Subcontracting Requirement

Dear All
When we issue goods(MB1B) (541)to Vendor there is no control that the system should reference a PO. We'll be able to issue and material for this movement type. Is there an option to make the PO as mandatory and select only the components listed in the PO to be issues. Kindly let me know if we can achieve this.
Regards
JK

Hi,
This is a typical case with MB1B Transfer posting, you will have to use a user exit / badi, plz explore in - IM - Maintain Customer Exits and Business Add-Ins - BAdI: Creation of Material Document
Take technical consultant's help.
u can check ur data in mb1b transaction based on exits or badi .
MB_CF001 Customer Function Exit in the Case of Updating a Mat. Doc.
MBCF0011 Read from RESB and RKPF for print list in MB26
MBCF0010 Customer exit: Create reservation BAPI_RESERVATION_CREATE1
MBCF0009 Filling the storage location field
MBCF0007 Customer function exit: Updating a reservation
MBCF0006 Customer function for WBS element
MBCF0005 Material document item for goods receipt/issue slip
MBCF0002 Customer function exit: Segment text in material doc. item
Business Add-in
ARC_MM_MATBEL_WRITE Archive AddOn-Specific Data for MM_MATBEL
ARC_MM_MATBEL_CHECK Check AddOn-Specific Criteria for MM_MATBEL
MB_CHECK_LINE_BADI BAdI: Check Line Before Copying to the Blocking Tables
MB_PHYSINV_INTERNAL Connection: Core Inventory and Retail AddOn
MB_RESERVATION_BADI MB21/MB22: Check and Complete Dialog Data
MB_QUAN_CHECK_BADI BAdI: Item Data at Time of Quantity Check
MB_MIGO_ITEM_BADI BAdI in MIGO for Changing Item Data
MB_MIGO_BADI BAdI in MIGO for External Detail Subscreens
MB_DOC_BADI_INTERNAL BAdIs when Creating a Material Document (SAP Internal)
MB_DOCUMENT_UPDATE BADI when updating material document: MSEG and MKPF
MB_DOCUMENT_BADI BAdIs when Creating a Material Document
MB_CIN_MM07MFB7_QTY Proposal of quantity from Excise invoice in GR
MB_CIN_MM07MFB7 BAdI for India Version exit in include MM07MFB7
MB_CIN_LMBMBU04 posting of gr
MB_BATCH_MASTER Setting of Batch Data at Goods Movement
ME2O is also a option to transfer the material to subcontracting vendor.
Regards,
Vikas Mayekar
Edited by: Vikas Mayekar on Jan 28, 2011 3:03 PM

Similar Messages

  • Delete Subcontracting Requirements in MD04.

    Hi SAP Gurus,
    Sub contracting PO created on 2004 for Material 'x'. The component also same as the header material. ( Issuing component and recceiving component both are same ).
    I have deleted the PO before issuing components to Vendor ( before 541 Mvt.)
    But in MD04 the system driving sub contracting requirements against the deleted PO.
    Is there any std correction program available to fix teh Issue.
    Regards
    Senthil.

    Yes, there is correct progam, i have faced teh same problem
    Check this OSS Note 128061 - Subcontracting: Inconsistencies in dependent requirements
    Bhima

  • Operational subcontracting scenario

    We have a requirement in operation subcontracting.
    In our production process some of the routing operations we are doing outside (external procurement). But the customer doesnu2019t want to create a Purchase Order for this process (each subcontracting requires a order and release). Since the number of operation level of subcontracting is more per day and they have contract with the subcontractor for the price for a year. Further they will send the order quantity by different schedule
    Please suggest for the above situation which process we need to follow and what are all the master data requirement and the transaction data requirement in a frequent manner.
    Regards
    Sridharan

    Create a  Contract and then create a Subcontracting PO  with reference to contract ( for a year )and assign the Component to be sent( Mostly  Dummy Material)
    And give the material description Similar to subcontractiong process.
    & IN OPL8, Production order dependent parameter : Set The dependent reqmt/.reservation - Never,  in General valid setting tab, this will restrict to create a PR while releasing Production order.
    and follow the same process as per the existing process.
    Note: IF you go to scheduling agreement for subcontracting You can't able to assign the component.
    Edited by: Sundaresan . E. V on Oct 5, 2010 11:29 AM

  • MRP for subcontracting

    hi thr ,
    here we r using planing strategy 10 .we have BOM like HALB A conatains ROH B
    and that ROH B is send outsidefor subcontracting for cutting operation .
    when i am taking planning run it is not generating DepReq for ROH B .
    i have maintained spl procurement key 30 in HALB A in MRP 2 view .
    why it not linking the ROH material .
    and what r the setting to be mainatained for such scenario .
    routing for the HALB contains only one operation Cutting and we have maintained PUR info record in the Routing for the same .
    plz guide for the same above .

