Subcontracting Process in Oracle Projects

Hello,
Can some one please share some inputs on how can a process of subcontracting handled in Oracle projects.
I would like to know the high level process (with modules to handle) when we enter in to an agrement with subcontractors
Example : - "A" is hiring Subcontactor "B" to work on a particular object.
Thanks in advance

Hi ,
The subcontracting process can be exceuted in the following way..
The modules involved will be PA, PO, AP..
This can be handle with the P2P cycle..
Raise a servie PO with the project information in the PO distributions for the service that needs to be subcotracted..
specify the matchig option in the PO Shipments
Enter a receipt (Optional)
Enter a AP invoice and match it with PO or receipt as per the requirement and then run PRC: Interface supplier costs..
this will post the expenditure in the Projects.
In addition to the above i fu have complex PO (with helding some portion of the order amount as retention, advace payment to be provded)
this can be handled through creating the PO through selfsevice PO which accomodates this functionality.l
Thanks
Vijay.

Similar Messages

  • Revenue Recognition Process in Oracle Projects

    I am new to Oracle Projects and needs to understand the Revenue Recognition process.
    User has created one Contract under which he has Intercompany Billing, Costing and Elimination Projects. He booked the cost under the Costing project and then ran a custom elimination program to eliminate the intercompany cost. Now he is going to the billing project and running the 'Generate Draft Revenue' program however nothing is getting generated. He wants to know why revenue is not getting recoginised.
    Is it the correct way of recognizing the revenue. The Distribution rule being used is Event/Event however no event has got created in the billing project to recognize the revenue.
    Please suggest.

    Hi ,
    The subcontracting process can be exceuted in the following way..
    The modules involved will be PA, PO, AP..
    This can be handle with the P2P cycle..
    Raise a servie PO with the project information in the PO distributions for the service that needs to be subcotracted..
    specify the matchig option in the PO Shipments
    Enter a receipt (Optional)
    Enter a AP invoice and match it with PO or receipt as per the requirement and then run PRC: Interface supplier costs..
    this will post the expenditure in the Projects.
    In addition to the above i fu have complex PO (with helding some portion of the order amount as retention, advace payment to be provded)
    this can be handled through creating the PO through selfsevice PO which accomodates this functionality.l
    Thanks
    Vijay.

  • Oracle-Project to closure Process flow

    Hello All,
    I need ta end to end process flow from defining a project to closing a project.
    Modules covered are :
    Oracle Project Costing
    Oracle Project Billing
    Oracle Project Management
    EBS Version : R12.1.3
    Thanks in Advance,
    Yadnesh

    For R12 you may review the following -
    Period Close Advisor: E-Business Suite (EBS) [ID 335.1]
    https://support.oracle.com/epmos/faces/ui/km/DocumentDisplay.jspx?_afrLoop=1233262710345909&id=335.1&_afrWindowMode=0&_adf.ctrl-state=1b2jhxy4qw_146#intro
    Regards
    Raghavender K

  • Oracle Projects Differences from 11i to R12

    Hello All,
    Currently we are upgrading from 11.5.10.2 to R 12.1.3
    We have oracle projects implemented in 11i.
    I am researching to get the differences occurred in oracle projects functional and technical from 11i to R12
    It will be a great help to us if we could get some documents or a link which shows the differences.
    Thanks and Regards,
    Ankit Vishwakarma

