Standard consumption vs actual consumption

Hi experts,
How can we we get standard consumption (as per bom) vs actual consumption (qty withdrawn) during production order confirmation co11n.
suppose we made production order for 100 nos but we confirmed only 60, then we technically completed the prodution order then system should give standard consumption and qty withdrawn of 60 nos not for 100 nos, here MCRE report is not correct, how we can get the desired report, what are the other t-codes that can be used or some other way round.
Please help me
Regards
GR

Dear,
There no such a report in standard SAP you need to develop it.
Onlt you can get some details through,
COOIS   Select components again List
then give the plant,Order details
execute
You can find 2 fields reqmn qty( planned qty) & qty Withdrawn(Actual consumption) in the report.
Check this link,
BOM V/s Actual Consumption
Regards,
R.Brahmankar

Similar Messages

  • Planned and actual consumption for each confirmation

    Dear All,
    There is a production order. it has two operations. i have made three confirmations of each operation for that order. now i want to see the planned and actual consumption for each confirmation. how is it possible.
    However i know that on order we can see planned and actual consumption but it is for total order but i want to see planned and actual consumption for each confirmation. Actually client wants that on 2nd confirmation what is planned consumption and what they consumed on actual. thanks

    Hi,
            In standard SAP this type of report not be there, but u can make it by using BOM,Confirmation table, & material document table.
    Use AFRU to get posted document no for confirmation & detail by joining it with MSEG by mblnr & MAZHR.
    now u get plan component qty by using mast & stpo if ur bom not changed in Production order , if in order component may be change then use afko & resb table & by comparing base qty or order qty & confirmation qty get plan component qty for confirmation.
    Thanks
    Rakesh

  • Actual consumption of direct activities

    HI SAP Experts,
    In master recepie we define standard  consumption rate of direct activities like machine hrs,power and laboourfor base quantity
    of product.Now my question to you gauys are as follows
    1.How would i know actual consumption of these activities per production order which is entered by pp people at the time of  production order confirmation or consumed in producing the product in particular period.
    2. As our client is in cement industry, we are using statistical key figure for power assesment to cement main cost centre. and from cement common, power value is  transferring to two  product that is cement opc and cement ppc. in common cost centre  total power cost is 20lakh and value trfrd to ppc and opc is in the ratio of 70:30  while our production ratio for that particular period is 55:45
    Now i am unable to trace out that what basis system has taken to distributed this power. This problem i am facing while analysing the co month end closing results i.e. product cost sheets
    Please help me in resolving this problem.
    thanx in advance
    ASHOK VERMA

    1.How would i know actual consumption of these activities per production order which is entered by pp people at the time of production order confirmation or consumed in producing the product in particular period.
    - You can check in KOB1 transaction by giving the Order number range and period. Manage your layout to see the Activity Qty and amount posted for a given date.
    2. As our client is in cement industry, we are using statistical key figure for power assesment to cement main cost centre. and from cement common, power value is transferring to two product that is cement opc and cement ppc. in common cost centre total power cost is 20lakh and value trfrd to ppc and opc is in the ratio of 70:30 while our production ratio for that particular period is 55:45
    - You check your SKF qty maintained for these Cost center and if required befor assessment you can change that. Or if you ahev already did the assessment then reverse the assessement , update your SKF qty and do the assessment again.
    Regards
    Ranjan Kumar

  • Reporting for PIRs: actual consumption against plan

    Hi all,
    can you recommend what standard reports can show actual consumption figures against plan in PIRs. Collective report is needed, looks like rows with columns for material code, plan figure, consumed figure and this is for given periods. And plan figure should be quantitiy without reduction quantities (that is initial quantitiy in PIR).
    Thanks in advance!

    Vivek wrote:
    I would still suggest, use the report (shouldn't take more than 30 mins. of your time) & it would greatly help in your 'estimation effort'.
    Thank you for your suggestion.
    I can start this transaction (MD73) and see some figures, but cannot make GI due to some reasons in existing environment (migo goes into dump). That is why I'm asking about reduction, what results will be showm by this report - planned figures as originally planned or reduced ones after issuing.

