Subcontracting and Return Delivery

Our Company has a subcontractor and send it some components. we have a third party that send other components to that SC.
when SC wants to return some components ( by quality reasons for example) to our company I proposed MB1B -> MvT. 542 to change materials from provided to vendor to our SLOC.
but when SC wants to return components to our Third Party, I have NO solution
(We Create PO for that third party. when SC recieves components, we do GR so those components go to provided to vendor).
Does SAP has any solution?
thanks in advance

Daniel,
As Jürgen mentioned above searching for content and I would add to this testing in your sandbox should be done before starting to post questions like this. You best learn things by researching and testing. Then ask when you are really stuck and can't find any answer.
Here some help for you.
If you want to return directly from the subcontractor's location and thus return directly from subcontract stock you create a standard return PO and put into the delivery tab section of the item the vendor number for the subcontractor and check the SC vendor check box.
When you then process the return PO via say MIGO_GR the return will happen directly from the subcontractor.

Similar Messages

  • Delete and Return delivery button in confirmation

    Hi All,
    We are in SRM 4.0 and using extended classic scenario.
    Recently we had an issue with the batch job CLEAN_REQREQ_UP. It has been scheduled for every 2 mts and it used to complete within 5 seconds. But one schedule of the job was running for a long time (3 days) and we didn't notice that. Parallaly the other schedules of the jobs are running fine.
    I checked the shopping carts, Po and GR created on those 3 days and they got udpated in back end system and also in SRM withtout any issues.
    But the "Delete and Return Delivery" button is not active in the confirmation documents posted on those three days. We need to activate those buttons in the confirmation documents.
    Note: Problem is NOT with the confirm Goods / service transaction. It is only with the confirmation documents posted on those 3 days.
    Is there a way to activate those two buttons in the confirmations document?
    Please help me.
    Thanks.

    Hi Arun,
    Run the Report BBP_GET_STATUS_2 for those three days only.
    and then check.
    Regards,
    Sachin

  • Difference between confirmation cancellation and return delivery

    Dear Gurus,
    can you explain to me the difference between confirmation cancellation and return delivery in terms of processes and impact on ECC postings?
    Thank you in advance for your collaboration,
    Fuffo
    Edited by: Fuffo Fuffi on Dec 21, 2010 2:36 PM

    Hi
    Confirmation Cancellation --> is used for reversing a confirmation which is posted wrongly in the system. This is generally used for reversing a faulty transaction.
    Return Delivery --> is used for sending the goods back to vendor. This happens when we receive goods from vendor and for some reasons the delivery does not meet customer's specification due to any reason. In these cases you record the goods movement as Return delivery sent back to Vendors.
    Regards
    Virender Singh

  • Difference between subsequent adjustment and return delivery ...?

    Dear all ,
    Provide difference between subsequent adjustment and return delivery ...?
    sri....

    Hi,
    Subsequent delivery means you have to reverse the goods receipts after
    entering corresponding invoice and you want to post another goods receipt
    than use subsequent delivery in MIGO with reference to old goods receipt
    number.
    Subsequent adjustment means updating the price difference in the quantity
    already supplied.
    Ex: Original invoice price is 100 for quantity of
    10 nou2019s, i.e., Invoice amount is 1000 after doing MIRO for amount
    1000 you get another supplementary Invoice for amount
    100 towards price revision. In this case  you have to adjust through subsequent
    adjustment.
    If your question was on posting logic for alternative posting of exchange rate differences. then,
    Subsequent adjustment*
    When you make a subsequent adjustment, the system posts all values with the exchange rate at the time of the goods receipt.
    Return Delivery
    If there is a return delivery, the posting date is based on the time of the goods receipts. The system converts the stock value using the average exchange rate with reference to the purchase order.
    Regards,
    Sadiq.

  • Free Receipts and Returnable Delivery

    Hi,
    I am having two requirements
    1.Free receipts thur PO
    2.Returnble delivery items thru PO>
    Could u please suggest how can I do this actitvity step by step along with required configration chnages.
    Please explain scenario 1 as Free Receipt thru PO (with ZERO price) and
    2.Returnbale material thru PO.
    Thanks
    Vijji

    Hi
    In both case you can create PO with flagged in item overview for free items system here automatically set price column as zero
    And in second option also you can select return delivery option in PO
    Create PO with Return delivery flagged>GR against PO here system automatically select Movt type 161>J1IS if it is excise mateial.to reverse the excise duties which you had availed credit earlier.