    Project new features
    Oracle Project Foundation
    New Concurrent Process
    ADM: Purge Obsolete Projects Data
    Oracle Project Costing
    Federal Budgetary Accounting for Project Expenditures via Subledger Accounting
    Contingency Worker Clearing Projects to allow CWK to charge multiple projects
    Additional Project Information in Oracle Time and Labor (Project Name and Task Name)
    Federal Budgetary Accounting for Project Revenue
    Additional journal entries are available in Subledger Accounting for the required Federal Budgetary entries.
    Date Effective Funds Consumption
    Project Type option that requires cost and event transaction dates to fall within the agreement start and end dates.
    Transactions are only billed against the agreement if the entire transaction amount can be funded (no partial recognition) for both revenue and invoicing.
    Without enabling this option, revenue generation supports partial billing for transactions.
    New Parameters for MGT: Invoice Review
    Project Status
    Project Closed After Date
    Project Range
    New Parameters for MGT: Unbilled Receivables Aging
    Project Status
    Project Closed After Date
    Project Range
    Oracle Project Management New Audit Process for Project Performance Reporting Setup
    AUD: Project Performance Reporting Setup
    New Parameters for Refresh Project Performance Data Process
    Actual or All Amounts (Plan and Actual)
    Workplan Version
    Financial Plan Version
    Workplan EnhancementsAbility to Delete Published Workplan Versions (except the latest published version, baseline version, and workplan versions included in a program hierarchy) Usability Enhancements
    Update Work Breakdown Structure page is now obsolete.
    View, maintain, and update a workplan structure from the Update Tasks page.
    Where no latest published workplan version exists, the current working version displays on the Update Tasks page when navigating to the Workplan Tasks.
    Indent or outdent multiple workplan tasks in a single step.
    Confirmation, information, and warning messages appear on HTML pages during Apply Latest Progress as well as the Submit Progress processes. Messages include status information during processing and the availability of the latest progress information.
    New Public API for Creating, Maintaining, and Deleting Programs New set of public API procedures:
    Designate a project as a program and indicate whether projects linked to the program can belong to multiple programs.
    Create links from a program to one or more projects
    Update links from a program to one or more projects
    Delete links from a program to one or more projects
    Budgeting And Forecasting Enhancements Enhanced Automatic Calculation and Derivation Logic
    For plan lines that do not have a specified a quantity, the amount is no longer copied to the quantity field with the rate value set to 1.
    Rate now has a lower precedence than quantity and amount in automatic calculations.  The rate will be re-derived when the quantity, rate and amount are entered at the same time for a plan line.
    When the burden multiplier is overridden by updates to the raw cost or burden cost, subsequent calculations of the burden cost will use the override burden multiplier.  The same is true when the markup percent is updated by changes to plan line components:  the override markup percentage will be used in revenue calculations.
    Enhanced Handling of Override Rates on Budget / Forecast Lines
    Override rates for a planning transaction on Edit Budget and Edit Forecast pages.
    o   Raw Cost Rateo   Budened Cost Rateo   Bill Rate
    Override rates are applied to all existing and new periodic lines for the planning transaction.
    Average rates fields on these pages are now disabled for entry and are used for display only.
    Simplified Addition of Planning Elements and Resources
    New but unbudgeted tasks and resources can be added to a budget or forecast version.
    Add either all new tasks and planning resources or new tasks only to the current plan version.
    Self Service Expenditure Inquiry
    Ability to drill into expenditure details from the Financials tab.
    Reporting Pack for Generation and Distribution of XML Publisher Reports
    A reporting pack is a set of report templates and recipients by project role.
    The Generate Reporting Pack concurrent program emails the reports generated from the report templates based on pre-defined intervals.
    The report template establishes each report’s layout and content.
    New reports templates are configured using XML Publisher tools.
    New or modified reports can be added to an existing reporting pack or be used to create an entirely new report set.
    Predefined data definition files that contain XML tags for performance measures and project data are provided.
    Predefined Reports:
    Project Change Document Report
    Project Committed Cost Report
    Project Cost Detail Report
    Project Cost Labor Report
    Project Cost Summary Report
    Project Earned Value Report
    Project Financial Summary Report
    Project Forecast Summary Report
    Project Revenue At Risk Report
    Budget Integration with Federal Budget Execution and/or 3rd Party Budget
    The budget integration workflow supports integration with the Federal Budget Execution module..
    The workflow can be customized to interface budget lines to external budgeting applications.
    Microsoft Project 2007 Certification
    Integration with Microsoft Project 2007 is supported.
