order first and post the pull list otherwise system does not shows similar components in staging step, or only shows those material to stage which are not identical for production order of B.
    Is it due to collective requirement indicator set in material master ?
    Please suggest the solution. and reason for issue
    With best regards,
    Manish K. Bachate

    Dear muhammad,
    You are right. Users always unchecked the include all req. indicator from global setting.
    Well if we check this indicator while staging, would it consider all req. for that material or only for that order ?
    Secondly as i said in issue post, this problem is arises when there are 2 prod. order which having similar component. until and unless i stage first order material, it wouldn't shows requirement for 2nd order while staging.
    Can you please suggest solution for above issue or what changes we require to made in our transaction method.

  • Material staging-MF60

    Gurus,
    Ours is a repetitive manufacturing, and for this we need to stage the materials against a planned order using Transaction code = MF60.
    Please help me quick in the necessary config settings as how to stage the material, through selection of Sloc/WM-pick parts/WM-rel order and Kanban, I have gone through SAP help it has left me puzzled, your quick help is highly appreciated.

    Hi James
    You need to do a couple of things
    WM Config - You need a production replenishment movement configured (I believe it should be 319). This needs to be assigned and configured in the PP integration of the WM IMG. This will include supply areas, control cycle records etc (data should also be created to match)
    This will be dependent upon your method of staging (pick parts, release order parts etc)
    When you run MF60 for the appropriate staging type it will identify the relevant items for staging. Initially you can manually step through the process (Demand > Stage > Transfer requirement etc), however, once ok with the process u can automate some of the steps to staging
    Cheers
    Steve

  • Material Staging through Pull List(MF60)

    Hi Gurus,
    1.My senario is Repetitive
    2.main Store:X,Production Store:Y
    3.Stock is available to Main Store
    4.material is being staged at Sorage Loc level
    5.Selection is through Planned Order(RSQ)
    6.Pull list is configured in IMG
    But I am not getting the materials to be staged. Pl guide me ,if I am missing any setting?
    regards
    Reshmi

    Dear Reshmi,
    After entering all details in MF60, go to Global settings
    Here Just check the tick marks & make as you required
    More over is stock is alredy exixts in Issue storage location then you cannot get in MF60
    After making required ticks in Global settings you can get
    Also check in OSPP whether Movement type 311 is defined or not
    Regards
    Madhu

  • Sale unit of measure is not copied into Delivery from MF60 staging

    Hello all,
    we are using MF60 for EWM staging. Component has base unit of measure as M2. For production purposes, issue unit of measure was set to KG.
    I managed to get KG in MF60 during staging, but Outbound delivery created contains however unit M2. This is unit of issue from sales org1 tab. I changed this to KG, but still M2 is coming.
    Please let me know if you know what is the problem.
    Thanks in advnace!
    Regards, Andrey.

    Hi Andrew,
    I think this issue is nothing to do with EWM. You can check with your SD consultant why sales UoM not getting copied into delivery. May be because of some delivery type or delivery item type settings.
    I had same issue for over delivery tolerance, which I raised with SAP and they advised to use the customized BAdi to get it done.
    Thanks,
    sandip

  • Material Staging for Pick part from MF60

    Hi,
    I would like to do material staging for a Pick part from MF60.
    During staging I get the error as
    WM material staging for production order reservation not possible
    Message no. RMPU311
    Kindly can you tell me how is it possible to perform tthis action using MF60.
    Using LP10 I am able to perform this staging for pick part. But Business requires to perform if from MF60.
    Thank You

    HI,
    It is possible to do staging for pick parts using MF60.
    I am setting up this for a plant, and the existing plants are able to do staging with MF60 for Pick Parts.
    Do you know the configuration that are required for doing staging using Pull List..