  • Auto Quality Notification and Return Delivery Via Usage Decision

    Hello Gurus
    Need help !
    I am using the Quality inspection with Material Specification.
    Just an overview of my current system settings -
    Inspection Type 101 for Purchased parts , My Inspection characteristics and Batch Charracteristics are linked .Batch classification is updated as a result of Usage Deceision
    My Requirement -
    If the Inspection lot is getting rejected , system should trigger the Quality notification and return delievery automatically .
    Can someone pl help me with detailed steps for acheiving this...
    Reqward points will be given immediatly for sharing thoughts
    BR

    Hi
    Thanks for reply.
    I think I missed some thing in my question
    I understand that this is Standard Sap when you post the stock into Return Deilivery stock , it 'll do the movement type 122 and create the material docuement.
    However My requiremnet is to get the Delivery Document number with the reference of which i can do the PGI .
    I gone thru the SAP help and learnt that we can trigger the Quality notification automatically if we reject the inspection lot...But not confident "how" as never done before..that the reason i posted my query if someone has done this before..
    OR
    Any option to create Delivery  Document when rejecting one Inspection Lot is UD..W/o Notification also will work for me..
    So I am aiming to get Delivery Document not material document as our materials are WM managed...
    Could some one put some light on this...
    BR

  • Difference between LIKP-VBTYP 'Returns' and 'Returns delivery for order'

    Hi...I have tried researching this myself, but still can't seem to get a good answer.  In the LIKP table, there is a VBTYP of 'H' for returns and 'T' for returns on delivery order.  I am trying to understand the difference between the two...how could you have a return with it NOT being on a delivered order?  Is there something basic I am missing? Any and all help extremely apprecated.

    Hi,
    I fully agree with the input given by Mr G Lakshmipathi.
    VBTYP as field description implies, it just says about the SD document category , but applicable to all documents such as order(includes outling agreements, inquiry,quotation as well) , delivery , billing.
    These values are inbuilt. wrt: document behaviour we use this doc category.
    You can even observe, doc category: K & O -
    K = Credit memo request  which applicables only in VA01
    O = Credit memo  applicables only in VF01.
    if you try to execute the table LIKP ( from SE16) with VBTYP=H, you will not get any doc's
    I hope it adds info.
    Regards,
    Reazuddin MD

  • Returns between Goods-Issue and Billing - Return delivery before Invoice

    Hi all,
    Here comes a problem with sales process configuration.
    Buisness case:
    Customer generate a sales order document, outbound delivery and posting goods. Invoice is generate on end of every month. Very often return delivery is generate before generate the invoice. Outbound delivery is after posting process and cancellation process is not recomended. If invoice will be generate with reference to the sales order, the quantity will be wrong, because system get information from sales order without correction to return delivery quantity. The assumption is that the invoice must have a correct quantity as a sum based on outbound and return delivery.
    So...any solution in standard?
    Regards,
    Michael

    In the RE Sales Order configuration you can make reference mandatory. Once you do this the user will not be able to even create a returns order without the original invoice.
    I hope this helps.
    Regards,
    Mani

  • Handling unit with serial numbers in return delivery

    There is a handling unit (HU),whose system status is PSTD(goods issue posted). The delivery is posted. The billing document are issued. Handling unit was packed with materials with equipments and serial numbers.
    Now I am creating another sales document(I want to return the good) and return delivery. No handling unit is attached to return delivery.  (Why not?  Returning original sales document is created with reference to original sales document)
    Now I attach the serial numbers to the return delivery. (the same serial numbers which are included(packed) in the above mentioned HU).  The return delivery is successfully posted. The status of equipment/serial numbers is on stock.
    The problem is that this serial number with equipment is still packed in the original HU.
    How can unpack the equipment from HU?   I think the problem is the status of HU which is PSTD(goods issue posted).
    Or alternative: can I move the HU unit from original delivery and attach it to return delivery?
    The changing of the status of HU is not posssible because the original delivery is posted and I do not want to change this original documents anymore too.

