Stock on hand in SIM planning version

Hi All,
Is there a way the stock copied from the active version 000 to the SIM planning versnon to be updated without running report /SAPAPO/VERSION_COPY_TRANS, but manually? The problem is that if I update the stock with the report the planning version is de-initialized.
Regards
Alper

I am afraid there is no easy way to do mass creation of stock. We have a similar situation where we need to create stock en masse for location products not defined in R3. The way we do it is using an excel file as input load that we make it read through standard function modules and create stock in Live Cache using /SAPAPO/OM_STOCK_CHANGE.
Some other function modules that we use
FILE_GET_NAME
/SAPAPO/DM_VRSIOEX_GET_VRSIOID
/SAPAPO/DATE_CONVERT_TIMESTAMP
/SAPAPO/OM_STOCK_CHANGE
/SAPAPO/DM_PEGID_GET_MATERIAL
Make sure that when you load, use appropriate UoM conversions.

Similar Messages

  • Inspection lot creation based on "right" inspection plan version

    I manage inspection plan ( inspection lot origin 01 ) with Change number; in this way I have differents inspection plan version based on date.
    When I do a Good Entry based on purchase order , I need that system creates inspection lot version based on the purchase order creation date and not , as now, based on good entry date
    Is it possible ?
    When I create the purchase order I send to vendor also the inspection plan characteristich that have to be maintened ; for this reason I need to find same characterist during good entry inspection
    Regards
    Silly

    You need to use one of the enhancements that Do-Wook has suggested.  There is no standard SAP way to suppress the inspection based on the vendor batch number.
    With the first enhancement you use the system to check for a previously received vendor batch and if one is found, then that batch number is proposed and not the next one from the numbering series.  In this case, the lot isn't created than due to the inspection lot control of the inspection type.
    With the second enhancement you check the vendor batch number and if it's been received you suppress the inspection lot creation and the stock goes right to unrestricted.
    You'll probably need to do one or the other.  Myself, I prefer the first enhancement.
    Craig

  • MTO Strategy consider the stock in hand

    Dear Experts,
    AM new in MRP Field, pls advise me about pure MTO Strategy which consider stock in hand. MRP run should consider the available stock for net requirement calculation. I tried with strategy 20,but it is not consider the stock.Pls advise,
    Regards,
    Vijesh

    Vijesh,
    MTO by definition will only consider Sales order stock.  This is the main planning difference between MTO and MTS.  Thus, if you have generic stock on hand (not sales order specific) it is supposed to be  excluded from MRP planning.
    If you wish for MTO planning to consider generic stock, you have to first convert the stock to Sales Order specific stock (Special stock type 'E') using a Material Movement transaction.  Or, you can stop using MTO and use an MTS strategy, such as 40.
    For more info about MTO planning see http://help.sap.com/erp2005_ehp_06/helpdata/EN/f4/7d2ed844af11d182b40000e829fbfe/frameset.htm
    Best Regards,
    DB49

  • Sales Block for order whose quantity exceeds % of available stock on hand

    Hello gurus,
    I am wondering if there is standard SAP functionality that could enable the following scenario:
    For a material in material group XYZ, if a sales order is entered that exceeds 50% of stock on hand, a delivery block is placed on the order.  If a sales order is entered that is under 50% of stock on hand, no delivery block is placed on the order.
    The number 50% is arbitrary and would be specified based on the material group.  As well, this can be based on the material.  I'm hoping there is configuration out there that would block the delivery creation if an item on the sales order exceeded a pre-defined % of available, unrestricted stock in the plant.  Any help would be greatly appreciated!

    Hi Andy,
    Let me summarise ur question - You have Material - A, B & C all of them belonging to a particular Mat. Group lets say - 444. Lets think if the stock of all the Materials - A, B & C is 100 CS's.
    When a Sales order is created for Material - A for Quantity of 60 CS - You want a Delivery block.
    If my understanding is yes, I think the requirement is too complex, but achiviable.
    Because -
    - If this can be achived its possible with only User exits, but the requirment is linked with Availability,
    - If we want to implement this in the Save user exit, the code has to go check the stock in availability and if the conditions are met needs to block the delivery,
    - you need to consider the stock situations as the re-scheduling will also be happening in the background,
    - Wht would happen if there are more than 1 material entered and both are different Material grounps. [Need to consider this scenario as well]
    Instead of Delivery block - You can implement the changes to Reject the line if the % crosses. That is reason for rejection. As this is more specific to line item.
    Create a Z* table and update it with the Material groups that you are planning to use. And give the %.
    Implement the code changes in the Save user exit in MV45AFZZ to check this table for each material group and validate it and then compare the Ordered Quantity with the available stock of that material. Not sure though from where you want to get the stock figures.
    I tried, but this might be a start. All the best.
    Thank you,
    Chaitu...