    Project Performance Reporting: Additional MeasuresYTD, QTD and At Completion calculated measures are available on the following pages:
    Performance Overview Period-to-Date
    Summary/Analysis
    Task Summary/Analysis Resource Summary/Analysis
    Project Performance Reporting: Inter-Project Revenue / Billing AmountsInter project revenue / billing amounts are available on the following pages:
    Project List View Workplan Cost
    Exception Reporting Performance Overview
    Task Summary/Analysis Resource Summary/Analysis
    Period-to-Date Summary/Analysis
    Supplier Cost DashboardSubcontractor Payment ControlsSupport for Pay when Paid Scenarios
    A new “Pay when Paid” payment term for subcontracts automatically places holds on all subcontractor invoices under that subcontract until the corresponding customer payment is received.
    Subcontract Payment Controls workbench allows project manager to manage the holds, with visibility into both the customer invoices and the related subcontractor invoices.
    Workflow notifications about the receipt of the customer payment allow the project manager to automatically or manually release the subcontract invoice.
    Associations between the customer invoices and the subcontractor invoices may be automatically maintained based on the billing of project expenditures for cost-plus contracts, or may be manually maintained for fixed price contracts.
    Payment Controls for Subcontract Deliverables
    Support for the tracking and monitoring of subcontract deliverables that place automatic holds on subcontractor invoices in the case of noncompliance.
    Oracle Procurement Contracts allow a subcontract administrator to specify payment impact controls that will take effect when a subcontract deliverable is not met.
    From the Subcontractor Payment Controls workbench, the project manager can view a checklist of the all the current subcontract deliverables, to assist in evaluating the subcontractor status prior to releasing monthly progress payments.
    Oracle Project Resource ManagementResource Search Enhancements
    Resource Search by Email Address
    Resource Search by Person Type
    Streamlined Navigation on Staffing Home
    Cross Validation of Project and Assignment Dates
    Requirement start dates are equal to or greater than the project start date and less than the project end date and that finish dates are equal to or less than the project end date but greater than the project start date.
    Assignments cannot be added beyond the project end date.
    A project team role end date cannot be beyond the project end date. If the roles are created before the project end dates are entered, users will receive an error if they later try to enter an end date that is earlier than the end date for existing roles.
    When project transaction dates are moved corresponding assignment dates are validated against the new project dates. If the new project transaction dates fall outside the dates for existing assignments, users are given an option to shift the assignment dates or cancel the date adjustment.
    Defaulting of Work Patterns’ From and To Dates
    Work pattern from and to dates will default from the requirement start and end dates.
    Improved Exception Handling of Maintain Project Resources Process
    PRC: Maintain Project Resources delivers improved exception handling and notification when it encounters errors while processing employee records.
    New Public APIs for Resource ManagementThe new PJR APIs fall into the following four categories:
    Requirement Public APIs
    Assignment Public APIs
    Candidate Public APIs
    Competence Public APIs
    Organization Authority: Obsolete Forecast Authority
    Removes the forecast authority functionality from the organization authority form
    Removes existing security data relating to forecast authority.
    Replaces the PJR forecast functionality with the new HTML based forecasting functionality. The new forecasting functionality has its own security mechanism and does not honor the old forecast authority model.
    Improves the performance of security calls to organization authority because the existing security data is being removed.
    Oracle Grants AccountingAward Budgeting Enhancements Budget period validations
    Budget periods will not be validated across award budgets when those awards fund a single project.
    Flexibility to establish award budgets based on the actual duration of the award, while not being confined based on the existing budgets already established for the project.
    Automatic summarization of project budgets
    With the new budget period validations, automatically summarize to a project budget viewable in Project Status Inquiry.
    Two profile options have been added to identify the budget entry methods that will be used to summarize the project budgets.
    Budget Line Sorting Option
    Sort budget lines by Resource name, or by effective dates for budgets with date range periods.  Provides the flexibility to view the budget lines by period or by budgeted resource.
    Award Status Inquiry Enhancements View by budget period
    Allows the Find Award Status window to be limited to a single period, range of periods, or inception to date for a particular award.
    Reflects the budget periods entered on the award budget.
    GL and PA Date Parameters on Find Expenditure Items window
    GL and PA date parameters have been added to the Find Expenditure Items window.
    GL Date Parameters on Find Commitments window
    GL Date parameters have been added to the Find Commitments window.
    KKG