    Ajay,
    Routing is not required as you are subcontracting HALB A (as mentioned by you only one operation representing external processing).
    1. Maintain HALB A - Special Procurement - F & 30
    2. Maintain BOM for HALB A with usage 1 - Production and status relevant for all. See that your BOM is within the valid date range of the required date. Here component ROH B should be assigned.
    3. Maintain Inforecord of Subcontracting type for HALB A.
    With this run MRP you should get Subcontract Req generated for ROH B.
    In your present case you have maintained external operation, which will get triggered only during creating/release of Production order. I think you will be having a planned order only for HALB A, please convert it into production/process order and check, then system will create subcontract requirement.
    Regards,
    Prasobh

  • Schedule Bom Material in Subcontracting PO.

    Hi,
    Our company allow to confirm SO qty from PO qty even the goods are not received in our plant.
    I have create a Stock PO for 1000 pc of Material. At the same time, I have also created another subcontract PO which including 300 pc of material as component. However, the component will arrived at the end of this month. How can I make sure this 300 pc stock will only reserved for this subcontracting PO and not scheduled by SO? I can see the subcontract requirement in ATP check but it cannot help me to reverse the stock for subcontracting.
    Regards,
    Eddy

    Please create a reservation for Subcontracting of 300 Qty,
    In such case system will not allow to issue that material anywhere else.

  • Subcontracting order

    Hi,
    We have one reservation for a material (BOM component of a Purchase order item) was originally created via a subcontracting PO. Then deletion indicator was set to PO line item. Then the component assigned to PO line item was deleted. But now we can not delete the reservation.
    If you have faced similar situation, could you please suggest me how delete the reservation(identified as Subcontract Requirement in MD04) in this case?
    Thanks and Regards,
    Nataraj

    Hi ,
    We have faced a similar situation wrt to Sales order and Production order where the dependent reservations were seen in MD04 after the deletion of sales order and also the TECO for production order .
    Try using  MBVR / mb22 and check , if not OSS would be the approach .
    Regards
    Lokesh

  • Subcontracting Changes

    Hi,
    I have some doubt in subcontracting, required your help for clear under standing.
    We are following standard subcontracting cycle in SAP, but some times there will changes in the subcon order after the materials are issued to the vendor. I need to accomodate the new material issue in the same subcon order and get back already sent items. How can I perfrom this SAP. What will be issues related to accounting entries in this case.
    Also some times I will change the BOM for subcon order before or after issue of materials to vendor. What will be the effect of this in the subcon order. If I do the same after order release how the system will behave and what changes the accounting entries will have.
    Please help understanding above doubts.
    Thanks and Regards,
    Pavan

    Hi Pavan,
    When ever you want to take back the components you can reverse with 542, and change the PO with the new components and issue new components. You dont have any accounting differences.
    Accounting differences occur only when you do GR and want to revers the components then you need to reverse the GR document.
    If SC challan is issued you can reverse the challan accordingly.
    Cheers
    Kris

  • Subcontractor requirement not deleted

    Dear ALL,
    I created  a subcontarctor purchase order for 100 pc and taken the mrp run .
    Subcontracting requirement of child component has been created for 100 pc as per BOM.
    Good reciept against the order has been done for 60 pc and the order is closed by delivery completed.
    When I check in md04 now it is still showing the subcontracting requirement of 40 pc.
    What can be the reason.
    regards,
    Pradeep Bhardwaj

    Pradeep,
    Check OSS Notes#128061, and within this note look for the specific note specific to your SAP version.
    Regards,
    Prasobh

