Standra cost run (material cannot be costed)

Dear Guru's,
Can any one help me,  I have one material which is created under Non - Stock (material type :NLAG) item,
user raised sales order and billing document on that material,  while releasing billing document to finance it is searching for current planned price.  CO-PA is activated.  while running standrard cost estimate run in ck11n and  ck40n one error message showing  that is Material PSERVICE cannot be costed.  pserivce means material name,  for this material master there is no costing tabs. 
This error message showing
Material PSERVICE cannot be costed
Message no. CK113
Diagnosis
In accordance with material type NLAG for material PSERVICE, the material is not relevant for costing.
System Response
Material PSERVICE is not costed.
Procedure
1. Check the master data for material PSERVICE.
Display material master record
2. If you have authorization for Customizing, check whether the material type is correctly set for this material. A material can only be costed if the Costing indicator in the material type is set.
1. can any body tell me non stock materials can we able run standard cost.
2. without costing tabs can we run standard cost
3. which material type can we run standard cost
This will appricated
Thanks & Regards
Chandra Sekhar Reddy
99868773663

Hi,
Most of the materrial types like FERT, HALB, ROH can be costed. Exception is like this non-stock material type.
With out costing view, it is not possible to perform standard cost estimate.
Hope, this helps!

Similar Messages

  • Extractor 0CO_PC_PCP_03: diferent costing runs for the same material

    Hi, experts.
    We are extracting data with 0CO_PC_PCP_03 extractor, but some materials do not return any record.
    If we use CO standard transactions, we can get the values for all materials, but with the extractor just few materials are returned.
    We are filtering the extractor with the costing run name and costing run date, but some materials are not extracted.
    This is occurring for a specific month only. We have extracted data for other months / costing runs and the same materials appears in CO transaction and in extractor result. The different thing with this problematic month is that there are other costing runs of the same type (costing variant), for a higher date.
    It seems like the extractor just can extract the last costing run for a material / month. Any idea?
    Thanks,
    Henrique Teodoro

    Hello,
    I have an update in my findings. Few days ago, R/3 user ran a new costing run for a set of materials, using the same costing variant / costing version used one year ago. And now, when I extract the costing run created one year ago, materials present in recently run set don´t appear anymore. I ran this same costing run weeks ago and the material are ok. After the new costing run with the same costing variant / costing version, they are gone from extraction.
    Seems like this extraction just can return the last costing variant / costing version for each material. Or maybe the table key that stores this data are costing variant / costing version, instead of costing run / costing run date.
    Anybody have any knowledge or experience on this?
    Thanks,
    Henrique

  • Costing Run Error

    Hi All,
    I am currently trying to roll cost for materials but have an error that i can not seem to resolve, i hope someone can assist me and help me understand.
    While rolling the cost for a specific material the MFG Overhead cost is not being calculated correctly, i have looked at the routings for this material and do see where the error might stem from, but i do not think it can be corrected from there.
    The error is that in the routing the cost for MFG Overhead is calculated by adding Labour (1H) and Setup (0.017) and MFG Overhead = 1.017.  The lot size of this material is 300 but when roll up the cost with CK11N per unit the Set up value is 0.003 but the MFG Overhead does not calculate in the same fashion it remains as 1.017 (it should be 1.017/300 = 0.0033 ) This is causing a massive discrepancy in costing.  Now one solution is that the amount can be corrected externally and then update the routing and run the costing, but there will be an issue if the lot size is increased in the future (instead of 300 the lot size is increased to 400, now the routing will have to be change to 1.017/400 = 0.0025).  How can i correct the logic within SAP?  I have tried configuring the costing sheet, but i am not not sure where to change it.  In my costing run i am using costing variant PPC1.
    I have tried being as detailed as possible, and i hope it is coherent.
    I would really appreciate you help and points will be awarded.
    Thanks in advance

