Sub-contracting: difference in Accounting

Hi guys,
I am using release 4.7 and we are discussing about 2 different ways to proceed sub-contracting.
1. Sub-contracting is handled only in MM: PR>PO>GR
2. Sub-contracting is handled as an external operation in routing:
Prod.Order>PR>PO>GR>Confirmation of Prod.Order
In particular we would like to understand the different impact these two ways of managing Sub-contracting have in accounting especially in Cost of production and in cost of goods sold.
Could you kindly give me some clarifications?
Thanks in advance
Vir

Hi Sunil,
there is a particular thing I forgot to say that is Material Ledger. In my company we implemented it and all stock materials are managed with standard control key.
So at the end of month there is Variances Analysis and Distribution to materials with multi-level strategy.
What I want to know is if both methods of Sub-contracting fullfil the requirements of cost of production and cost of goods sold reconciliation .
Your precious answer is grateful
Vir

Similar Messages

  • Price Difference in Sub contracting

    Hi all,
    I have a question on price difference on sub-contracting.  The issue is, there is a sub contracting PO for Rs.100 for 10 units.  GR is done for 100 units.  Before the IR is done, there is a change in the PO price to Rs.60.  Further of the 10 units which was received, 6 units have been issued out.  Now the stock in hand is only 4 units.  As there is a price change, the difference in the price to the extent of the stock availability is posted to Stock account  (40/10*4 = 16) and the balance of price difference (for non-availability of stock) *shoud  be*  posted to price difference account.
    Wanted to confirm  from where is the price difference account is picked up for sub contract?  Whether it is the GL account given in PRD or FRL in OBYC settings.
    Also please throw light on how to stop the changing the price after GR and before IR.
    Thanks in Advance.
    Narasimhan.J

    Hi Kishore,
    Thanks for replying.  Yes, we use MAP only.
    I  created a test scenario and changed the GL accounts at Transaction FRL - External activitiy in OBYC settings and could see that the GL account specified in the FRL is picked up to post the price difference.
    To the extent of stock availablility it is posted to the FG account and  rest is posted to the GL account  specified in Transaction FRL in OBYC setting.
    Regards
    Narasimhan.J

  • SAP PP-difference between External processing & Sub-contracting

    Hello SAP-Guruu2019s
    What is the difference between External processing & Sub-contracting w,r,t PP module

    HI
    Operations that are performed by a third party are called external processing operations
    The detailed data you can enter in external processing operations can be divided into two basic groups:
    External processing data
    Procurement option data
    External processing data contains information from the supplier on net price and planned delivery time. The procurement option data contains vendor account and purchasing information, such as the purchasing info record, purchasing group and organization.
    In subcontracting, the vendor is provided with materials (components), which he uses to produce the finished product.
    This section describes how to procure materials using a subcontract order. It describes how subcontract orders are processed in Purchasing, Inventory Management, and Invoice Verification.
    In subcontract order processing, the vendor receives materials (components) with which it produces the end product. The following are involved:
    You order the end product using a subcontract order. The components that the vendor needs to manufacture the end product are specified in the purchase order.
    In Inventory Management, the components are posted to the stock of material provided to vendor. The components are then supplied to the vendor.
    The vendor performs its service and delivers the ordered material (the end product). The consumption of the components is posted.
    If, after the goods receipt has been posted, the vendor informs you that a larger or smaller quantity of the components was actually consumed than planned in the purchase order, you must make an adjustment.
    The vendor charges for his or her service. The invoice is posted in Invoice Verification.
    The quantities of the components to be provided to the vendor are entered into the stock of material to be provided to vendor. This stock has the following features:
    It is managed as part of your total valuated stock, and is available for MRP.
    It is only managed at plant level, since it is not stored at your own company but on the vendor's site.
    Two stock types are possible:
    unrestricted-use stock
    quality inspection stock
    Stock can be transferred between the two stock types. Withdrawals can only be posted from unrestricted stock, however.
    You can take a physical inventory of the stock of material to be provided to vendor
    -ashok

  • GL account doesnt exist in company code-error in Sub contracting PO.