  • Standard Report to check consumption values for multiple materials

    Hi,
    Is there any standard report to check "consumption" values for multiple materials? The user needs to check the consumption values over a period of time for multiple materials (VERP, ROH) before deciding the re-order and safety stock values for them. Any help on this will be greatly appreciated.
    Thanks,
    Swapnil

    Dear Swapnil,
    Report MCRE is widely used for the material cosnumption than checking in COOIS.
    Also these reports can help you.
    MCPF                 Material analysis: Dates                
    MCPO                 Material analysis: Quantities           
    MCPW                 Material analysis: Lead time            
    Regards
    Mangalraj.S

  • Cost Center Assessment to Cost Hierarchy based on Actual Consumption error

    Assessment is set up:
    SENDER:   Cost Center: Overhead Expenses (values in expense accounts)
    RECEIVER:  Top Node of Cost Object Hierarchy  (material consumption has been posted to two objects - related account has value and quantity fields)
    Segment is set up:
    Sender Rules: Posted Amounts
    Share:100%
    Actual value origin
    Receiving tracing factor:
    Receiver rule: Variable Portions
    Var. portion type: Actual Consumption
    No Scaling
    Assumption is that "Var. portion type: Actual Consumptions" means the quantity in the consumption account on the receiver from the inventory posting.     Is this true?
    Edited by: Chris Gibson on Apr 13, 2010 11:56 PM

    Hi dear Ajay, thank you for your answer.
    first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
    regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
    On sender tab I have only the cost center. no cost element defined.
    receiver its cost center.
    furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
    the only difference is: planned costs which their origin is already an assessment are not being assessed again.
    I can show you the print screens with cycles setup if it helps
    best regards
    MF

  • Capturing actual consumption weight in delivery VF01n

    Dear All,
    I want to capture actual consumption weight i;e weight consumed in production order, needs to be captured while making delivery document by VF01N, can any expert help me on this with any BADI our user exit.
    Thanks in advance.
    Moderator message: please do your own research before asking.
    Edited by: Thomas Zloch on Jan 10, 2011 2:02 PM

    Data flow to the delivery header/delivery item is controlled by data transfer routines assigned in copy control configuration.  Modify (or copy and create new) the routines assigned in your config.  Disclaimer...I can't say whether this covers a PP scenario appropriately though; I haven't done any PP in 10 years.

  • Difference between MC46 date and actual consumption date

    Hi,
    I found there is always the date difference between the MC46 date for the last consumption and actual last posting date for consumption.
    What could be the reason for that?
    Or what is the date apprearing in MC46 if you click on triple line option.
    Thanks in advance
    Ramesh
    Edited by: ramesh varma on Jun 17, 2011 3:45 PM

    Hi Jürgen.
    Thanks for your solution. It solved my problem
    Regards
    Ramesh

  • Production schedule report/Standard v/s actual report

    Dear experts,
    Need two standard report for
    1) Production schedule report- production during the perion and their cost component and items break up
    2) Standard v/s actual report - Standard defined for material  and actually consumed in term of qty and Cost for material and production order.
    regards
    RR

    Hi ajay,
    Thanks for your valuable advice,
    I did all the changes mentioned in thread.
    Cost component wise production target cost and actual cost is coming.
    Same way i did it for qty.but my actual qty of production order is not coming but input qty is coming.
    Option selected for output qty and same is not coming in report
    key figure-output qty
    value type-4actual
    version-770IVERS
    Option selected for input qty and qty is coming in reports also
    key figure-input qty
    value type-5target
    target cost version-790SVERS
    Need to ask one more question,Shall i create separate cost component for FG cogm a/c?.my fg cogm and settlement a/c is same.
    and also how to extract all data(cost component wise) in excel for all orderwise/material wise
    reards
    RR

  • What is the impact if we switch from standard costing to actual costing?

    Hi all,
    what is the impact if we switch from standard costing to actual costing?
    what are the changes is needed in costing?
    thanks.