  • Current Stock on Hand in ME2O

    Dear Experts,
    I want to look at the current stock on Hand in ME2O.  Though I can see the word "Current stock" in ME2O, I am not able to see the value. 
    Kindly help me to see the current stock in ME2O.
    Regards
    Tom

    In ME2O, You can see available stock. But you cannot see value.
    The report "SC Stock Monitoring for Vendor" creates a list of stocks of
    materials provided to a vendor, with the current stock situation,
    planned issues and planned receipts.
    Outward (issue) elements are:
    o   Dependent requirements from subcontracting purchase requisitions (SC
         requisitions)
    o   Dependent requirements from subcontract purchase orders
    Inward (receipt) elements are:
    o   Stock transfer reservations (where MRP areas are used)
    o   Purchase requisitions to an external supplier who replenishes the SC
         stock
    o   Purchase orders to an external supplier
    o   Deliveries (from own plant to subcontractor)
    tures of list
    You can delimit your selection on the initial screen. For example, you
    can use the Group by Batches  indicator to specify grouping by batch
    numbers.
    The list is initially aggregated, i.e. the requirement and inward
    elements are shown as totals lines. You can also show the individual
    purchase orders, deliveries etc.
    All outward and inward elements are shown with their open quantity only.
    If, for example, 8 out of 10 units covered by a purchase requisition
    have already been ordered, the list only includes the remaining quantity
    of 2.
    The sum of the SC stock and the inward movements less the dependent
    requirements yields the available SC stock (shown in green if 0 or
    positive, or red if negative).
    The following BOM components are not taken into account in the selection
    of the dependent requirements:
    o   Phantom assemblies
    o   Co-products (components with negative input quantity)
    o   Bulk material items
    o   Components withdrawn not from SC stock but from a different special
        stock (individual customer or project stock).
    Regards
    Antony

  • How to calculate stock on hand initial based on VALUATED not Category group

    Dear Expert,
    Now, i want run SNP with initial stock on hand calculated by stock on hand based on VALUATED not category group like CC or CI. Because in ECC we used a lot of valuation types for materials.
    please show us.
    thanks so much
    hungth

    Hi,
    1) You need to answer the question whether you really need this 200 quantity in APO or not? Is your requirement only relevant to SNP? Or that even for GATP, PPDS, etc you don't want to get this 200 stock in APO. If you don't want this 200 quantity in APO at all, then what I said  earlier would be applicable. You could try to have enhancement in CIF so that valuation type AKDTCLT1(200 quantity) gets exluded in CIF and doesn't reach APO. I am not really sure how simple or complex this could be, but most likely should be possible.
    2) Once the stock is in APO, are you able to distinguish between the 2 stocks in anyway? As far as I know, it won't be possible to distinguish. You could see the version (batch from R/3), and the stock category. I am not sure if valuation type info would be available in any way in APO, but may be I am wrong. Even if you were somehow linking the stock valuation type to the storage location stock, I think only possibility for your would have been to block storage location specific stock to come to APO in CIF (for ALL storage locations), but the stock at Plant level would still come to APO.
    If somehow you are able to distinguish the stock based on valuation type, then Ada's solution could be used.
    Thanks - Pawan

  • Day's Supply, Stock On Hand, Safety Penalty and Delay Penalty

    Hi All,
    1. Day's Supply and Stock Hand at the Distribution Center
    Checking the planning book, does the stock on hand KF represent also the day's supply? or only the receipts?
    ex. of what i see in the planning book:
       receipt = 100, stock on hand = 100, day's supply = 7
    There is also a case where I see 128 days as my day's supply but i have no stock on hand.
    How is the day's supply determined?  How do I know the number of stocks it represent?
    2. Safety Penalty and Delay Penalty
    If my safety penalty is higher than my delay penalty, will it be true that it will prioritize to meet the required safety stock rather than the demand?
    Hope someone can help me on this. 
    Thanks a lot.