  • Unable to do adjustments for PO Receipt Accrual in Oracle Projects

    We are working on Release 11.5.10.
    The Allow Adjustments flag for the transaction sources in Projects for receipt accruals (Oracle Purchasing Receipt Accruals) and For Supplier Invoices (Oracle Payables Invoice Variance) are not updatable. Since we are using the Accrue on Receipt option, so only the Invoice variance amount is tranferred to Oracle Projects from Accounts payables. There are situations when the cost gets booked to a wrong task or wrong Project. In such case the adjustments to receipt accruals and Invoice Variance needs to be done. But the same cannot happen in Oracle projects without enabling the Allow Adjustments flag, which is not updatable in Release 11i. How can we make any adjustments to receipt accruals and Supplier Invoices matched with the PO Receipts in Release 11i?
    Appreciate any Pointers on this.

    Hi
    In PO receiving form, enter a transaction of type Correction or Return to Receiving, with minus the quantity you want to adjust. This will be a negative transaction to the original project and task.
    Then update the PO line distribution to the new project and task. Finally enter another receipt / deliver transaction to the new project and task.
    Run the PRC: Interface Supplier Cost. This process will create new transactions in the old and new projects. The new transactions are linked to the same PO, same line number as the original PO Accrual transaction.
    If the supplier invoice have not yet entered in AP, then entering a supplier invoice, matching to the PO will get the variances charge to the new project.
    Other wise, you might want to reverse the matching, and reenter the match to the new distribution.
    You could also enter a MIX supplier invoice which has the amount as zero. In such invoice enter a negative distribution line to the old project, and a positive distribution line to the new project.
    Dina

  • Oracle Projects not totaling properly after adjusts have been made 11i 11.5.10

    Hi Guru,
    The our Oracle Projects group is in the process of cleaning up CIP balances on Projects which are left after the Project has been interfaced once to Fixed Assets. We are using the ADJUST function to clear the balances and this is working well for STATE 1 and STATE 2, but it is not working very well for STATE 3 projects. We have 6 Projects in STATE 3 which when the adjust was done, the correct amount was passed to FA but the CIP/interfaced CIP totals on the Capital screen are incorrect. A method is needed to correct the Capital CIP balance.

    This is a very common issue.
    One way to avoid this is as follows
    1) Define a new item status called "Uncosted"
    2) On the Item status screen (Inventory > setup > item > status code), make Uncosted item status NON-transactable.
    3) Define a process where the item status changes from Uncosted to Active only after the item cost is entered. This can be done via a manual process or by a custom program that uses Item api to change the status.
    Hope this helps,
    Sandeep Gandhi

  • Can Oracle Project costing drive the depreciation expense amount from FA

    -Does Oracle project have direct integration with Oracle FA for deriving the Depreciation amount to oracle project costing and same as sallary in oracle payroll ?
    Answer:
    1) No, there is no integration as such with Payroll
    --- Second Q If Yes ;
    If i have Machine X it depreciates 100 USD per month , so i have assigned this machine for 15 days in project 1 and the other 15 days to project 2 did the system will allocate 50 USD to project 1 and 50 USD to project 2?
    Can someone answer this - my thoughts are ...
    2)Yes, ideally it should allocate amount to multiple projects, not sure whether it is done automatically or we need to run any process ... is there any documentation on this as I was unable to find it.
    Please if the Q1 have answer yes i need document how to do this integration , and if Q2 answer is yes also i need who to or what is the condition to reach this point?
    Thanks, Ferhiz DInshaw

    per our pidgin conversation:
    first of all, you are right - there is no such integration with Payroll or FA. depreciation is calculated in FA only. in Projects we do not derive it or control it in any way.
    all we do in PA is we collect costs as they occur, generate asset lines and advise FA that an asset is subject to depreciation
    regarding multiple projects - that is not how it works right now. a project can have as many assets as needed. However these assets are bound to a single project and do not exist as organization wide transactions.
    when you interface your asset lines to FA, you can merge them to existing assets. This again is standard FA functionality. If there is a requirement to have cross project assets in PA, it is an enhancement request.
    hope it helps
    thanks
    gene

  • TFS 2013 Build for PL/SQL and Oracle Projects

    Hi,
    We use TFS Build with SQL Server Projects.
    We also have PL/SQL projects .We are using MSSCCI to check in and check out files. Is there anyway we can use TFSbuild  for these projects( [PL/SQL]/Oracle) too ?
    Thank you.
    Su