    While doing GR for the sub contracting PO, I am getting this error for line item 4:  GL account 490237 is doesnot exist in company code 0600.
    3 line items are already recieved to the GL account 490223 which is correct.
    for 4 th line item when i am going to do the GR the above error is occuring,
    I have checked the FRL setting for Valuation grouping code VB01 with 490237; it should be acually 490223.
    Where can I see the changes relevant to that, all of a sudden GR is asking for the new GL account than the one which use to posted earlier? Pls help me experts.
    Thanks
    Sri

    The correct G/L account is 490223, so far posted with. what changes went to production I dont know
    Valuation grouping code in obyc is VB01 490237 (at present for FRL)
                                                            VB02 490223 (at present fro FRL).
    due to which all of a sudden its looking for 490237 which is not correct.
    after our EHP5, is this got changed to vice versa?
    Thanks
    Sri

  • Sub Contracting GR Accounting Entries

    Hi All,
    I am posting GR for sub contracting PO and found the following entries in the accounting document of GR:
    1. Stock Acct. of Finished product
    2. GR/ IR Clearing Acct
    3. Sub Contracting Charges
    4. Change in Sub Contracting Stock
    However, I did not see the accounting entries for:
    1. Stock Acct. of Spare parts
    2. Consumption Acct
    Please suggest how to corrent the same?
    Rgds,
    KK

    Hi,
    Check in GR Document whether line item for component consumption exists with MvT 543, if yes then check whether MAP of material is ZERO.
    If line with MvT 543 doesn't exist then you might have forgot to activate "Item OK" indicator for component line item during GR in MIGO. Confirm this by checking componet stock in MMBE for special Stock "O" for Vendor. Just cancel the GR Document and Post GR again.
    During GR against Subcontracting PO (In MIGO), following A/c Entry should get posted;
    BSX     Assembly Stock A/c          Dr     5000.00
    BSV     Change in Stock A/c          Cr     5000.00
    FRL     Subcontracting Charges A/c     Dr     1000.00
    WRX     GR/IR Clearing A/c          Cr     1000.00
    GBB-VBO     Component Consumption A/c     Dr     4000.00
    BSX     Component Stock A/c          Cr     4000.00

  • SUB CONTRACTING ACCOUNTING ENTRY - DOUBT

    Hi,
    the blw is the a/cing entry for the sub contract process , here pls tell me how the a/c detemination for Rs 1000 is picking i.e for BSX & BSV..
    i knew that FRL &  WRX picked based the po price say Rs .200
    and GBB & BSX is picked based on the mat master value of the ram mat, which we send to subcontractor.. say Rs 800
    i need to know , how the BSX and BSV value is picking?? pls clarify
    BSX- stock account finished -
    1000(+)
    BSV- change in stock -
    1000(-)
    FRL-external service----
    200(+)
    WRXGR/IR clearing acct--
    200(-)
    GBB_VBO- consumption acct raw material sent to vendor-----800(+)
    BSX- stock account--
    800(-)

    in your case , Your  Finished material is  valuated at MAP  with price control "V" ,    so the total value of material produced will be  the sum of the Raw material components consumed and  the subcon charges.
    Change in stock  account is hit when  you receive any material from subcontracting .
    so  BSX entry  is  "Stock  debit "  800 +200  = 1000  (sum of  Components consumed and  Subcon charges)
          BSV  Entry is for "Change in stock " credit = 1000 (equivalent to Finished material value)

  • Sub contract account

    Dear Friends,
    For subcontracting purchase order at the time of goods reciept for
    15 kg of the component COMP-1 at $20/kg = $300
    5 pcs of the component COMP-2 at $30/pc = $150
    The goods receipt is valuated with $950. This is calculated as follows:
    The subcontract price (50 pcs * $10/pc = $500) and
    Value of the components ($300 + $150).
    As per the SAP standard the below entry is shown as example.  my user is asking when the value of external service is loaded in the
    stock account end product as 950 then why again external service account as 500 again debited separately
    can anybody explain clearly this entry. because my user is expecting only 1) gr/IR , 2)SEMIFINISHED GOODS(Which is recived from sub contractor) 3) Rawmaterial account( which is issued for sub contract) 4) Raw materail consumption account.
    I am unable to explain about external service account and  change involving stock accounts. Please give ur valuable time to answer me?
         At goods receipt
    GR/IR clearing account     500 -
    External service account     500 +
    Stock account: end product     950 +
    Change involving stocks     950 -
    Stock account: comp.     450 -
    Consumption account     450 +