  • SubReq not shown in MS04

    Hi Gurus
    I have created a plnning scenerio for LTP and completed the MRP run for material X, in MS04 for that material I am not seeing the sub contracting requirements from its parent material Y. The subcontracting requirements "SubReq" of Y is shown in MD04 of X but not in MS04.
    In above example the Y is subcontracted materials and X is component used for Y, means X is component in BOM of Y.
    Where to be check, please help.
    Edited by: Nethi Venkata Ramana on Nov 3, 2008 3:47 PM

    Hi
    Appreciate your response in this regard.
    Is there any SAP note or some notes where I can get this information. Because we have a production issue on this, I agree it is true but how to present to customer.
    Regards
    Nethi

  • MRP with subcontractor stock

    Hi SAP Experts,
    I have a question about MRP.
    Can we work MRP with subcontractor stock?
    Let me explain, the MRP could not to generate new planning orders if I have subcontractor stock. For example:
    In MD04 transaction
    MtlRes 100- units
    MtlRes 100- units
    MtlRes 100- units
    SubcSt 300 units
    If I have this situation, the MRP run could not to generate planning orders because the subcontractor stock recover the quantity.
    This problem (almost) drive me crazy. I really appreciate any help.
    Thanks in advance.

    Dear Demetrio                                                                               
    Please note that the logic for subcontracting was changed as of release   
    4.0A.                                                                     
    As of release 4.0 the net requirements calculation for components to be   
    provided in subcontracting takes into account that the provision stock    
    can only be used to cover the corresponding requirement of material       
    provided. The provision stock that is already available from a            
    subcontractor (vendor) can only therefore be used to cover the            
    requirements of material provided at this subcontractor.                                                                               
    The system uses only the stock that has not been assigned to a            
    subcontractor as unrestricted-use stock to cover all requirements.                                                                               
    For further information about this issue please consider the below QA. With the modification of note 170597 the old logic can be achieved. Please notice that it is a modification note.
    1. Question
    Why does the MD04/MD05 display an own segment for subcontracting as of Release 4.0B and how does the materials planning work with this new logic?
    Answer
    The logic regarding the subcontracting was changed as of 4.0. This is explained in detail in the release notes for 4.0A:Planning of the components to be provided for subcontracting
    Material Requirements Planning -> Planning Execution -> Material Requirements Planning: Planning of the components to be provided for subcontracting
    2. Question
    Why does the third-party order processing for subcontracting work differently as of Release 4.0B?
    Answer
    The (Pseudo) Third-Party Order Processing for parts provided together with the own segment for subcontracting results in problems and can result in inconsistencies. This is described in detail in Note 214298.
    As of Release 4.5A you can implement the third-party order processing with subcontracting MRP areas (refer to the corresponding documentation).In addition you can use a modification to reset the system to the behavior before 4.0A, refer to Note 388479. As of Release 4.7, BAdI 'MD_SUBCONT_LOGIC' allows this without a modification.
    3. Question
    Why does the discontinued part for subcontracting not work?
    Answer
    You cannot divert requirements of material provided to the follow-up material. The reasons are described in detail in Note 43636, section 6.
    4. Question
    Why does the system not display the requirements of material provided in the storage location MRP area, as expected?
    Answer
    Requirements of material provided (subcontracting requirements, material staging requirements) never reach a storage location MRP area, because later you cannot post the withdrawal from this MRP area.
    The withdrawal of the components (to be provided) during the goods receipt for an SC procurement proposal occurs always from the stock with subcontractor, which is managed - from the viewpoint of the inventory management - on plant level and has no storage location reference.Refer to Note 503497 for details.
    5. Question
    Why does a requirement move from the subcontractor segment into the plant segment and is covered there although it appears already to be covered in the subcontractor operation segment by a receipt element (Pseudo third-party order processing for the subcontractor)?
    Answer
    The corresponding receipt element must standardly always be within the rescheduling horizon. This is required (due to technical reasons) even then when the input itself does not have to be rescheduled, so that the net invoice can deliver consistent results for the subcontractor segment together with the rescheduling check.
    If the receipt element occurs after the requirements date, the corresponding element must participate in the rescheduling check (Transaction OMDW).
    Regards
    Soundar