    I am afraid you are right
    - The return delivery was created without HU. ( i mean HU which was originally sold in original delivery. )
    Do you think I should create HU for return delivery with the same/different ID?  How can I transfer equipment from original delivery HU to return delivery and HU ?
    The problem seem to be that the original delivery and HU is locked (sytem status= posted )after posting.  If I cancel posting of return delivery then I can attach a new HU. But the equipment is still part of the original HU.
    Can I move equipment/serial numbers from original to returned HU? Is that possible at all?
    I am talking about phisical  same HU, so I guess there should be not 2 different HUs in the SAP system created.
    I am looking for the scenario to sell equipment in one HU and return it in the same HU with return delivery.
    thank you for your effort and responses

  • QA32: post stock (return delivery) with subcontract purchase order

    Hi all,
    When doing return delivery to vendor with QA32, the system returns error message :
    Enter Batch ,  M7 18 .
    It's a subcontract PO , and the sub item  has batch.
    So it seems i need to enter batch when doing return delivery. But i can't find any field to input the batch.
    Any way to solve this problem?
    Thanks.

    Do one thing just put *(Star) in batch field.
    or
    The batch is Either---> Valuation type of matrila if it is a split valuation
    or
    Batch is nothing but batch of produc/Material having BathMgt Active.
    MSC1N/2n/3n is t-code to view batch.
    but as per my knowledge it is Split valuation only can be seen in accounting view of material master ...such as HL,HM,HT(subcontracting)  etc
    Try this
    Sujit

  • Return delivery in subcontracting

    Dear all,
    I have created a subcontracting PO. Migo is done and the finished assembly material is subject to quality management. When I am posting a return delivery of the finihed product in QA11 or QA32 , system gives the error message no LB 031
    " Of the required qty of materials quantity will remain open"
    Regards.
    Milind

    Hi
    Please check the settings for Subcontract order with respect to delivery type. This is the place where we assign the Plant to Delivery type. Please let me know if you are still having problems.
    Deepak

  • Subcontracting return delivery

    Hi,
    how can I post a mvt 161 for subcontracting ?
    I posted a mvt 101 for the finished product which has a bill of material with two spare parts, now I'm trying to modify the purchase order and add a flag on Returns item field but the message error is:
    Returns not possible for subcontracting items
    How can I post the return delivery to subcontracting vendor for the finished products ?
    Regards

    Hi,
    Think in diff . way.
    why don't use '122' mvt type , and then modify your PO & again reissue the components..
    The  usage of 'Returnble PO' cann't be used here.
    Regards
    R

  • Return process in Scheduling agreement and correction delivery creation

    Hi Experts,
    I have couple of Questions:
    1) I want to know the return process in case of scheduling agreement, how exactly we should go about it.
    2) Regarding creation correction deliveries in the scheduling agreements.
    I enter in a valid scheduling agreement number into transaction VA32, click the "JIT DlSch" button, click "Corr. Delivery" button and then enter in a date and quantity.
    After I hit "Save" button, I am taken back to the initial VA32 screen and see the following message...
    Sched. Agr. w/ Rel. ####### has been saved (no delivery created)
    Message no. V1261
    Does anybody have any insight to why this is happening? Thanks in advance.
    Sourabh

    Whether it is a scheduling agreement or sale order, in case of returns, you need to generate the following:-
    a)  Return Sale order or scheduling agreement referencing the parent billing document
    b)  Return delivery if goods are taken back in parent plant via VL01N
    c)  Credit note to customer via VF01
    d)  Excise credit via J1IH
    Last but not least, please spell the name correctly.
    thanks
    G. Lakshmipathi

  • Capture and post list in MIGO for excise in return delivery

    Dear All,
    when I am doing return delivery in MIGO by 122 mov type and wants to capture and post the invoice at the same time.
    the list apperaing only part 1 enty and no excise duty in selection list.
    can anybody reply how to get this option added for capture and post
    Regards,
    Yashpal