    Dear,
            Go to transaction code OBYC , check the G/L account against Account key FRL . That is the G/L which will hit instead of inventory account while doing goods receipt . Suppose Rs5/- per one unit of service and 100 units of service will be provided. Then this Rs 500/- will hit this G/L account which is provided by FRL accnt key .This will be balanced by GR/IR clearing account.
            Then in OBYC check account key BSV. The G/L which will be assigned to this key will be the change in stock G/L.Suppose we receive a finished goods worth Rs1000/- . Then against Finished goods inventory account this account will get balanced.
            Then in OBYC click on GBB accnt key , then check account modifier VBO . Against valuation classs check the G/Ls . During subcontracting the raw material which gets consumed will hit this G/L account. Suppose we used one Rs 800/- worth of raw material. Then during GR this will be consumed. So inventory credit and Consumption account debit . That consumption account is maintained at this location.
            These are the three accnt keys which are used for subcintracting account determination.
    Hope it helps
    Abhijit

  • Sub Contracting-Inventory GL shoule be P&L or Clearing Account?

    Hi,
    I am facing problem in Sub contracting. Please any one can clarify me whether Sub Contracting-Inventory GL should be P&L or Clearing Account?
    Thanks
    KB

    it should be clearing account. Because we receive the goods,These goods are need to transfer to toher party.

  • Sub contract

    my client running fg sub contracting  (electro plating )cycle through the MRP
    after return from vendor with mvt type 105 (543) i check document list with MB51. i found following g/l account effects :
    SFG consumption for sub contract  account = 602026
    Gr/IR Clearing Account = 164335
    SFG-inventory account = 323055
    for sub contract account = 602130
    Inventory account = 320010
    Costs of goods mfg = 602200
    but if do whole sub contracting cycle without MRP i can see effect in following G/L a/C:
    Manual Cycle .
    Inventory account = 320010
    Gr/IR Clearing Account = 164335
    Price Differance Account = 602155
    change in stock = 603010
    Sub Contract expense = 603000
    SFG-inventory account = 323055
    SFG consumption for sub contract account = 602026
    my question is why this differance comes ?
    if i want gl accounts hit by manual process in MRP process what changes to be made ?

    Hi,
    Price diffrences arise during valuation @ GR if the material is managed at standard price in MMR.
    Also there is one more setting in customizing that for a plant that price differences should or not be posted during GR.
    spro-IMGMMInv MGmtGR--price differences for subcontracting at GR
    Regards,
    Deepak.

  • Sub Contracting Process

    my client running fg sub contracting  (electro plating )cycle through the MRP
    after return from vendor with mvt type 105 (543) i check document list with MB51. i found following g/l account effects :
    SFG consumption for sub contract  account = 602026
    Gr/IR Clearing Account = 164335
    SFG-inventory account = 323055
    for sub contract account = 602130
    Inventory account = 320010
    Costs of goods mfg = 602200
    but if do whole sub contracting cycle without MRP i can see effect in following G/L a/C:
    Manual Cycle .
    Inventory account = 320010
    Gr/IR Clearing Account = 164335
    Price Differance Account = 602155
    change in stock = 603010
    Sub Contract expense = 603000
    SFG-inventory account = 323055
    SFG consumption for sub contract account = 602026
    my question is why this differance comes ?
    if i want gl accounts hit by manual process in MRP process what changes to be made ?

    Hi
    Kindly check with the following:
    In customizing  for that plant price differences should or not be posted during GR.
    SPRO->IMG>MM>Inv MGmt>GR-->price differences for subcontracting at GR
    Thanks

  • Mb1b (sub contract)

    while doing MB1b ( for sub contract)
    error is
    G/L account 799999 does not exist in company code AAA
    i tried
    fs00
    g/l account  - 799999
    c,code         -  aaa
    the following error comes
    " Account 799999 does not exist in company code AAA
    and
    Account 799999 blocked for creation in chart of accounts INT
    what to do
    ali