    Hi Althea,
    Thank you for your response.
    In the routing we have removed the MFG Overhead and now are using the Costing Sheet to calculate the Overhead.  I think i have updated everything, eg costing sheet, costing sheet components, percentage overhead rates, costing variants.  But now the requirement has changed again!!!! Just when you think you have crawled your way out of a ditch, someone pulls you back in. 
    In the legacy system they were able to calculate overhead in relation to cost centers ( Setup, Labor and Overhead for 403, Setup, Labor and Overhead for 403B and for 407 etc), but in the costing sheet you can only enter one cost center, is it possible to enter multiple cost centers and where would i do that?
    Now i had a cost element for Overhead, but in the cost element category was incorrectly selected as 43 (Internal activity allocation) instead of 41 (Overhead rates) now when i am trying to use select that Cost Element in the Costing Sheet under the credit area it will not allow me to save it.  I have created a new cost element but i am not certain what the impact might be
    Please help!!!
    Thanks in advance

  • Actual cost of material in COPA

    Hi Team,
    We have implemented PP, CO & COPA  our client has the requirement to see the actual cost of material in COPA as per their requirement we designed the KE30 report as product wise profitability report in that report we used the record types B( direct postings from FI), C(Order settlement), D(over head cost) from the copa assessment cycle & F ( SD billing).
    1) Is it possible to see the actual cost of material( Including activity cost) in copa.
    2) If it is possible please advise.

    Hello
    It is not possible to get the actual cost of the material in COPA. Actual cost can only be derived if you implement material ledger.
    However in COPA we may come close to actual cost to some extent. The following configuration needs to be done:
    1. Run standard cost estimate every month so that the price reflects the most recent material prices.
    2. Define assessment cycles for auxiliary cost centers (whose cost should form part of inventory cost) to production cost centers.
    3. Configure for splitting and revaluation at actual price.
    4. Take the production variances to COPA.
    5. Create a report to show the standard cost and variances.
    One of the difference is that the total standard cost is for the quantities sold during the period however the variances will be for the quantities produced during the period.
    Another difference is that the unabsorbed overheads could not be allocated to individual materials.
    Hope this helps.
    Sangram

  • Ho do we make msg. CK666 become warning msg when we do costing run?

    Dear Experts,
    The sys. activate transfer price for preserve use.
    When we do costing run for profit center valuation, the following error msg ocurred.
    CK666 Material 227BO0001/plant 1030: Transfer price could not be found.
    Diagnosis
    When switching profit center 0000008000->0000005000 (from the material component to the costing object), a transfer price could not be determined for transfer price variant 0 in respect of material 227BO0001 in plant 1030.
    System Response
    If you carry out costing for a profit center valuation, material 227BO0001 goes into the cost estimate without a value.
    If you create a cost estimate for group valuation, profit from material 227BO0001 is not transferred into the cost component split.
    Procedure
    Check the settings for transfer price variant 0.
    In OKEQ, the variant for TP is blank.
    Ho do we make msg. CK666 become warning msg when we do costing run? and let costing result can be release, or there's another way?
    Thanks in advance.

    There is alternative solution.
    Try using TCode SE91.
    Enter the class - CK and Enter the message number 666.
    Select that line message line.
    Go to Utilities, Click on "Where-Used-list" or press "CtrlShiftF3" from keyboard.
    Select programs and deselect all others.
    Identify your program and double click against that under short description.
    There you can change the letter from "E" to "W" as your requirement.
    NOTE: take assistance of ABAPer of this, Do enquire about the implication of the same in sandbox before doing anything on any other client.
    Thanks & Regards
    JP

  • Delete cost run & reset release for current month

    For our client we have created a new plant while testing this plant user created a material and they have done a cost run in ck11n  with costing varient zv01 but in they released the cost with costing varient ppc1 with this system got inconsistency and not not allowing to release cost for any other material in the current month if we try to mark it for next month it is working fine.
    we deleted the cost run through ck44 & ckr1 then also we are faceing the same problem. Kindly give me the solution how can i reset the release and later i want to run the ck11n & ck24 for material in the current month  to do  the production cycle.  please consider this is as a urgent.
    Regards
    Chakravarthy