    Thanks PATHAN Mahadalikhan.
    Additional Question.
    What if,
    D1
    Demand           300  
    SOH                500  
    Day's Supply     7      
    D2
    Demand           300  
    SOH                200
    Day's Supply     7     
    D3
    Demand           200
    SOH               
    Day's Supply     7     
    D4
    Demand            0
    SOH                 0
    Day's Supply     7    
    D5
    Demand            0
    SOH                 0
    Day's Supply     7 
    D6
    Demand            0
    SOH                 0
    Day's Supply     7 
    *this will be like this until the end of the plan.
    What can be the reason behind the day's supply reflected even if there is no more demand and Stock on hand?
    Thanks.

  • Tcode KEFC and message:"Plan version is not supported"

    Hello all,
    Please is someone aware of solution for this situation:
    - I upload with tcode KEFC forecast datas from excel file in CO-PA
    - receiver records are created with errors
    - when I check for the errors system tells me that "Plan version is not supported, diagnosis : Plan version "0" has not been created in operating concern "1000", Procedure: Transfer version "0" to operating concern "1000" and maintain the attrributes for that version"
    - my concern is that when I check in customizing Planning, Initial Step: display view settings in operating concern details the version "0" is existingin the operati,ng concern "1000"
    So do you have a solution for this issue?
    Thanks and best regards
    JCO

    Hi Sudhakar,
    Thanks for answer but version "0" is tickled for Plan Actual, WIP and variance and I don't understand what to do about KEPM.
    Best regards
    JCO

  • Ageing Report(STOCK IN HAND)

    Dear All,
    Can I have ageing report for stock in hands (Lot based ) in PP/MM
    modules.
    Kindly give your advises .
    Thanks In Advance
    Rakesh Sehgal

    Hi Rakesh,
    pls check below two tcodes
    1. MC46 - Slow Moving Items
    2. MC50 - Dead stock items
    Regards,
    Sankaran

  • Diff: Version on workflow builder and Maintain Active Plan version on SWU3

    Group,
    Can any one help me to understand the Version on workflow builder and Maintain Active Plan version on SWU3
    Thanks in advance !
    Richard A

    Dear Richard Antony,
    The Versioning in the Workflow is very important its some what simmilar to the version on any SAP Objets like Tables, Program etc.
    Here Suppose any change comes in working workflow, then in stead of directly change them you can create a version of them and them modify it. So that you can reverst back to that version if required.
    Like wise there is lots of importance of versioning Workflow.
    The Active Plan version is also important to establish at SWU3. As all the Workflow is using Organization management which is very depended on the Active Plan version. so based on which Plan version you want to use you can Provide in SWU3 to tell Workflow system to use this.
    Hope this will give you a clear picture.
    Regards,
    Chandrashekhar.

  • Calling MB5B from a program to determine stock on hand as on date

    Dear friends,
    I want to call transaction MB5b from my report passing (matnr, plant and selection date-sy-datum ) values from internal table (11500 records) and fetch the quantity field that gets displayed after executing. How to do that. can anyone write the code for that. Because writing full program for determining stock-on-hand seems meaningless as we can get that value from MB5b. Can we trap that parameter in the standard program RM07mlbd and import that parameter to the program. Any suggestions.
    Please write full code. I guarantee Points would be rewarded if solved.
    Regards.
    D.P.Mallick

    Hi,
    could you please post the code how it was done. I am facing a similar issue.
    Regards
    Mohan

  • Stock on hand problem

    Hi All,
    what are the steps to perform the uploading of actual qty of items in the warehouse every end of months ? we begin to calculate qty of items in the warehouses (disregarding qty in system (SBO)) from date 30 to date 4 of early of next month. We use stock taking template, inventory tracking and stock posting but some items will have negative stock on hand qty, what is the causes ? are the ordered and committed influence this stock ? Thanks in advance.
    Balaj

    The negative stock is because you have not checked in Admin > System Init > Document Settings > Block negative inventory.  Showing negative inventory is not a good business practise as  tangible goods can never be negative.  This On hand quantity is not affected by Ordered or committed.  This is purely what is physically in the warehouse.
    You must first change the setting to Block Negative Inventory.
    Then you must using Stock taking DTW template to import monthly stock balance and reconcile stock using Inventory Quantiy, Inventory tracking,.. option.
    Suda