    Hi Su, 
    Thanks for your post.
    How do you manually build  your PL/SQL/Oracle projects?
    TFS Build invoke MSBuild command to build project/solution on build agent machine by default. If these projects can be built using MSBuild command line manually, then we can use TFS Build(default build process template) to build these projects.
    If these projects need be built using another complier, and this compiler support run the command line to invoke it, so you can add the InvokeProcess activity(execute the command line) to invoke this compiler to build these projects in build process template,
    then create build definition using this customized build process template.
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • MSP Integration with Oracle Projects

    Hi Dina,
    Does the integration between MSP and Oracle Projects work without any issues in R 12.1.3? We've tried using it in the past with R 12.0.6 but have to say the experience was not good. It used to work at times and fail on other times. Most of the times the first time import from MSP to Oracle Project used to work but subsequent changes to the WBS used to give issues while trying to import into Oracle Projects (even though the link to the Oracle Project existed in MSP).
    One of our new customers (Construction Company) wants to create the WBS in MSP (Microsoft Project ver 2003 or 2007) and then import it into Oracle Projects to track progress, effort and cost. Any changes to the WBS (which happens frequently) will be done in MSP and imported back into Oracle Projects. Does the above mentioned requirement work consistently in R 12.1.3? Please let us know.
    Thanks
    Regards,
    Sri

    The MSP integration requirements that you describe should work in the latest versions of 11i e.g. (FP.M RUP4) as well as R12.1.3.
    My experience is that providing all scheduling is done in MSP then the integration functionality works well.
    The recommended process flow for MSP integration is:-
    •     Oracle Projects: A project manager creates a project in Oracle Projects from a project template containing information for deliverables, work breakdown structures, and resource assignments
    •     MSP: The unscheduled resource and workplan data is downloaded to Microsoft Project for scheduling
    •     MSP: The project is scheduled in Microsoft Project based on task assignments, task dependencies, task constraints, and other attributes
    •     MSP: The scheduled workplan data is uploaded to Oracle Projects for publishing
    •     Oracle Projects: The project workplan is published in Oracle Projects
    •     Oracle Projects: After the workplan is published, the project is accessible to all team members working on the project. Team members work on their assignments and report their progress in Oracle Projects
    •     Oracle Projects: The team members' progress on the tasks is collected for updating the project plan
    •     Oracle Projects: The project plan is updated with the team members' progress
    •     MSP: The project is now unscheduled. The unscheduled project plan is downloaded to Microsoft Project for rescheduling
    •     MSP: The project plan is rescheduled in Microsoft Project and the task information is updated
    •     Oracle Projects: The rescheduled workplan is uploaded to Oracle Projects for publication
    Andy.

  • Deploy process in Oracle BPM Enterprise.

    Hi,
    I have a process which i have developed in Oracle BPM studio. Now I need to deploy this process in Oracle BPm Enterprise version. The other problem is how to access this process from enterprise. Where all the roles and participants maintained. I have oracle BPM enterprise integrated with Weblogic server.
    Please help!!
    Edited by: Anurag Yadav on Jul 31, 2009 12:11 PM

    Download the "Oracle BPM Enterprise Administration Guide" PDF from http://download.oracle.com/docs/cd/E13154_01/bpm/docs65/index.html.
    Take a look at pages 10 - 17. Page 17 describes how to create a new role in Enterprise.
    Look at page 22. This describes how you can match the abstract roles (roles created in Studio) to real roles (roles created in Enterprise described on page 17).
    In development, I'll usually just select the "Smart Publish" option as I'm publishing the project. This automatically creates a new real role on Enterprise and automatically matches it to the abstract role created in Studio while you're publishing your project.
    Dan

  • RE:  Oracle Projects Setup and budget

    hello
    iam a new user in oracle projets module and working with construction industry. can u please help me in briefing out the process flow of projects.
    Another query is when iam tring to create Activity Based budget with respect to a project number, iam unable to incorporte the Quantity and Rate in the Budget.
    with regards
    vijay
    email:[email protected]