    Hi
    Whether you should do MR21 or not ??
    a. If the cost estimate you reversed belongs to Last month and you are going to post the GR in last month then you should do MR21
    b. if the cost estimate you reversed belongs to may and GR will also be posted in May - No need for Mr21... Because, even though you release cost on say, may 2nd, the cost always gets released from the Start of the Month
    br, Ajay M

  • Costing of Material without BOM & its Impact in COPA

    Hello,
    I have a scenario wherein Few Finished materials does not have BOM and Routing. However client is aware of Standard Price for these Materials. These materials are lying in stock since long but may get sold. Client is ready to update standard price by MR21 and would not mind to exclude these materials from costing run. However We have profitability analysis active, so as per my understanding while selling such parts for which system does not have costing run, it will give cost estimate error since no costing variant was used for price calculation of these materials.
    Need your suggestions.
    Regards,
    Rahul

    Hi….
    You don’t use MR21 because SAP don’t create CO-PA
    document without standard cost estimate of material which have
    price control “S” when you create billing document  .
    To change material current stock’s amount, you can use MR21.
    MR21 don’t have a role to release standard cost to material master.
    For material which don’t have BOM and routing but have price control “S”
    , you should calculate standard cost using t-code KKPAN to create billing
    document without error related to standard cost.

  • Resons for Missing Materials in Costing run- very urgent

    Hi,
    Can anyone tell me why are some materials not picked in the costing run.
    Can anyone list the reasons for missing the materials?
    Can give me in general, not in particular to my problem, so that I can check through each one of those reasons and figure out my problem
    You help in this regard is highly appreciated
    Thanks in advance
    Kumar

    Hi,
    Please check:
    1. The fields 'With Quantity Structure' and 'Material Origin' are checked in the costing 1 view of material master.
    2. 'Do not cost' is not checked for those materials to be costed.
    3. Required materials are selected (not deselected) for the costing run.
    4. Check the quantity structure explosion indicator in MRP4 view of the material master and if its based on production version, check the assignment of production version.
    4. Ensure that you are executing the costing run only for those materials for which you have not already executed the costing run and relased the cost estimate for the period under review.
    Hope these points help...

  • Cost item in costing run

    hi,
    the costing run is to get a standard cost for a finished goods item.
    may i know if the costing run besides calculate the cost incurred from raw material consumption, material overhead, manufacturing overhead, will costing run also cover sales overhead or distribution overhead cost?
    or put it this way, the costing run cover cogm only or until cogs in order to get the standard cost of finished goods item.,
    thanks
    rgds

    Hi,
    It always depends on the settings made in costing sheet and cost component structure. If you have maintained for admin and sales overhead in costing sheet and cost component structure then it will pick in costing run.
    Regards,
    Sreekanth

  • Unit Costing in Material components

    Dear Experts,
    I have come across a requirement where dummy materials are to be used for cost planning. These materials wonu2019t be processed any further. The planned cost for these materials is project specific ie. Material A in Project 001 costs 1 $ while same material in Project 002 costs 5$.
    We are planning to use unit costing to cater this requirement. Unit costing works for Item category L.
    The planned cost from Unit costing for material is considered when we create u201Creservation + purchaser requisitionu201D for WBS element for the material.
    On Creating u201Creservationu201D for WBS element, the planned cost from Unit costing is ignored and the planned price is calculated as per the valuation strategy maintained in the Network costing variant (valaution variant). However it is intended that the cost for unit costing is to be considered for reservation for WBS.
    We are using std. costing variant PS04 for material costing.
    Is there something I am missing so that the planned cost for material from Unit costing is considered in case of reservation for WBS?
    Regards
    Sejo

    Phoenixcfa & Ahmed,
    Thanks for ur inputs.
    I had already thought of the option you have suggested. In the currect process, the "Res / Purc. req." is maintained as "Immediate" at network header level. So the activity also inherits the same reservation relevance & it cannot be changed from "immediate" to "Never".
    As suggested by Phoenixcfa it has some thing to do with split valuation. I could carry out the unit costing for a material with "res. for WBS" in IDES.
    Hope, I will figure why it doesnot work our Dev system, soon.
    Regards
    Sejo

  • How do I delete a costing run?