    Hello,
    Its an nice idea to switch from standard to actual costing. It would be advisable to make this switch over happen in a new period praferably with a new year. You would need to carry out the settings for material ledger / actual costing and for the accounting settings you may refer to sap note 908737.
    Not much costing changes would be necessary to the existing configuration but you would need to activate material ledger and allign your Inventory accordingly. The settings for ML would be relatively simple but the main problem would be handling the inventory that you already have in stock. You would also need to have a proper closing procedure followed by next month's planning approach which would actualise the inventory at the end of the month and decide the methodology for next month's plan valuation. It  should be kept in mind for configuring ML.
    The closing sequence would be as under:
    1. Complete all Cost Center and production order postings.
    2. Complete all Cost center Assessment / Distribution
    3. Calculate Actual rate
    4. Revaluate production orders
    5. Calculate WIP
    6. Settle Production Order
    7. Run Costing Run (CKMLCP)
    Material ledger is capable of actualising activity costs and WIP as well and you should configure it according to your need.
    You can follow the standard SAP documentations for configurations + Note 908737 for configuring ML.
    Kind Regards // Shaubhik

  • How can I download acrobat x standard using my actual licence nr.

    I have my licence with cd included but now I use an HP ps slim with no possibility to insert the cd ... there shoulb be the chance to download adobe and register my licence ... help! giuseppe.

    I knew …
    It is very peculiar … I thought there must be the way to download and add my licence nr. To validate adobe acrobat… as we can do  with many other products …
    Giuseppe Mistroni
    朱塞佩 霧羅尼
    C.F.O.
    Tonino Lamborghini Group
    cid:[email protected]
    Tonino Lamborghini SpA
    Head Office/Sede Commerciale: via Funo, 41 - 40050 Funo di Argelato (BO) - Italy
    Registered Office/Sede Legale: via San Giacomo, 25 - 41121 Modena - Italy
    C.F.: 03139260370 - P.I.: 00865150387
    tel. + 39 051 862628 - fax +39 051 864956
    www.lamborghini.it<http://www.lamborghini.it/> – mail: [email protected]<mailto:[email protected]>
    Follow us on:
    cid:[email protected]<http://www.facebook.com/ToninoLamborghiniGroup>  cid:[email protected] <https://twitter.com/#!/tlamborghini_>   cid:[email protected] <http://www.linkedin.com/company/tonino-lamborghini/products?trk=tabs_biz_product>   cid:[email protected] <http://issuu.com/toninolamborghini>   cid:[email protected] <http://www.youtube.com/user/TLEnergyDrink/videos>
    Shop now at Forzieri.com<http://www.it.forzieri.com/ita/shopping_shop.asp?l=ita&c=eng&brand_id=188> !
    CONFIDENTIALITY NOTICE: This message and any files transmitted with it are legally privileged and confidential. Any unauthorised use or disclosure of the content of this message is strictly prohibited and may be unlawful. If you are not the intended recipient, please notify the sender by reply and delete the message and any attachments from your system. Thank you very much.
    Da: Test Screen Name [email protected]
    Inviato: martedì 25 marzo 2014 12:39
    A: Giuseppe Mistroni
    Oggetto: how can I download acrobat x standard using my actual licence nr.
    Re: how can I download acrobat x standard using my actual licence nr.
    created by Test Screen Name<http://forums.adobe.com/people/TestScreenName> in Acrobat Installation & Update Issues - View the full discussion<http://forums.adobe.com/message/6240076#6240076

  • Over-consumption and under-consumption in Sucontracting.

    Hi,
    how can I manage an over-consumption and under-consumption in subcontracting.
    What are the related activities that must be done in this cases?
    Best regards

    Hi
    How can I manage an over-consumption and under-consumption in subcontracting?
    for that you have to do subsequent adjustment in T.Code: MIGO....
    For eg.) As per your BOM....you have sent 10kg. of Grease to your Sc-Vendor useing M.Type:541....for assembling of your FG...Now after completion of the Assembling,you found that only 7kg. of Grease only used by Sc-Vendor  for your assembling  and 3kg of Grease is still lying at SC-Vendor's Place.......Now you have to do Subsequent adjustment in MIGO and take back the balance under consumed Grease from SC-Vendor...To Do this,
    Goto -
    > T.Code: MIGO...choose the transaction "Subsequent Adjustment" and ref. doc. as your SC-PO...
    And in Itm View,for the Line item Grease....you maintain the underconsumed qty( ie.  3kg) and Check the Under Consumption check box ....
    Now if you execute the subsequent Adjustment....this 3kg of Grease will be regenerated  in 544 O- movement type as under consumed component and it will be Lying at Sc-Vendor's place...and you have to get back this into Company's Stock separately in MB1B useing M.Type:542...
    Same this you can do for Over Consumption also....for this you should not Check the Under Consumption Check Box....Here the Over consumed material will be consumed in 543 O- movement type...and again you have to issue this Over Consumed qty to SC-Vendor in M.Type:MB1B useing m.Type: 541...
    The same subsequent Adjustment you can do for Scrap generation also....
    Hope you will understand the subsequent Adjustment process in Sub-Contracting...
    Reward if useful
    S.Baskaran