    Hi,
    For subcontracting process you need to set up following
    If Material has Price Control as "V" (MAP)
    (BSX) Stock A/c of Assembly - Dr
    (BSV) Change in Subcon Stock - Cr
    (FRL) Subcontracting Charges - Dr
    (WRX) GR/IR Clearing A/c - Cr
    (BSX) Stock A/c of Components - Cr
    (GBB-VBO) Consumption A/c of Components - Dr
    If Material has Price Control as "S" (Std. Price)
    If Material is having Price Control as "S" then Price Difference A/c will also in picture.
    This depends on configuration; SPRO > MM > Inventory Management and Physical Inventory > Goods Receipt > Price Differences for Subcontract Orders at Goods Receipt
    Price Differences for Subcontract Orders at Goods Receipt
    In this step, you configure for each valuation area whether price differences are generated for a Subcontract order at the time of a goods receipt if the manufactured material is managed at standard price and the standard price varies from the receipt value (externally performed service + value of components + delivery costs).
    Example
    Finished product: $400 (value at standard price)
    Subcontract order:
    o Ext. service : $250
    o Components : $100
    Posting schema without price differences:
    Stock account FERT : 400 +
    Stock change : 400 -
    GR/IR clearing acct : 250 -
    External service acct : 250 +
    Compon. stock account : 100 -
    Consumption account : 100 +
    Posting schema with price differences:
    Stock account FERT : 400 +
    Stock change : 350 -
    Price difference : 50 -
    GR/IR clearing acct : 250 -
    External service acct : 250 +
    Compon. stock account : 100 -
    Consumption account : 100 +
    And cost center is mandatory for subcontracting process
    the accounts for the BSX FRL and GBB-VOB needs the cost elements
    Thanks
    Diwakar

  • Sub-contracting charges to be capitalised

    Dear All,
    Kindly give your input on the following,
    One of my client who is manufacturing Circuit Board, this activity is done both in-house production as well as sub-contracting.
    i. they are producing circuit board in In-house, as per the BOM component and costing CK11n, the price of the Circuit board will be updated in the Material master as standard price, but
    some time they will give to sub-contract, (material + labour) and they want to capitalise the sub-contracting labourcharges (job work charges) to the cost of the material,
    One material code with standard price and when i try to do MIGO from sub-contractor , i dont know how the system will behave
    How do i do and capitalize the labour charges to the cost of material (material code is only one)
    Kindly give me your valuable input which will help me to solve this issue
    Thanks and regards
    Elan

    Thanks for your input.
    Correct me if am wrong
    As per your input,
    if the Material Master is Standard Price "S"
    I created Sub-contracting PO and when I receive the goods against the PO (MIGO), system will check the price in the material master and price in the MIGO, if any difference it will post price difference account in FI , Material master price with "S" will be remain same.
    In such case, am not capitalising the job work charges to the material is it?
    Kindly clarify the same
    Regards
    Elan

  • 541 & 543 Mvt for Sub Contract Process with Split Valuation

    Hi all,
    We have activated SPLIT VALUATION for sub contracting in ECC 6.0
    We have clasified into 3  Valuation Catergories as New,Repaired & Faulty.
    The logic & naming convention of the materials are
    New Material : C1
    Repaired : C2
    Faulty : C3
    The details are as.....a faulty material can be converted into Repaired by the external  Vendors,for which we raise a PO and do MB1B with 541 mvt type with ref to this PO.
    The Acing Entries are
    PK      GL Code        Material     Value
    99         117000         C3            10
    89         117000         C2            100
    93         600530                           90
    While in process the GR w.r.t the above mentioned PO ,we are getting 6 accounting entries (which is delivered by Stand SAP) they are as
    PK      GL Code       Descrip     Value
    89         117000        Stock        100
    96         117400        GR/IR         150
    91         600530        Sub Cont    100
    86         600863        Sub Service 150
    99         117000        Stock          100
    81         600530        Sub Cont     100
    Can any please explain me how the system calculates the above Accounting Entry.
    We are confused why the system calculates ( entries) for the 91,81,86 Posting Key.
    I have uderstood that PK 89 for goods inward, 96 is for GR/IR clr, 99 is for reversal of 541 mvt type.
    Other 3 entries i have the confusion ........
    Can anyone please guide me and explain in detail how ,why andfrom where the system is calculating the entries.
    Hope that you will help me in this regards
    Take Care
    God Bless
    Regards
    Praveen.
    Edited by: Praveen Singh on Sep 16, 2008 8:07 PM