  • External operation storage location

    Hi,
       I am generating a purchase requisiton for an external operation from a production order. This purchase req is a std purchase req and account assignment is F (production order). The line item does not have a storage location due to which the ME59N fails. Does anyone know how I can get the strorage location for this external operation purchase req to populate and how I can get the ME59N to work for purchase reqs of these kinds ?
    Thanks

    Hello
    I'd like to suggest you to read carefully the following note:
    503497 - Subcontracting and MRP areas
    The following information provided on this note confirms that the storage location is not necessary for subcontracting, therefore, this field is empty:
    The most important point to understand the system behavior is the fact that the withdrawal of the (subcontracting) component is generally carried out during the goods receipt for an SC procurement proposalfrom the subcontractor stock that is managed at plant level from an inventory management point of view and that has no reference to a storage location at all.
    This causes that subcontractor requirements can never enter a storage location MRP area, since you can later not post the withdrawal from this MRP area.
    Thus SC-requirements always enter the SC segment of the plant MRP area or the SC-MRP area.
    The SC MRP area in turn is supplied by stock transfer reservations from the plant MRP area or via third-party order processing through procurement proposals with goods receipt directly to the subcontractor. A supply through the materials planning from a storage location MRP area is not possible.
    For the above reason, SC-requirements do also not carry any storage location, since the storage location does not have any control function at all for SC-requirements:
    You cannot and you should not determine a storage location MRP area (see above), and the subcontractor MRP area is determined via the vendor of the procurement proposal, thus it is independent of the storage location.
    See also Note 376050 on this topic that makes a modification available which prevents the deletion of the storage location in the subcontractor requirements, so that you can use, for example, customer-specific reports to analyze the storage location.
    You may consider the modification from note 376050, which prevents the deletion of the storage location from the subcontracting requirements, however, this is generally only relevant for displaying the storage location and this is not used for processing the item.
    BR
    Caetano

  • Delivery type "LB" and MRP

    Hi All
    I work on the APO side and iam not thorough with MM . I have a question about the subcontracting scenario .
    We provide components to the subcontractor who then makes the finished products and ships them to our plant. Let us assume we have a subcontracting requirement for 100 CS. We now create a delivery (ME2o)  to the subcontractor for 100 CS ( delivery type LB) .  When we look at MD04 the delivery created for 100 CS is not offsetting the subcontracting requirement of 100 CS.  So we now have a demand of 100 + 100  = 200 CS  which is actually not the case.  Is this a standard SAP behaviour ?
    I believe whenever we issue goods to the vendor the stock at subcontractor location (MatSub) increases and the dependent demand gets offset by stock at subcontractor location .  But why doesnt a delivery to the vendor offset the dependent demand ? Please help
    Thanks
    Saradha

    Hi ,
    I think planning strategy group plays a role in consuming the requirements along with MRP type (defined at material level)
    check out MRP3 view -> Planning , Strategy group.
    Thanks,
    sudhakar

  • PIR should not consume for the SubReq

    Hi Guru's,
    Please help me how to configure the planning strategy for my below requirement.
    Currently i am procuring a HALB material thru subcontracting. This HALB is having BOM components. I need to send the BOM components to the vendor for assembly.
    The BOM components will be used in some other HALB also. My requirement is, the BOM components should not consume for the subcontracting requirements, it needs to consume for in house production only.
    The subcon requirement needs to generate the dependent requirements only, it should consume the PIR.
    Currently i am using the planning strategy 70, requirement type VSFB. In this, PIR is consuming for the SubReq.
    Please suggest me the suitable planning strategy for this scenario.
    Thanks & Regards,
    V. Suresh

    Suresh,
    I am curious why you would not want SubReq. It is also a different kind of dependent requirement. Also it seems yo are supplying the components to your vendor. So it makes sense that your forecast is consumed by dependent requirements so that planning is effective.
    If for any reason you do not want to supply components to vendor then it would be best to mark such components as vendor provided. In such cases it would not consume your forecast (PIR). Hope this gives some new perspective.
    Thanks,
    Ram