    Hi,
    If u have done only GR for Both materials then Cancel ur GR and Post it again.
    And if you have Done J1iex for first material then Cancel GR first then Cancel Excise Invoice.
    Now to cancel Excise Invoice follow the path as
    From the SAP Easy Access screen, choose Logistics ® Materials Management ® Inventory Management ® Goods Movement ® Goods Movement (MIGO).
    In the top line:
    Select Cancellation.
    Select Material document.
    Enter the number of the goods receipt that you want to cancel
    Choose .
    Flag all of the line items as OK.
    Save the reversal document.
    Reversing CENVAT Postings
    From the SAP Easy Access screen, choose Indirect Taxes ® Procurement ® Excise Invoice ® Incoming Excise Invoices ® Individual Processing ® Change/Display/Post/Cancel.
    In the top line:
    Select Post CENVAT.
    Select Vendor Excise Invoice.
    Enter the excise invoice number.
    Choose .
    Choose Simulate CENVAT.
    A dialog box appears, showing which postings the system will make to reverse the CENVAT.
    To close the dialog box, choose .
    Choose Post CENVAT.
    Canceling Excise Invoices
    From the SAP Easy Access screen, choose Indirect Taxes ® Procurement ® Excise Invoice ® Incoming Excise Invoices ® Individual Processing ® Change/Display/Post/Cancel.
    In the top line:
    Select Cancel.
    Select Vendor Excise Invoice.
    Enter the excise invoice number.
    Choose .
    Save the excise invoice
    if Not solved then please specify that is error by system.
    Regards,
    Pardeep malik

  • Returning of material by 122 and via delivery component in migo

    I read a post in which return delivery has been discussed through. But in my business the return delivery is done delivery component and sent back to the vendor via a challan. Also tell me how to get back the payment from the vendor.
    Presently we are doing  return delivery + material document  and check the return delivery in migo. Subsequently a challan is also made.  How to make the challan is not clear to me.
    Also how to return the material by creating a Purchase order.
    I am not clear about the above subject very much so i have given two options a) through return challan  2)  via purchase order. The objective is that the exicise commitments should also get reversed.
    This problem is arising due to incomplete implementation.
    Regards

    If you were talking about Return Purchase order then follow the steps:
    CREATE RETURN PURCHASE ORDER u2013 ME21N
    MAKE A GOODS RECEIPT u2013 MIGO
    CREATE & POST EXCISE INVOICE FOR OTHER MOVEMENTS - J1IS & J1IV
    CREATE CREDIT MEMO - MIRO
    When you Create Return po click Return Item Check box in the Po Item Overview.
    When you do migo for Return po 161 mov type will automatically happens.
    After Creating migo Create a Excise Invoice for Other Movements using J1IS and post the same thru J1IV
    Raise a Credit memo against Vendor in miro.
    Regards,
    Ashok

Maybe you are looking for

  • My Mac Doesn't Show to Others on AirDrop

    I have a MacBook Pro 15" Retina Display running the latest Mac OS X 10.8.3 with all the updates. My Mac is obviously supported by AirDrop as it is a current model. When I 1st got it, I used AirDrop all the time to transfer files back and forth with n

  • Error in Adobe forms in CE SP3

    Hi I have used Adobe Interactive form in a Web DynPro DC after doing the necessary configuration for ADS in CE SP3. But when I run the application I receive an exception somethis like this com.sap.tc.adobe.pdfdocument.base.core.PDFDocumentRuntimeExce

  • Dynadock Universal USB 3.0 Docking Station: no autoconnect of USB-HDD after Win8 power-up

    Hello, I've recently obtained a Dell XPS-12 which only has a SSD-HDD. In order to overcome the limitations in terms of available connections I bought a Dynadock which works fine so far. I want to use the Dynadock in a configuration where it is the on

  • Do I want to overwrite my copy of the local file?

    Is there any way to stop the ridiculous, pestering question everytime I open a file in Dreamweaver CS3? I already have a 3 second delay while I'm trying to edit my code. Could I possibly get rid of 1 of the obnoxious things on my list?

  • Netstream.bufferTime not working properly

    netstream.attachAudio(MIC)&publish is called at the sender peer, "buffertime=10&play" is called at the the receiver. The audio can not autoplay  when the buffer is full. Plz help