    If you work for an Oracle Partner (which I assume you do because you've copied and pasted an OPN page above), you can take the boot camp mentioned here - http://education.oracle.com/pls/web_prod-plq-dad/db_pages.getpage?page_id=5001&get_params=p_exam_id:1Z0-511
    Regards,
    Brandye Barrington
    Certification Forum Moderator

  • Integration Methods - Oracle Projects with Primavera using API

    Hi,
    We are trying to do manual integration in between Oracle Projects with Primavera using API, if some one can able to help us on the process and procedure that would be really helpful....
    Thanks
    Rgds,
    Vijay
    [email protected]

    Hi,
    The Primavera intergration works with the "Standard Intergration" of Oracle 11i & R12.1 with the version of P6, this is the statement was in by the market experts. Even I have not worked on this intergration part of primavera with Oracle. still, I can provide you some search engine links, which could help you in http://www.projectp.com/products/op3.php ; http://www.projectedconsulting.com/index.php/community/blog/2010/04/primavera-and-oracle-projects-integration/
    Lavanya

  • Oracle Projects, POand INV integration? need help

    Dear All Project Gurus,
    We are all having Oracle Purchasing , Inventory , Order Management and Project Costing modules implemented.
    The issue is that
    we want to place a Standard PO with Project/Task details for the
    inventorisable/Stockable Items. So that the Items canbe inventoirsed i.e Received/Inspected/Delivered.
    The system doesnot allow to do so.
    So I want to know,
    Where does this gets validated that only is the detination type in PO is as expense, the Project and Task details tab gets enabled.
    Appriciated any solution Guru's
    Thanks in Advance
    Shameer

    Hi
    The solution you are suggesting will be involved in a highly complex customization. Since you will need to cover many processes.
    When you purchase items for inventory destination, without PJM, Oracle Inventory sends the receiving transaction to GL account of inventory valuation, and from Payables it sends to GL the price variances and any additional costs. If you are going to customize you might need to deal with both sources.
    The customization should deal with subsequent transactions like return to vendor and correction of receiving transactions, and any debit memos or adjustments of supplier invoices.
    Once the items are in Inventory, there is no functionality of reservation per project. Think about solving such requirement, including methods to track the quantities per project. This is solved by PJM.
    When you issue items from Inventory to a project, standard system credits inventory valuation account and debits project cost account. However, based on your previous customization, the project was already charged when items were received. So you need also to work around this process, so the project will not be double charged, and the accounting effect will also be modified. Note, PJM knows not to transfer costs to PA when items are issued from the same project locator in Inventory.
    If users transfer the items to another project, you don't have a feature to adjust costs and transfer them between projects. Note, PJM deals nicely with items transfered between projects.
    Dina

  • Oracle Projects AIM documents template - BR100, TE, BP Etc

    Hi All,
    Can someone help me in getting the AIMs doc for oracle project costing / billing / managment R12?
    It would be gr8 to have any of the business process doc / functional specs ( BR100) / Test cases / Migration Doc / Gap analysis doc etc.
    Just templates of these will also sufficient if docs are not availalble.
    Please send it to [email protected] or guide me with URLs if possible.
    Thanks in Advance. :-)
    Regards

    Please see old threads which answer your questions -- http://forums.oracle.com/forums/search.jspa?threadID=&q=Download+AND+AIM&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
    Thanks,
    Hussein

  • Legacy Timesheet System and Oracle Projects

    Dear All,
    Is it possible to interface legacy timesheet system with Oracle Projects. The intention is to enter timesheets/hours thru the legacy system and calculation of revenue and invoice in Oracle Projects.
    1)Is this achievable, without issues?
    2)How complex is this to achieve?
    3)Any URL or documentation will be really helpful in this regard.
    Thanks.
    Regards,
    Anand

    Hi
    There is no need for API.
    You should write your own script to populate the interface table.
    When you run the process PRC: Transaction Import, the system is validating the transactions. Only the valid transactions are imported as Expenditure Items. Exceptions remain in the interface, and you can review and correct those.
    Review the deatils on Oracle Projects APIs, Client Extensions and Open Interface Reference.
    Note, you should have set up a Transaction Source in Oracle Projects for your legacy Time system.
    Dina

Maybe you are looking for