  • Modeling dummy product and planned orders

    Hi SAP Gurus,
    I have requirement where i need to model particular business requirements on subcontracting and the same is resulting in need of modeling of dummy product and dummy planned orders. Please share your inputs on what would be impact of dummy product and dummy planned orders in ECC. and also how to make sure that it does cause any issues in costing.
    I am modeling subcontracting requirement and i need to create following master data.
    All the below products are at plant P.
    P has the components as Q_D
    Q_D has the components as Q
    Q has the components as R
    Where Q_D is the dummy product produced at plant P.
    P and Q are subcontracted items to the vendor V.
    P is the finished good, Q and Q_D are Semi finished goods, R is raw material.
    When we plan we are creating Purchase orders for P and Q. And Q_D is made inhouse and we need to create planned order for it. how do we handle the planned orders created for Q_D. we dont want them to convert to production orders. we want a way to clear off these dummy planned orders once we close the POs of P and Q.
    Please advise.
    Thanks.
    Jagadeesh

    Hi senthil,
    Check if the forecast date is beyond PPDS horizon.
    Also in product master on PPDS tab, you should maintain 4 in PP Planning procedure.
    Bye.
    Nitin

  • About the MRP element.

    hi,
    My problem is as follows.
    I have to find out what is next MRP element for the material/production version pair.
    In  my case  to consider the production finish date for planned order  date & scheduled end date for production  order as next MRP element for the material.
    If i got more than one production version for the same material,
    what criteria should i apply for calculating next MRP element.

    Hi,
    Planned order:-A request created in the planning run for a plant to trigger the procurement of a plant material for a certain quantity for a specific date.
    Customer order:- is nothing but sales order, A customer request to the company for delivery of goods or services at a certain time.
    The request is received by a sales area that is then responsible for fulfilling the contract.
    MRP elements are
    OrdRes Order reservation (production order)
    PurRqs Purchase requisition
    SubReq Subcontracting requirement
    SchLne Schedule line
    BtchSt Batch stock
    PrdOrd Production order
    Order Customer stock for make-to-order
    CusReq Customer reqmt (Reqmt element from demand management)
    ShipNt Shipping notification (committed order quantity)
    StLcSt Storage location stock (Storage location MRP)
    BStLoc Batch storage location
    SchAgr Scheduling agreement
    Reser. Reservation created manually
    NtwOrd Network order
    PlOrd. Planned order
    PrjStk Project stock
    IndReq Planned independent requirements
    ForReq Forecast requirements (forecast-based planning)
    QM lot QM inspection lot
    ComCnf Production order confirmation
    SimReq Simulative requirements
    SomOrd Simulative order
    DepReq Dependent requirements
    RelOrd Release order (Multi-plant planning: stock transfer)
    TrRes. Release order requisition (Werksübergr. Planung: Umlagerung)
    UnplRq Unplanned requirements (additional reqmts from forecast)
    StTRes Stock transfer reservation
    Transf Transfer reservation
    Inqury RFQ
    Quote Quotation
    Order Sales order
    SchAgr Scheduling agreement
    Contr. Contract
    Fr.del FOC delivery
    Deliv. Delivery
    CusReq Customer requirement
    GIssue Goods issue
    Stock Plant stock
    GRecpt Goods receipt
    Replsh Replenishment horizon

Maybe you are looking for

  • Problem On Windows-XP of Swing App

    The problem of the Heavy-weight Swing appication in the following Operating environment - Operating System : Microsoft Windows XP [Version 5.1.2600] Processor : Intel Pentium-4 2.20 GHz RAM : 256 MB Graphics Adapter : RADEON IGP 340M / Intel 82845 Ja

  • Animated gif plays only once

    I am using Captivate 5.5 on a Windows machine. I inserted an animated gif into my Captivate, using insert > animation...  Then, I inserted a button. When I pressed F4 to preview the animation, it played only once. I put a check mark on the loop on th

  • How do I turn on home sharing for apple tv?

    How do I turn on Home Sharing on iTunes on my iPad 2?

  • Lightroom mobile not syncing

    I have LR 5.5 and I have enabled collections to sync.  Previously the collections would show up in LR mobile but no images in the collections.  A couple of collections would say they have 100 photos but only show 3 or so... blacked out the rest.  Whe

  • Table field more than 255 characters long

    Dear Experts, I want to create a table field more than 255 chars long It will be possible through LCHR or LRAW but incase it field contists of data less 255 chars it will result in loss of data. Plz help