  • How can I set up MRP to use QI Stock at the Vendor, for Planned Ind Reqmts

    Hi experts,
    We are running ECC 6.0.
    In one of our plants, we have a lot of components that are available as QI stock in Material Provided to Vendor status.
    We build SKUs (MRP type M3) at the top level in the BOM, and the SKUs use the above components. We mostly enter demand at the SKU level in the plant (LSF).
    We have set up the source list for all the SKUs in this plant with MRP = 1.
    When MRP runs for the components (MRP type PD), system is able to first allocate the QI stock to any of the requirements that are driven by the higher level SKUs. Only then, it creates Planned Orders for the components to account for the shortage.
    Issue : We now enter forecast (LSF) directly at the Component level  (for some Materials). Now, even though we have excess
    component stock to handle all the demand (dependant demand driven from the SKUs + LSF at the Component level), system doesn't allocate the excess QI stock to the LSF demand at the component level. It just creates Planned orders.
    Strategy Group for both the SKU and Component is 10. We don't have MRP Areas implemented.
    I tried setting up the source list at the Component level using the vendor but there is no use.
    Does any one have an idea on how this can be addressed?We want to be able to use up the QI stock first before we create Planned orders.
    Thanks,
    Rao

    How can you create QI stock first before your planed order from MRP run? Do you know this is not standard SAP ?

  • "Open in Smart View" option. Hyperion Planning version 11.1.1.3

    Failure to download planning form to Smart View using the "Open in Smart View" option. Hyperion Planning version 11.1.1.3. Error message "Web launch operation has been cancelled.
    Your feedback is appreciated.

    I understand you are on 11.1.1.3.
    However, this is documented in the Known Issues section of the Smart View 11.1.2.1 readme and could be worth a try: 
    When you try to open a Planning web form in Smart View through Workspace, you may get this error: “Web launch operation has been cancelled.” This happens if Essbase has not been added as a server in Shared Connections. Workaround: Open the Smart View Panel in Smart View and add an Essbase server as described in the online help or "Adding Essbase Servers" in chapter 2 of the Smart View User's Guide. 
    HTH-
    Jasmine.

  • Actual and Plan Versions annual view - Multiple versions per company code

    Good Day,
    Iu2019m creating an FI-CO query with an annual view of both Actuals and Plan Values, which uses period and version as input values. The dilemma is around the plan versions which are hardcoded per company codes (eg. 1 Company Code = versions 501 u2013 512)
    Can anyone suggest a possible solutions as normally there is only one version used for planning but in this instance there are multiple versions per Company Code.
    Currently the report is hardcoded for one Company Code and going forward it should cater for more than one(Company Company* 12 Version)
    Kind Regards

    Remove restriction on comp code. There could be 2 models.
    1. Include comp code, value type and version in the rows. This way you get multiple records for a comp code. One record for actual data and one record each for plan versions. To have this model at the query, the data model in the cube also should be in this way (what we call as the account model), multiple records differentiated into actual/plan by valuetype and different versions by version.
    2. Include comp code in rows. Create selections, one for actuals (restrict with key fig and value type 10, actuals), one for each plan versions (restrict key fig with value type 20, version 501. Create one selection for each version this way). This way we have one record per comp code with diff key fig for actual and plan versions. We call this as key fig model. To have this model at the query, the data model in the cube could be account model or key fig model. If it is key fig model then no need of selections. The key fig could be taken directly from the cube.

Maybe you are looking for

  • Macbook Pro (Lion 10.7.3) will not connect to Wi-Fi -- persistant 'connection time-out', and fails.

    I can see this seems to be a common problem, and it is amazing that there seems to be no consensus (that I can find) on what the underlying problem is. Here are the basics.... I have two Macbook Pro 13's... Pretty much identical setups (Lion 1.7.3 et

  • Ipod Classic, no Now Playing for videos?

    Is this only on my classic, or am I the only one who is bothered by this? When I pause a video on my ipod to go through a playlist or back to the main menu, there isn't a 'now playing' option to resume the video i was watching. Also If I pause the vi

  • IE problems with vertical spry menu bar

    hi, first of all: I'm aware that this problem has been discussed before. but nothing I've found so far has really helped me. the problem is that my vertical spry menu bar doesn't work properly with the internet explorer. I've (clumsily) repositioned

  • Need help in logging into BI Presentation Services

    Hi All, I am new to this technology. I wanted to learn OBIEE. Just downloaded and installed in my system. And started reading 'Oracle BI Answers, Delivers and Interactive Dashboards User Guide.pdf'. In that, i have read that to access stand-alone ver

  • Illustrator CC crashes after printing

    Adobe Illustrator CC 2014 crashes every time I print a job. Reminding me to save early and often. Any advise? I hate to think that I'm going to have to re-install, but my ears are open.