    Hi,
    I have a costing run which is already released. How do I delete it? I have deleted the price update from Material Master using CKR1. I want to totally delete the costing run. Please advise. Thanks.
    Regards,
    Sakthy

    Hi Sakthy,
    Please check the online help document for more information.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/7e/cb841c43a311d189ee0000e81ddfac/content.htm
    CK44;
    Choose Accounting->Controlling->Product Cost Controlling->Product Cost Planning->Environment->Costing Run->Delete Costing Run. The Delete Costing Run screen will appear.
    1. Enter the name and date of the costing run. Data is displayed on the costing run that is to be deleted.
    2. Push trash can button
    best regards, Takashi

  • Help Costing  Run !!

    hello friends,
              I am having  a BOM with 210 items.
    I want to run cost estimate for the BOM.I want to know
    how and where should i manage the price of BOM items
    (in which transaction i should maintain price of BOM items).
    ALso let me prerequsites and procedure for running the
    cost estimates  .
    Kindly help me
    Regards
    SAM

    BOM item Price can be maintedned in Material Master Accounting / Costing  View or Purchase Inforecord. Which price to be
    considered is depends on Costing variant.
    Product Costing steps...
    Step 1:
    Header Data – Create a costing run by specifying a name. Also enter description of the same along with date for which the costing run is taken
    Finally save this data.
    Step 2:
    General Data – Select Costing Variant, Costing Version from the available options. Enter Controlling Area and Company Code.
    Step 3:
    Processing - Selection of Material
    Click on the parameter icon, which will open a new window – change parameter window. In this window enter single material code/ range of material/ multiple material code and plant code.
    Tick the field “Always Recost Material” and remove tick from background processing. After this save the data and go to the previous screen.
    Click the execute button. The status field will show a green signal if all the materials were selected correctly, else will show red signal specifying error.
    Processing – Structured Explosion
    This step will read the Bill of Material for the selected product/products. Go to change parameter window and remove tick from background processing. Save the data and go to the previous screen.
    Execute this step and the status field will show green signal for successful execution.
    Processing – Costing
    This step will create standard cost estimate for all the materials selected in Selection step and BOM exploded in structured explosion step.
    Go to change parameter window and remove tick from background processing. Save the data and go to the previous screen.
    Execute this step and the status field will show green signal for successful execution. The materials field will show total no. of materials that were costed.
    Processing – Analysis
    After costing step is over, a report is generated that enables to process and analyze the costing results. For example, compare the costing run with other costing runs or compare the costing results with a price from the material master.
    After this remove tick from background processing field in the change parameter window and return to the previous screen for executing this step.
    Processing – Marking
    This step will mark the standard cost estimate for the costed products in the previous step. If the authorization field is locked, then it is to be opened by selecting the relevant company code.
    This step would enable the results of standard cost estimate to be updated as future price in the material master.
    Go to change parameter screen to make relevant changes and then execute this step after returning to the main screen.
    Processing – Release
    This is the last step in costing run transaction. This step will update the results of standard cost estimates in the material master as the current standard price.
    It is to be noted that after releasing a cost estimate for a material in a company code, no marking or release can be carried out again for the current period. Before releasing a cost estimate, is should be made sure that the future standard prices are correct.
    Go to change parameter screen to make relevant changes and then execute this step after returning to the main screen. To verify the updated prices, check the material prices in material master.
    At every step if there is any error or warning, the log field will display it in detail.
    if useful assign points.............
    Venkat
    Edited by: VenkatSrinvas Konda on May 2, 2008 6:29 AM