    Go to OMWB and click on simulation and here enter you mateirla number, plant and Mtype 101
    Then click on account assignment
    you will see all the entries
    Posting Lines Text              VlGCd AGC  VCl   PK Acct D      PK Acct Cr   
    Gain/loss from revaluation      -e-   -e-  -e-   83 440700      93 440700    
    Inventory posting               -e-   -e-  TRA1  89 130000      99 130000    
    Incidental costs of external a  -e-   -e-  -e-   86 460820      96 460820    
    External activity               -e-   -e-  TRA1  86 460960      96 460960    
    Change in stock account         -e-   -e-  TRA1  81 460820      91 460820    
    Purchase offsetting account     -e-   -e-  -e-   40 --Missing-  50 --Missing-
    Purchase account                -e-   -e-  -e-   40 --Missing-  50 --Missing-
    Materials management exch.rate  -e-   -e-  -e-   40 440600      50 440600    
    Cost (price) differences        -e-        TRA1  83 440000      93 440005    
    GR/IR clearing account          -e-   -e-  TRA1  86 210005      96 210005    
    Inventory posting               -e-   -e-  TRA1  89 130000

  • Creation of Sub Contracting PO through Maintenance Order

    Dear All,
    I am aware of the sub contracting indicator to be cliked in the maintenance order in order for the system to generate a Sub Contracting PO through Maintenance Order. However I am unable to see this indicator in maintenance order fields.
    Is there anything that I am missing in customising settings or is this related to activation of any business function sets.
    I am working in ECC 6.0 EhP 5.0.
    Need your help / inputs so as to resolve my issue.
    Thanks in advance.
    JK

    Hi Tehsin,
    Thanks for ur response. 
    However this is something I am aware of. The settings suggested by you will automatically generate a PR with Account Assignemnt Category as 'Order' (F) & Item Category as 'Service' (D) combination.
    I am looking for the auto generation of PR through the maintenance order with Account Assignemnt Category as 'Order' (F) & Item Category as 'Sub Contracting' (L) combination.
    Looking forward to hear from all.
    Thanks in advance
    JK.

  • Error while doing MIGO for a sub-contracted item

    Hello to Everybody,
    I am facing below problem -
    Error : Incorrect CCtr <Cost Center Code> with this account (CCtr category must=D) for
    <Item Code> , while doing MIGO. (for receiving sub-contracted item from vendor).
    May I request for possible solution to above error ?
    regards,

    Dear Sanjay,
    You can determine the cost object for the posting of the  costs in the transaction OKB9.
    Following thread should resolve this issue:
    Re: cost of subcontracting
    Regards,
    Naveen.

Maybe you are looking for

  • Printing to a Windows shared printer, keep getting "Hold for Authentication" when I'm on the Windows shared network and can browse the computers.

    I have had two MacBook Pros now, and this has been an issue in Mountain Lion and Mavericks. I've got a shared printer on the local Windows network (it's a USB printer shared via the network and the computer), and the other Windows computers in the ho

  • HT4557 my computers won't show up in home sharing on Apple TV

    I connected AppleTV to my television, everything works but can't get the home sharing to show my laptop, iPad or iPhone. I have gone thru all of the setttings on each to work with Home Share, made sure the user name and password are correct on all...

  • Session management in JSF

    Hi all I am confused with how to manage users session when logged to my web app (jsf 2.0 primefaces 3.3.4 and glassfish server 3) I actually use a UserBean class that has the following: * To change this template, choose Tools | Templates * and open t

  • Idoc re triggring issue

    Hi friends, for my customer request i have given them 2 days full volume of GLPCA Line item list and corresponding Idoc list. Like Idoc = PCA= PCA Doc list i have given to him in an excel sheet, it's having more than 800 idocs, now customer is asking

  • Accounting doc. generation

    WHEN I AM DOING VF02 AND GENERATING ACCCOUNTING DOCUMENT GETTING ERROR THAT XXXXX GL IS BLOCKED . I WANT TO KNOW WHERE THIS SETTING HA BEEN DONE  AND HOW IT WORKS SO THAT I ACAN CHANGE THE GL OR TAKE CORRECTIVE ACTION. Please tell me how accounting d