  • Plan actual consumption report

    Dear All,
    The client want to see a report
    where the planned consumption of quantity mentioned in the BOM and the actula consumption at conformation along with the standard price of sfg.
    he wants to get the difference per unit of standard& actual.
    this is basically he wants without overhead .
    any suggestion

    Hi,
    Plz chk the t.code:KOB1,Before That create consumtion cost element group.So u can get plan and actuval consumtion and quantity at each production order wise.
    Regards
    Nagaraju sami

  • Standard extractor for forecast & consumptions values (prow and mver table)

    Hi All,
    Is there any SAP BI standard extractor for forecast and consumptions data ?
    For information,
    ECC6 Forecast table : PROW.
    ECC6 Consumptions table : MVER.
    Thx.
    radj.
    Edited by: Radjech Radjech on Jul 27, 2011 11:13 AM
    Edited by: Radjech Radjech on Jul 27, 2011 11:25 AM

    I have created a generic extractor, in the past, with the FEBEP table. However, my requirement was to join it with the BSID and BSAD tables in order to determine payments that have been received into the lockbox but not cleared, so that the Credit Department has a more up-to-date look at customer accounts.
    If you have multiple companies you could end up with a Cartesian product when the data for this view is rendered because the Accounting Document and Fiscal Year don't uniquely identify records in BSEG and BKPF. Additionally, you wouldn't know exactly which Accounting Document Line Item is the correct record on BSEG. Both of these cases are potential sticky points for both a custom view or User Exit in CMOD, unless you've been given by the end customer a way to mitigate these. For instance, you may be able to derive the Company Code for the FEBEP entry by using the Cost Center or Profit Center, unless your Cost Centers or Profit Centers can span across companies.

  • Production Report - Reference BOM, PO BOM and Actual Consumption

    Hi everyone,
    I´m looking for some standard report that shows the quantity and cost based on the Bill of Material and the actual quantity consumed in Production Order.
    When the production order is created, the BOM is copied to the order, but the materials and quantities could be changed before production.
    Reports like KOC4 compares the actual consumed quantity with the planned quantities from Production Order, not from the original BOM.

    Hi Fabio
    There is no such standard report in my opinion. You can develop it based on below logic
    1. Read bom number from Prod order
    2. Read components of bom from STPO table
    3. Actual qty consumed can be fetched from LIS tables like S03* or from mseg/mkpf or Corp
    Br. Ajay M

Maybe you are looking for

  • Purchase order not create in sus

    Dear customizer, Ihave implemented a plan driven procurement with sus (r/3-sus) scenario,we have a problem when we transfer idoc from r/3 to sus.In sus sistem give me this error message "An error occured within an XI interface: Exception occurredE:BB

  • Applet runnning jre7 sends tons of PersistenceDelegate requrests to server:

    Our server runs jdk1.6. Applet runs on IE7. Just recently, some clients with jre1.7 experiences slow down. By monitoring our Apache Mod_jk log, we see tons of requests from client such as: GET /epen-webapp/java/lang/ClassPersistenceDelegate.class GET

  • SSL errors connecting to secure sites

    <blockquote>Locking thread.<br> Please continue in your previous thread: [[/questions/891765]]</blockquote> I had earlier posted a query on a problem connecting to https sites. refreshing the network card parameters seems to have solved the problem.

  • Exchanging a macbook pro + odd issues

    Hey everyone, I recently (2 weeks from last Friday) received a new MacBook Pro from Apple via online purchase. Unfortunately, after about a week and a half of use, I decided to return it based on an opinion from a local tech store that services Apple

  • AlwaysOn 2012 Failover has problem: fails

    Hi all, this is my first post ever, so I apoligize if I'm not doing well. We installed SQL Server 2012. All good! We configured AlwaysOn High Availability Group. Some problems but all good! We are testing and we are having some problems. If we shutdo