  • How to get report for cost estimates material cost only

    Hi Gurus,
    We have requirement in sales order costing that we need to develope report which shows only Material cost for all BOM levels.
    Normally at lower levels cost of Material and activity cost will be treated as Material cost for next level. Here I want to consider only material cost not activity cost at lower levels
    Pls suggest the logic and tables for exploding BOM and fetching material cost only.
    Thanks
    Sneha

    Sneha
    If you tick the "Roll up" indicatorfor each cost component  in Cost Comp Str OKTZ, then overheads do  not get added to the material cost... This is my understanding about it.. Is it behaving some thing different in your case??
    br, Ajay M

  • Releasing of Production Order without Cost-Run

    Dear Sir,
    We want to incorporate a check in the system so that no Production-Order should be released unless the Manufactured component (component being manufactured in the Production Order)  has the proper cost run . By proper cost run mean that standard cost for the component is greater than 0 .
    Kindly guide us . Full marks are asssured for the suggested solution please .
    Regards
    B Mittal

    Hi,
      Try with user status and the conditions specified in Bs02
      Regards,
      nandha

  • Custom SAP report used to display an average standard cost per material.

    Hi All,
    I need to implement a report with the following functionality,
    This is a custom SAP report used to display an average standard cost per material.  Standard cost data is stored in SAP at the Material/Plant level.  This report will gather the individual Standard Costs at each applicable plant (restricted by selection screen input and additional logic specified in more detail in the u201CReport Fieldsu201D section) for applicable Materials (restricted by selection screen input; if not specified all materials should be returned) and calculate an average standard cost for each material.  The corresponding Currency and Base Unit of Measure will also be displayed.
    Additionally the relevant u201CCommodity Code/Import Codeu201D information should be displayed for each material returned.  This attribute is also stored at the Material/Plant level.  To determine the value of this field for each relevant material, the report logic must retrieve the values stored for each plant.  If all values are the same, the value can be output to the report.  If not all values are equal, a message u201CNot Consistentu201D should be output.  It should be noted that if all values are u201Cnull,u201D a null value should be returned in the report.
    Can any one provide me with sample code for the same??
    Thanks Debrup.

    Hello,
    Also refer this [ THREAD|Re: error in Fleet management customising] and [link|Error when recording measurements in IFCU]
    Regards
    Nav
    Edited by: Desire_Naveen on Nov 4, 2009 12:35 PM

Maybe you are looking for

  • Skipping problem with ipod

    I have another problem with my 30G ipod video. It skips certain songs, not entirely, but partway through. For instance, there is a song that it will play for 15 sec, and then skip to the next one. It is always the same songs and it skips at the same

  • Issue with Search Help Creation

    Hi All, I need to display the match code for the Z table ZPRODUCT and the field is PRODH. The data should be retrieved from the table T179 by filtering PRODH = 'ZZ*' and STUFE = '1'. So, I am trying to create a Search Help for this requirement. But,

  • Segment field in SD transaction Postings

    Hi As we are using Derived Segment FAGL_DERIVE_SEGMENT (there is no segment assignment in PCtr master data i.e. segment identified with out PCtr also), the segment field is not coming in VA01, ME21N. What to do to get the field segment in the above t

  • Oracle.jsp.webutil.email.SendMailBean

    Hi, I have the code below in a jsp page, while using the oracle.jsp.webutil.email.SendMailBean. The attacment doesn't seem to be working. I placed the sendmail.properties file in the WEB-INF directory as the documentation suggested. Does anybody have

  • Export from remote machine(directory storing in local machine)

    Hi all, I have 10g(10.2.0.2) installed on my local linux machine and want to export a schema from a remote server(10.2.0.1).The schema is about 10GB,and there is not enough space in remote server to store the directory.if i use data pump ,ie expdp,ca